CN210455129U - 一种具有补偿登靠功能的风电运维船 - Google Patents
一种具有补偿登靠功能的风电运维船 Download PDFInfo
- Publication number
- CN210455129U CN210455129U CN201921182447.XU CN201921182447U CN210455129U CN 210455129 U CN210455129 U CN 210455129U CN 201921182447 U CN201921182447 U CN 201921182447U CN 210455129 U CN210455129 U CN 210455129U
- Authority
- CN
- China
- Prior art keywords
- platform
- compensation
- ship
- motion compensation
- wind power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921182447.XU CN210455129U (zh) | 2019-07-25 | 2019-07-25 | 一种具有补偿登靠功能的风电运维船 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921182447.XU CN210455129U (zh) | 2019-07-25 | 2019-07-25 | 一种具有补偿登靠功能的风电运维船 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210455129U true CN210455129U (zh) | 2020-05-05 |
Family
ID=70448428
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921182447.XU Active CN210455129U (zh) | 2019-07-25 | 2019-07-25 | 一种具有补偿登靠功能的风电运维船 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210455129U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110329442A (zh) * | 2019-07-25 | 2019-10-15 | 上海雄程海洋工程股份有限公司 | 一种具有补偿登靠功能的风电运维船及其登靠方法 |
CN111768314A (zh) * | 2020-08-07 | 2020-10-13 | 马睿 | 一种海上风电运维研究方法 |
CN117885857A (zh) * | 2024-02-21 | 2024-04-16 | 中交海峰风电发展股份有限公司 | 一种多功能海上风电运维母船 |
-
2019
- 2019-07-25 CN CN201921182447.XU patent/CN210455129U/zh active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110329442A (zh) * | 2019-07-25 | 2019-10-15 | 上海雄程海洋工程股份有限公司 | 一种具有补偿登靠功能的风电运维船及其登靠方法 |
CN111768314A (zh) * | 2020-08-07 | 2020-10-13 | 马睿 | 一种海上风电运维研究方法 |
CN111768314B (zh) * | 2020-08-07 | 2024-01-16 | 马睿 | 一种海上风电运维研究方法 |
CN117885857A (zh) * | 2024-02-21 | 2024-04-16 | 中交海峰风电发展股份有限公司 | 一种多功能海上风电运维母船 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2558358B1 (en) | Marine lifting apparatus | |
CN109534188B (zh) | 一种海上浮动吊装平台的刚柔混合式波浪运动补偿装置 | |
CN110329442A (zh) | 一种具有补偿登靠功能的风电运维船及其登靠方法 | |
CN210455129U (zh) | 一种具有补偿登靠功能的风电运维船 | |
CN103112553B (zh) | 自航式半潜维修船及使用方法 | |
KR101572395B1 (ko) | 수직 가변형 해양 세일 시스템 | |
CN109553005B (zh) | 一种用于海上浮动平台的刚柔式多维波浪运动补偿装置 | |
CN109292647B (zh) | 一种主动式刚柔混合波浪运动补偿装置及其控制方法 | |
US20100067989A1 (en) | Vessel for transporting wind turbines and methods thereof | |
FR2862602A1 (fr) | Navire a flotteur immerge stabilise par controle electronique des positions de masses mobiles et d'orientations d'ailerons immerges | |
CN106828812B (zh) | 半潜式深海风电安装平台及其风力发电机组整体安装方法 | |
CN105947113A (zh) | 用于提高船舶并靠补给稳定性的机械吸附装置 | |
WO2010026555A2 (en) | A vessel for transporting wind turbines and methods thereof | |
CN206634171U (zh) | 半潜式深海风电安装平台 | |
CN107856819A (zh) | 浮动船厂及浮动式舰船维修和建造方法 | |
US20100263581A1 (en) | Marine Lifting Apparatus | |
AU2017256254B2 (en) | Hinge module for connecting catamaran-type vessel's platform and hull | |
CN108674597A (zh) | 一种自升式风电安装平台 | |
CN113005877A (zh) | 一种海上廊桥 | |
CN207089597U (zh) | 运维工具及潮间带风力发电机组的运维系统 | |
KR102444047B1 (ko) | 해상 풍력발전기 설치선 | |
CN206552215U (zh) | 一种深水海底电缆敷设船 | |
CN206427239U (zh) | 一种沿海风电场运输维修抢险作业船 | |
JP2022540094A (ja) | 洋上発電システム | |
RU2365520C2 (ru) | Судно, питаемое и движимое энергией качки своего корпуса |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A wind power operation and maintenance ship with compensation boarding function Effective date of registration: 20220107 Granted publication date: 20200505 Pledgee: Industrial Bank Co.,Ltd. Shanghai pilot Free Trade Zone Lingang New District sub branch Pledgor: SHANGHAI XIONGCHENG MARINE ENGINEERING CO.,LTD. Registration number: Y2022980000225 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20230128 Granted publication date: 20200505 Pledgee: Industrial Bank Co.,Ltd. Shanghai pilot Free Trade Zone Lingang New District sub branch Pledgor: SHANGHAI XIONGCHENG MARINE ENGINEERING CO.,LTD.|SHANGHAI XIONGCHENG SHIP ENGINEERING Co.,Ltd. Registration number: Y2022980000225 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A wind power operation and maintenance ship with compensation boarding function Effective date of registration: 20230201 Granted publication date: 20200505 Pledgee: Industrial Bank Co.,Ltd. Shanghai pilot Free Trade Zone Lingang New District sub branch Pledgor: SHANGHAI XIONGCHENG MARINE ENGINEERING CO.,LTD.|SHANGHAI XIONGCHENG SHIP ENGINEERING Co.,Ltd. Registration number: Y2023310000019 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |