CN211872424U - Rail Fastener System and Rail System - Google Patents

Rail Fastener System and Rail System Download PDF

Info

Publication number
CN211872424U
CN211872424U CN201922219758.5U CN201922219758U CN211872424U CN 211872424 U CN211872424 U CN 211872424U CN 201922219758 U CN201922219758 U CN 201922219758U CN 211872424 U CN211872424 U CN 211872424U
Authority
CN
China
Prior art keywords
rail
backing plate
iron
base plate
fastener system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922219758.5U
Other languages
Chinese (zh)
Inventor
蒋金洲
徐玉坡
梁晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
Original Assignee
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Railway Sciences Corp Ltd CARS, Railway Engineering Research Institute of CARS filed Critical China Academy of Railway Sciences Corp Ltd CARS
Priority to CN201922219758.5U priority Critical patent/CN211872424U/en
Application granted granted Critical
Publication of CN211872424U publication Critical patent/CN211872424U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

本实用新型提供了一种钢轨扣件系统及钢轨系统,该钢轨扣件系统包括铁垫板、第一螺栓、扣件装置、第一挡座、第二挡座和至少一片轨距调整片,第一挡座和第二挡座沿轨道的宽度方向间隔设置于钢枕上,铁垫板设置于第一挡座和第二挡座之间,并且,铁垫板的长度小于第一挡座与第二挡座之间的间距,轨距调整片设置于第一挡座与铁垫板之间,和/或第二挡座与铁垫板之间;第一螺栓将铁垫板压紧于钢枕;扣件装置安装于铁垫板,用于将钢轨压紧于铁垫板。通过本实用新型,缓解了现有技术中钢枕类的轨道所存在的调整轨距的操作比较繁琐的技术问题。

Figure 201922219758

The utility model provides a rail fastener system and a rail system. The rail fastener system comprises an iron backing plate, a first bolt, a fastener device, a first stopper, a second stopper and at least one gauge adjustment piece, The first stopper and the second stopper are arranged on the steel sleeper at intervals along the width direction of the track, the iron backing plate is arranged between the first stopper and the second stopper, and the length of the iron backing plate is smaller than that of the first stopper and the second stopper. The distance between the second stopper, the gauge adjustment piece is arranged between the first stopper and the iron backing plate, and/or between the second stopper and the iron backing plate; the first bolt presses the iron backing plate against the Steel sleeper; the fastener device is installed on the iron backing plate, which is used to press the rail against the iron backing plate. The utility model alleviates the technical problem that the operation of adjusting the gauge of the steel sleeper in the prior art is relatively complicated.

Figure 201922219758

Description

钢轨扣件系统及钢轨系统Rail Fastener System and Rail System

技术领域technical field

本实用新型涉及铁道交通技术领域,尤其涉及一种钢轨扣件系统及钢轨系统。The utility model relates to the technical field of railway transportation, in particular to a rail fastener system and a rail system.

背景技术Background technique

桥梁铺设无缝线路后,随着环境温度变化,桥梁要承受无缝线路纵向作用力;桥梁的温度跨度越长则承受无缝线路的纵向力越大。为了释放桥梁在温度变化及列车荷载作用下的变形使钢轨产生的伸缩力和挠曲力,减少对桥梁结构的不利影响,需要降低钢轨纵向伸缩的阻力,使钢轨能适当地伸缩,并且容许无缝线路的钢轨有一定的位移,以保证桥梁和无缝线路的安全可靠。After the bridge is laid with the seamless line, with the change of the ambient temperature, the bridge has to bear the longitudinal force of the seamless line; the longer the temperature span of the bridge, the greater the longitudinal force of the seamless line. In order to release the expansion and contraction force and deflection force of the steel rail caused by the deformation of the bridge under the action of temperature change and train load, and reduce the adverse effect on the bridge structure, it is necessary to reduce the resistance of the longitudinal expansion and contraction of the steel rail, so that the steel rail can properly expand and contract, and allow no The rails of the seam line have a certain displacement to ensure the safety and reliability of the bridge and the seamless line.

轨道的承载基础件主要包括两种:钢枕和轨道板。在轨道的安装和维护过程中,钢枕类的轨道的轨距的调整操作比较繁琐,降低了工作效率。There are two main types of bearing bases for the track: steel sleepers and track slabs. During the installation and maintenance of the track, the adjustment operation of the gauge of the track such as the steel sleeper is cumbersome, which reduces the work efficiency.

实用新型内容Utility model content

本实用新型的目的是提供一种钢轨扣件系统及钢轨系统,以缓解现有技术中钢枕类的轨道所存在的调整轨距的操作比较繁琐的技术问题。The purpose of the utility model is to provide a rail fastener system and a rail system, so as to alleviate the technical problem that the operation of adjusting the gauge of the rails in the prior art is cumbersome.

