CN211143115U - A New Implanted Stiff Frame Pile-Sheet Retaining Wall - Google Patents
A New Implanted Stiff Frame Pile-Sheet Retaining Wall Download PDFInfo
- Publication number
- CN211143115U CN211143115U CN201921962849.1U CN201921962849U CN211143115U CN 211143115 U CN211143115 U CN 211143115U CN 201921962849 U CN201921962849 U CN 201921962849U CN 211143115 U CN211143115 U CN 211143115U
- Authority
- CN
- China
- Prior art keywords
- foundation
- pile
- skeleton
- implanted
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本实用新型涉及挡土结构技术领域,且公开了一种新型植入式劲性骨架桩板挡土墙,包括地基和填土层,所述地基位于填土层右侧下方的内部锚入劲性骨架锚固段,所述劲性骨架锚固段的顶部延伸至地基的外部并通过混凝土浇筑形成劲性骨架浇筑桩身。该新型植入式劲性骨架桩板挡土墙,通过充分利用了现状岩体的完整性和强度,把地面以上普通桩通过植入式劲性骨架桩锚入岩石地基内,节约了桩基地面以下部分的工程造价,此工法采用小型钻机即可完成钻孔施工,解决了大型机械无法在陡坡地形条件下施工的难题,且无需人工地下挖孔作业,减小了施工风险,此工法也极大地较少了桩基地下部分的工程造价,节约了工期。
The utility model relates to the technical field of earth retaining structures, and discloses a new type of implanted stiff skeleton pile plate retaining wall, which comprises a foundation and a filling layer. A rigid skeleton anchoring section, the top of the rigid skeleton anchoring section extends to the outside of the foundation and forms a rigid skeleton pouring pile body through concrete pouring. By making full use of the integrity and strength of the existing rock mass, the new type of implanted stiff skeleton pile plate retaining wall anchors the ordinary piles above the ground into the rock foundation through the implanted stiff skeleton piles, saving the pile foundation. For the construction cost of the part below the ground, this construction method can use a small drilling rig to complete the drilling construction, which solves the problem that large-scale machinery cannot perform construction under steep slope terrain conditions, and does not require manual underground digging operations, reducing construction risks. This construction method also The construction cost of the lower part of the pile foundation is greatly reduced, and the construction period is saved.
Description
技术领域technical field
本实用新型涉及挡土墙技术领域,具体为一种新型植入式劲性骨架桩板挡土墙。The utility model relates to the technical field of retaining walls, in particular to a new type of implanted stiff skeleton pile plate retaining wall.
背景技术Background technique
挡土墙是指支承路基填土或山坡土体、防止填土或土体变形失稳的构造物,在挡土墙横断面中,与被支承土体直接接触的部位称为墙背;与墙背相对的、临空的部位称为墙面;与地基直接接触的部位称为基底;与基底相对的、墙的顶面称为墙顶;基底的前端称为墙趾;基底的后端称为墙踵。Retaining wall refers to a structure that supports roadbed fill or hillside soil and prevents the fill or soil from being deformed and unstable. In the cross section of the retaining wall, the part that is in direct contact with the supported soil is called the wall back; and The part opposite to the back of the wall and facing the air is called the wall; the part that is in direct contact with the foundation is called the base; the top surface of the wall opposite to the base is called the top of the wall; the front end of the base is called the wall toe; the rear end of the base called the wall heel.
在陡坡地形或沿河的施工条件下,常规桩板挡墙机械成孔法施工困难,采用人工挖孔法风险较大,而桩所在处地质条件又较好,岩石单轴饱和抗压强度一般不小于30MPa,基本上比桩所采用的混凝土的强度还高,且桩所在处的地基稳定,不存在外倾不利结构面,如果把完整且强度极高的岩体挖掉,再灌注相对强度较低的混凝土,还没有原来的岩石地基完整性和强度高,且由于岩石强度极高,施工工期也较长。Under the construction conditions of steep slope terrain or along the river, it is difficult to construct the conventional pile-slab retaining wall mechanical hole forming method, and the manual hole digging method is more risky, and the geological conditions of the piles are good, and the uniaxial saturated compressive strength of the rock is average. It is not less than 30MPa, which is basically higher than the strength of the concrete used for the piles, and the foundation where the piles are located is stable, and there is no unfavorable structural surface cambered out. The lower concrete does not have the high integrity and strength of the original rock foundation, and because the rock strength is extremely high, the construction period is also longer.
实用新型内容Utility model content
针对现有技术的不足,本实用新型提供了一种新型植入式劲性骨架桩板挡土墙,具备节约了桩基地面以下部分的工程造价、节约工期的优点,解决了在陡坡地形或沿河的施工条件下,常规桩板挡墙机械成孔法施工困难,采用人工挖孔法风险较大,而桩所在处地质条件又较好,岩石单轴饱和抗压强度一般不小于30MPa,基本上比桩所采用的混凝土的强度还高,且桩所在处的地基稳定,不存在外倾不利结构面,如果把完整且强度极高的岩体挖掉,再灌注相对强度较低的混凝土,还没有原来的岩石地基完整性和强度高,且由于岩石强度极高,施工工期也较长的问题。Aiming at the deficiencies of the prior art, the utility model provides a new type of implanted stiff skeleton pile-plate retaining wall, which has the advantages of saving the engineering cost and construction period of the part below the pile base surface, and solves the problem in steep slope terrain or Under the construction conditions along the river, the mechanical hole forming method of the conventional pile-plate retaining wall is difficult to construct, and the manual hole digging method is more risky, and the geological conditions of the piles are good, and the uniaxial saturated compressive strength of the rock is generally not less than 30MPa. Basically, the strength is higher than that of the concrete used for the piles, and the foundation where the piles are located is stable, and there is no unfavorable structural surface. , There is no problem of high integrity and strength of the original rock foundation, and due to the extremely high rock strength, the construction period is also long.
本实用新型提供如下技术方案:一种新型植入式劲性骨架桩板挡土墙,包括地基和填土层,所述地基位于填土层右侧下方的内部锚入劲性骨架锚固段,所述劲性骨架锚固段的顶部延伸至地基的外部并通过混凝土浇筑形成劲性骨架浇筑桩身,所述相邻的劲性骨架浇筑桩身之间设有挡土板,所述挡土板靠近填土的内侧设有锚杆。The utility model provides the following technical solutions: a new type of implanted stiff skeleton pile-plate retaining wall, comprising a foundation and a filling layer, wherein the foundation is located in the inner anchoring section of the stiff skeleton under the right side of the filling layer, The top of the rigid frame anchoring section extends to the outside of the foundation and forms a rigid frame pouring pile body through concrete pouring, and a soil retaining plate is arranged between the adjacent rigid frame pouring pile bodies, and the soil retaining plate An anchor rod is provided on the inner side near the filling.
优选的,所述地基上垂直开设有用于劲性骨架锚固段锚入的桩孔。Preferably, a pile hole for anchoring the rigid frame anchoring section is vertically opened on the foundation.
优选的,所述挡土板靠近填土层的一侧开设有用于锚杆锚入的锚杆孔。Preferably, the side of the earth retaining plate close to the filling layer is provided with a bolt hole for the bolt to be anchored in.
优选的,所述锚杆与水平面呈一定倾角的贯穿填土层并锚入地基内部。Preferably, the anchor rod penetrates the filling layer at a certain inclination angle to the horizontal plane and is anchored into the interior of the foundation.
与现有技术对比,本实用新型具备以下有益效果:Compared with the prior art, the utility model has the following beneficial effects:
该新型植入式劲性骨架桩板挡土墙,充分利用了现状岩体的完整性和强度,把地面以上普通桩通过植入式劲性骨架桩锚入岩石地基内,节约了桩基地面以下部分的工程造价,此工法采用小型钻机即可完成钻孔施工,解决了大型机械无法在陡坡地形条件下施工的难题,且无需人工地下挖孔作业,减小了施工风险,此工法也极大地较少了桩基地下部分的工程造价,节约了工期。The new type of implanted stiff skeleton pile-plate retaining wall makes full use of the integrity and strength of the existing rock mass, and anchors the ordinary piles above the ground into the rock foundation through the implanted stiff skeleton piles, saving the pile foundation ground. For the following part of the project cost, this construction method can complete the drilling construction with a small drilling rig, which solves the problem that large-scale machinery cannot be constructed under the conditions of steep slope terrain, and does not require manual underground digging operations, which reduces the construction risk. This construction method is also extremely The earth reduces the engineering cost of the lower part of the pile foundation and saves the construction period.
附图说明Description of drawings
图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;
图2为本实用新型结构挡土板俯视示意图。FIG. 2 is a schematic top view of the structural earth retaining plate of the present invention.
图中:1、地基;2、填土层;3、劲性骨架锚固段;4、劲性骨架浇筑桩身;5、挡土板;6、锚杆。In the figure: 1. Foundation; 2. Filling layer; 3. Stiff skeleton anchoring section; 4. Stiff skeleton pouring pile body; 5. Retaining plate; 6. Anchor rod.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
请参阅图1-2,一种新型植入式劲性骨架桩板挡土墙,包括地基1和填土层2,地基1上垂直开设有用于劲性骨架锚固段3锚入的桩孔,地基1位于填土层2右侧下方的内部锚入劲性骨架锚固段3,劲性骨架锚固段3的顶部延伸至地基1的外部并通过混凝土浇筑形成劲性骨架浇筑桩身4,该挡土墙结构通过充分利用了现状岩体的完整性和强度,把地面以上普通桩通过植入式劲性骨架桩锚入岩石地基1内,节约了桩基地面以下部分的工程造价,此工法采用小型钻机即可完成钻孔施工,解决了大型机械无法在陡坡地形条件下施工的难题,且无需人工地下挖孔作业,减小了施工风险,此工法也极大地较少了桩基地下部分的工程造价,节约了工期,相邻的劲性骨架浇筑桩身4之间设有挡土板5,挡土板5靠近填土层2的一侧开设有用于锚杆6锚入的锚杆孔,挡土板5靠近填土层2的内侧设有锚杆6,锚杆6与水平面呈一定倾角的贯穿填土层2并锚入地基1内部,该新型植入式劲性骨架桩板挡土墙通过在挡土板5和地基1之间锚入贯穿填土层2的锚杆6,使锚杆6与地基1和填土层2之间有效作用,可增强该挡土墙抵抗填土层2侧压力的能力。Please refer to Figure 1-2, a new type of implanted stiff skeleton pile-sheet retaining wall, including foundation 1 and
工作原理:首先,在地基1上垂直开设桩孔,将劲性骨架锚固段3穿入地基1上的桩孔内,然后,在劲性骨架锚固段3延伸至地基1上方的一端处搭设混凝土浇筑模板,再利用混凝土进行浇筑形成劲性骨架浇筑桩身4,最后,待劲性骨架浇筑桩身4成型后,在相邻的劲性骨架浇筑桩身4之间搭设用于挡土板5成型的混凝土浇筑模板,再利用混凝土进行浇筑形成挡土板5,在挡土板5和地基1上开设锚杆孔并锚入锚杆6,再进行填土层2的填充铺设,即可。Working principle: First, vertical pile holes are opened on the foundation 1, and the rigid
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921962849.1U CN211143115U (en) | 2019-11-14 | 2019-11-14 | A New Implanted Stiff Frame Pile-Sheet Retaining Wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921962849.1U CN211143115U (en) | 2019-11-14 | 2019-11-14 | A New Implanted Stiff Frame Pile-Sheet Retaining Wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211143115U true CN211143115U (en) | 2020-07-31 |
Family
ID=71770760
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921962849.1U Expired - Fee Related CN211143115U (en) | 2019-11-14 | 2019-11-14 | A New Implanted Stiff Frame Pile-Sheet Retaining Wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211143115U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112211204A (en) * | 2020-10-22 | 2021-01-12 | 贵州桥梁建设集团有限责任公司 | A wall formwork support structure of a column-slab wall slope protection structure and its construction method |
-
2019
- 2019-11-14 CN CN201921962849.1U patent/CN211143115U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112211204A (en) * | 2020-10-22 | 2021-01-12 | 贵州桥梁建设集团有限责任公司 | A wall formwork support structure of a column-slab wall slope protection structure and its construction method |
CN112211204B (en) * | 2020-10-22 | 2024-12-27 | 贵州桥梁建设集团有限责任公司 | A wall formwork support structure of a column-slab wall slope protection structure and a construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105840207B (en) | Construction method for comprehensive tunnel entering structure of large-span tunnel penetrating shallow-buried bias-pressure loose accumulation body | |
CN105863650B (en) | It is a kind of elder generation wall after hole tunnel construction method | |
CN107288138B (en) | The control structure and construction method of the rock side slope containing weak intercalated layer | |
CN103485363A (en) | Three-dimensional continuous frame type reinforced concrete structure retaining wall | |
CN206220105U (en) | A kind of double-deck Frozen Soil Cylinder anchoring soil nailed wall retaining structure system | |
CN110374134A (en) | A kind of combined member increased suitable for retaining wall and construction method | |
CN109914422A (en) | A kind of steel pipe and soil nail combined foundation pit supporting structure and construction method | |
CN107642041A (en) | Super large diameter hollow pile group anchorage | |
CN108442404A (en) | Assembled composite ecotype retaining wall and its construction method | |
CN101691760B (en) | Composite foundation combining anchor rods with excavation and construction method thereof | |
CN109667273A (en) | A kind of construction method of deep foundation pit supporting structure | |
CN109252542B (en) | A kind of tree root stump lightweight retaining wall for road widening and construction method thereof | |
CN104863177A (en) | Composite retaining wall structure and construction method thereof | |
CN107604940A (en) | A kind of steel pipe grid Expansive Soils Retaining Wall and its construction method | |
CN110055982A (en) | A kind of novel anchor holding frame lattice miniature steel pipe pile supporting system | |
CN211200426U (en) | Anti-sliding supporting and retaining structure for miniature steel pipe pile retaining wall | |
CN208328666U (en) | A kind of Extended chemotherapy seat-plate type bridge abutment structure with anchor pole | |
CN211143115U (en) | A New Implanted Stiff Frame Pile-Sheet Retaining Wall | |
CN107642040A (en) | Construction method of super large diameter hollow pile group anchorage | |
CN204780990U (en) | Combined type retaining wall structure | |
CN207484290U (en) | The hollow clump of piles anchorage of super-large diameter | |
CN203498863U (en) | Three-dimensional continuous-frame-type reinforced concrete structural retaining wall | |
CN201502065U (en) | A type of composite foundation for bolt combined excavation | |
CN114703842B (en) | Coral sand foundation drilled prefabricated hollow pipe pile and construction method | |
CN202787275U (en) | Tubular soil nailing wall of novel pneumatic impact anchor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200731 |
|
CF01 | Termination of patent right due to non-payment of annual fee |