CN211694203U - Building construction supervision device based on BIM technology - Google Patents
Building construction supervision device based on BIM technology Download PDFInfo
- Publication number
- CN211694203U CN211694203U CN202020227405.XU CN202020227405U CN211694203U CN 211694203 U CN211694203 U CN 211694203U CN 202020227405 U CN202020227405 U CN 202020227405U CN 211694203 U CN211694203 U CN 211694203U
- Authority
- CN
- China
- Prior art keywords
- rod
- wall
- rotating
- hole
- slot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005516 engineering process Methods 0.000 title claims abstract description 15
- 238000009435 building construction Methods 0.000 title claims abstract description 11
- 238000003780 insertion Methods 0.000 claims abstract description 27
- 230000037431 insertion Effects 0.000 claims abstract description 27
- 238000010276 construction Methods 0.000 claims description 8
- 239000002689 soil Substances 0.000 description 9
- 238000012544 monitoring process Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000012806 monitoring device Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本实用新型公开了一种基于BIM技术的建筑施工监管装置,包括底座、套杆、电机和监管仪主体,所述底座的底端开设有嵌槽,所述嵌槽的内壁通过转动活动安装有固定杆,所述固定杆的外壁开设有第一通孔,所述底座的正面开设有第二通孔,且第二通孔的内部插设有插杆,所述底座的顶端开设有转槽,且转槽的内部插设有转块,且转块的外壁开设有嵌孔,所述转槽的内壁开设有开槽,所述开槽的内部插设有嵌杆,所述开槽的内壁内嵌有弹簧。本实用新型通过设置有转杆和套杆,使套杆可以进行上升,从而使套杆带动顶座上升,同时电机带动监管仪主体转动,可以使监管仪主体的监管范围更广,底座和固定杆可以便于在泥土地上进行固定,使用方便。
The utility model discloses a building construction supervision device based on BIM technology, which comprises a base, a sleeve rod, a motor and a main body of a supervisory instrument. The bottom end of the base is provided with a socket, and the inner wall of the socket is movably installed with a socket through rotation. A fixed rod, the outer wall of the fixed rod is provided with a first through hole, the front of the base is provided with a second through hole, and the inside of the second through hole is inserted with an insertion rod, and the top of the base is provided with a turning slot , and a turning block is inserted in the inside of the turning slot, and the outer wall of the turning block is provided with an insert hole, the inner wall of the turning slot is provided with a slot, and the inside of the slot is inserted with an insert rod. A spring is embedded in the inner wall. The utility model is provided with a rotating rod and a sleeve rod, so that the sleeve rod can be raised, so that the sleeve rod drives the top seat to rise, and at the same time, the motor drives the main body of the supervisory instrument to rotate, so that the main body of the supervisory instrument can be monitored more widely, and the base and the fixed The pole can be easily fixed on the dirt ground and is easy to use.
Description
技术领域technical field
本实用新型涉及监管装置领域,具体为一种基于BIM技术的建筑施工监管装置。The utility model relates to the field of supervision devices, in particular to a building construction supervision device based on BIM technology.
背景技术Background technique
BIM技术是以建筑工程项目的各项相关数据作为基础,通过数字信息仿真模拟建筑物所具有的真实信息,通过三维建筑模型,实现工程监理、物业管理、设备管理、数字化加工、工程化管理等功能,在建筑工程中是非常常见的一种装置,通常将监管仪放入到工地的支撑架上,随后通过监管仪对四周进行监管,随后建立模型,从而使建筑变得更加方便。BIM technology is based on various relevant data of construction projects, simulates the real information of buildings through digital information, and realizes project supervision, property management, equipment management, digital processing, engineering management, etc. through three-dimensional architectural models. The function is a very common device in construction engineering. Usually, the monitoring device is placed on the support frame of the construction site, and then the surrounding is monitored by the monitoring device, and then the model is established, so as to make the construction more convenient.
但是现有的监管仪结构较为简单,对四周的监管范围较小,不能很好对四周进行检测,使用较为不便,且工地上有些泥土地上不能很好的进行置放,使其稳定性较差,使用较为不便,因此亟需一种基于BIM技术的建筑施工监管装置来解决上述问题。However, the structure of the existing monitoring instrument is relatively simple, the monitoring scope of the surrounding area is small, the surrounding area cannot be detected well, and the use is relatively inconvenient, and some soil on the construction site cannot be placed well, making it less stable. , it is inconvenient to use, so there is an urgent need for a building construction supervision device based on BIM technology to solve the above problems.
实用新型内容Utility model content
本实用新型的目的在于提供一种基于BIM技术的建筑施工监管装置,以解决上述背景技术中提出的对四周的监管范围较小,在一些泥土地置放不便,稳定性较差的问题。The purpose of the present utility model is to provide a building construction supervision device based on BIM technology, to solve the problems of small surrounding supervision range, inconvenient placement in some soil, and poor stability proposed in the above-mentioned background art.
为实现上述目的,本实用新型提供如下技术方案:一种基于BIM技术的建筑施工监管装置,包括底座、套杆、电机和监管仪主体,所述底座的底端开设有嵌槽,所述嵌槽的内壁通过转动活动安装有固定杆,所述固定杆的外壁开设有第一通孔,所述底座的正面开设有第二通孔,且第二通孔的内部插设有插杆,所述底座的顶端开设有转槽,且转槽的内部插设有转块,且转块的外壁开设有嵌孔,所述转槽的内壁开设有开槽,所述开槽的内部插设有嵌杆,所述开槽的内壁内嵌有弹簧,所述转块的顶端固定安装有转杆,所述底座的顶端中心位置处固定安装有立柱,所述立柱的两侧皆固定安装有滑块,所述立柱的外壁套接有套杆,所述套杆的中心位置处开设有第一滑槽,所述第一滑槽的内壁两侧皆开设有第二滑槽,所述套杆的外壁套接有转杆,所述套杆的顶端固定安装有顶座,且顶座的内部固定安装有电机,所述电机的输出端固定安装有转板,且转板的顶端固定安装有监管仪主体。In order to achieve the above purpose, the present invention provides the following technical solutions: a building construction supervision device based on BIM technology, comprising a base, a sleeve rod, a motor and a supervisory instrument main body, the bottom end of the base is provided with an embedded groove, and the embedded The inner wall of the slot is movably installed with a fixing rod, the outer wall of the fixing rod is provided with a first through hole, the front side of the base is provided with a second through hole, and the inside of the second through hole is inserted with an insertion rod, so The top of the base is provided with a turning slot, and a turning block is inserted inside the turning slot, and the outer wall of the turning block is provided with a socket hole, the inner wall of the turning slot is provided with a slot, and the interior of the slot is inserted with a slot. The inner wall of the slot is embedded with a spring, the top of the rotating block is fixedly installed with a rotating rod, the top center of the base is fixedly installed with a column, and both sides of the column are fixedly installed with sliding The outer wall of the column is sleeved with a sleeve rod, the center of the sleeve rod is provided with a first chute, the inner wall of the first chute is provided with a second chute on both sides, and the sleeve rod is provided with a second chute. The outer wall is sleeved with a rotating rod, the top of the sleeve rod is fixedly installed with a top seat, and a motor is fixedly installed inside the top seat, the output end of the motor is fixedly installed with a rotating plate, and the top of the rotating plate is fixedly installed with a rotating plate. Supervisory body.
优选的,所述立柱插设在第一滑槽的内部,所述滑块插设在第二滑槽的内部,所述立柱通过滑块和套杆组成滑动式结构。Preferably, the upright post is inserted inside the first chute, the slider is inserted in the second chute, and the upright post is formed into a sliding structure by the slider and the sleeve rod.
优选的,所述套杆的外壁设置有外螺纹,所述转杆的内壁设置有内螺纹,所述套杆与转杆螺纹连接。Preferably, the outer wall of the sleeve rod is provided with an external thread, the inner wall of the rotating rod is provided with an internal thread, and the sleeve rod is threadedly connected with the rotating rod.
优选的,所述转块的形状为环形,所述转槽的形状为环形,所述转块的外壁直径与转槽的内壁直径大小相等,所述转槽与转块组成转动式结构。Preferably, the shape of the rotating block is annular, the shape of the rotating groove is annular, the diameter of the outer wall of the rotating block is equal to the diameter of the inner wall of the rotating groove, and the rotating groove and the rotating block form a rotating structure.
优选的,所述弹簧的一端与开槽的内壁固定安装焊接,所述弹簧的另一端与嵌杆固定焊接,所述弹簧与嵌杆组成弹性结构。Preferably, one end of the spring is fixedly welded to the inner wall of the slot, and the other end of the spring is fixedly welded to the insert rod, and the spring and the insert rod form an elastic structure.
优选的,所述第一通孔的位置和第二通孔的位置相同,所述固定杆设置有三组,所述插杆依次贯穿三组所述固定杆,且插杆的端头外壁设置有外螺纹,所述插杆端头插设的第二通孔内壁设置有内螺纹,所述插杆与第二通孔螺纹连接。Preferably, the positions of the first through holes are the same as the positions of the second through holes, the fixing rods are provided with three groups, the insertion rods pass through the three groups of the fixing rods in sequence, and the outer walls of the ends of the insertion rods are provided with External thread, the inner wall of the second through hole in which the end of the insertion rod is inserted is provided with an inner thread, and the insertion rod is threadedly connected with the second through hole.
与现有技术相比,本实用新型的有益效果是:该基于BIM技术的建筑施工监管装置设置有转杆和套杆,使套杆可以进行上升,从而使套杆带动顶座上升,同时电机带动监管仪主体转动,可以使监管仪主体的监管范围更广,底座和固定杆可以便于在泥土地上进行固定,使用方便。Compared with the prior art, the beneficial effects of the present utility model are: the BIM technology-based building construction supervision device is provided with a rotating rod and a sleeve rod, so that the sleeve rod can be raised, so that the sleeve rod drives the top seat to rise, and the motor By driving the main body of the supervisory instrument to rotate, the supervisory scope of the main body of the supervisory instrument can be wider, the base and the fixing rod can be easily fixed on the soil, and the use is convenient.
1、该装置设置有套杆和转杆,拉动嵌杆,使嵌杆脱离嵌孔的内部,随后可以使转块在转槽的内部转动,随后转动转杆,通过转杆的螺纹结构带动套杆发生移动,同时立柱上的转块在第二滑槽的内部滑动,避免套杆跟随转杆发生转动,进而可以使套杆可以进行升降,随后套杆带动顶座上升,顶座带动监管仪主体上升,可以使监管仪主体的监管范围更加广泛,不会被阻挡的情况,使用方便,同时电机带动转板转动,转板带动监管仪主体转动,可以进一步使监管仪主体的监管范围更广,避免发生盲区的情况,使用监管仪主体的监管数据更加准确。1. The device is provided with a sleeve rod and a rotating rod. Pull the embedded rod to make the embedded rod separate from the inside of the embedded hole, then the rotating block can be rotated inside the rotating groove, and then the rotating rod can be rotated to drive the sleeve through the threaded structure of the rotating rod. The rod moves, and the rotary block on the column slides inside the second chute to prevent the sleeve rod from rotating with the rotary rod, so that the sleeve rod can be lifted and lowered, and then the sleeve rod drives the top seat to rise, and the top seat drives the monitor. The rise of the main body can make the supervision scope of the main body of the supervisory instrument wider, and it is easy to use when it will not be blocked. At the same time, the motor drives the rotary plate to rotate, and the rotary plate drives the main body of the supervisory instrument to rotate, which can further make the supervision of the main body of the supervisory instrument wider. , to avoid the occurrence of blind spots, and use the monitoring data of the main body of the monitoring instrument to be more accurate.
2、该装置设置有底座和固定杆,转动插杆,使插杆的端头通过螺纹结构脱离第二通孔的内部,随时拉动插杆,可以使插杆脱离底座的内部,同时插杆脱离第一通孔的内部,进而使固定杆可以进行转动,随后可以固定杆形成三角形支架,随后将固定杆插入到泥土地上,可以增加底座在泥土地的占地面积,进而增加底座的稳定性,使用方便,将固定杆收入嵌槽的内部,通过插杆嵌入到第一通孔的内部进行固定,可以使底座置放在普通的平底上,使用方便。2. The device is provided with a base and a fixed rod. Rotate the rod, so that the end of the rod is separated from the inside of the second through hole through the threaded structure. Pulling the rod at any time can make the rod detach from the interior of the base, and at the same time the rod is detached from the inside of the base. Inside the first through hole, the fixed rod can be rotated, and then the fixed rod can be formed into a triangular bracket, and then the fixed rod can be inserted into the soil, which can increase the footprint of the base on the soil, thereby increasing the stability of the base. Easy to use, the fixing rod is put into the inside of the inserting groove, and the inserting rod is embedded into the inside of the first through hole for fixing, so that the base can be placed on a common flat bottom, which is convenient to use.
附图说明Description of drawings
图1为本实用新型的正视剖面结构示意图;Fig. 1 is the front view sectional structure schematic diagram of the present utility model;
图2为本实用新型图1中A处的放大结构示意图;Fig. 2 is the enlarged structural schematic diagram of the place A in Fig. 1 of the utility model;
图3为本实用新型立柱、套杆和转杆的立体结构示意图;Fig. 3 is the three-dimensional structure schematic diagram of the upright column, the sleeve rod and the rotating rod of the present invention;
图4为本实用新型转块和嵌孔的立体结构示意图;Fig. 4 is the three-dimensional structure schematic diagram of the rotary block and the embedded hole of the present invention;
图5为本实用新型底座的侧视剖面结构示意图。FIG. 5 is a schematic view of the side sectional structure of the base of the present invention.
图中:1、底座;2、嵌槽;3、固定杆;4、插杆;5、立柱;6、套杆;7、转杆;8、顶座;9、电机;10、转板;11、监管仪主体;12、第一滑槽;13、第二滑槽;14、滑块;15、转槽;16、转块;17、嵌孔;18、开槽;19、弹簧;20、嵌杆;21、第一通孔;22、第二通孔。In the figure: 1. Base; 2. Groove; 3. Fixed rod; 4. Insertion rod; 5. Upright column; 6. Sleeve rod; 7. Rod; 8. Top seat; 9. Motor; 11. Main body of supervisory instrument; 12. First chute; 13. Second chute; 14. Slider; 15. Turning slot; 16. Turning block; 17. Embedded hole; 18. Slotting; 19. Spring; , embedded rod; 21, the first through hole; 22, the second through hole.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
请参阅图1-5,本实用新型提供的一种实施例:Please refer to Figures 1-5, an embodiment provided by the present utility model:
一种基于BIM技术的建筑施工监管装置,包括底座1、套杆6、电机9和监管仪主体11,底座1的底端开设有嵌槽2,嵌槽2的内壁通过转动活动安装有固定杆3,固定杆3的外壁开设有第一通孔21,底座1的正面开设有第二通孔22,且第二通孔22的内部插设有插杆4,第一通孔21的位置和第二通孔22的位置相同,固定杆3设置有三组,插杆4依次贯穿三组固定杆3,且插杆4的端头外壁设置有外螺纹,插杆4端头插设的第二通孔22内壁设置有内螺纹,插杆4与第二通孔22螺纹连接,转动插杆4,使插杆4的端头通过螺纹结构脱离第二通孔22的内部,随时拉动插杆4,可以使插杆4脱离底座1的内部,同时插杆4脱离第一通孔21的内部,进而使固定杆3可以进行转动,随后可以固定杆3形成三角形支架,随后将固定杆3插入到泥土地上,可以增加底座1在泥土地的占地面积,进而增加底座1的稳定性,使用方便,将固定杆3收入嵌槽2的内部,通过插杆4嵌入到第一通孔21的内部进行固定,可以使底座1置放在普通的平底上,使用方便。A building construction supervision device based on BIM technology, comprising a base 1, a
底座1的顶端开设有转槽15,且转槽15的内部插设有转块16,且转块16的外壁开设有嵌孔17,转块16的形状为环形,转槽15的形状为环形,转块16的外壁直径与转槽15的内壁直径大小相等,转槽15与转块16组成转动式结构,转块16可以在转槽15的内部进行转动,从而使转杆7可以进行转动,进而可以使套杆6进行上升,进而可以使监管仪主体11的监管范围更加广泛,使监管仪主体11的监管数据更加准确,使用方便。The top of the base 1 is provided with a turning
转槽15的内壁开设有开槽18,开槽18的内部插设有嵌杆20,开槽18的内壁内嵌有弹簧19,弹簧19的一端与开槽18的内壁固定安装焊接,弹簧19的另一端与嵌杆20固定焊接,弹簧19与嵌杆20组成弹性结构,拉动嵌杆20,使嵌杆20脱离嵌孔17的内部,随后可以使转块16在转槽15的内部转动,可以使监管仪主体11的位置进行上升,随后松开嵌杆20,弹簧19带动嵌杆20嵌入到嵌孔17的内部进行固定,进而使转块16无法转动,可以使监管仪主体11的位置得到固定,使用方便。The inner wall of the turning
转块16的顶端固定安装有转杆7,底座1的顶端中心位置处固定安装有立柱5,立柱5的两侧皆固定安装有滑块14,立柱5插设在第一滑槽12的内部,滑块14插设在第二滑槽13的内部,立柱5通过滑块14和套杆6组成滑动式结构,转杆7带动套杆6转动,同时立柱5通过滑块14对第二滑槽13进行固定,进而使套杆6无法进行转动,可以使套杆6进行伸缩,操作简单,使用方便。The top end of the
立柱5的外壁套接有套杆6,套杆6的中心位置处开设有第一滑槽12,第一滑槽12的内壁两侧皆开设有第二滑槽13,套杆6的外壁套接有转杆7,套杆6的外壁设置有外螺纹,转杆7的内壁设置有内螺纹,套杆6与转杆7螺纹连接,随后转动转杆7,通过转杆7的螺纹结构带动套杆6发生移动,同时立柱5上的转块16在第二滑槽13的内部滑动,避免套杆6跟随转杆7发生转动,进而可以使套杆6可以进行升降,随后套杆6带动顶座8上升,顶座8带动监管仪主体11上升,使监管仪主体11的监管视线不会被阻挡,进而使监管的范围更广,测量数据更加准确,使用方便。The outer wall of the
套杆6的顶端固定安装有顶座8,且顶座8的内部固定安装有电机9,电机9的输出端固定安装有转板10,且转板10的顶端固定安装有监管仪主体11,电机9带动转板10转动,转板10带动监管仪主体11转动,可以进一步使监管仪主体11的监管范围更广,避免发生盲区的情况,使用监管仪主体11的监管数据更加准确。The top end of the
工作原理:使用时,拉动嵌杆20,使嵌杆20脱离嵌孔17的内部,随后可以使转块16在转槽15的内部转动,随后转动转杆7,通过转杆7的螺纹结构带动套杆6发生移动,同时立柱5上的转块16在第二滑槽13的内部滑动,避免套杆6跟随转杆7发生转动,进而可以使套杆6可以进行升降,随后套杆6带动顶座8上升,顶座8带动监管仪主体11上升,随后松开嵌杆20,弹簧19带动嵌杆20嵌入到嵌孔17的内部进行固定,进而使转块16无法转动,可以使监管仪主体11的位置得到固定,可以使监管仪主体11的监管范围更加广泛,不会被阻挡的情况,使用方便,同时电机9带动转板10转动,转板10带动监管仪主体11转动,可以进一步使监管仪主体11的监管范围更广,避免发生盲区的情况,使用监管仪主体11的监管数据更加准确。Working principle: when in use, pull the embedded
转动插杆4,使插杆4的端头通过螺纹结构脱离第二通孔22的内部,随时拉动插杆4,可以使插杆4脱离底座1的内部,同时插杆4脱离第一通孔21的内部,进而使固定杆3可以进行转动,随后可以固定杆3形成三角形支架,随后将固定杆3插入到泥土地上,可以增加底座1在泥土地的占地面积,进而增加底座1的稳定性,使用方便,将固定杆3收入嵌槽2的内部,通过插杆4嵌入到第一通孔21的内部进行固定,可以使底座1置放在普通的平底上,使用方便。Rotate the
对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It will be apparent to those skilled in the art that the present invention is not limited to the details of the above-described exemplary embodiments, and that the present invention may be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention. Therefore, the embodiments are to be considered in all respects as exemplary and not restrictive, and the scope of the present invention is defined by the appended claims rather than the foregoing description, and it is therefore intended that the All changes within the meaning and range of the required equivalents are embraced within the present invention. Any reference signs in the claims shall not be construed as limiting the involved claim.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020227405.XU CN211694203U (en) | 2020-02-28 | 2020-02-28 | Building construction supervision device based on BIM technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020227405.XU CN211694203U (en) | 2020-02-28 | 2020-02-28 | Building construction supervision device based on BIM technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211694203U true CN211694203U (en) | 2020-10-16 |
Family
ID=72778967
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020227405.XU Expired - Fee Related CN211694203U (en) | 2020-02-28 | 2020-02-28 | Building construction supervision device based on BIM technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211694203U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112483850A (en) * | 2020-11-16 | 2021-03-12 | 湖南有色金属职业技术学院 | Building construction monitoring devices based on BIM technique |
CN113864612A (en) * | 2021-10-11 | 2021-12-31 | 泰州职业技术学院 | A BIM-based building data monitoring device |
CN114183668A (en) * | 2021-12-21 | 2022-03-15 | 江苏省苏力环境科技有限责任公司 | Integrated form air automatic monitoring system |
-
2020
- 2020-02-28 CN CN202020227405.XU patent/CN211694203U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112483850A (en) * | 2020-11-16 | 2021-03-12 | 湖南有色金属职业技术学院 | Building construction monitoring devices based on BIM technique |
CN113864612A (en) * | 2021-10-11 | 2021-12-31 | 泰州职业技术学院 | A BIM-based building data monitoring device |
CN114183668A (en) * | 2021-12-21 | 2022-03-15 | 江苏省苏力环境科技有限责任公司 | Integrated form air automatic monitoring system |
CN114183668B (en) * | 2021-12-21 | 2023-10-10 | 江苏省苏力环境科技有限责任公司 | Integrated air automatic monitoring system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211694203U (en) | Building construction supervision device based on BIM technology | |
CN209070297U (en) | A kind of VR equipment projection screen | |
CN106123747A (en) | The application in earthing bar buried depth is tested of the earthing bar buried depth detector | |
CN214747913U (en) | An observation device for settlement and displacement of water transfer project | |
CN213118295U (en) | Surveying instrument for geological engineering construction | |
CN218645177U (en) | A Height-Adjustable Remote Sensing Mapping Marking Pole | |
CN108413931B (en) | Monitoring device for building | |
CN108801104B (en) | Laterite type slope displacement monitoring device and using method | |
CN216483055U (en) | Portable geographic information remote sensing mapping device | |
CN217276195U (en) | A surveying and mapping instrument positioning device for premises surveying and mapping | |
CN217178113U (en) | A fixed device for geological disaster monitoring equipment | |
CN210896474U (en) | Progress show board for construction management | |
CN110514866B (en) | An Assembled Anemometer Bracket That Can Be Automatically Corrected | |
CN219776713U (en) | A kind of wire fall for building construction | |
CN207585504U (en) | A kind of construction management survey tool | |
CN220565862U (en) | Isolation fence for building construction | |
CN216952271U (en) | Environmental monitoring supervisory equipment based on variety district examination appraisal | |
CN215639475U (en) | A build by laying bricks or stones vertical measuring device for housing construction engineering | |
CN219734912U (en) | BIM engineering mapping device | |
CN221594991U (en) | A new deep buried installation auxiliary device | |
CN219978576U (en) | An optical cable cover that is easy to maintain | |
CN216896508U (en) | Three-dimensional topography is with instrument for measurement | |
CN212256665U (en) | Finance subject is with exchange rate curve teaching display device | |
CN215078644U (en) | A psychological assessment device | |
CN210777448U (en) | Atomic structure display device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201016 |
|
CF01 | Termination of patent right due to non-payment of annual fee |