[go: up one dir, main page]

CN212047466U - Transportation handling device of mobile lighthouse - Google Patents

Transportation handling device of mobile lighthouse Download PDF

Info

Publication number
CN212047466U
CN212047466U CN202020634267.7U CN202020634267U CN212047466U CN 212047466 U CN212047466 U CN 212047466U CN 202020634267 U CN202020634267 U CN 202020634267U CN 212047466 U CN212047466 U CN 212047466U
Authority
CN
China
Prior art keywords
rod
sleeve
hole
vertical rod
rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020634267.7U
Other languages
Chinese (zh)
Inventor
董凌霄
王旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Saun Machinery Co ltd
Original Assignee
Hangzhou Saun Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Saun Machinery Co ltd filed Critical Hangzhou Saun Machinery Co ltd
Priority to CN202020634267.7U priority Critical patent/CN212047466U/en
Application granted granted Critical
Publication of CN212047466U publication Critical patent/CN212047466U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Handcart (AREA)

Abstract

The utility model relates to a transportation handling device of a mobile lighthouse, which comprises a frame, a connecting pipe, a first sleeve pipe sleeved on the connecting pipe in a rotating way, a caster arranged on the first sleeve pipe, and a locking mechanism arranged on the first sleeve pipe; the electric extension rod comprises a vertical rod, a second sleeve, an upper rotating rod, a lower rotating rod, a linkage rod, a first electric cylinder, an extension rod and a second electric cylinder, wherein the vertical rod is fixedly connected to the periphery of the rack, the second sleeve is vertically arranged on the periphery of the rack and corresponds to the position of the vertical rod, the upper rotating rod and the lower rotating rod are hinged between the vertical rod and the second sleeve and are parallel to each other, the linkage rod is fixedly connected to the upper rotating rod and is close to one end of the vertical rod, the first electric cylinder is hinged between the linkage rod and the vertical rod, the extension rod. This scheme has simplified the structure of mobile lighthouse in lift supporting mechanism and bottom truckle jack department, has made things convenient for staff's operation for the mobile lighthouse can accomplish fast and arrange or dismantle, has striven for more time for emergency work.

