CN211006674U - A steel pipe pile piling positioning device - Google Patents
A steel pipe pile piling positioning device Download PDFInfo
- Publication number
- CN211006674U CN211006674U CN201921397397.7U CN201921397397U CN211006674U CN 211006674 U CN211006674 U CN 211006674U CN 201921397397 U CN201921397397 U CN 201921397397U CN 211006674 U CN211006674 U CN 211006674U
- Authority
- CN
- China
- Prior art keywords
- pipe pile
- steel pipe
- arc
- hole
- positioning plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 64
- 239000010959 steel Substances 0.000 title claims abstract description 64
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 7
- 238000010586 diagram Methods 0.000 description 6
- 238000009434 installation Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 5
- 238000012986 modification Methods 0.000 description 5
- 230000004048 modification Effects 0.000 description 5
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本实用新型涉及一种钢管桩打桩定位装置,属于钢管桩施工技术领域。包括定位板以及固定安装在定位板上的限位装置;所述定位板设置管桩过孔并且环绕管桩过孔设置用于同限位装置连接的连接孔;所述限位装置包括对应管桩过孔且对称间隔设置的两块固定在底座上的弧形板,底座使用连接螺栓配合螺母同定位板固定连接;钢管桩顶端设置用于同承重台连接的法兰,外壁间隔设置限位钢条,限位钢条之间的距离与两块弧形板之间的距离一致;法兰上设置弧形长圆孔,承重台设置与弧形长圆孔对应的固定螺栓孔并穿过固定螺栓配合螺母同法兰连接。本实用新型结构设置合理,使用方便,能够高效率、高质量完成钢管桩的施打以及承重台与钢管桩的连接,使用性能好。
The utility model relates to a piling positioning device for steel pipe piles, which belongs to the technical field of steel pipe pile construction. It includes a positioning plate and a limiting device fixedly installed on the positioning plate; the positioning plate is provided with a pipe pile through hole and a connecting hole is arranged around the pipe pile through hole for connecting with the limiting device; the limiting device includes a corresponding pipe Two arc-shaped plates fixed on the base with the pile passing through holes and arranged symmetrically at intervals, the base is fixedly connected with the positioning plate by connecting bolts and nuts; the top of the steel pipe pile is provided with a flange for connecting with the bearing platform, and the outer wall is set at a limited interval. The distance between the limit steel bars is the same as the distance between the two arc-shaped plates; the flange is provided with arc-shaped oblong holes, and the bearing platform is provided with fixed bolt holes corresponding to the arc-shaped oblong holes and through the fixed bolt holes. Bolts and nuts are connected to the flange. The utility model has reasonable structure and convenient use, can complete the application of the steel pipe pile and the connection between the bearing platform and the steel pipe pile with high efficiency and high quality, and has good use performance.
Description
技术领域technical field
本实用新型涉及一种钢管桩打桩定位装置,属于钢管桩施工技术领域。The utility model relates to a piling positioning device for steel pipe piles, which belongs to the technical field of steel pipe pile construction.
背景技术Background technique
目前装配式建筑发展迅猛,为满足日益增加的环保要求,工厂预制、现场组装型式在不断发展。其中的装配式钢管桩基础由上部工厂预制的承重台、下部工厂制作的钢管桩组成。预制承台与钢管桩的连接一般采用螺栓机械连接,可以有效减少湿作业工作量,从而有效减少对环境的破坏,但是钢管桩施打前期易产生沿轴向的转动,这样造成承台上的预留螺栓孔位与钢管桩上的预留螺栓孔位产生偏差,造成安装承台时螺栓无法同时穿过承台和钢管桩的预留孔,无法进行安装。At present, prefabricated buildings are developing rapidly. In order to meet the increasing environmental protection requirements, factory prefabrication and on-site assembly are constantly developing. The prefabricated steel pipe pile foundation consists of a prefabricated load-bearing platform in the upper factory and a steel pipe pile made in the lower factory. The connection between the prefabricated cap and the steel pipe pile is generally mechanically connected by bolts, which can effectively reduce the workload of wet work and thus effectively reduce the damage to the environment. There is a deviation between the reserved bolt holes on the steel pipe pile and the reserved bolt holes on the steel pipe pile, resulting in that the bolts cannot pass through the reserved holes of the bearing platform and the steel pipe pile at the same time when the bearing platform is installed, and the installation cannot be carried out.
实用新型内容Utility model content
本实用新型的目的是提供一种钢管桩打桩定位装置,来解决上述技术问题。The purpose of the utility model is to provide a piling positioning device for steel pipe piles to solve the above-mentioned technical problems.
为了实现上述目的,本实用新型采用的技术方案是:In order to achieve the above purpose, the technical scheme adopted by the present utility model is:
一种钢管桩打桩定位装置,包括定位板以及固定安装在定位板上的限位装置;所述定位板设置管桩过孔并且环绕管桩过孔设置用于同限位装置连接的连接孔;所述限位装置包括对应管桩过孔且对称间隔设置的两块固定在底座上的弧形板,底座使用连接螺栓配合螺母同定位板固定连接;钢管桩顶端设置用于同承重台连接的法兰,外壁间隔设置限位钢条,限位钢条之间的距离与两块弧形板之间的距离一致;法兰上设置弧形长圆孔,承重台设置与弧形长圆孔对应的固定螺栓孔并穿过固定螺栓配合螺母同法兰连接。A piling positioning device for steel pipe piles, comprising a positioning plate and a limiting device fixedly installed on the positioning plate; the positioning plate is provided with a pipe pile through hole and a connecting hole for connecting with the limiting device is arranged around the pipe pile through hole. The limiting device includes two arc-shaped plates fixed on the base corresponding to the through holes of the pipe piles and arranged symmetrically at intervals, and the base is fixedly connected with the positioning plate by connecting bolts and nuts; the top of the steel pipe pile is set for the same bearing platform For the connected flanges, limit steel bars are set at intervals on the outer wall, and the distance between the limit steel bars is the same as the distance between the two arc-shaped plates; arc-shaped oblong holes are set on the flange, and the bearing platform is set with the arc-shaped oblong holes. The corresponding fixing bolt holes are connected with the flange through the fixing bolts and the nut.
本实用新型技术方案的进一步改机在于:弧形板与底座之间设置倾斜的加强肋板。A further modification of the technical solution of the utility model is that an inclined reinforcing rib is arranged between the arc-shaped plate and the base.
本实用新型技术方案的进一步改机在于:承重台上的固定螺栓孔的孔径大于固定螺栓的外径。A further modification of the technical solution of the utility model is that the diameter of the fixing bolt holes on the bearing platform is larger than the outer diameter of the fixing bolts.
本实用新型技术方案的进一步改机在于:承重台上的固定螺栓孔的孔径为固定螺栓外径的1.5倍;弧形长圆孔的弧线长度为固定螺栓的外径的2倍。The further modification of the technical scheme of the utility model is that the diameter of the fixing bolt hole on the bearing platform is 1.5 times the outer diameter of the fixing bolt; the arc length of the arc-shaped oblong hole is 2 times the outer diameter of the fixing bolt.
本实用新型技术方案的进一步改机在于:连接螺栓为全螺纹螺栓;连接螺栓的上部由两个螺母固定,连接螺栓的下部螺纹连接底部封闭的螺母并将螺母同定位板焊接。A further modification of the technical solution of the present invention is that the connecting bolt is a full threaded bolt; the upper part of the connecting bolt is fixed by two nuts, and the lower part of the connecting bolt is threadedly connected to the nut closed at the bottom and is welded with the positioning plate.
本实用新型技术方案的进一步改机在于:承重台上端面设置环形垫板。A further modification of the technical solution of the utility model is that: the upper end face of the bearing platform is provided with an annular backing plate.
由于采用了上述技术方案,本实用新型取得的技术效果有:Due to adopting the above-mentioned technical scheme, the technical effects obtained by the present utility model are as follows:
本实用新型中的钢管桩上的法兰设置弧形长圆孔,同时将承重台上的固定螺栓孔的孔径变大,增加固定螺栓环向允许误差,便于承重台与钢管桩之间的固定螺栓的连接安装。In the utility model, the flange on the steel pipe pile is provided with arc-shaped oblong holes, and at the same time, the diameter of the fixing bolt holes on the bearing platform is enlarged, and the allowable error of the fixing bolt circumferential direction is increased, which is convenient for the connection between the bearing platform and the steel pipe pile. Connection installation of fixing bolts.
本实用新型中的限位装置的弧形板能够根据设计要求采取一定高度值,以钢管桩上的法兰卡住限位装置上限为施打结束,能够便于控制承重台下的钢管桩高程一致。The arc plate of the limiting device in the utility model can take a certain height value according to the design requirements, and the end of the application is when the flange on the steel pipe pile is stuck with the upper limit of the limiting device, which can facilitate the control of the steel pipe pile under the load-bearing platform. Elevation is the same.
本实用新型中的限位装置的两块弧形板间隔空隙设置,配合钢管桩上的限位钢条使用,可以有效限制钢管桩在初始打桩过程中沿轴向转动。The two arc-shaped plates of the limiting device in the utility model are arranged at intervals and used in conjunction with the limiting steel bars on the steel pipe pile, which can effectively limit the rotation of the steel pipe pile along the axial direction during the initial piling process.
本实用新型的限位装置与定位板安装,在定位板底部焊接螺母并采用全螺纹螺栓连接方式,能够方便在钢管桩施打结束后拆除限位装置。The limiting device of the utility model is installed with the positioning plate, and the bottom of the positioning plate is welded with nuts and connected with full threaded bolts, which can facilitate the removal of the limiting device after the steel pipe pile is driven.
本实用新型结构设置合理,使用方便,能够高效率、高质量完成钢管桩的施打以及承重台与钢管桩的连接,综合使用性能好。The utility model has reasonable structure and convenient use, can complete the application of the steel pipe pile and the connection between the bearing platform and the steel pipe pile with high efficiency and high quality, and has good comprehensive use performance.
附图说明Description of drawings
图1是本实用新型限位装置立体示意图;Fig. 1 is the three-dimensional schematic diagram of the limiting device of the present invention;
图2是本实用新型限位装置与定位板连接示意图;2 is a schematic diagram of the connection between the limiting device of the present invention and the positioning plate;
图3是本实用新型定位板示意图;3 is a schematic diagram of the positioning plate of the present invention;
图4是本实用新型钢管桩示意图;Fig. 4 is the schematic diagram of the utility model steel pipe pile;
图5是本实用新型钢管桩侧视图;Fig. 5 is the side view of the utility model steel pipe pile;
图6是本实用新型承重台与钢管桩连接示意图;6 is a schematic diagram of the connection between the bearing platform and the steel pipe pile of the present invention;
其中,1、定位板,2、管桩过孔,3、连接孔,4、弧形板,5、底座,6、连接螺栓,7、钢管桩,8、法兰,9、限位钢条,10、弧形长圆孔,11、固定螺栓孔,12、固定螺栓,13、加强肋板,14、环形垫板,15、承重台。Among them, 1, positioning plate, 2, pipe pile through hole, 3, connecting hole, 4, arc plate, 5, base, 6, connecting bolt, 7, steel pipe pile, 8, flange, 9, limit steel Strip, 10, arc oblong hole, 11, fixing bolt hole, 12, fixing bolt, 13, reinforcing rib, 14, annular backing plate, 15, bearing platform.
具体实施方式Detailed ways
下面结合附图及具体实施例对本实用新型做进一步详细说明:Below in conjunction with accompanying drawing and specific embodiment, the utility model is described in further detail:
本实用新型公开了一种钢管桩打桩定位装置,适用于钢管桩施打作业以及钢管桩同上端的承重台的连接施工作业。下面是具体的实施例:The utility model discloses a steel pipe pile driving positioning device, which is suitable for the steel pipe pile driving operation and the connection construction operation of the steel pipe pile and the bearing platform at the upper end. The following are specific examples:
本实用新型是一种钢管桩打桩定位装置,主要包括钢管桩部分、承重台部分以及限位定位部分。其中的限位定位部分包括定位板1以及固定安装在定位板1上的限位装置。定位板1上设置管桩过孔2并且固定安装有限位装置,定位板1主要的作用是便于限位装置的安装。在定位板1上环绕管桩过孔2设置若干用于同限位装置连接的连接孔3。定位板1通常是由若干块对称的板件对接而成,这样能够便于钢管桩安装到位后的拆除工作。具体如图3所示。图3中是两块板件的示意图情况,施工中可以预制若干块相应板件,根据实际需要组装相应数量的板件形成定位板。The utility model relates to a steel pipe pile driving positioning device, which mainly comprises a steel pipe pile part, a bearing platform part and a limit positioning part. The limiting positioning part includes a
本实用新型中的限位装置,如图1、图2所示,包括对应管桩过孔2设置的两块弧形板4,两块弧形板4的下端均固定连接底座5,通过底座5限位装置能够安装到定位板1上。两块弧形板4对称并且间隔一段距离设置。底座5上也设置通孔,连接螺栓6穿过底座5上的通孔以及定位板1上的连接孔后,配合螺母将定位板1同底座5固定连接。The limiting device in the present invention, as shown in Figures 1 and 2, includes two arc-
为了便于限位装置通定位板之间的拆除工作,优先地将,连接螺栓6设置为全螺纹螺栓;并且在连接螺栓6的上部设置两个螺母固定螺接,在连接螺栓6的下部螺纹连接底部封闭的螺母,该将螺母同定位板1的下端面焊接。在拆除过程中,先将连接螺栓6上部的两个螺母卸下,然后将连接螺栓6卸下。连接螺栓6下端的螺由于同定位板1之间为焊接固定关系,在拆卸过程中处于固定不动的状态,连接螺栓6能够顺利的卸下。In order to facilitate the dismantling work between the limiting device and the positioning plate, preferably, the connecting
本实用新型中的钢管桩7的上端连接设置承重台15,具体的是,在钢管桩7顶端设置用于同承重台15连接的法兰8。在法兰8上设置弧形长圆孔10,同时在承重台15上设置与弧形长圆孔10对应的固定螺栓孔11,使用固定螺栓11穿过承重台15和法兰8然后配合使用螺母将两者连接在一起。在具体的实施中,为了便于承重台15同法兰8的连接,增大了法兰8上的弧形长圆孔10以及承重台15上的固定螺栓孔11的参数。具体的是,安装承重台15上的固定螺栓孔11的孔径大于固定螺栓12的外径。承重台15上的固定螺栓孔11的孔径为固定螺栓12外径的1.5倍。弧形长圆孔10的弧线长度为固定螺栓12的外径的2倍。弧形长圆孔10与固定螺栓孔的配合,增加了固定螺栓的环向允许误差,便于安装。具体结构如图4、图5、图6所示。The upper end of the
为了防止钢管桩7在初始打桩过程中绕轴线的转动,在钢管桩7的外壁间隔设置限位钢条9,两根限位钢条9之间的距离与两块弧形板4之间的距离一致,两根限位钢条9卡在两块弧形板4之间能够起到防止钢管桩7转动的作用。 具体如图5所示。In order to prevent the
在具体的实施中,限位装置的弧形板4与底座5之间设置倾斜的加强肋板13,保证限位装置的结构强度。In a specific implementation, an inclined reinforcing
承重台15上的固定螺栓孔11的孔径大于固定螺栓12的外径。The diameter of the fixing bolt holes 11 on the
承重台15上的固定螺栓孔11的孔径为固定螺栓12外径的1.5倍;弧形长圆孔10的弧线长度为固定螺栓12的外径的2倍。The diameter of the fixing
连接螺栓6为全螺纹螺栓;连接螺栓6的上部由两个螺母固定,连接螺栓6的下部螺纹连接底部封闭的螺母并将螺母同定位板1焊接。The connecting
本实用新型在承重台15的上端面设置环形垫板14。In the present invention, an
该装置进行钢管桩安装施工的过程如下,先将定位板1就位,并将钢管桩7旋转至指定位置,安装限位装置并使限位装置的预留空隙卡住钢管桩7的限位钢条9,安装连接螺栓并使用螺母进行固定。然后进行钢管桩施打,至钢管桩7上端的法兰8卡到限位装置的弧形板4的顶端为施打结束,将限位装置拆除。最后,将承重台15安装到钢管桩7的上端。The installation and construction of the steel pipe pile by the device is as follows. First, the
本实用新型通过改进设计限位装置以及配合连接的承重台和钢管桩,实现了钢管桩以及承重台的高效便捷施工,保证了施工质量和效率,具有良好的使用性能。The utility model realizes the efficient and convenient construction of the steel pipe pile and the bearing platform by improving the design of the limiting device and the supporting platform and the steel pipe pile, which ensures the construction quality and efficiency, and has good use performance.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921397397.7U CN211006674U (en) | 2019-08-27 | 2019-08-27 | A steel pipe pile piling positioning device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921397397.7U CN211006674U (en) | 2019-08-27 | 2019-08-27 | A steel pipe pile piling positioning device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211006674U true CN211006674U (en) | 2020-07-14 |
Family
ID=71474688
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921397397.7U Active CN211006674U (en) | 2019-08-27 | 2019-08-27 | A steel pipe pile piling positioning device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211006674U (en) |
-
2019
- 2019-08-27 CN CN201921397397.7U patent/CN211006674U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103590488B (en) | Bolts assemblies double-layer aluminium alloy latticed shell structure | |
CN111270850A (en) | Novel fast-assembling exempts from to weld girder steel of encorbelmenting fixed device | |
CN111456909B (en) | Central tube component, central tube having the same, and tower tube foundation | |
WO2019119735A1 (en) | Connecting component, concrete tower fragment and mold, and tower and manufacturing method for the tower | |
CN111809652A (en) | Assembled gravity wind power infrastructure and its construction method | |
CN109024900A (en) | A kind of detachable assembling type steel construction combination bean column node | |
CN106812214A (en) | A kind of assembling type steel structure beam column node connection device | |
CN107725281B (en) | A piece-assembled T-shaped steel inner stiffening wind turbine steel tube tower section | |
CN106869404A (en) | A kind of prefabricated assembled bolt connection steel reinforced concrete combination beam | |
CN114319417B (en) | A barrel-shaped assembled wind power tower foundation and its construction method | |
CN211006674U (en) | A steel pipe pile piling positioning device | |
CN209816666U (en) | Assembled bracing connection structure between steel-pipe piles | |
CN105369820A (en) | Prefabricated steel structure fan base | |
CN220223330U (en) | Can have enough to meet need assembled tower crane foundation standard festival | |
CN209799510U (en) | assembled reinforced concrete silo | |
US11993909B2 (en) | Construction method for reinforcing and repairing steel pipe pile for offshore wind power | |
CN110820758A (en) | Detachable connecting component of steel pipe support and section steel tie bar | |
CN207362873U (en) | A kind of fixation kit suitable for the compound piping lane of bamboo | |
CN215252985U (en) | Prestressed hollow sandwich concrete-filled steel tube lattice type mixed jacket | |
CN216882520U (en) | Welding construction device for pipe cage pipeline | |
CN212561934U (en) | Novel connecting device for avoiding collision between wire pipe and composite floor truss rib | |
CN209817399U (en) | Assembled connecting device for steel pipe cross connection | |
CN205188991U (en) | Prefabricated assembled steel construction wind turbine foundation | |
CN211201216U (en) | Horizontal stop device of rack integral hoisting | |
CN111794211A (en) | A prefabricated assembled pipe pile that is easy to hoist and splicing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |