[go: up one dir, main page]

CN211393602U - Quick installation of wiping line, maintenance device - Google Patents

Quick installation of wiping line, maintenance device Download PDF

Info

Publication number
CN211393602U
CN211393602U CN201921855788.9U CN201921855788U CN211393602U CN 211393602 U CN211393602 U CN 211393602U CN 201921855788 U CN201921855788 U CN 201921855788U CN 211393602 U CN211393602 U CN 211393602U
Authority
CN
China
Prior art keywords
sets
crane beam
quick installation
trolley
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921855788.9U
Other languages
Chinese (zh)
Inventor
张玉涛
韩思源
赵广恩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201921855788.9U priority Critical patent/CN211393602U/en
Application granted granted Critical
Publication of CN211393602U publication Critical patent/CN211393602U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model provides a wiping line installs, overhauls device fast, includes the crane beam, the fixed gusset that sets up in crane beam right side, crane beam top sets up the track, set up the walking motor on the track, walking motor upper portion sets up the crossbeam, crossbeam one end sets up the hoist engine, the operation platform upper right corner is connected at the crossbeam middle part, the operation platform upper left corner sets up the supporting wheel, the supporting wheel can roll or slide on the crane beam. The device saves labor resources, improves working efficiency, reduces construction cost, reduces the probability of high-altitude falling accidents, and improves safety.

Description

Quick installation of wiping line, maintenance device
Technical Field
The utility model discloses be applied to in factory building overhead traveling crane wiping line installation and maintenance construction, relate to a wiping line quick installation, maintenance device and method.
Background
At the present stage, a large number of crown blocks are used in industrial production workshops in China, and a trolley line is widely applied as a crown block power supply system, such as: rigid body sliding contact line, angle steel sliding contact line. Mounting a sliding contact line: 1) material transportation: the trolley wire support, the trolley wire and the mounting accessories are transported, lifted and placed on a crane beam in a centralized manner by using a crane, manually transported to a mounting position on the crane beam, or transported to the lower part of the crane beam on the ground, and lifted to the mounting position in a scattered manner by using manpower; 2) mounting a trolley line support: hanging an operator on the outer side of a crane beam by using a suspension cage to weld and install the slide wire bracket, and replacing the suspension cage for each bracket installation; 3) installing a sliding contact line: the operating personnel climb on the slide wire bracket to install the slide wire.
The existing trolley conductor installation process has the following defects:
1) the occupied human resources are much;
2) the repeated placement of the cage by the operator requires frequent loading and unloading of the crane beam, so that the probability of high-altitude falling of the operator is increased;
3) the operating personnel climb and carry out the operation on the wiping line support and increased the danger coefficient that personnel and material dropped.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a wiping line installs, overhauls device fast has solved the problem that exists among the prior art.
A trolley line quick installation and maintenance device comprises a crane beam, wherein a rib plate is fixedly arranged on the right side of the crane beam, a track is arranged at the top of the crane beam, a walking motor is arranged on the track, a cross beam is arranged on the upper part of the walking motor, a winch is arranged at one end of the cross beam, the middle part of the cross beam is connected with the upper right corner of an operation platform, a support wheel is arranged on the upper left corner of the operation platform, the support wheel can roll or slide on the crane beam (although the figure is a schematic figure, the skilled person can understand the figure), a crossing wheel is arranged on the lower left corner of the operation platform, a vertical face inclined support is arranged between the bottom of the operation platform and the cross beam, a railing stand column is further arranged on the bottom of the operation platform, and a safety rope is arranged;
further, the spanning wheels are three rollers connected with the regular triangle bracket.
Further, the operation platform is formed by fixedly connecting I-beams.
Further, the regular triangle support is divided into a front layer and a rear layer, and three bearing seats are arranged between the front layer and the rear layer.
Further, one bearing is installed in each of the three bearing seats, and the roller is installed in the bearing seat through a roller shaft.
Furthermore, the device is provided with two motors, two sets of positive and negative rotation electric control systems respectively control the two motors, one motor is used for walking along a crane beam (0.4KW), and the other motor is used for lifting construction materials (1.5 KW); the device is provided with a spanning wheel which can span a reinforcing rib plate on the side surface of the crane beam; the device uses a large number of triangular structures to increase the stability of the device; the safety barrier of the device is replaced by the safety rope, so that the weight of the whole device is reduced, and the construction safety is ensured.
The technical effects are as follows:
1) the mounting materials are only required to be conveyed to the lower part of the crane beam, and the required materials are lifted by using the device with a winch, so that the manpower resource is saved, the high-altitude materials are prevented from being conveyed, and the construction safety is improved;
2) the operating personnel takes the device to carry out installation operation, utilizes the device to carry out the removal from taking the walking motor, avoids frequently going up and down the crane beam, removes the hanging flower basket, improves work efficiency, reduces danger.
The utility model has the advantages that:
the device provides a trolley line mounting tool, saves labor resources, improves working efficiency, reduces construction cost, reduces the probability of high-altitude falling accidents, and improves safety.
Drawings
Fig. 1 is a front view of the trolley line quick installation and maintenance device of the present invention;
FIG. 2 is a top view of the trolley line quick installation and maintenance device of the present invention;
fig. 3 is a schematic view of a spanning wheel in the present invention;
fig. 4 is an electrical control schematic diagram of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Secondly, the technical terms such as "first", "second", "up", "down", "left", "right", "front", "back", "far", "near", etc. mentioned in the present invention are technical terms known clearly in the technical field and some position or spatial definitions performed for convenience of describing the embodiment, and are not limiting of the present invention, so it is not necessary to make much explanation.
A trolley conductor rapid installation and maintenance device comprises a crane beam 5, wherein a rib plate 6 is fixedly arranged on the right side of the crane beam, a track 7 is arranged at the top of the crane beam, a walking motor 8 is arranged on the track, a cross beam 9 is arranged on the upper portion of the walking motor, a winch 10 is arranged at one end of the cross beam, the middle portion of the cross beam is connected with the upper right corner of an operation platform 4, a supporting wheel 11 is arranged on the upper left corner of the operation platform 4, the supporting wheel can roll or slide on the crane beam (although the supporting wheel is a schematic diagram, a person skilled in the art can understand the drawing), a crossing wheel 12 is arranged on the lower left corner of the operation platform, a vertical face inclined support 1 is arranged between the bottom of the operation platform and the cross beam, a railing upright post 3 is further arranged on the bottom of the operation platform, and a safety rope; the crossing wheels are three rollers connected with a regular triangle bracket; the operation platform is formed by fixedly connecting I-beams; the regular triangle support is divided into a front layer and a rear layer, and three bearing seats are arranged between the front layer and the rear layer; and one bearing is arranged in each of the three bearing seats, and the roller is arranged in the bearing seat through a roller shaft.
Example 1
As shown in fig. 1-3, a trolley line quick installation and overhaul device is provided with two motors, two sets of positive and negative rotation electric control systems respectively control the two motors, one motor M1 is used for walking along a crane beam (0.4KW), and the other motor M2 is used for lifting construction materials (1.5 KW); the device is provided with a spanning wheel which can span a reinforcing rib plate on the side surface of the crane beam; the device uses a large number of triangular structures to increase the stability of the device; the safety barrier of the device is replaced by the safety rope, so that the weight of the whole device is reduced, and the construction safety is ensured. The electric line is connected to a 380V construction power supply: wherein QA is a power switch; KM1, KM2, KM3 and KM4 are contactors; FR1, FR2 are thermal relays; SB1 is the emergency stop button; SB2 is Forward button; SB3 is Back button; SB4 is winding up button; SB5 is winding descending button; KM1, KM2, KM3 and KM4 are contacts of contactors KM1, KM2, KM3 and KM4, respectively; FR1 and fe2 are auxiliary contacts of the thermal relays FR1 and FR2, respectively.
The using method comprises the following steps:
(1) after the crane rail is installed and straightened, the device is erected on a crane beam and is connected with a construction power supply;
(2) the constructor stands on the operation platform to perform construction operation, and can automatically adjust the device to walk according to the construction progress; frequent up and down hoisting of the crane beam by repeatedly placing the cage is avoided, the construction safety is improved, and the working efficiency is improved;
(3) a constructor stands on the operation platform and uses a winch to hoist the required construction materials (a trolley line bracket, a trolley line accessory and a trolley line) from the ground; save labor resources and improve construction safety.
It will be appreciated by those skilled in the art that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The embodiments disclosed above are therefore to be considered in all respects as illustrative and not restrictive. All changes which come within the scope of the invention or which are equivalent to the scope of the invention are embraced by the invention.

Claims (6)

1. The utility model provides a wiping line installs, overhauls device fast, includes the crane beam, the fixed gusset that sets up in crane beam right side, crane beam top sets up the track, set up the walking motor on the track, walking motor upper portion sets up the crossbeam, crossbeam one end sets up the hoist engine, the operation platform upper right corner is connected at the crossbeam middle part, the operation platform upper left corner sets up the supporting wheel, the supporting wheel can roll or slide on the crane beam.
2. The trolley line quick installation and overhaul device as claimed in claim 1, wherein a cross wheel is arranged at the lower left corner of the work platform, a vertical inclined support is arranged between the bottom of the work platform and the cross beam, a railing column is further arranged on the bottom of the work platform, and a safety rope is arranged between the railing column and the side portion of the work platform.
3. The trolley line quick installation and overhaul device as claimed in claim 2 wherein the spanning wheel is three rollers connected by a regular triangle bracket.
4. The trolley line quick installation and overhaul device as claimed in claim 1 wherein the work platform is formed by fixedly connecting i-beams.
5. The trolley line quick installation and overhaul device as claimed in claim 3 wherein the regular triangular support is divided into a front layer and a rear layer, and three bearing seats are arranged between the front layer and the rear layer.
6. A trolley line quick installation and service device as claimed in claim 5, wherein one bearing is mounted in each of said three bearing housings, said trolley being mounted in said bearing housings by means of trolley shafts.
CN201921855788.9U 2019-10-31 2019-10-31 Quick installation of wiping line, maintenance device Active CN211393602U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921855788.9U CN211393602U (en) 2019-10-31 2019-10-31 Quick installation of wiping line, maintenance device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921855788.9U CN211393602U (en) 2019-10-31 2019-10-31 Quick installation of wiping line, maintenance device

Publications (1)

Publication Number Publication Date
CN211393602U true CN211393602U (en) 2020-09-01

Family

ID=72225119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921855788.9U Active CN211393602U (en) 2019-10-31 2019-10-31 Quick installation of wiping line, maintenance device

Country Status (1)

Country Link
CN (1) CN211393602U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110817693A (en) * 2019-10-31 2020-02-21 中冶天工集团有限公司 Quick installation of wiping line, maintenance device
CN114195010A (en) * 2021-11-25 2022-03-18 河北华丰能源科技发展有限公司 Hoisting device and method for steel-based sliding contact line

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110817693A (en) * 2019-10-31 2020-02-21 中冶天工集团有限公司 Quick installation of wiping line, maintenance device
CN114195010A (en) * 2021-11-25 2022-03-18 河北华丰能源科技发展有限公司 Hoisting device and method for steel-based sliding contact line
CN114195010B (en) * 2021-11-25 2024-11-12 河北华丰能源科技发展有限公司 A hoisting device and method for steel-based busbar

Similar Documents

Publication Publication Date Title
CN211393602U (en) Quick installation of wiping line, maintenance device
CN201924282U (en) Construction device of road and bridge crash-proof wall
CN102849627A (en) Cathode transporting crown block of transfer system for centralized overhaul of electrolytic bath
CN100417586C (en) Integral lifting method of large bridge crane and its appts
CN111980392A (en) Crown block sliding contact line installation device and construction method thereof
CN203247031U (en) Hoisting device for curtain board transporting
CN102021888A (en) Equipment for constructing bump walls on roads and bridges
CN104973517A (en) Electric gantry platform for installing sintering machine head equipment and application method thereof
CN110817693A (en) Quick installation of wiping line, maintenance device
CN212866678U (en) Large-scale cambered surface steel rack color steel tile erection equipment
CN210340141U (en) House building engineering lifting device
CN204549923U (en) The mobile mast-up of a kind of chemical equipment overhaul
CN214141300U (en) Special double-beam bridge crane for metallurgy
CN206800228U (en) Remove the frame mounting of arch bridge
CN216102238U (en) Elevator load test vehicle-mounted device
CN215055466U (en) Discharging platform for high-rise building
CN213569241U (en) Vertical lifting device
CN212449361U (en) Material conveying device
CN115367616A (en) Furnace shell hoisting device for blast furnace overhaul and installation and use method thereof
CN210013125U (en) Stretch-draw regularization operation platform
CN222249957U (en) Hoisting device for large die
CN201485192U (en) Movable bridge type gantry crane device
CN218665046U (en) General type auxiliary hoisting device in narrow and small space
CN205603109U (en) Blast furnace chute overhauls dolly
CN112158724A (en) Telescopic track maintenance lifting appliance device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant