CN210369843U - Lifting protection platform for main body construction and decoration synchronous operation - Google Patents
Lifting protection platform for main body construction and decoration synchronous operation Download PDFInfo
- Publication number
- CN210369843U CN210369843U CN201921068250.3U CN201921068250U CN210369843U CN 210369843 U CN210369843 U CN 210369843U CN 201921068250 U CN201921068250 U CN 201921068250U CN 210369843 U CN210369843 U CN 210369843U
- Authority
- CN
- China
- Prior art keywords
- frame
- structure building
- main body
- building wall
- decoration
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model provides a main part construction and fitment are lift protection platform for synchronous operation, including main part construction body and fitment operation body, still including laying two sets of elevating gear in concrete main part structure building wall both sides respectively, the frame body that does not include rectangular bodily form is equallyd divide to main part construction body and fitment operation body, and attach the wall device, still including installing in attaching the protector between wall device and frame body, fitment operation body is still including installing the protection platform at frame body top, the protection platform includes a plurality of horizontal poles of encorbelmenting of installing along the width direction interval of frame body, and install the guard plate on the horizontal pole of encorbelmenting, still including installing the side guard plate of keeping away from concrete main part structure building wall one end in the guard plate, and install a plurality of bracing pieces on frame body and each horizontal pole of encorbelmenting respectively. The utility model discloses a main part construction and fitment are lift protection platform for synchronous operation can realize the synchronous operation of main part construction and fitment.
Description
Technical Field
The utility model relates to a building engineering technical field, in particular to main part construction and fitment synchronous operation are with lift protection platform.
Background
At present in the building structure work progress of china, the building outer wall decoration operation of some construction units can be followed closely by main part construction operation, and prior art, concrete construction mode is for utilizing the lifting function of inserted lift scaffold, construct the main part to the building top layer earlier, the outer wall decoration operation is carried out from the top downwards through the decline function of inserted lift scaffold afterwards, this operation method can postpone the progress of decoration operation and prolong total construction period on the one hand, on the other hand inserted lift scaffold takes place danger such as eminence falls easily in the decline process, be unfavorable for construction safety control.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model aims at providing a main part construction and fitment are lift protection platform for synchronous operation can realize the synchronous operation of main part construction and fitment to do not influence the construction progress under the prerequisite of realizing safe construction.
In order to achieve the above purpose, the technical scheme of the utility model is realized like this:
a lifting protection platform for main body construction and decoration synchronous operation is installed on a concrete main body structure building wall body, the lifting protection platform comprises a main body construction body and a decoration operation body which are erected along the height direction of the concrete main body structure building wall body, the distance between the main body construction body and the decoration operation body is 6-9 m, the lifting protection platform further comprises two groups of lifting devices which are respectively arranged on two sides of the concrete main body structure building wall body to drive the main body construction body and the decoration operation body to lift, the main body construction body and the decoration operation body respectively comprise rectangular frame bodies, wall attaching devices for installing the frame bodies on the concrete main body structure building wall body and protection devices between the wall attaching devices and the frame bodies, and the decoration operation body further comprises a protection platform installed on the top of the frame bodies, the protection platform includes along a plurality of horizontal poles of encorbelmenting of the width direction interval installation of the frame body, and install in guard plate on the horizontal pole of encorbelmenting still including install in keeping away from of guard plate the side guard plate of concrete major structure building wall body one end, and install respectively in the frame body and each a plurality of bracing pieces on the horizontal pole of encorbelmenting.
As a limitation, each frame body includes a plurality of groups of longitudinal frame assemblies distributed at intervals along the length direction of the concrete main structure building wall, and a plurality of groups of transverse frame assemblies distributed along the height direction of the concrete main structure building wall and respectively connected with the longitudinal frame assemblies at corresponding positions, each group of longitudinal frame assemblies includes two longitudinal beams arranged at intervals along the width direction of the concrete main structure building wall, and each group of transverse frame assemblies includes an operation layer walkway plate and a transverse truss arranged adjacent to the operation layer walkway plate.
As a further limitation, each of the wall attaching devices is at least two groups arranged along the height direction of the concrete main structure building wall, each group of the wall attaching devices comprises two wall attaching bodies arranged along the length direction of the concrete main structure building wall at intervals, and each of the wall attaching bodies comprises a wall attaching support installed on the concrete main structure building wall through a bolt.
As a further limitation, each of the guards includes:
the anti-tilting device comprises two mounting frame bodies which are respectively mounted on the longitudinal beams close to two sides of the concrete main structure building wall body and an anti-tilting guide frame which is respectively arranged on the wall-attached support and enables a main body construction body and a decoration operation body to lift in a guide track, each mounting frame body comprises two C-shaped beams which are arranged along the length direction of the concrete main structure building wall body in an opposite mode, a plurality of columns are arranged between the two C-shaped beams along the height direction of the C-shaped beams at intervals, the anti-tilting guide frame comprises two support seats which are arranged on the wall-attached support at intervals and support frames which are respectively arranged on the two support seats correspondingly, and pulleys which slide in C-shaped grooves of the C-shaped beams at corresponding positions are respectively arranged on each support frame;
the anti-falling device comprises an L-shaped anti-falling block and a reset spring connected between the anti-falling block and the wall-attached support, the top of the anti-falling block is hinged to the anti-falling guide frame through a hinge shaft, the anti-falling device further comprises an anti-falling baffle positioned at one end of the anti-falling block, and the other end, far away from the end close to the anti-falling baffle, of the anti-falling block is provided with an arc-shaped clamping groove matched with the cylinder;
the top bracing device comprises a top bracing seat, a top bracing rod and a top bracing head, wherein one end of the top bracing seat is hinged between the supporting seats, the top bracing rod is connected to the top bracing seat, the top bracing head is connected to the top bracing rod, and a clamping groove clamped with the column body is formed in the top bracing head.
As a further limitation, each set of the lifting devices comprises a first lower hanger arranged between the bottoms of the two sets of the longitudinal frame components of the main body construction body, an upper hanger arranged between the tops of the two sets of the longitudinal frame components of the main body construction body, and a second lower hanger arranged between the bottoms of the two sets of the longitudinal frame components of the decoration operation body; still include via first couple hook in go up the electric block of stores pylon, in install the chain on the electric block, in the chain is kept away from the second couple is installed to electric block's link, in it has the first leading wheel that the outer peripheral face set up first guide way to articulate between first stores pylon down, in around being equipped with on the first guide way one end with concrete major structure building wall is connected, the other end with the first lifting rope that the second couple links, in it has the second leading wheel that the outer peripheral face set up the second guide way to articulate between stores pylon under the second, in around being equipped with on the second guide way one end with concrete major structure building wall is connected, the other end with the second lifting rope that the second couple links.
As a further limitation, a mechanical sensor is mounted on the upper hanger, and the first hook is hooked on the mechanical sensor.
As a further limitation, an inverted U-shaped steel plate is installed between the operation layer walkway plate of the finishing work body and the concrete main structure building wall.
As a further limitation, an enclosure device is respectively installed on each frame body, the enclosure device is formed by splicing a plurality of groups of enclosure modules, and each group of enclosure modules respectively comprises installation clamping seats installed at intervals along the height direction of the longitudinal beam and a protection net sheet installed in the installation clamping seats.
The height of the main construction body is 10.5 m-11 m.
As a further limitation, the height of the decoration operation body is 6 m-7 m.
Compared with the prior art, the utility model discloses following advantage has:
(1) the lifting protection platform for main body construction and decoration synchronous operation can realize the synchronous operation of main body construction and decoration through the arrangement of the main body construction body, the decoration operation body and the two groups of lifting devices so as to shorten the construction period and ensure the safe operation, and the protection capability of the decoration operation body can be improved through the arrangement of the protection platform;
(2) the first lifting rope and the second lifting rope are independently arranged, so that the main body construction body and the decoration operation body can be synchronously or independently lifted according to requirements, and the use convenience is improved;
(3) the mechanical sensor can prompt the bearing weight and improve the use safety of the lifting protection platform;
(4) the arrangement of the enclosure device can improve the use safety performance of the lifting protection platform.
Drawings
The accompanying drawings, which form a part hereof, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention without undue limitation. In the drawings:
fig. 1 is a schematic perspective view of a lifting protection platform for main body construction and decoration synchronous operation according to an embodiment of the present invention;
FIG. 2 is a front view of the lifting protection platform for main body construction and decoration synchronous operation according to the embodiment of the present invention;
FIG. 3 is a left side view of the lifting protection platform for main body construction and decoration synchronous operation according to the embodiment of the present invention;
FIG. 4 is an enlarged view of a portion of FIG. 1 at A;
fig. 5 is a schematic structural view of a walkway plate of an operation layer according to an embodiment of the present invention;
FIG. 6 is an enlarged view of a portion of FIG. 1 at B;
fig. 7 is an assembly schematic view of the auxiliary wall and the protection device according to the embodiment of the present invention;
fig. 8 is a usage status diagram of the wall-attached body and the protection device according to the embodiment of the present invention;
fig. 9 is a schematic structural view of the anti-falling block according to the embodiment of the present invention;
fig. 10 is a schematic structural view of a first bottom suspension bracket according to an embodiment of the present invention;
fig. 11 is a schematic structural view of an upper hanger according to an embodiment of the present invention;
fig. 12 is a partially enlarged view of fig. 2 at C.
Description of reference numerals:
1-main construction body, 111-longitudinal beam, 112-operation layer walkway plate, 113-cross truss, 114-enclosure device, 1141-installation clamping seat, 1142-protective net sheet, 121-wall attaching support, 13-protective device, 131-C beam, 132-column, 133-C groove, 134-supporting seat, 135-supporting frame, 136-pulley, 137-anti-drop block, 138-jacking device, 2-finishing operation body, 21-overhanging cross bar, 22-protective plate, 23-side protective plate, 24-supporting rod, 25-inverted U-shaped steel plate, 3-lifting device, 31-first lower hanging rack, 32-upper hanging rack, 33-second lower hanging rack, 34-electric hoist, 35-first hook, 36-chain, 37-a second hook, 38-a first lifting rope, 39-a second lifting rope, 40-a mechanical sensor and 4-a concrete main structure building wall.
Detailed Description
It should be noted that, in the present invention, the embodiments and features of the embodiments may be combined with each other without conflict.
The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
This embodiment relates to a main part construction and fitment are lift protection platform for synchronous operation, by showing in fig. 1 to fig. 12, lift protection platform installs on concrete major structure building wall 4, and lift protection platform includes main part construction body 1 and fitment operation body 2 of arranging along concrete major structure building wall 4 direction of height, and lay respectively in concrete major structure building wall 4 both sides, in order to drive two sets of elevating gear 3 that main part construction body 1 and fitment operation body 2 go up and down, in this embodiment, the interval is 6m ~ 9m between main part construction body 1 and fitment operation body 2, in this embodiment, the height of main part construction body 1 is 10.5m ~ 11m, the height of fitment operation body 2 is 6m ~ 7 m.
In this embodiment, the main construction body 1 and the finishing operation body 2 respectively include a rectangular frame, a wall attaching device for mounting the frame on the concrete main structure building wall 4, a protection device 13 mounted between the wall attaching device and the frame, and for better protection, the finishing operation body 2 further includes a protection platform mounted on the top of the frame, specifically, the protection platform includes a plurality of overhanging cross bars 21 mounted at intervals along the width direction of the frame, a protection plate 22 mounted on the overhanging cross bars 21, a side guard plate 23 mounted on the protection plate 22 at the end far from the concrete main structure building wall 4, and a plurality of support bars 24 mounted on the frame and the overhanging cross bars 21, specifically, each support bar 24 is mounted between the following longitudinal beam 111 and the overhanging cross bar 21, in this embodiment, in order to improve the protection effect, an inverted U-shaped steel plate 25 is arranged between the operation layer walkway plate 112 of the decoration operation body 2 and the concrete main structure building wall 4.
In this embodiment, each frame body includes a plurality of groups of vertical frame members distributed at intervals along the length direction of the concrete main structure building wall 4, and a plurality of groups of horizontal frame members distributed along the height direction of the concrete main structure building wall 4 and respectively connected with the vertical frame members at corresponding positions, each group of vertical frame members includes two longitudinal beams 111 arranged at intervals along the width direction of the concrete main structure building wall 4, each group of horizontal frame members includes an operation layer walkway plate 112, and a horizontal truss 113 arranged adjacent to the operation layer walkway plate 112.
Each attaches wall device and is at least two sets ofly that set up along concrete major structure building wall 4 direction of height, and in this embodiment, the main part construction body 1 attaches the wall device and is three groups, and fitment operation body 2 attaches the wall device and is two sets ofly, and each attaches the wall device and all includes two that set up along concrete major structure building wall 4 length direction interval and attaches the wall body, specifically, each attaches the wall body and includes respectively including attaching wall support 121 on concrete major structure building wall 4 via the bolt mounting.
In this embodiment, each protection device 13 is disposed corresponding to the wall-attached support 121, each protection device 13 includes an anti-tilt device, and a top-support device 138, and in a specific structure, the anti-tilt device includes two mounting frames respectively mounted on the longitudinal beams 111 near both sides of the concrete main structure building wall 4, and an anti-tilt guide frame respectively mounted on the wall-attached support 121 and configured to lift the main construction body 1 and the finishing operation body 2 within a guide track, each mounting frame includes two C-shaped beams 131 disposed opposite to each other along the length direction of the concrete main structure building wall 4, a plurality of columns 132 are disposed at intervals between the two C-shaped beams 131 along the height direction of the C-shaped beams 131, the anti-tilt guide frame includes two support bases 134 disposed at intervals on the wall-attached support 121, and support bases 135 respectively disposed on the two support bases 134, and pulleys 136 sliding in C-shaped grooves 133 of the C-shaped beams 131 at corresponding positions are respectively disposed on each support base 135.
In this embodiment, the anti-falling device comprises an L-shaped anti-falling block 137 and a return spring connected between the anti-falling block 137 and the wall-attached support 121, the top of the anti-falling block 137 is hinged to the anti-falling guide frame through a hinge shaft, the anti-falling device further comprises an anti-falling baffle located at one end of the anti-falling block 137, and an arc-shaped clamping groove matched with the column 132 is formed in the other end, far away from one end close to the anti-falling baffle, of the anti-falling block 137. In this embodiment, the top supporting device 138 includes a top supporting base with one end hinged between the supporting bases 134, a top supporting rod connected to the top supporting base, and a top supporting head connected to the top supporting rod, and the top supporting head is provided with a slot engaged with the pillar 132.
In this embodiment, each set of lifting devices 3 includes a first lower hanger 31 installed between the bottoms of the two sets of longitudinal frame assemblies of the main body construction body 1, an upper hanger 32 installed between the tops of the two sets of longitudinal frame assemblies of the main body construction body 1, and a second lower hanger 33 installed between the bottoms of the two sets of longitudinal frame assemblies of the finishing body 2; the lifting device further comprises an electric hoist 34 hooked to the upper hanging rack 32 through a first hook 35, a chain 36 is installed on the electric hoist 34, a second hook 37 is installed at the connecting end, far away from the electric hoist 34, of the chain 36, a first guide wheel with a first guide groove formed in the outer peripheral surface is hinged between the first lower hanging rack 31, a first lifting rope 38 with one end connected with the concrete main structure building wall 4 and the other end hooked with the second hook 37 is arranged on the first guide groove in a winding mode, a second guide wheel with a second guide groove formed in the outer peripheral surface is hinged between the second lower hanging rack 33, and a second lifting rope 39 with one end connected with the concrete main structure building wall 4 and the other end hooked with the second hook 37 is arranged on the second guide groove in a winding mode. Through the arrangement of the first and second lifting ropes 38 and 39, they can be hooked on the second hook 37 separately or simultaneously to lift the main body construction body 1 and the finishing work body 2 separately or simultaneously as required.
In order to improve the safety, a mechanical sensor 40 is installed on the upper hanger 32, the first hook 35 is hooked on the mechanical sensor 40, in order to improve the protection performance, enclosure devices 114 are installed on the main body construction body 1 and each frame body of the decoration operation body 2 respectively, the enclosure devices 114 are formed by splicing a plurality of groups of enclosure modules, each group of enclosure modules comprises installation clamping seats 1141 installed at intervals along the height direction of the longitudinal beam 111 and protection net sheets 1142 installed in the installation clamping seats 1141, in the embodiment, the installation clamping seats 1141 comprise a plurality of groups of H-shaped paired clamping blocks arranged at intervals along the length direction of the concrete main body structure building wall 4, and U-shaped pieces installed between the H-shaped paired clamping blocks respectively.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (10)
1. The utility model provides a main part construction and fitment are lift protection platform for synchronous operation installs on concrete major structure building wall, its characterized in that: the lifting protection platform comprises a main body construction body and a decoration operation body which are erected along the height direction of the concrete main structure building wall body, the distance between the main body construction body and the decoration operation body is 6 m-9 m, the lifting protection platform also comprises two groups of lifting devices which are respectively arranged on two sides of the concrete main structure building wall body and drive the main body construction body and the decoration operation body to lift, the main body construction body and the decoration operation body respectively comprise rectangular frame bodies, wall attaching devices for installing the frame bodies on the concrete main structure building wall body, and protection devices installed between the wall attaching devices and the frame bodies, the decoration operation body also comprises a protection platform installed on the top of the frame bodies, and the protection platform comprises a plurality of cantilever cross rods which are installed at intervals along the width direction of the frame bodies, and the protection plate is arranged on the overhanging cross rod, and the protection plate further comprises a side protection plate arranged at one end of the concrete main structure building wall body and a plurality of support rods respectively arranged on the frame body and the overhanging cross rod.
2. The lifting protection platform for main body construction and decoration synchronous operation of claim 1, wherein: each the frame body all includes the edge the multiunit of concrete major structure building wall's length direction interval distribution indulges the frame subassembly, and follows the horizontal frame subassembly of multiunit that the direction of height of concrete major structure building wall distributes, respectively with the vertical frame subassembly that corresponds position department is connected, each group indulge the frame subassembly and all include the edge two longerons that the width direction interval of concrete major structure building wall set up, each group the horizontal frame subassembly all includes the operation layer and walks the guidance tape, and be adjacent to the horizontal truss that the guidance tape set up is walked to the operation layer.
3. The lifting protection platform for main body construction and decoration synchronous operation of claim 2, wherein: each attach the wall device and be at least two sets ofly along concrete major structure building wall direction of height sets up, each group attaches the wall device and all includes along two that concrete major structure building wall length direction interval set up attach the wall body, each attach the wall body respectively including install via the bolt in attach the wall support on concrete major structure building wall.
4. The lift protection platform for main body construction and finishing synchronous operation of claim 3, wherein each of the protection devices comprises:
the anti-tilting device comprises two mounting frame bodies which are respectively mounted on the longitudinal beams close to two sides of the concrete main structure building wall body and an anti-tilting guide frame which is respectively arranged on the wall-attached support and enables a main body construction body and a decoration operation body to lift in a guide track, each mounting frame body comprises two C-shaped beams which are arranged along the length direction of the concrete main structure building wall body in an opposite mode, a plurality of columns are arranged between the two C-shaped beams along the height direction of the C-shaped beams at intervals, the anti-tilting guide frame comprises two support seats which are arranged on the wall-attached support at intervals and support frames which are respectively arranged on the two support seats correspondingly, and pulleys which slide in C-shaped grooves of the C-shaped beams at corresponding positions are respectively arranged on each support frame;
the anti-falling device comprises an L-shaped anti-falling block and a reset spring connected between the anti-falling block and the wall-attached support, the top of the anti-falling block is hinged to the anti-falling guide frame through a hinge shaft, the anti-falling device further comprises an anti-falling baffle positioned at one end of the anti-falling block, and the other end, far away from the end close to the anti-falling baffle, of the anti-falling block is provided with an arc-shaped clamping groove matched with the cylinder;
the top bracing device comprises a top bracing seat, a top bracing rod and a top bracing head, wherein one end of the top bracing seat is hinged between the supporting seats, the top bracing rod is connected to the top bracing seat, the top bracing head is connected to the top bracing rod, and a clamping groove clamped with the column body is formed in the top bracing head.
5. The lifting protection platform for main body construction and decoration synchronous operation of claim 2, wherein: each group of lifting devices comprises a first lower hanging frame arranged between the bottoms of the two groups of longitudinal frame components of the main body construction body, an upper hanging frame arranged between the tops of the two groups of longitudinal frame components of the main body construction body, and a second lower hanging frame arranged between the bottoms of the two groups of longitudinal frame components of the decoration operation body; still include via first couple hook in go up the electric block of stores pylon, in install the chain on the electric block, in the chain is kept away from the second couple is installed to electric block's link, in it has the first leading wheel that the outer peripheral face set up first guide way to articulate between first stores pylon down, in around being equipped with on the first guide way one end with concrete major structure building wall is connected, the other end with the first lifting rope that the second couple links, in it has the second leading wheel that the outer peripheral face set up the second guide way to articulate between stores pylon under the second, in around being equipped with on the second guide way one end with concrete major structure building wall is connected, the other end with the second lifting rope that the second couple links.
6. The lifting protection platform for main body construction and decoration synchronous operation of claim 5, wherein: and a mechanical sensor is arranged on the upper hanging frame, and the first hook is hooked on the mechanical sensor.
7. The lifting protection platform for main body construction and decoration synchronous operation of claim 2, wherein: and an inverted U-shaped steel plate is arranged between the operation layer walkway plate of the decoration operation body and the concrete main structure building wall body.
8. The lifting protection platform for main body construction and decoration synchronous operation of claim 2, wherein: and the enclosure device is formed by splicing a plurality of groups of enclosure modules, and each group of enclosure modules comprises installation clamping seats and protection meshes, wherein the installation clamping seats are installed at intervals along the height direction of the longitudinal beam, and the protection meshes are installed in the installation clamping seats.
9. The lifting protection platform for main body construction and decoration synchronous operation of claim 1, wherein: the height of the main body construction body is 10.5-11 m.
10. The main body construction and finishing synchronous operation lifting protection platform of claim 9, characterized in that: the height of the decoration operation body is 6-7 m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921068250.3U CN210369843U (en) | 2019-07-10 | 2019-07-10 | Lifting protection platform for main body construction and decoration synchronous operation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921068250.3U CN210369843U (en) | 2019-07-10 | 2019-07-10 | Lifting protection platform for main body construction and decoration synchronous operation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210369843U true CN210369843U (en) | 2020-04-21 |
Family
ID=70270326
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921068250.3U Expired - Fee Related CN210369843U (en) | 2019-07-10 | 2019-07-10 | Lifting protection platform for main body construction and decoration synchronous operation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210369843U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110219451A (en) * | 2019-07-10 | 2019-09-10 | 河北亿安工程技术股份有限公司 | Main body construction and finishing synchronization job lifting protective platform and operational method |
CN116892288A (en) * | 2023-09-11 | 2023-10-17 | 山西盛帅建筑工程有限公司 | Attached lifting scaffold lifting mechanism |
-
2019
- 2019-07-10 CN CN201921068250.3U patent/CN210369843U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110219451A (en) * | 2019-07-10 | 2019-09-10 | 河北亿安工程技术股份有限公司 | Main body construction and finishing synchronization job lifting protective platform and operational method |
CN110219451B (en) * | 2019-07-10 | 2024-02-27 | 河北亿安工程技术股份有限公司 | Lifting protection platform for main body construction and decoration synchronous operation and operation method |
CN116892288A (en) * | 2023-09-11 | 2023-10-17 | 山西盛帅建筑工程有限公司 | Attached lifting scaffold lifting mechanism |
CN116892288B (en) * | 2023-09-11 | 2023-11-17 | 山西盛帅建筑工程有限公司 | Attached lifting scaffold lifting mechanism |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210369843U (en) | Lifting protection platform for main body construction and decoration synchronous operation | |
CN109826411A (en) | A kind of climbing frame and its operation method for building | |
CN205934718U (en) | Movable hanging basket device for bridge construction | |
CN110004834A (en) | A kind of automatic climbing platform for hanging cable construction | |
RU2736256C2 (en) | Assembled protective screen for perimeter fencing | |
CN110219451B (en) | Lifting protection platform for main body construction and decoration synchronous operation and operation method | |
CN109296192B (en) | Lifting frame for assembled building | |
CN110886225A (en) | Construction method of cable tower stay cable installation system | |
CN213417598U (en) | Basket is hung with portable to bridge construction | |
CN216240384U (en) | Operation platform assembly with ladder stand suitable for steel structure high altitude installation | |
RU198229U1 (en) | MOBILE STAIRCASE FOR DOME BUILDING | |
CN210508434U (en) | Roof steel skeleton light net rack cement composite board mounting system | |
CN211169743U (en) | Building outer wall protection scaffold lift | |
CN210659199U (en) | Attached detachable multifunctional aerial work platform | |
CN205529939U (en) | Bridge testing and maintenance platform of rope type | |
CN220336411U (en) | Protection platform lifting point truss for building construction | |
CN214059667U (en) | Hoist bridge crane convenient to maintain | |
CN219823484U (en) | Attached tower crane pedestrian passageway | |
CN220847087U (en) | Movable scaffold work platform suitable for bridge overhauls | |
CN217418117U (en) | Handrail elevator protection mounting tool | |
CN214220525U (en) | Scaffold for building engineering | |
CN219010950U (en) | Monorail sliding operation platform for overhauling outer side of subway viaduct | |
CN219411718U (en) | Operation frame for safety protection of high-altitude operation | |
CN213774374U (en) | Support for installing reinforcing steel bars | |
CN221255244U (en) | Steel-concrete composite beam main longitudinal beam construction platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200421 |