本实用新型的上述目的可采用下列技术方案来实现:Above-mentioned purpose of the present utility model can adopt following technical scheme to realize:

本实用新型提供一种钢轨扣件系统,包括:铁垫板、第一螺栓、扣件装置、第一挡座、第二挡座和至少一片轨距调整片,所述第一挡座和所述第二挡座沿轨道的宽度方向间隔设置于钢枕上,所述铁垫板设置于所述第一挡座和所述第二挡座之间,并且,所述铁垫板的长度小于所述第一挡座与所述第二挡座之间的间距,所述轨距调整片设置于所述第一挡座与所述铁垫板之间,和/或所述第二挡座与所述铁垫板之间;所述第一螺栓将所述铁垫板压紧于所述钢枕;所述扣件装置安装于所述铁垫板,用于将钢轨压紧于所述铁垫板。The utility model provides a rail fastener system, comprising: an iron backing plate, a first bolt, a fastener device, a first stopper, a second stopper and at least one gauge adjustment piece, the first stopper and the The second stopper is arranged on the steel sleeper at intervals along the width direction of the track, the iron backing plate is arranged between the first stopper and the second stopper, and the length of the iron backing plate is smaller than the length of the iron backing plate. The distance between the first stopper and the second stopper, the gauge adjustment piece is arranged between the first stopper and the iron backing plate, and/or the second stopper and the between the iron backing plates; the first bolt presses the iron backing plate against the steel sleeper; the fastener device is installed on the iron backing plate for pressing the rail against the iron backing plate.

在优选的实施方式中,所述钢轨扣件系统包括多片所述轨距调整片;所述铁垫板与所述第一挡座之间和所述铁垫板与所述第二挡座之间均设有调整间隙,多片所述轨距调整片分别设置于所述铁垫板的两端的所述调整间隙中。In a preferred embodiment, the rail fastener system includes a plurality of the gauge adjustment pieces; between the iron backing plate and the first stop and between the iron backing plate and the second stop There are adjustment gaps between them, and a plurality of the gauge adjustment pieces are respectively arranged in the adjustment gaps at both ends of the iron backing plate.

在优选的实施方式中,所述铁垫板的两端的所述调整间隙中均设置有至少一片具有绝缘性的所述轨距调整片。In a preferred embodiment, at least one piece of the gauge adjustment piece with insulating properties is provided in the adjustment gap at both ends of the iron backing plate.

在优选的实施方式中,所述钢轨扣件系统包括压板,所述压板上设有压板凸起部和用于穿设所述第一螺栓的第一通孔,所述轨距调整片上设有与所述压板凸起部相配合的调整片凹槽;所述第一螺栓将所述压板压紧于所述铁垫板,所述压板凸起部卡接于所述调整片凹槽。In a preferred embodiment, the rail fastener system includes a pressure plate, the pressure plate is provided with a pressure plate protrusion and a first through hole for penetrating the first bolt, and the gauge adjustment piece is provided with an adjustment piece groove matched with the raised portion of the pressure plate; the first bolt presses the pressure plate against the iron backing plate, and the raised portion of the pressure plate is clamped to the groove of the adjustment piece.

在优选的实施方式中,所述钢轨扣件系统包括垫片,所述垫片上设有用于穿设所述第一螺栓的第二通孔,所述垫片设置于所述压板的上方。In a preferred embodiment, the rail fastener system includes a gasket, the gasket is provided with a second through hole for penetrating the first bolt, and the gasket is arranged above the pressing plate.

在优选的实施方式中,所述铁垫板的上设有用于穿设所述第一螺栓的长圆孔,所述长圆孔的长度方向平行于所述铁垫板的长度方向。In a preferred embodiment, the iron backing plate is provided with an oblong hole for passing the first bolt, and the length direction of the long circular hole is parallel to the length direction of the iron backing plate.

在优选的实施方式中,所述钢轨扣件系统包括橡胶垫板,所述橡胶垫板设于所述铁垫板的下方,且与所述铁垫板相接触;所述橡胶垫板的两端分别与所述第一挡座和所述第二挡座相抵接。In a preferred embodiment, the rail fastener system includes a rubber backing plate, and the rubber backing plate is arranged below the iron backing plate and is in contact with the iron backing plate; The ends are respectively abutted with the first block seat and the second block seat.

在优选的实施方式中,所述钢轨扣件系统包括调高垫板,所述调高垫板设于所述橡胶垫板的下方,并且所述调高垫板的两端分别与所述第一挡座和所述第二挡座相抵接。In a preferred embodiment, the rail fastener system includes a height-adjusting backing plate, the height-adjusting backing plate is arranged below the rubber backing plate, and two ends of the height-adjusting backing plate are respectively connected to the first A block abuts against the second block.

在优选的实施方式中,所述铁垫板上固设有铁座;所述扣件装置包括轨撑、第二螺栓和至少一片轨撑调整片,所述轨撑用于扣压所述钢轨,所述轨撑的远离所述钢轨的端面与所述铁座之间设有轨撑间隙,所述轨撑调整片设置于所述轨撑间隙中;所述第二螺栓将所述轨撑压紧于所述铁座。In a preferred embodiment, an iron seat is fixed on the iron backing plate; the fastener device includes a rail support, a second bolt and at least one rail support adjustment piece, and the rail support is used for withholding the steel rail, A rail support gap is set between the end face of the rail support away from the steel rail and the iron base, and the rail support adjustment piece is arranged in the rail support gap; the second bolt presses the rail support tighter than the iron seat.

本实用新型提供一种钢轨系统,包括:钢枕、钢轨和上述的钢轨扣件系统,所述钢轨扣件系统安装于所述钢枕,并将所述钢轨扣压固定。The utility model provides a steel rail system, comprising: a steel sleeper, a steel rail and the above-mentioned steel rail fastener system, the steel rail fastener system is installed on the steel sleeper, and the steel rail is crimped and fixed.

本实用新型的特点及优点是:The features and advantages of the present utility model are:

本实用新型提供的钢轨扣件系统适用于钢枕类轨道,通过该钢轨扣件系统,能够实现将钢轨稳固地装配到钢枕上,稳定性高。当需要调整轨距时,松开第一螺栓,调整铁垫板两端的轨距调整片的数量,使铁垫板、以及安装于铁垫板上的钢轨和扣件装置,一起在第一挡座和第二挡座之间移动,实现轨距的调整。The rail fastener system provided by the utility model is suitable for rails such as steel sleepers, and through the rail fastener system, the rail can be stably assembled on the steel sleeper, and the stability is high. When it is necessary to adjust the gauge, loosen the first bolt and adjust the number of gauge adjustment pieces at both ends of the iron pad, so that the iron pad, the rail and the fastener device mounted on the iron pad are in the first gear together. It can move between the seat and the second block to realize the adjustment of the gauge.

使用该钢轨扣件系统,使轨距调整更加方便,并且调整完成后,铁垫板的两端分别通过轨距调整片与第一挡座和第二挡座保持抵接,第一挡座和第二挡座可以对铁垫板起到较好的支撑作用,有利于保持钢轨位置。The use of the rail fastener system makes the adjustment of the gauge more convenient, and after the adjustment is completed, the two ends of the iron backing plate are respectively kept in contact with the first stopper and the second stopper through the gauge adjustment piece, and the first stopper and The second block can play a better supporting role for the iron backing plate, which is conducive to maintaining the position of the rail.

第一挡座和第二挡座之间的间距大小、与铁垫板的长度之间的差值,限定了铁垫板的调整范围,使铁垫板在设定的范围内移动,可以避免铁垫板发生过大的偏移;通过调整两端的轨距调整片的数量,可以对轨距进行比较准确地调整。The difference between the distance between the first stopper and the second stopper and the length of the iron backing plate limits the adjustment range of the iron backing plate, so that the iron backing plate moves within the set range, which can avoid The iron backing plate has an excessive deviation; by adjusting the number of gauge adjustment pieces at both ends, the gauge can be adjusted more accurately.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solutions in the embodiments of the present invention more clearly, the following briefly introduces the accompanying drawings used in the description of the embodiments. Obviously, the drawings in the following description are only some implementations of the present invention. For example, for those of ordinary skill in the art, other drawings can also be obtained based on these drawings without any creative effort.

图1为本实用新型提供的钢轨扣件系统的轴测图;Fig. 1 is the axonometric view of the rail fastener system provided by the utility model;

图2为图1所示的钢轨扣件系统的正视图;Figure 2 is a front view of the rail fastener system shown in Figure 1;

图3为图1所示的钢轨扣件系统的爆炸图;Figure 3 is an exploded view of the rail fastener system shown in Figure 1;

图4为图1所示的钢轨扣件系统中的铁垫板的结构示意图;4 is a schematic structural diagram of an iron backing plate in the rail fastener system shown in FIG. 1;

图5为图1所示的钢轨扣件系统中的轨距调整片的结构示意图;5 is a schematic structural diagram of a gauge adjustment piece in the rail fastener system shown in FIG. 1;

图6为图1所示的钢轨扣件系统中的压板的结构示意图;FIG. 6 is a schematic structural diagram of a pressing plate in the rail fastener system shown in FIG. 1;

图7为图1所示的钢轨扣件系统中的垫片的结构示意图;7 is a schematic structural diagram of a gasket in the rail fastener system shown in FIG. 1;

图8为图1所示的钢轨扣件系统中的绝缘套管的结构示意图;8 is a schematic structural diagram of an insulating sleeve in the rail fastener system shown in FIG. 1;

附图标号说明:Description of reference numbers:

10、钢轨;11、轨道的宽度方向10. Steel rail; 11. Width direction of the rail

20、扣件装置;21、轨撑;22、第二螺栓;23、轨撑调整片;20. Fastener device; 21. Rail support; 22. Second bolt; 23. Rail support adjustment piece;

31、铁垫板;311、长圆孔;312、铁座;31, iron backing plate; 311, oblong hole; 312, iron seat;

32、第一螺栓;32. The first bolt;

33、轨距调整片;331、调整片凹槽;332、调整间隙;33. Gauge adjustment piece; 331. Adjustment piece groove; 332. Adjustment gap;

34、绝缘套管;341、螺栓孔;342、套管上部;343、套管下部;34, insulating sleeve; 341, bolt hole; 342, upper part of sleeve; 343, lower part of sleeve;

35、垫片;351、第二通孔;352、垫片的上表面;35, gasket; 351, second through hole; 352, the upper surface of the gasket;

36、压板;361、第一通孔;362、压板凸起部;36, pressure plate; 361, first through hole; 362, pressure plate protrusion;

37、橡胶垫板;38、调高垫板;37. Rubber pad; 38. Height-adjusting pad;

40、钢枕;41、安装螺母;40. Steel sleeper; 41. Installation nut;

51、第一挡座;52、第二挡座。51, the first block; 52, the second block.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

实施例一Example 1

本实用新型提供了一种钢轨扣件系统,如图1-图3所示,该钢枕扣件系统包括铁垫板31、第一螺栓32、扣件装置20、第一挡座51、第二挡座52和至少一片轨距调整片33,第一挡座51和第二挡座52沿轨道的宽度方向11间隔设置于钢枕40上,铁垫板31设置于第一挡座51和第二挡座52之间,并且,铁垫板31的长度小于第一挡座51与第二挡座52之间的间距,轨距调整片33设置于第一挡座51与铁垫板31之间,和/或第二挡座52与铁垫板31之间;第一螺栓32将铁垫板31压紧于钢枕40;扣件装置20安装于铁垫板31,用于将钢轨10压紧于铁垫板31。The utility model provides a rail fastener system, as shown in Figures 1-3, the steel sleeper fastener system includes an iron backing plate 31, a first bolt 32, a fastener device 20, a first stop 51, a first The second stopper 52 and at least one gauge adjustment piece 33 , the first stopper 51 and the second stopper 52 are arranged on the steel sleeper 40 at intervals along the width direction 11 of the track, and the iron backing plate 31 is arranged on the first stopper 51 and the second stopper 52 . Between the second stopper 52 , and the length of the iron backing plate 31 is smaller than the distance between the first stopper 51 and the second stopper 52 , the gauge adjustment piece 33 is disposed on the first stopper 51 and the iron backing plate 31 between the second stopper 52 and the iron backing plate 31; the first bolt 32 presses the iron backing plate 31 against the steel sleeper 40; the fastener device 20 is installed on the iron backing plate 31 for connecting the rail 10 is pressed against the iron backing plate 31.

该钢轨扣件系统适用于钢枕类轨道,通过该钢轨扣件系统,能够实现将钢轨10稳固地装配到钢枕40上,稳定性高。当需要调整轨距时,松开第一螺栓32,调整铁垫板31两端的轨距调整片33的数量,使铁垫板31、以及安装于铁垫板1上的钢轨10和扣件装置20,一起在第一挡座51和第二挡座52之间移动,实现轨距的调整。The rail fastener system is suitable for rails such as steel sleepers, and through the rail fastener system, the rail 10 can be stably assembled on the sleeper 40 with high stability. When the gauge needs to be adjusted, loosen the first bolt 32 and adjust the number of gauge adjustment pieces 33 at both ends of the iron backing plate 31 so that the iron backing plate 31 , the rail 10 and the fastener device installed on the iron backing plate 1 20, move together between the first block seat 51 and the second block seat 52 to realize the adjustment of the gauge.

使用该钢轨扣件系统,使轨距调整更加方便,并且调整完成后,铁垫板31的两端分别通过轨距调整片33与第一挡座51和第二挡座52保持抵接,第一挡座51和第二挡座52可以对铁垫板31起到较好的支撑作用,有利于保持钢轨10位置。The use of this rail fastener system makes the adjustment of the gauge more convenient, and after the adjustment is completed, the two ends of the iron backing plate 31 are kept in contact with the first stopper 51 and the second stopper 52 through the gauge adjustment piece 33 respectively. The first stopper 51 and the second stopper 52 can better support the iron backing plate 31 , which is beneficial to maintain the position of the steel rail 10 .

第一挡座51和第二挡座52之间的间距大小、与铁垫板31的长度之间的差值,限定了铁垫板31的调整范围,使铁垫板31在设定的范围内移动,可以避免铁垫板31发生过大的偏移;通过调整两端的轨距调整片33的数量,可以对轨距进行比较准确地调整。The difference between the distance between the first stopper 51 and the second stopper 52 and the length of the iron backing plate 31 defines the adjustment range of the iron backing plate 31, so that the iron backing plate 31 is within the set range By moving inwards, the iron backing plate 31 can be prevented from being too large offset; by adjusting the number of the gauge adjusting pieces 33 at both ends, the gauge can be adjusted more accurately.

通过分别设定铁垫板31的端部与第一挡座51之间的距离、和铁垫板31的端部与第二挡座52之间的距离,可以实现对铁垫板31向两个方向调整的范围大小分别进行设定。例如:在一些情况下,铁垫板31与第一挡座51直接抵接,铁垫板31与第二挡座52之间设有调整间隙332,至少一片轨距调整片33设于该调整间隙332中;在另一些情况下,铁垫板31与第二挡座52直接抵接,铁垫板31与第一挡座51之间设有调整间隙332,至少一片轨距调整片33设于该调整间隙332中;优选地,钢轨扣件系统包括多片轨距调整片33;铁垫板31与第一挡座51之间和铁垫板31与第二挡座52之间均设有调整间隙332,多片轨距调整片33分别设置于铁垫板31的两端的调整间隙332中,如图2所示,靠近第一挡座51的调整间隙332中和靠近第二挡座52的调整间隙332中分别设有两片轨距调整片33。By setting the distance between the end of the iron backing plate 31 and the first stopper 51 and the distance between the end of the iron backing plate 31 and the second stopper 52, it is possible to adjust the distance between the iron backing plate 31 and the second stopper 52. The size of the adjustment range in each direction can be set separately. For example, in some cases, the iron backing plate 31 is in direct contact with the first stopper 51 , an adjustment gap 332 is provided between the iron backing plate 31 and the second stopper 52 , and at least one gauge adjustment piece 33 is provided in the adjusting gap 332 . In the gap 332; in other cases, the iron backing plate 31 is in direct contact with the second stopper 52, an adjustment gap 332 is provided between the iron backing plate 31 and the first stopper 51, and at least one gauge adjustment piece 33 is provided. In the adjustment gap 332 ; preferably, the rail fastener system includes a plurality of gauge adjustment pieces 33 ; There is an adjustment gap 332, and a plurality of gauge adjustment pieces 33 are respectively arranged in the adjustment gap 332 at both ends of the iron backing plate 31. As shown in FIG. 2, in the adjustment gap 332 close to the first stopper 51 and close to the second stopper Two gauge adjustment pieces 33 are respectively provided in the adjustment gap 332 of 52 .

进一步地,铁垫板31的两端的调整间隙332中均设置有至少一片具有绝缘性的轨距调整片33,通过该具有绝缘性的轨距调整片33,以保证铁垫板31与钢枕40之间的绝缘。Further, at least one insulating gauge adjustment piece 33 is provided in the adjustment gaps 332 at both ends of the iron backing plate 31 , and the iron backing plate 31 and the steel sleeper are ensured by the insulating gauge adjusting piece 33 . Insulation between 40.

为了提高轨距调整片33安装的精确度,发明人对轨距调整片33的结构作了改进:如图5所示,轨距调整片33上设有调整片凹槽331;钢轨扣件系统包括压板36,压板36上设有压板凸起部362和用于穿设第一螺栓32的第一通孔361,压板凸起部362与调整片凹槽331相配合,第一螺栓32将压板36压紧于铁垫板31,压板凸起部362卡接于调整片凹槽331,压板36对轨距调整片33可以起到定位作用,便于在装配时将轨距调整片33准确安装到设定位置,并阻止轨距调整片33沿轨道的纵向发生偏移,防止轨距调整片33窜出。In order to improve the installation accuracy of the gauge adjusting piece 33, the inventor has improved the structure of the gauge adjusting piece 33: as shown in FIG. 5, the gauge adjusting piece 33 is provided with an adjusting piece groove 331; Including a pressure plate 36, the pressure plate 36 is provided with a pressure plate convex portion 362 and a first through hole 361 for passing the first bolt 32, the pressure plate convex portion 362 is matched with the adjustment plate groove 331, and the first bolt 32 connects the pressure plate. 36 is pressed against the iron backing plate 31, and the raised portion 362 of the pressure plate is clamped to the groove 331 of the adjustment piece. Set the position, and prevent the gauge adjustment piece 33 from shifting along the longitudinal direction of the rail, and prevent the gauge adjustment piece 33 from running out.

如图2所示,钢轨扣件系统包括垫片35,垫片35上设有用于穿设第一螺栓32的第二通孔351,垫片35设置于压板36的上方,垫片35可以减小第一螺栓32紧固对压板36产生的压强,避免压板36局部受力太大;垫片35与压板36相配合,可以起到减小第一螺栓32的紧固作用力对铁垫板31局部产生的压强。As shown in FIG. 2 , the rail fastener system includes a gasket 35 . The gasket 35 is provided with a second through hole 351 for penetrating the first bolt 32 . The gasket 35 is arranged above the pressing plate 36 , and the gasket 35 can reduce The small first bolt 32 tightens the pressure generated on the pressure plate 36 to avoid the local pressure on the pressure plate 36 being too large; the gasket 35 cooperates with the pressure plate 36 to reduce the tightening force of the first bolt 32 on the iron backing plate 31 Locally generated pressure.