Description

Transportation handling device of mobile lighthouse
Technical Field
The utility model belongs to the technical field of the technique of illumination and specifically relates to a transportation handling device of mobile lighthouse is related to.
Background
The movable lighthouse is an emergency tool necessary for the fields of construction sites, disaster relief, emergency rescue and the like. The existing mobile lighthouse is complex in structure on the retraction structure of a lifting support mechanism and bottom trundles, and workers can assemble and disassemble the mobile lighthouse after a series of complex operations, so that the mobile lighthouse cannot be rapidly deployed or disassembled, and precious time is delayed.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a transportation handling device of mobile lighthouse has simplified the device structure, has made things convenient for staff's operation for can accomplish fast and arrange or dismantle the mobile lighthouse, strive for more time for emergency work.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
a transportation handling device of a mobile lighthouse comprises a frame, connecting pipes fixedly connected to two sides of the frame, first sleeves rotatably sleeved on the connecting pipes, trundles arranged on the first sleeves, and locking mechanisms arranged on the first sleeves and used for locking the trundles in a vertical state; the electric extension rod comprises a vertical rod, a second sleeve, an upper rotating rod, a lower rotating rod, a linkage rod, a first electric cylinder, an extension rod and a second electric cylinder, wherein the vertical rod is fixedly connected to the periphery of the rack, the second sleeve is vertically arranged on the periphery of the rack and corresponds to the position of the vertical rod, the upper rotating rod and the lower rotating rod are hinged between the vertical rod and the second sleeve and are parallel to each other, the linkage rod is fixedly connected to the upper rotating rod and is close to one end of the vertical rod, the first electric cylinder is hinged between the linkage rod and the vertical rod, the extension rod.
Through adopting above-mentioned technical scheme, when needs use or pack up the truckle, the staff rotates the first sleeve pipe on the connecting pipe, and the truckle just can take place to rotate along with first sleeve pipe to realize the use of truckle or pack up, when the truckle is in the use or packs up the state, locking mechanical system will lock first sheathed tube position, and the truckle just can keep always using or the state of packing up. When transportation handling device prepares to deploy, the piston rod extension of first electronic jar, gangbar, last pivot pole and lower pivot pole just can take place synchronous revolution around the axis of rotation that corresponds, and second sleeve pipe and extension rod alright expand, rethread electronic jar makes the extension rod stretch out from the second sleeve pipe immediately, and the extension rod will be the butt finally subaerial and with whole transportation handling device jack-up, and transportation handling device just successfully accomplishes and deploys. If the transportation handling device is to be packed up, the staff controls the piston rod of the first electric cylinder to contract, and controls the second electric cylinder to retract the extension rod into the second sleeve pipe. Compare in current transportation handling device, this scheme has simplified the structure of mobile lighthouse in lift supporting mechanism and bottom truckle jack department, has made things convenient for staff's operation greatly for the mobile lighthouse can accomplish fast and arrange or dismantle, has striven for more time for emergency work.
The utility model discloses further set up to: the locking mechanism comprises a first through hole horizontally formed in the connecting pipe, a first slot which is formed in the first sleeve and is opposite to the first through hole in the rotating process of the first sleeve, a first bolt which penetrates through the first slot and is inserted into the first through hole, and a first spring which is arranged on the outer side wall of the first sleeve and used for driving the first bolt to be inserted into the first through hole.
Through adopting above-mentioned technical scheme, when the truckle was in the use or when packing up the state, first slot on the first sleeve can just to first through-hole, and first spring will order about first bolt and pass first slot and insert first through-hole in, and the position of truckle can be locked, and locking mechanical system's structural principle is simple, and very convenient in the operation. If want the swivel caster again, the staff with first bolt extract in the first through-hole rotatory first sleeve again can, it is equally very convenient in the operation.
The utility model discloses further set up to: the connecting pipe comprises round pipes positioned on two sides of the rack and a square pipe which is arranged at the end part of the round pipe and fixedly connected with the rack, and a first through hole is formed in the square pipe; the cross section of the first sleeve is in a square ring shape, the first sleeve can rotate and slide on the round tube, and the first sleeve can only slide on the square tube.
Through adopting above-mentioned technical scheme, after first sleeve pipe slided to the pipe, first sleeve pipe and truckle alright take place rotatoryly freely, after first sleeve pipe and truckle rotatory to suitable state, the staff slided first sleeve pipe to square the pipe again, and square pipe will restrict first sheathed tube angle for the truckle can be steadily in the use or pack up the state, has guaranteed the stability of truckle.
The utility model discloses further set up to: the notch of the first through hole is flared.
Through adopting above-mentioned technical scheme, the flaring setting of first through-hole notch department can play the guide effect when first bolt inserts first through-hole for in first bolt can imbed first through-hole more smoothly, the position locking of first sleeve pipe and truckle will be more smooth.
The utility model discloses further set up to: and a pull ring for pulling the first bolt is arranged on the first bolt.
Through adopting above-mentioned technical scheme, the pull ring provides a fine application of force position for the staff draws first bolt, has made things convenient for the staff to remove first bolt.
The utility model discloses further set up to: the vertical rod is provided with a second slot, and the central axis of the second slot is parallel to the rotating axis of the lower rotating rod; a second through hole which is right opposite to the second slot after the lower rotating rod is unfolded is formed in the lower rotating rod, and a second bolt which penetrates through the second slot and is inserted into the second through hole is formed in the vertical rod.
Through adopting above-mentioned technical scheme, after second sleeve pipe and extension rod expand, the second through-hole on the lower rotating rod will just to the second slot, and the staff passes the second slot with the second bolt and inserts in the second through-hole, and the position of lower rotating rod can be locked, and the stability of second sleeve pipe and extension rod will further be promoted. If it is to pack up second sleeve pipe and extension rod, the staff with the second bolt extract the second through-hole contract first electronic jar again can, it is equally very convenient in the operation.
The utility model discloses further set up to: and the vertical rod is provided with a second spring for driving a second bolt to be inserted into the second through hole.
Through adopting above-mentioned technical scheme, the second bolt can be ordered about to the second spring and inserted in the second through-hole always, has effectively avoided the unexpected condition that breaks away from lower transfer line of second bolt, has guaranteed the stability between lower transfer line and the montant.
To sum up, the utility model discloses a beneficial technological effect does:
1. the arrangement of the connecting pipe, the first sleeve, the trundles, the locking mechanism, the vertical rod, the second sleeve, the upper rotating rod, the lower rotating rod, the linkage rod, the first electric cylinder, the extension rod and the second electric cylinder greatly facilitates the operation of workers, so that the mobile lighthouse can be quickly deployed or disassembled, and more time is won for emergency work;
2. the arrangement of the round pipe, the square pipe and the square annular first sleeve enables the caster to be stably in a using or retracting state;
3. the arrangement of the second slot, the second through hole and the second bolt can further improve the stability of the second sleeve and the extension rod;
4. the setting of second spring has effectively avoided the unexpected condition that breaks away from lower transfer line of second bolt, has guaranteed the stability between lower transfer line and the montant.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an enlarged partial schematic view of portion A of FIG. 1;
fig. 3 is a partially enlarged schematic view of a portion B in fig. 1.
In the figure, 1, a frame; 2. a caster wheel; 3. a vertical rod; 4. a second sleeve; 5. rotating the rotating rod upwards; 6. rotating the rod downwards; 7. a linkage rod; 8. a first electric cylinder; 9. an extension pole; 10. a second electric cylinder; 11. a second through hole; 12. a second slot; 13. a second bolt; 14. a second spring; 15. a connecting pipe; 151. a circular tube; 152. a square tube; 16. a first sleeve; 17. a first through hole; 18. a first slot; 19. a first latch; 20. a pull ring; 21. a first spring.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, the transporting, loading and unloading device of the movable lighthouse comprises a frame 1, four trundles 2 arranged at the bottom of the frame 1, vertical bars 3 fixedly connected to four corners of the frame 1, and four second sleeves 4 erected around the frame 1, wherein the positions of the four second sleeves 4 correspond to the positions of the four vertical bars 3 one by one; still including articulating and go up the pole 5 and the lower pole 6 that goes up that just is parallel to each other between second sleeve 4 and montant 3, fixed connection goes up the pole 5 and is close to one of montant 3 and keep certain inclination's gangbar 7 with last pole 5, articulate the first electronic jar 8 between montant 3 and gangbar 7, slide and paste extension rod 9 that plays supporting role in second sleeve 4 closely, and fixed connection is used for stretching out or retracting the electronic jar 10 of second of extension rod 9 on second sleeve 4. The staff removes whole transportation handling device through truckle 2, and after it moved the appointed area, the piston rod extension of first electronic jar 8, gangbar 7, go up the peg 5 and down peg 6 just can take place the rotation in step, second sleeve 4 and extension rod 9 alright expansion, then electronic jar 10 of second will order about extension rod 9 and stretch out from second sleeve 4, extension rod 9 will butt and will whole transportation handling device jack-up on ground at last, the transportation handling device just finishes arranging. If the transportation loading and unloading device is to be folded, the operator controls the second electric cylinder 10 to retract the extension rod 9 into the second sleeve 4, and simultaneously controls the piston rod of the first electric cylinder 8 to retract. It should be noted that, the first electric cylinder 8 and the second electric cylinder 10 are connected to the generator through the electric wire.
Referring to fig. 1 and 2, the lower rotating rod 6 is provided with a second through hole 11, and a central axis of the second through hole 11 is parallel to a rotating axis of the lower rotating rod 6. A second slot 12 is formed in the vertical rod 3, the central axis of the second slot 12 is also parallel to the rotation axis of the lower rotating rod 6, and when the lower rotating rod 6 is completely unfolded, the second through hole 11 is opposite to the second slot 12. The vertical rod 3 is further provided with a second bolt 13 which passes through the second slot 12 and is inserted into the second through hole 11. After the second sleeve 4 is completely unfolded, the second through hole 11 is opposite to the second slot 12, a worker passes the second bolt 13 through the second slot 12 and inserts the second through hole 11, the position of the lower rotating rod 6 can be locked, and the stability of the second sleeve 4 and the stability of the extension rod 9 can be improved. When the second bolt 13 is pulled out of the second through hole 11, the lower rotating rod 6 can rotate again.
Referring to fig. 2, a second spring 14 is fixedly connected between the vertical rod 3 and the second pin 13, and when the second spring 14 is in a natural state, the second pin 13 always passes through the second slot 12 and is inserted into the second through hole 11, so that the second pin 13 is prevented from accidentally disengaging from the lower rotating rod 6; when the second spring 14 is compressed, the second pin 13 will disengage the second through hole 11 and the lower rotation rod 6 will rotate again.
Referring to fig. 3, the transportation handling device of a mobile lighthouse further comprises round tubes 151 located at two sides of the frame 1 and in a horizontal state, square tubes 152 fixedly connected to the ends of the round tubes 151 and collinear with the round tubes 151, and first sleeves 16 slidably sleeved on the outer side walls of the square tubes 152, wherein the caster 2 is installed on one of the outer side walls of the first sleeves 16, the first sleeves 16 can rotate and slide on the round tubes 151, but the first sleeves 16 can only slide on the square tubes 152. The round tube 151 and the square tube 152 constitute the connection tube 15. The square pipe 152 is provided with a first through hole 17 in a horizontal state, the length direction of the first through hole 17 is perpendicular to the length direction of the square pipe 152, and the notch of the first through hole 17 is flared. The first sleeve 16 is provided with a first slot 18 which can be opposite to the first through hole 17, the first sleeve 16 is provided with a first bolt 19 which passes through the first slot 18 and is inserted into the first through hole 17, and one end of the first bolt 19 is hinged with a pull ring 20. In order to prevent the first bolt 19 from being accidentally separated from the first through hole 17, a first spring 21 is fixedly connected between the first sleeve 16 and the first bolt 19, and when the first spring 21 is in a natural state, the first bolt 19 always passes through the first slot 18 and is inserted into the first through hole 17; when the first spring 21 is compressed, the first pin 19 will disengage the first through hole 17, and the first sleeve 16 will slide on the square tube 152 again. Wherein the first through hole 17, the first slot 18, the first latch 19 and the first spring 21 constitute a locking mechanism for locking the caster 2 in the vertical state. When the state of truckle 2 needs to be adjusted, the staff first slides first sleeve 16 to on pipe 151, first sleeve 16 and truckle 2 alright take place to rotate on pipe 151, after truckle 2 rotated to use or packed up the state, the staff slided first sleeve 16 and truckle 2 to square pipe 152 again, square pipe 152 can restrict the rotation of first sleeve 16 and truckle 2, so that truckle 2 can be steadily in the use or pack up the state, first slot 18 when on first sleeve 16 can just be to first through-hole 17, first spring 21 will order about first bolt 19 and pass first slot 18 and insert in first through-hole 17, the position of truckle 2 can be locked. If the caster 2 is to be rotated again, the worker pulls the first pin 19 out of the first through hole 17 and rotates the first sleeve 16.
The implementation principle of the embodiment is as follows: the staff removes whole transportation handling device through truckle 2, after it moves the appointed area, the piston rod extension of first electronic jar 8, gangbar 7, go up the peg 5 and just can take place the rotation with lower peg 6 in step, second sleeve 4 and extension rod 9 alright expand, after second sleeve 4 expandes completely, second through-hole 11 will just be to second slot 12, the staff passes second bolt 13 again through second slot 12 and inserts in second through-hole 11, the position of lower peg 6 can be locked, then electronic jar 10 of second will order about extension rod 9 and stretch out from second sleeve 4, extension rod 9 will butt at last and jack-up whole transportation handling device on ground, transportation handling device just deploys and finishes. If the transportation loading and unloading device is to be folded, the operator controls the second electric cylinder 10 to retract the extension rod 9 into the second sleeve 4, and simultaneously controls the piston rod of the first electric cylinder 8 to retract. It should be noted that, the first electric cylinder 8 and the second electric cylinder 10 are connected to the generator through the electric wire. In addition, when the state of truckle 2 needs to be adjusted, the staff first slides first sleeve 16 to on pipe 151, first sleeve 16 and truckle 2 alright take place to rotate on pipe 151, after truckle 2 rotated to use or pack up the state, the staff slided first sleeve 16 and truckle 2 to square pipe 152 again, square pipe 152 can restrict the rotation of first sleeve 16 and truckle 2, so that truckle 2 can be steadily in the use or pack up the state, first slot 18 when on first sleeve 16 can just be to first through-hole 17, first spring 21 will order about first bolt 19 and pass first slot 18 and insert in first through-hole 17, the position of truckle 2 can be locked. If the caster 2 is to be rotated again, the worker pulls the first pin 19 out of the first through hole 17 and rotates the first sleeve 16.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (7)

1. The utility model provides a transportation handling device of removal beacon which characterized in that: the device comprises a rack (1), connecting pipes (15) fixedly connected to two sides of the rack (1), first sleeves (16) rotatably sleeved on the connecting pipes (15), casters (2) installed on the first sleeves (16), and locking mechanisms arranged on the first sleeves (16) and used for locking the casters (2) in a vertical state; the electric driving device is characterized by further comprising a vertical rod (3) fixedly connected to the periphery of the rack (1), a second sleeve (4) vertically arranged on the periphery of the rack (1) and corresponding to the position of the vertical rod (3), an upper rotating rod (5) and a lower rotating rod (6) which are hinged between the vertical rod (3) and the second sleeve (4) and parallel to each other, a linkage rod (7) fixedly connected to the upper rotating rod (5) and close to one end of the vertical rod (3), a first electric cylinder (8) hinged between the linkage rod (7) and the vertical rod (3), an extension rod (9) vertically sliding in the second sleeve (4), and a second electric cylinder (10) arranged on the second sleeve (4) and used for driving the extension rod (9) to slide.
2. A transport handling unit for a mobile lighthouse according to claim 1, further comprising: the locking mechanism comprises a first through hole (17) horizontally formed in the connecting pipe (15), a first inserting groove (18) formed in the first sleeve (16) and facing the first through hole (17) in the rotating process of the first sleeve (16), a first plug pin (19) penetrating through the first inserting groove (18) and inserted into the first through hole (17), and a first spring (21) arranged on the outer side wall of the first sleeve (16) and used for driving the first plug pin (19) to be inserted into the first through hole (17).
3. A transport handling unit for a mobile lighthouse according to claim 2 wherein: the connecting pipe (15) comprises round pipes (151) positioned on two sides of the rack (1) and square pipes (152) arranged at the end parts of the round pipes (151) and fixedly connected with the rack (1), and the first through holes (17) are formed in the square pipes (152); the cross section of the first sleeve (16) is in a square ring shape, the first sleeve (16) can rotate and slide on the round pipe (151), and the first sleeve (16) can only slide on the square pipe (152).
4. A transport handling unit for a mobile lighthouse according to claim 2 wherein: the notch of the first through hole (17) is flared.
5. A transport handling unit for a mobile lighthouse according to claim 2 wherein: and a pull ring (20) for pulling the first bolt (19) is arranged on the first bolt (19).
6. A transport handling unit for a mobile lighthouse according to claim 1, further comprising: a second slot (12) is formed in the vertical rod (3), and the central axis of the second slot (12) is parallel to the rotating axis of the lower rotating rod (6); a second through hole (11) which is right opposite to the second slot (12) after the lower rotating rod (6) is unfolded is formed in the lower rotating rod (6), and a second bolt (13) which penetrates through the second slot (12) and is inserted into the second through hole (11) is arranged on the vertical rod (3).
7. A transport handling unit for a mobile lighthouse according to claim 6 wherein: and the vertical rod (3) is provided with a second spring (14) for driving a second bolt (13) to be inserted into the second through hole (11).
CN202020634267.7U 2020-04-23 2020-04-23 Transportation handling device of mobile lighthouse Active CN212047466U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020634267.7U CN212047466U (en) 2020-04-23 2020-04-23 Transportation handling device of mobile lighthouse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020634267.7U CN212047466U (en) 2020-04-23 2020-04-23 Transportation handling device of mobile lighthouse

Publications (1)

Publication Number Publication Date
CN212047466U true CN212047466U (en) 2020-12-01

Family

ID=73509622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020634267.7U Active CN212047466U (en) 2020-04-23 2020-04-23 Transportation handling device of mobile lighthouse

Country Status (1)

Country Link
CN (1) CN212047466U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117755632A (en) * 2023-12-30 2024-03-26 郑州市疾病预防控制中心 Portable physical and chemical inspection box
KR102921596B1 (en) * 2021-07-23 2026-02-03 한국전력공사 Rail lift for transporting electric instruments and method of transporting electric instruments using it

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102921596B1 (en) * 2021-07-23 2026-02-03 한국전력공사 Rail lift for transporting electric instruments and method of transporting electric instruments using it
CN117755632A (en) * 2023-12-30 2024-03-26 郑州市疾病预防控制中心 Portable physical and chemical inspection box

Similar Documents

Publication Publication Date Title
CN105236276A (en) Foldable gantry crane capable of ascending and descending
CN212047466U (en) Transportation handling device of mobile lighthouse
CN110635214A (en) Mobile HF Antenna System
JP2000288111A (en) Safety belt mounting device
CN205170243U (en) Emergency rescue tripod
CN204437701U (en) A kind of gas cylinder fixed support device
CN206707400U (en) A kind of security enclosure of transforming plant device
CN102535943A (en) Tent bracket convenient for unfolding and folding and unfolding and folding method for tent bracket
CN112317479B (en) Powder warehouse cleaning machine convenient to use and light in weight
CN220537368U (en) High hanging type safety rope device for crawler crane arm support
JPH02117591A (en) Foldable crane having boom comprising two or three elements connected mutually
CN107181198A (en) Lift single pole crossing frame
CN205820692U (en) Mutual inductor coil suspender and spreader assembly
CN206719178U (en) One kind forces closing device and system
CN106744438A (en) Telescoping cable trench cover drawing device
JPH06257142A (en) Reinforcement cage installing device and reinforcement cage assembling and installing method using this device
CN206203762U (en) Telescoping cable trench cover drawing device
CN208150704U (en) winding device
CN221317159U (en) Adaptive clamping support framework for steel pipe transportation
CN223385796U (en) Lifting device
CN221609714U (en) A wind turbine hoisting port guardrail
CN222596223U (en) Maintenance platform, hub assembly for wind generating set and wind generating set
CN223813963U (en) Building construction earthwork excavation foundation ditch protector
CN113818815A (en) A modular oil rig
CN223098357U (en) A fire connection device for high altitude welding

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant