[go: up one dir, main page]

CN211524042U - Building site steel pipe scaffold puts up fixing device - Google Patents

Building site steel pipe scaffold puts up fixing device Download PDF

Info

Publication number
CN211524042U
CN211524042U CN201821411234.5U CN201821411234U CN211524042U CN 211524042 U CN211524042 U CN 211524042U CN 201821411234 U CN201821411234 U CN 201821411234U CN 211524042 U CN211524042 U CN 211524042U
Authority
CN
China
Prior art keywords
hole
steel pipe
fixing
bolt
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821411234.5U
Other languages
Chinese (zh)
Inventor
葛易
张宇
王长军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Debang Construction Co ltd
Original Assignee
Chuzhou Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chuzhou Vocational and Technical College filed Critical Chuzhou Vocational and Technical College
Priority to CN201821411234.5U priority Critical patent/CN211524042U/en
Application granted granted Critical
Publication of CN211524042U publication Critical patent/CN211524042U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型公开了一种建筑工地钢管施工架搭建固定装置,包括多个连接部、螺柱、两个螺母,连接部包括连接套筒、钢管、螺栓,连接套筒具有容纳空间,连接套筒上设有安装孔、固定孔,该固定孔与容纳空间连通;钢管的一端位于容纳空间内,钢管上设有连接孔,连接孔位于容纳空间内,连接孔与固定孔对应设置;螺栓与固定孔螺纹连接,螺栓的底端位于连接孔内;多个连接部的连接套筒均通过安装孔套装在螺柱上;两个螺母分别安装在螺柱的两端。

Figure 201821411234

The utility model discloses a construction and fixing device for a steel pipe construction frame on a construction site, which comprises a plurality of connecting parts, studs and two nuts. The connecting part comprises a connecting sleeve, a steel pipe and a bolt; A mounting hole and a fixing hole are arranged on it, and the fixing hole is communicated with the accommodating space; one end of the steel pipe is located in the accommodating space; The holes are threadedly connected, and the bottom end of the bolt is located in the connection hole; the connection sleeves of the plurality of connection parts are all sleeved on the stud through the installation hole; the two nuts are respectively installed on both ends of the stud.

Figure 201821411234

Description

一种建筑工地钢管施工架搭建固定装置A construction site steel pipe construction frame erecting and fixing device

技术领域technical field

本实用新型涉及建筑技术领域,尤其涉及一种建筑工地钢管施工架搭建固定装置。The utility model relates to the technical field of construction, in particular to a construction fixing device for a steel pipe construction frame on a construction site.

背景技术Background technique

在钢结构搭建中,钢管是使用最为广泛的材料,钢结构采用管件进行搭建中,需要连接件将管件进行连接。采用的管件连接方式主要是焊接和螺栓连接,管件焊接是非拆卸式连接,管件焊接后,不能进行拆卸,使用不方便,同时在使用过程中,由于施工架的钢管不仅仅是垂直或水平的,在必要的时候需要调节钢管之间的角度,进而传统的固定装置使用不方便,并且传统的固定方式,在长期使用后,钢管与固定装置之间受腐蚀连接在一起,不便于后期的拆卸再使用。故提出本申请,以便钢管连接。In the construction of steel structures, steel pipes are the most widely used materials. In the construction of steel structures with pipe fittings, connectors are required to connect the pipe fittings. The connection method of pipe fittings is mainly welding and bolt connection. The welding of pipe fittings is a non-detachable connection. After the pipe fittings are welded, they cannot be disassembled, which is inconvenient to use. When necessary, the angle between the steel pipes needs to be adjusted, and the traditional fixing device is inconvenient to use, and the traditional fixing method, after long-term use, the steel pipe and the fixing device are corroded and connected together, which is not convenient for later disassembly and reassembly. use. This application is therefore made for the purpose of connecting steel pipes.

实用新型内容Utility model content

为解决背景技术中存在的技术问题,本实用新型提出一种建筑工地钢管施工架搭建固定装置,效果好。In order to solve the technical problems existing in the background technology, the utility model proposes a fixing device for building a steel pipe construction frame on a construction site, which has good effect.

本实用新型提出的一种建筑工地钢管施工架搭建固定装置,包括多个连接部、螺柱、两个螺母,连接部包括连接套筒、钢管、螺栓,连接套筒具有容纳空间,连接套筒上设有安装孔、固定孔,该固定孔与容纳空间连通;钢管的一端位于容纳空间内,钢管上设有连接孔,连接孔位于容纳空间内,连接孔与固定孔对应设置;螺栓与固定孔螺纹连接,螺栓的底端位于连接孔内;多个连接部的连接套筒均通过安装孔套装在螺柱上;两个螺母分别安装在螺柱的两端。The utility model proposes a construction and fixing device for a steel pipe construction frame on a construction site, which comprises a plurality of connecting parts, studs and two nuts. The connecting part includes a connecting sleeve, a steel pipe and a bolt. A mounting hole and a fixing hole are arranged on it, and the fixing hole is communicated with the accommodating space; one end of the steel pipe is located in the accommodating space; The holes are threadedly connected, and the bottom end of the bolt is located in the connection hole; the connection sleeves of the plurality of connection parts are all sleeved on the stud through the installation hole; the two nuts are respectively installed on both ends of the stud.

优选的,各连接部还包括固定柱,固定柱位于容纳空间内并位于钢管内侧,固定柱与连接套筒连接,固定柱上设有通孔;上述螺栓位于通孔内。Preferably, each connection part further includes a fixing column, the fixing column is located in the accommodating space and inside the steel pipe, the fixing column is connected with the connecting sleeve, and the fixing column is provided with a through hole; the above-mentioned bolt is located in the through hole.

优选的,螺栓与通孔螺纹连接。Preferably, the bolt is threadedly connected to the through hole.

优选的,螺栓与固定孔的连接处安装有防水橡胶垫。Preferably, a waterproof rubber pad is installed at the connection between the bolt and the fixing hole.

本实用新型中,将钢管的一端置于容纳空间内,利用螺栓穿过固定孔、连接孔、通孔,拧紧螺栓,有效的将连接套筒、钢管连接起来。In the utility model, one end of the steel pipe is placed in the accommodating space, bolts are passed through the fixing hole, the connecting hole and the through hole, and the bolts are tightened to effectively connect the connecting sleeve and the steel pipe.

利用螺柱,让螺柱穿过安装孔,通过拧紧两端螺母,将多个连接部连接起来。如此,能够有效的将多个钢管连接起来,也方便拆卸,使用方便,拆装速度快,效果好。Using studs, let the studs pass through the mounting holes, and connect the multiple connections by tightening the nuts at both ends. In this way, a plurality of steel pipes can be effectively connected, and the disassembly is convenient, the use is convenient, the disassembly and assembly speed is fast, and the effect is good.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为钢管的结构示意图。Figure 2 is a schematic diagram of the structure of the steel pipe.

具体实施方式Detailed ways

需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互的结合;下面参考附图并结合实施例对本实用新型做详细说明。It should be noted that the embodiments in the present application and the features of the embodiments may be combined with each other without conflict; the present invention will be described in detail below with reference to the accompanying drawings and the embodiments.

参照图1、2,本实用新型提出的一种建筑工地钢管施工架搭建固定装置,包括多个连接部、螺柱1、两个螺母2,连接部包括连接套筒3、钢管4、螺栓5,连接套筒3具有容纳空间,连接套筒3上设有安装孔6、固定孔7,该固定孔7与容纳空间连通;钢管4的一端位于容纳空间内,钢管4上设有连接孔11,连接孔11位于容纳空间内,连接孔11与固定孔7对应设置;螺栓5与固定孔7螺纹连接,螺栓5的底端位于连接孔11内;多个连接部的连接套筒3均通过安装孔6套装在螺柱1上;两个螺母2分别安装在螺柱1的两端。Referring to Figures 1 and 2, a construction and fixing device for a steel pipe construction frame on a construction site proposed by the present utility model includes a plurality of connecting parts, a stud 1, and two nuts 2. The connecting part includes a connecting sleeve 3, a steel pipe 4, and a bolt 5. , the connecting sleeve 3 has an accommodating space, and the connecting sleeve 3 is provided with a mounting hole 6 and a fixing hole 7, and the fixing hole 7 is communicated with the accommodating space; one end of the steel pipe 4 is located in the accommodating space, and the steel pipe 4 is provided with a connecting hole 11 , the connecting hole 11 is located in the accommodating space, and the connecting hole 11 is correspondingly arranged with the fixing hole 7; the bolt 5 is threadedly connected with the fixing hole 7, and the bottom end of the bolt 5 is located in the connecting hole 11; the connecting sleeves 3 of the plurality of connecting parts pass through The mounting hole 6 is sleeved on the stud 1 ; the two nuts 2 are respectively mounted on both ends of the stud 1 .

在进一步实施方式中,各连接部还包括固定柱8,固定柱8位于容纳空间内并位于钢管4内侧,固定柱8与连接套筒3连接,固定柱8上设有通孔9;上述螺栓5位于通孔9内。增加固定柱8,提高连接强度,提高连接效果。In a further embodiment, each connection part further includes a fixing column 8, the fixing column 8 is located in the accommodating space and inside the steel pipe 4, the fixing column 8 is connected with the connecting sleeve 3, and the fixing column 8 is provided with a through hole 9; the above-mentioned bolts 5 is located in the through hole 9 . Increase the fixed column 8 to improve the connection strength and improve the connection effect.

在进一步实施方式中,螺栓5与通孔9螺纹连接。连接更加稳定,效果好。In a further embodiment, the bolt 5 is screwed to the through hole 9 . The connection is more stable and the effect is good.

在进一步实施方式中,螺栓5与固定孔7的连接处安装有防水橡胶垫10。避免雨水进入,避免腐蚀。In a further embodiment, a waterproof rubber pad 10 is installed at the connection between the bolt 5 and the fixing hole 7 . Avoid the entry of rainwater and avoid corrosion.

将钢管4的一端置于容纳空间内,利用螺栓5穿过固定孔7、连接孔11、通孔9,拧紧螺栓5,有效的将连接套筒3、钢管4连接起来。Place one end of the steel pipe 4 in the accommodating space, use the bolt 5 to pass through the fixing hole 7, the connecting hole 11 and the through hole 9, and tighten the bolt 5 to effectively connect the connecting sleeve 3 and the steel pipe 4 together.

利用螺柱1,让螺柱1穿过安装孔6,通过拧紧两端螺母2,将多个连接部连接起来。如此,能够有效的将多个钢管4连接起来,也方便拆卸,使用方便,拆装速度快,效果好。Using the stud 1, let the stud 1 pass through the mounting hole 6, and connect the multiple connection parts by tightening the nuts 2 at both ends. In this way, the plurality of steel pipes 4 can be effectively connected, and the disassembly is also convenient, the use is convenient, the disassembly and assembly speed is fast, and the effect is good.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above descriptions are only the preferred specific embodiments of the present invention, but the protection scope of the present invention is not limited to this. Equivalent replacement or modification of the new technical solution and its utility model concept shall be included within the protection scope of the present utility model.

Claims (4)

1. A building site steel pipe scaffold setting and fixing device is characterized by comprising a plurality of connecting parts, studs and two nuts, wherein each connecting part comprises a connecting sleeve, a steel pipe and a bolt, each connecting sleeve is provided with an accommodating space, each connecting sleeve is provided with a mounting hole and a fixing hole, and the fixing holes are communicated with the accommodating spaces; one end of the steel pipe is positioned in the accommodating space, a connecting hole is formed in the steel pipe and positioned in the accommodating space, and the connecting hole and the fixing hole are correspondingly formed; the bolt is in threaded connection with the fixing hole, and the bottom end of the bolt is positioned in the connecting hole; the connecting sleeves of the connecting parts are sleeved on the studs through the mounting holes; two nuts are respectively arranged at two ends of the stud.
2. The building site steel pipe scaffold building and fixing device as claimed in claim 1, wherein each connecting portion further comprises a fixing column, the fixing column is located in the accommodating space and located on the inner side of the steel pipe, the fixing column is connected with the connecting sleeve, and a through hole is formed in the fixing column; the bolt is positioned in the through hole.
3. The building site steel pipe scaffold building and fixing device as claimed in claim 2, wherein the bolt is in threaded connection with the through hole.
4. The building site steel pipe scaffold building and fixing device as claimed in claim 1, wherein a waterproof rubber pad is installed at a joint of the bolt and the fixing hole.
CN201821411234.5U 2018-08-29 2018-08-29 Building site steel pipe scaffold puts up fixing device Expired - Fee Related CN211524042U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821411234.5U CN211524042U (en) 2018-08-29 2018-08-29 Building site steel pipe scaffold puts up fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821411234.5U CN211524042U (en) 2018-08-29 2018-08-29 Building site steel pipe scaffold puts up fixing device

Publications (1)

Publication Number Publication Date
CN211524042U true CN211524042U (en) 2020-09-18

Family

ID=72438852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821411234.5U Expired - Fee Related CN211524042U (en) 2018-08-29 2018-08-29 Building site steel pipe scaffold puts up fixing device

Country Status (1)

Country Link
CN (1) CN211524042U (en)

Similar Documents

Publication Publication Date Title
CN204754274U (en) Transmission line concrete pole reinforcing apparatus
CN105178443A (en) Bolt connecting joint suitable for single-layer latticed shell with rectangular steel pipes
CN105442760A (en) Steel bar connection mode used for connection among prefabricated reinforced concrete members
CN105544739A (en) Single-layer reticulated shell bolt connection node and constructing and mounting method
CN105155781A (en) Reinforced connecting structure and method between precast reinforced concrete components
RU2329359C1 (en) Bolted junction of thin-walled elements
CN203729440U (en) Stay bar lower joint of rigid supporting dome structure
CN206988584U (en) Pipeline combined type suspension and support
CN105672477A (en) High-strength bolt hollow hub node
CN211524042U (en) Building site steel pipe scaffold puts up fixing device
CN108412037A (en) A kind of assembled hollow hub node applied to grid shell
CN103967318A (en) Universal package ball type node of lattice type steel tube concrete wind power tower
CN103967508A (en) Stretchable quick stress compensation type steel frame connection structure
CN205382565U (en) Hollow hub node of high strength bolt
CN204826226U (en) Bolted connection node suitable for rectangle steel pipe individual layer net shell
CN108265831B (en) Connection structure of assembled concrete member
CN211172434U (en) Pipe truss butt joint interface
CN207296185U (en) Sleeve nest plate combined reinforced bar attachment device
CN204459532U (en) Building pipe link
CN205369543U (en) Individual layer net shell bolted connection node
CN211228140U (en) High-strength connecting device for top plate construction bracket
CN215977762U (en) Former bamboo member connecting piece based on hoop member
CN209760442U (en) Beam-column connection node of an integrated steel structure building
CN106864684A (en) A kind of stress joint device for controlling marine riser bending load to be distributed
CN201145106Y (en) Flange structure for long axis pump to fix pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211021

Address after: 239000 5-5004, third floor, science and technology business incubator building, middle section of Huaihe Avenue, Mingguang City, Chuzhou City, Anhui Province

Patentee after: Anhui Debang Construction Co.,Ltd.

Address before: 239000 2188 Fung Lok Road, Nan Qiao District, Chuzhou, Anhui

Patentee before: CHUZHOU VOCATIONAL AND TECHNICAL College

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200918

Termination date: 20210829

CF01 Termination of patent right due to non-payment of annual fee