在本实用新型的一实施方式中,铁垫板31的上设有用于穿设第一螺栓32的长圆孔311,长圆孔311的长度方向与铁垫板31的长度方向均平行于轨道的宽度方向11,第一螺栓32能够在长圆孔311中沿轨道的宽度方向11移动,以便于铁垫板31在钢枕40上沿轨道的宽度方向11移动。长圆孔311还可以替换为圆孔,圆孔的直径大于第一螺栓32的外径,以提供第一螺栓32相对于铁垫板31移动的空间。In an embodiment of the present invention, the iron backing plate 31 is provided with an oblong hole 311 for piercing the first bolt 32, and the length direction of the long circular hole 311 and the length direction of the iron backing plate 31 are both parallel to the width of the track In the direction 11, the first bolt 32 can move along the width direction 11 of the track in the oblong hole 311, so that the iron backing plate 31 can move along the width direction 11 of the track on the steel sleeper 40. The oblong hole 311 can also be replaced with a round hole, and the diameter of the round hole is larger than the outer diameter of the first bolt 32 to provide a space for the first bolt 32 to move relative to the iron backing plate 31 .

如图4、图6和图7所示,压板36上设有两个第一通孔361,垫片35上设有两个第二通孔351,铁垫板31的单侧设有两个长圆孔311,第一通孔361、第二通孔351和长圆孔311一一对地相对齐。钢枕40上固设有安装螺母41,第一螺栓32依次穿过垫片35、压板36和铁垫板31,与安装螺母41螺纹配合,实现紧固铁垫板31;安装螺母41可以采用标准件,或者具有内螺纹的零件;优选地,安装螺母41焊接于钢枕40。As shown in FIGS. 4 , 6 and 7 , the pressing plate 36 is provided with two first through holes 361 , the gasket 35 is provided with two second through holes 351 , and one side of the iron backing plate 31 is provided with two The oblong holes 311 , the first through holes 361 , the second through holes 351 and the oblong holes 311 are aligned one by one. A mounting nut 41 is fixed on the steel sleeper 40, and the first bolt 32 passes through the washer 35, the pressure plate 36 and the iron backing plate 31 in sequence, and is threadedly matched with the mounting nut 41 to realize the fastening of the iron backing plate 31; the mounting nut 41 can be Standard parts, or parts with internal threads; preferably, the mounting nut 41 is welded to the steel sleeper 40 .

进一步地,该钢枕扣件系统还包括绝缘套管34,如图3和图8所示,绝缘套管34包括套管上部342和套管下部343,绝缘套管34设有贯穿的螺栓孔341;套管下部343设置于第二通孔351、第一通孔361和长圆孔311中,套管上部342置于垫片35的上方,并与垫片的上表面352抵接,第一螺栓32穿设于绝缘套管34的螺栓孔341中。绝缘套管34采用绝缘材料,避免第一螺栓32与铁垫板31接触,以保证铁垫板31与钢枕40之间的绝缘。Further, the steel sleeper fastener system also includes an insulating sleeve 34. As shown in FIG. 3 and FIG. 8, the insulating sleeve 34 includes an upper part 342 of the sleeve and a lower part 343 of the sleeve, and the insulating sleeve 34 is provided with a through bolt hole 341; the lower part 343 of the sleeve is arranged in the second through hole 351, the first through hole 361 and the oblong hole 311; The bolts 32 pass through the bolt holes 341 of the insulating sleeve 34 . The insulating sleeve 34 is made of insulating material to prevent the first bolt 32 from contacting the iron backing plate 31 , so as to ensure the insulation between the iron backing plate 31 and the steel sleeper 40 .

在本实用新型的一实施方式中,钢轨扣件系统包括橡胶垫板37,橡胶垫板37设于铁垫板31的下方,且与铁垫板31相接触;橡胶垫板37的两端分别与第一挡座51和第二挡座52相抵接,可通过选择不同刚度的橡胶垫板37,实现与线路设计所需的刚度。In an embodiment of the present invention, the rail fastener system includes a rubber backing plate 37 , the rubber backing plate 37 is arranged below the iron backing plate 31 and is in contact with the iron backing plate 31 ; the two ends of the rubber backing plate 37 are respectively In contact with the first stopper 51 and the second stopper 52 , the rigidity required by the circuit design can be achieved by selecting the rubber backing plate 37 with different rigidity.

在本实用新型的一实施方式中,钢轨扣件系统包括调高垫板38,调高垫板38设于橡胶垫板37的下方,并且调高垫板38的两端分别与第一挡座51和第二挡座52相抵接,通过叠放不同厚度的调高垫板38,可实现钢轨高低位置的调整。In an embodiment of the present invention, the rail fastener system includes a height-adjusting backing plate 38 , the height-adjusting backing plate 38 is arranged below the rubber backing plate 37 , and two ends of the height-adjusting backing plate 38 are respectively connected to the first stopper. 51 and the second stop 52 are in contact with each other, and by stacking the height-adjusting pads 38 of different thicknesses, the height position of the rail can be adjusted.

如图1和图4所示,铁垫板31上固设有铁座312;扣件装置包括轨撑21、第二螺栓22和至少一片轨撑调整片23,轨撑21用于扣压钢轨10,轨撑21的远离钢轨10的端面与铁座312之间设有轨撑间隙,轨撑调整片23设置于轨撑间隙中;铁垫板31上设有与第二螺栓22相配合的通孔,第二螺栓22将轨撑21压紧于铁座312。通过轨撑21与钢轨10的轨腰和轨底上表面相配合,可以防止钢轨10倾翻,将钢轨10紧固与铁垫板31上。通过调整设于轨撑间隙中的轨撑调整片23的数量,可以调整轨撑21在铁垫板31上的位置,以调整轨距。As shown in FIG. 1 and FIG. 4 , an iron base 312 is fixed on the iron backing plate 31 ; the fastener device includes a rail brace 21 , a second bolt 22 and at least one rail brace adjustment piece 23 , and the rail brace 21 is used to crimp the rail 10 . , between the end face of the rail support 21 away from the rail 10 and the iron base 312 is provided with a rail support gap, the rail support adjustment piece 23 is arranged in the rail support gap; The second bolt 22 presses the rail support 21 against the iron base 312 . The rail support 21 is matched with the rail waist and the upper surface of the rail bottom of the rail 10 , so that the rail 10 can be prevented from overturning, and the rail 10 can be fastened to the iron backing plate 31 . By adjusting the number of the rail support adjusting pieces 23 provided in the rail support gap, the position of the rail support 21 on the iron backing plate 31 can be adjusted to adjust the gauge.

实施例二Embodiment 2

本实用新型提供了一种钢轨系统,该钢轨系统包括钢枕、钢轨和上述的钢轨扣件系统,钢轨扣件系统安装于钢枕,并将钢轨扣压固定。该钢轨系统具有以下优点:The utility model provides a steel rail system, which comprises a steel sleeper, a steel rail and the above-mentioned steel rail fastener system, the steel rail fastener system is installed on the steel sleeper, and the rail is crimped and fixed. This rail system has the following advantages:

1.钢轨扣件系统适用于钢枕类轨道,能够较好地实现支承钢轨10、提供垂向弹性和保持钢轨10位置的功能,稳定性高,并且结构简单,易于调整,便于拆装与维护;1. The rail fastener system is suitable for steel sleeper rails, which can better support the rail 10, provide vertical elasticity and maintain the position of the rail 10, with high stability, simple structure, easy adjustment, and easy disassembly and maintenance. ;

2.便于调整钢轨10高低位置,实现与线路设计所需的刚度,满足线路不同纵向阻力要求的特点;2. It is easy to adjust the height and position of the rail 10, to achieve the rigidity required by the line design, and to meet the characteristics of different longitudinal resistance requirements of the line;

3.通过轨距调整片33和轨撑调整片23相结合,使调整轨距的操作更加灵活方便。3. By combining the gauge adjusting piece 33 with the rail support adjusting piece 23, the operation of adjusting the gauge is more flexible and convenient.

以上所述仅为本实用新型的几个实施例,本领域的技术人员依据申请文件公开的内容可以对本实用新型实施例进行各种改动或变型而不脱离本实用新型的精神和范围。The above are only a few embodiments of the present invention, and those skilled in the art can make various changes or modifications to the embodiments of the present invention according to the contents disclosed in the application documents without departing from the spirit and scope of the present invention.

Claims (10)

