[go: up one dir, main page]

CN211954292U - Large diameter hot water energy metering system - Google Patents

Large diameter hot water energy metering system Download PDF

Info

Publication number
CN211954292U
CN211954292U CN202020339694.2U CN202020339694U CN211954292U CN 211954292 U CN211954292 U CN 211954292U CN 202020339694 U CN202020339694 U CN 202020339694U CN 211954292 U CN211954292 U CN 211954292U
Authority
CN
China
Prior art keywords
temperature
flowmeter
pipe section
straight pipe
hot water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020339694.2U
Other languages
Chinese (zh)
Inventor
王荣杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Juxin Shanghai Technology Co ltd
Original Assignee
Fubiao Measuring Instrument Shanghai Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fubiao Measuring Instrument Shanghai Co ltd filed Critical Fubiao Measuring Instrument Shanghai Co ltd
Priority to CN202020339694.2U priority Critical patent/CN211954292U/en
Application granted granted Critical
Publication of CN211954292U publication Critical patent/CN211954292U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

本实用新型涉及一种大口径热水能量计量系统,它包括流量计、压力变送器、温度变送器、流量积算仪、高温排气阀;大口径管道出水管道的直管段中部设有流量计,后直管段设有一个压力变送器和四个温度变送器,四个温度变送器均布在后直管段外圈;大口径管道回水管道的直管段上设有一个压力变送器和四个温度变送器,四个温度变送器均布在回水管道的直管段外圈,流量计、两个压力变送器、两套四路温度变送器分别接入流量积算仪。本实用新型使用多根温度变送器测量多点管道内热水温度值,最后取其温度平均值,更为合理,不发生漏水,泄压,烫伤等任何安全问题,有比较好的长期稳定性和可靠性,足以实现贸易计量。

Figure 202020339694

The utility model relates to a large-diameter hot water energy metering system, which comprises a flowmeter, a pressure transmitter, a temperature transmitter, a flow totalizer and a high-temperature exhaust valve; Flowmeter, the rear straight pipe section is provided with a pressure transmitter and four temperature transmitters, and the four temperature transmitters are evenly distributed on the outer ring of the rear straight pipe section; there is a pressure transmitter on the straight pipe section of the large-diameter pipe return pipe Transmitter and four temperature transmitters, four temperature transmitters are distributed on the outer ring of the straight pipe section of the return pipe, flowmeter, two pressure transmitters, and two sets of four-way temperature transmitters are respectively connected Flow totalizer. The utility model uses a plurality of temperature transmitters to measure the temperature value of the hot water in the multi-point pipeline, and finally takes the average value of the temperature, which is more reasonable, does not cause any safety problems such as water leakage, pressure relief, scalding, etc., and has better long-term stability. robustness and reliability, sufficient for trade measurement.

Figure 202020339694

Description

大口径热水能量计量系统Large diameter hot water energy metering system

技术领域technical field

本实用新型涉及一种大口径热水能量计量系统。The utility model relates to a large-diameter hot water energy metering system.

背景技术Background technique

热水是使用最为广泛的载热介质,是非常重要的二次能源。热水能量计量量大面广,对加强管理,公平贸易,节能能源,提高经济效益等方面都有重要意义。Hot water is the most widely used heat transfer medium and a very important secondary energy source. The measurement of hot water energy is large and wide, which is of great significance to strengthening management, fair trade, energy saving, and improving economic benefits.

目前世界上主流的热水能量计量测量方法有超声流量计和电磁流量计,这两种方法互有优缺点。除此以外,差压式流量测量也有应用。At present, the mainstream hot water energy measurement methods in the world include ultrasonic flowmeter and electromagnetic flowmeter. These two methods have advantages and disadvantages. In addition, differential pressure flow measurement also has applications.

电磁流量计仅可测量导电液体,最高可测量液体温度达到130℃,差压流量计测量准确度低,一般不高于1.0级,压力损失大,增加额外能耗。The electromagnetic flowmeter can only measure conductive liquids, and the maximum liquid temperature can reach 130 °C. The measurement accuracy of the differential pressure flowmeter is low, generally not higher than 1.0, the pressure loss is large, and the additional energy consumption is increased.

发明内容SUMMARY OF THE INVENTION

本实用新型旨在克服现有技术的缺陷,提供一种大口径热水能量计量系统,不发生漏水,泄压,烫伤等任何安全问题。The utility model aims to overcome the defects of the prior art, and provides a large-diameter hot water energy metering system without any safety problems such as water leakage, pressure relief, scalding and the like.

为了解决上述技术问题,本实用新型是这样实现的:In order to solve the above-mentioned technical problems, the utility model is realized in this way:

一种大口径热水能量计量系统,其特征在于:它包括流量计、压力变送器、温度变送器、流量积算仪、高温排气阀;所述大口径管道出水管道的直管段中部设有流量计,所述后直管段设有一个压力变送器和四个温度变送器,四个温度变送器均布在后直管段外圈;所述大口径管道回水管道的直管段上设有一个压力变送器和四个温度变送器,四个温度变送器均布在回水管道的直管段外圈,所述流量计、两个压力变送器、两套四路温度变送器分别接入流量积算仪。A large-diameter hot water energy metering system is characterized in that: it includes a flow meter, a pressure transmitter, a temperature transmitter, a flow totalizer, and a high-temperature exhaust valve; A flow meter is provided, and the rear straight pipe section is provided with a pressure transmitter and four temperature transmitters, and the four temperature transmitters are evenly distributed on the outer ring of the rear straight pipe section; There is a pressure transmitter and four temperature transmitters on the pipe section, and the four temperature transmitters are evenly distributed on the outer ring of the straight pipe section of the return pipe. The flowmeter, two pressure transmitters, two sets of four The road temperature transmitter is connected to the flow totalizer respectively.

所述的大口径热水能量计量系统,其特征在于:所述流量计的前直管段长度大于等于20D,流量计的后直管段长度大于等于5D。The large-diameter hot water energy metering system is characterized in that the length of the front straight pipe section of the flowmeter is greater than or equal to 20D, and the length of the rear straight pipe section of the flowmeter is greater than or equal to 5D.

所述的大口径热水能量计量系统,其特征在于:所述流量计为超声流量计。The large-diameter hot water energy metering system is characterized in that: the flowmeter is an ultrasonic flowmeter.

所述的大口径热水能量计量系统,其特征在于:所述四个温度变送器插入后直管段的深度分别为D/2、D/3、5D/24、D/12,并通过法兰安装。The large-diameter hot water energy metering system is characterized in that: the depths of the straight pipe sections after the four temperature transmitters are inserted are respectively D/2, D/3, 5D/24, and D/12, and they are Lan installation.

所述的大口径热水能量计量系统,其特征在于:所述位于流量计上游的最高点安装高温自动排气阀。The large-diameter hot water energy metering system is characterized in that: a high-temperature automatic exhaust valve is installed at the highest point upstream of the flow meter.

所述的大口径热水能量计量系统,其特征在于:还包括一个控制柜,可根据不同需求配备防雷设备、流量计转换器、UPS电源。The large-diameter hot water energy metering system is characterized in that: it further comprises a control cabinet, which can be equipped with lightning protection equipment, flow meter converter and UPS power supply according to different requirements.

本实用新型的有益效果是:使用多根温度变送器测量多点管道内热水温度值,最后取其温度平均值,更为合理,不发生漏水,泄压,烫伤等任何安全问题,有比较好的长期稳定性和可靠性,足以实现贸易计量。The beneficial effects of the utility model are: using a plurality of temperature transmitters to measure the temperature value of the hot water in the multi-point pipeline, and finally taking the average value of the temperature, which is more reasonable, and does not cause any safety problems such as water leakage, pressure relief, scalding, etc. Good long-term stability and reliability are sufficient for trade measurement.

附图说明Description of drawings

下面结合附图和实施方式对本实用新型作进一步的详细说明:Below in conjunction with accompanying drawing and embodiment, the utility model is described in further detail:

图1为本实用新型的结构示意图。Figure 1 is a schematic structural diagram of the utility model.

图2为温度变送器插入在管道中的示意图。Figure 2 is a schematic diagram of the temperature transmitter inserted in the pipeline.

图3为系统电气安装示意图。Figure 3 is a schematic diagram of the electrical installation of the system.

具体实施方式Detailed ways

如图1、3所示:一种大口径热水能量计量系统,它包括流量计1、压力变送器2、温度变送器3、流量积算仪4、高温排气阀5;所述大口径管道6直径D为350mm-1400mm;大口径管道出水管道的直管段中部设有流量计1,该流量计1的前直管段61长度大于等于20D,流量计1的后直管段62长度大于等于5D,所述后直管段62设有一个压力变送器2和四个温度变送器3,四个温度变送器3均布在后直管段外圈;所述大口径管道回水管道7的直管段上设有一个压力变送器2和四个温度变送器3,四个温度变送器3均布在回水管道7的直管段外圈。所述流量计1、两个压力变送器2、两套四路温度变送器3分别接入流量积算仪4,流量积算仪4可以最终显示质量流量和能量,并且带2路4-20mA输出供热电厂和热力公司使用和1路RS485信号备用,热水能量计量系统的电气安装也非常重要,例如: 强电和弱电一定要分套管连接,避免强电对于弱电信号的干扰;套管务必为镀锌碳钢管道,以避免外界的电磁干扰以及啮齿类动物对于电缆线的啃食。As shown in Figures 1 and 3: a large-diameter hot water energy metering system, which includes a flowmeter 1, a pressure transmitter 2, a temperature transmitter 3, a flow totalizer 4, and a high-temperature exhaust valve 5; the The diameter D of the large-diameter pipeline 6 is 350mm-1400mm; a flowmeter 1 is arranged in the middle of the straight pipe section of the water outlet pipe of the large-diameter pipeline. equal to 5D, the rear straight pipe section 62 is provided with a pressure transmitter 2 and four temperature transmitters 3, and the four temperature transmitters 3 are evenly distributed on the outer ring of the rear straight pipe section; the large-diameter pipe return pipe A pressure transmitter 2 and four temperature transmitters 3 are arranged on the straight pipe section of 7 , and the four temperature transmitters 3 are evenly distributed on the outer ring of the straight pipe section of the return water pipeline 7 . The flowmeter 1, two pressure transmitters 2, and two sets of four-way temperature transmitters 3 are respectively connected to the flow totalizer 4, which can finally display mass flow and energy, and has 2 channels 4 -20mA output is used for heating power plants and heating companies and 1 channel RS485 signal backup. The electrical installation of the hot water energy metering system is also very important. For example, the strong current and the weak current must be connected in separate casings to avoid the interference of the strong current to the weak current signal; The casing must be galvanized carbon steel pipe to avoid external electromagnetic interference and rodents gnawing on the cable.

进一步的,所述流量计1为超声流量计,其具有超声探头在线安装和插拔的显著功能,一旦仪表探头发生问题,可以在线安装,而不发生漏水,泄压,烫伤等任何安全问题。Further, the flowmeter 1 is an ultrasonic flowmeter, which has a significant function of online installation and plugging of ultrasonic probes. Once a problem occurs with the instrument probe, it can be installed online without any safety problems such as water leakage, pressure relief, and burns.

进一步的,由于流量计口径特别大,使用以往常用的单根温度变送器测量温度的方法是存在问题的。因为口径大,环境条件又存在温度低的问题,大口径管道内一定存在温度梯度差。所以,我们的测量方案是使用多根温度变送器测量多点管道内热水温度值,最后取其温度平均值,如图2所示:所述四个温度变送器3插入后直管段的深度分别为D/2、D/3、5D/24、D/12,并通过法兰安装,例如,当大口径管道6的直径为1200mm时,四个温度变送器3的插入深度分别为600mm、400mm、250mm、100mm。Further, due to the particularly large diameter of the flowmeter, it is problematic to use a single temperature transmitter commonly used in the past to measure temperature. Because of the large diameter and the low temperature in the environmental conditions, there must be a temperature gradient difference in the large diameter pipeline. Therefore, our measurement plan is to use multiple temperature transmitters to measure the temperature of hot water in the multi-point pipeline, and finally take the average temperature, as shown in Figure 2: the four temperature transmitters 3 are inserted into the straight pipe section The depths are D/2, D/3, 5D/24, D/12, respectively, and are installed through flanges. For example, when the diameter of the large-diameter pipe 6 is 1200mm, the insertion depths of the four temperature transmitters 3 are respectively 600mm, 400mm, 250mm, 100mm.

进一步的,所述位于流量计1上游的任何几处最高点安装高温自动排气阀,以排除管道内的空气,因为热水相较冷水而言,更容易从液体中释放空气。否则,会引起流量计波动,示值偏大等不良影响,这并不是流量计本身的问题,而是流量计对介质含气问题的外部表现。Further, a high-temperature automatic exhaust valve is installed at any of the highest points upstream of the flow meter 1 to remove the air in the pipeline, because hot water is easier to release air from the liquid than cold water. Otherwise, it will cause the flowmeter to fluctuate and the indication value is too large.

进一步的,所述流量计1安装在本系统的最低处,以避免空气的进入,导致非满管流动,带来不必要的额外误差。Further, the flow meter 1 is installed at the lowest part of the system to avoid the entry of air, which will lead to the flow of the non-full pipe and bring unnecessary additional errors.

进一步的,本系统还包括一个控制柜,可根据不同需求配备防雷设备、流量计转换器、UPS电源。为防止整个能量计量系统的突然断电,务必使用UPS不间断电源,以保证数据信息的及时保存和对于断电的抢修工作。整个热水能量计量系统如果安装在偏僻或容易打雷的地方,务必要采取防雷措施,避免对产生重大仪表损失和信号传输的中断。Further, the system also includes a control cabinet, which can be equipped with lightning protection equipment, flow meter converter, and UPS power supply according to different requirements. In order to prevent the sudden power failure of the entire energy metering system, it is necessary to use UPS uninterruptible power supply to ensure the timely preservation of data information and emergency repair work for power failure. If the entire hot water energy metering system is installed in a remote or lightning-prone place, lightning protection measures must be taken to avoid major instrument loss and interruption of signal transmission.

Claims (6)

1. A large-caliber hot water energy metering system is characterized in that: the device comprises a flowmeter, a pressure transmitter, a temperature transmitter, a flow integrating instrument and a high-temperature exhaust valve; the middle part of the straight pipe section of the large-caliber pipeline water outlet pipeline is provided with a flowmeter, the rear straight pipe section is provided with a pressure transmitter and four temperature transmitters, and the four temperature transmitters are uniformly distributed on the outer ring of the rear straight pipe section; the large-caliber pipeline water return pipeline is characterized in that a pressure transmitter and four temperature transmitters are arranged on the straight pipe section of the large-caliber pipeline water return pipeline, the four temperature transmitters are uniformly distributed on the outer ring of the straight pipe section of the water return pipeline, and the flowmeter, the two pressure transmitters and the two sets of four temperature transmitters are respectively connected into the flow integrating instrument.
2. The large caliber hot water energy metering system of claim 1, wherein: the length of the front straight pipe section of the flowmeter is more than or equal to 20D, and the length of the rear straight pipe section of the flowmeter is more than or equal to 5D.
3. The large caliber hot water energy metering system of claim 1, wherein: the flowmeter is an ultrasonic flowmeter.
4. The large caliber hot water energy metering system of claim 1, wherein: the depths of the four temperature transmitters inserted into the straight pipe section are respectively D/2, D/3, 5D/24 and D/12, and the four temperature transmitters are installed through flanges.
5. The large caliber hot water energy metering system of claim 1, wherein: the highest point at the upstream of the flowmeter is provided with a high-temperature automatic exhaust valve.
6. The large caliber hot water energy metering system of claim 1, wherein: the intelligent control cabinet also comprises a control cabinet, and lightning protection equipment, a flowmeter converter and a UPS power supply can be arranged according to different requirements.
CN202020339694.2U 2020-03-18 2020-03-18 Large diameter hot water energy metering system Expired - Fee Related CN211954292U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020339694.2U CN211954292U (en) 2020-03-18 2020-03-18 Large diameter hot water energy metering system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020339694.2U CN211954292U (en) 2020-03-18 2020-03-18 Large diameter hot water energy metering system

Publications (1)

Publication Number Publication Date
CN211954292U true CN211954292U (en) 2020-11-17

Family

ID=73180095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020339694.2U Expired - Fee Related CN211954292U (en) 2020-03-18 2020-03-18 Large diameter hot water energy metering system

Country Status (1)

Country Link
CN (1) CN211954292U (en)

Similar Documents

Publication Publication Date Title
CN106382466B (en) A kind of gas pipeline metering regulator and method
CN106838628B (en) A kind of multisensor heat supply network leakage early-warning monitoring method
US4883087A (en) Central heating system and water system and method for controlling the tightness thereof
CN108278497A (en) Study the experimental provision of steel gas pipe underground Release and dispersion
CN206488050U (en) Gas pipeline pressure flow hybrid control system integration skid-mounted unit
CN211954292U (en) Large diameter hot water energy metering system
CN106402667A (en) Online resistance type leakage preventing system
CN106352930B (en) A gas flow testing device and coal mill capacity wind measuring instrument
CN206311259U (en) A kind of Portable running water line pressure measurement apparatus
CN105953950A (en) Pipeline fluid detection device
CN212746020U (en) Equal dryness distribution and branch flow measurement device for steam pipe network nodes
CN210922741U (en) LWGY liquid turbine flowmeter
CN211040932U (en) Multifunctional boiler water supply deoxidization system
CN210981452U (en) Measuring device for water pressure loss of water meter
CN210128251U (en) Pipeline safety monitor
CN114838401A (en) A steam monitoring system for heating network pipes
CN205136886U (en) Pneumatic tube way flange ring spare is prevented leaking in collection of shale gas
CN207906866U (en) Study the experimental provision of steel gas pipe underground Release and dispersion
CN213363898U (en) Water supply flow measuring device of heat supply network system
CN105938026A (en) Ultrasonic calorimeter with water leakage alarm function
CN222505521U (en) System for measuring DMA district inlet flow of tandem type double-remote-transmission water meter
CN221445212U (en) Protection device for water meter core
CN213956621U (en) Heat metering device suitable for different load factors
CN205536116U (en) Caliduct automated inspection alarm system
CN209894496U (en) Thermal performance detection device for electric heating stove

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230703

Address after: 201802 J, building 2, No. 988, Jingtang Road, Jiading District, Shanghai

Patentee after: Juxin (Shanghai) Technology Co.,Ltd.

Address before: 201802 room 1185, building 10, No. 500, Shengxin South Road, Jiading District, Shanghai

Patentee before: FUBIAO MEASURING INSTRUMENT (SHANGHAI) Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201117

CF01 Termination of patent right due to non-payment of annual fee