1. A rail fastener system, comprising: the device comprises an iron base plate, a first bolt, a fastener device, a first baffle seat, a second baffle seat and at least one gauge adjustment sheet, wherein the first baffle seat and the second baffle seat are arranged on a steel sleeper at intervals along the width direction of a track, the iron base plate is arranged between the first baffle seat and the second baffle seat, the length of the iron base plate is smaller than the distance between the first baffle seat and the second baffle seat, and the gauge adjustment sheet is arranged between the first baffle seat and the iron base plate and/or between the second baffle seat and the iron base plate;
the first bolt tightly presses the iron base plate to the steel sleeper; the fastener device is arranged on the iron base plate and used for pressing the steel rail on the iron base plate.
2. A rail fastener system according to claim 1, including a plurality of said gauge adjustment tabs; adjusting gaps are arranged between the iron base plate and the first blocking seat and between the iron base plate and the second blocking seat, and the plurality of gauge adjusting plates are arranged in the adjusting gaps at two ends of the iron base plate respectively.
3. A rail fastener system according to claim 2, wherein at least one said gauge adjustment tab is provided in said adjustment gap at each end of said iron tie plate.
4. A rail fastener system according to claim 1, including a clamp plate having a clamp plate protrusion and a first through hole for receiving the first bolt, the gauge adjustment tab having an adjustment tab recess for engaging the clamp plate protrusion;
the first bolt compresses the pressing plate tightly on the iron base plate, and the protruding part of the pressing plate is clamped in the adjusting plate groove.
5. A rail fastener system according to claim 4, including a shim, the shim having a second through-hole for receiving the first bolt therethrough, the shim being disposed above the pressure plate.
6. A rail fastener system according to claim 1, wherein the iron base plate is provided with an oblong hole for passing the first bolt therethrough, and a length direction of the oblong hole is parallel to a length direction of the iron base plate.
7. A rail fastener system according to claim 1, including a rubber pad disposed beneath and in contact with the iron pad; and two ends of the rubber base plate are respectively abutted against the first blocking seat and the second blocking seat.
8. A rail fastener system according to claim 7, including a height-adjusting shim plate disposed below the rubber shim plate, and having opposite ends abutting the first and second stops, respectively.
9. A rail fastener system according to claim 1, wherein said iron tie plate has an iron seat secured thereto;
the fastener device comprises a rail brace, a second bolt and at least one rail brace adjusting sheet, the rail brace is used for buckling the steel rail, a rail brace gap is formed between the end face, far away from the steel rail, of the rail brace and the iron base, and the rail brace adjusting sheet is arranged in the rail brace gap; the second bolt presses the rail brace to the iron base.
10. A rail system, comprising: a steel tie, a rail and a rail fastener system as claimed in any one of claims 1 to 9, said rail fastener system being mounted to said steel tie and clinching said rail thereto.
CN201922219758.5U 2019-12-12 2019-12-12 Rail Fastener System and Rail System Active CN211872424U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922219758.5U CN211872424U (en) 2019-12-12 2019-12-12 Rail Fastener System and Rail System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922219758.5U CN211872424U (en) 2019-12-12 2019-12-12 Rail Fastener System and Rail System

Publications (1)

Publication Number Publication Date
CN211872424U true CN211872424U (en) 2020-11-06

Family

ID=73244738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922219758.5U Active CN211872424U (en) 2019-12-12 2019-12-12 Rail Fastener System and Rail System

Country Status (1)

Country Link
CN (1) CN211872424U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113417173A (en) * 2021-08-04 2021-09-21 杨清福 Track structure suitable for super-high-speed train
CN118498128A (en) * 2024-07-16 2024-08-16 无锡市青山铁路器材有限公司 Vibration-damping fastener device for railway steel rail

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113417173A (en) * 2021-08-04 2021-09-21 杨清福 Track structure suitable for super-high-speed train
CN118498128A (en) * 2024-07-16 2024-08-16 无锡市青山铁路器材有限公司 Vibration-damping fastener device for railway steel rail

Similar Documents

Publication Publication Date Title
CN201962560U (en) Steel rail fastener and steel rail fastener connecting structure
KR101563768B1 (en) Laterally adjustable rail fastening system
CN211872424U (en) Rail Fastener System and Rail System
CN205934597U (en) Rail extra small resistance fastener
KR101530966B1 (en) Rail fastening system with guide having reinforced plate contact surface
CN208250912U (en) Large span big displacement beam-ends lift pillow device
CN206438346U (en) A kind of adjustable offset distance buckle structure of railway switch elastic
CN212771759U (en) Railway fastener with large adjusting capacity
CN209353169U (en) A fastener assembly for exposed bridge deck tracks
CN110158375B (en) Switch type spring strip double-layer elastic vibration reduction fastener system
JP3829113B2 (en) Rail elastic fastening device
CN108755286B (en) Height-adjustable, shock-resistant and high-temperature-resistant track fastener
CN203729159U (en) Vulcanized integrated rail fastener
US10704205B2 (en) Holddown assembly for railway rail
CN211850107U (en) Height-adjustable friction damper
CN203904783U (en) Joint bar for trough type rail
CN209619759U (en) Fasteners for auxiliary or guard rails
CN204738189U (en) F of moderate -low speed magnetic levitation system shaped steel double slit attach fitting
CN207227873U (en) The insulating pad with bulge-structure for track traffic fastener
WO2024012490A1 (en) Main-auxiliary composite rail using bolt mechanism to downward press main rail tightly onto auxiliary rail
CN212025784U (en) Steel beam bridge thermoregulator section sleeper location fastener
CN210287983U (en) Straddle type monorail finger-shaped plate system
CN203334183U (en) Fastener structure for steel beam bridge open-bridge-floor track
CN211036566U (en) Switch type elastic strip double-layer elastic vibration-damping fastener system
JP2018104966A (en) Anti-derailment guard angle support apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant