CN210140619U CN201920818997.XU CN201920818997U CN210140619U CN 210140619 U CN210140619 U CN 210140619U CN 201920818997 U CN201920818997 U CN 201920818997U CN 210140619 U CN210140619 U CN 210140619U
Authority
CN
China
Prior art keywords
post
box
galvanized
conveyor belt
galvanizing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920818997.XU
Other languages
Chinese (zh)
Inventor
韩磊鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Deben Fastener Co ltd
Original Assignee
Hebei Zhongyun Traffic Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Zhongyun Traffic Engineering Co Ltd filed Critical Hebei Zhongyun Traffic Engineering Co Ltd
Priority to CN201920818997.XU priority Critical patent/CN210140619U/en
Application granted granted Critical
Publication of CN210140619U publication Critical patent/CN210140619U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Coating With Molten Metal (AREA)

Abstract

本实用新型提供一种螺钉镀锌后处理装置,包括用于传输镀锌待处理螺钉的传动机构、用于对传送带上的镀锌待处理螺钉二次镀锌的镀锌后处理箱、用于风吹冷却经二次镀锌操作后的镀锌螺钉的风箱、用于水冷并清洗经风吹冷却后的镀锌螺钉的水冷箱和用于烘干经过水冷后的镀锌螺钉的烘干箱,所述传送带穿过所述镀锌后处理箱,所述镀锌后处理箱内部设置喷射镀锌层的喷管和加热装置;所述传送带穿过所述风箱,所述风箱内部设置鼓风机,所述鼓风机出口连接分流盘。一种螺钉镀锌后处理装置能够为经过初次镀锌操作后的螺钉进行有效二次镀锌,并且冷却、烘干效果好。

Figure 201920818997

The utility model provides a screw galvanizing post-processing device, which comprises a transmission mechanism for transmitting the galvanized screws to be processed, a galvanized post-processing box for secondary galvanizing the galvanized screws to be processed on the conveyor belt, Wind box for cooling galvanized screws after secondary galvanizing operation, water cooling box for water cooling and cleaning of galvanized screws after wind blow cooling, and drying box for drying galvanized screws after water cooling , the conveyor belt passes through the galvanized post-treatment box, and a spray pipe and a heating device for spraying the galvanized layer are arranged inside the galvanized post-treatment box; the conveyor belt passes through the bellows, and a blower is arranged inside the bellows, The outlet of the blower is connected to the diverter plate. A screw galvanizing post-processing device can effectively perform secondary galvanizing for screws after primary galvanizing operation, and has good cooling and drying effects.

Figure 201920818997

Description

一种螺钉镀锌后处理装置A screw galvanized post-processing device

技术领域technical field

本实用新型涉及镀锌装置技术领域,尤其是一种螺钉镀锌后处理装置。The utility model relates to the technical field of galvanizing devices, in particular to a screw galvanizing post-processing device.

背景技术Background technique

在螺钉表面镀锌,可以增加螺钉的防腐效果,热浸镀锌防锈的费用要比其他漆料图层的费用低,热浸镀锌的原理,简单的说即是将已清洗洁净的铁件,经由Flux 的润湿作用,浸入锌浴中,使钢铁与熔融锌反应生成一合金化的皮膜。良好的热浸镀锌作业,应是各流程均在严格的管制下,彻底发挥该流程的功能。且若前一流程的操作不善,会造成后续流程的连锁不良反应,而大量增加作业成本或造成不良热浸镀锌产品。若前处理不良,则熔锌无法与钢铁正常完全反应,形成最完美的镀锌皮膜组织。若后处理不良,则破坏镀锌皮膜外观,降低商品价值等。Galvanizing on the surface of the screw can increase the anti-corrosion effect of the screw. The cost of hot-dip galvanizing is lower than that of other paint layers. The principle of hot-dip galvanizing is to simply put the cleaned iron The parts, through the wetting effect of Flux, are immersed in a zinc bath, so that the steel reacts with molten zinc to form an alloyed film. In a good hot dip galvanizing operation, each process should be under strict control, and the function of the process should be fully exerted. And if the operation of the previous process is not good, it will cause a chain reaction of adverse reactions in the subsequent process, which will greatly increase the operating cost or cause poor hot-dip galvanized products. If the pretreatment is not good, the molten zinc cannot react completely with the steel to form the most perfect galvanized film structure. If the post-treatment is not good, the appearance of the galvanized film will be damaged, and the commodity value will be reduced.

目前来说,对螺钉镀锌一般采用的是直接将待镀锌螺钉浸入锌液中镀锌,实现镀层功能,这样直接热浸后再进行冷却处理,但是,这样形成的镀锌表层表面容易产生镀锌不均的现象,影响镀锌附着效果;并且镀锌后的冷却处理时,通常直接采用浸入冷水中水冷却的方式,但是这样螺钉表面的水渍不能有效处理干净,影响螺钉的使用寿命,有些虽然包括不同的处理过程,但是过程繁琐,易导致处理过程中螺钉的丢失及遗落。At present, galvanizing of screws is generally used to directly immerse the screws to be galvanized in zinc solution to realize the coating function, so that the cooling treatment is performed after direct hot dipping. However, the galvanized surface formed in this way is easy to produce The phenomenon of uneven galvanizing affects the adhesion effect of galvanizing; and the cooling treatment after galvanizing is usually directly immersed in cold water for cooling, but the water stains on the surface of the screw cannot be effectively cleaned, which affects the service life of the screw. , Some of them include different treatment processes, but the process is cumbersome, which may easily lead to the loss and loss of screws during the treatment process.

实用新型内容Utility model content

鉴于以上所述现有技术的缺点,本实用新型的目的在于提供一种螺钉镀锌后处理装置,采用镀锌后的二次均匀处理,实现二次均匀镀锌处理,并且冷却、烘干效果好。In view of the shortcomings of the above-mentioned prior art, the purpose of this utility model is to provide a screw galvanizing post-processing device, which adopts secondary uniform galvanizing treatment after galvanizing to realize secondary uniform galvanizing treatment, and has cooling and drying effects. it is good.

为实现上述目的及其他相关目的,本实用新型提供一种螺钉镀锌后处理装置,包括:In order to achieve the above purpose and other related purposes, the utility model provides a screw galvanized post-processing device, comprising:

传动机构,包括传送带和带动所述传送带运动的传动轮,所述传动轮与电机连接,所述传动轮置于所述传送带两端并通过支架支撑;The transmission mechanism includes a conveyor belt and a transmission wheel that drives the conveyor belt to move, the transmission wheel is connected to a motor, and the transmission wheel is placed at both ends of the conveyor belt and supported by a bracket;

镀锌后处理箱,设置在靠近所述传送带的进口端,所述镀锌后处理箱内部根据传送方向依次设置两次喷射镀锌层的喷管和加热装置;The galvanizing post-processing box is arranged near the inlet end of the conveyor belt, and the inside of the galvanizing post-processing box is sequentially provided with a nozzle and a heating device for spraying the galvanized layer twice according to the conveying direction;

风箱,所述风箱紧挨所述镀锌后处理箱设置在其后方,所述风箱内部设置鼓风机,所述鼓风机出口连接分流盘;a bellows, the bellows is arranged at the rear of the galvanized post-processing box, a blower is arranged inside the bellows, and the outlet of the blower is connected to a shunt plate;

水冷箱,所述水冷箱紧挨所述风箱,所述水冷箱内部装有水;以及a water-cooling box, the water-cooling box is adjacent to the bellows, and the water-cooling box is filled with water; and

烘干箱,所述烘干箱紧挨所述水冷箱且靠近所述传送带出口端,所述烘干箱内部设置烘干板。A drying box, the drying box is adjacent to the water cooling box and close to the outlet end of the conveyor belt, and a drying board is arranged inside the drying box.

优选地,所述传送带根据螺钉的传送顺序依次穿过所述镀锌后处理箱、所述风箱,所述水冷箱、所述烘干箱,且镀锌后处理箱、风箱、水冷箱、烘干箱分别与所述传送带密封连接。Preferably, the conveyor belt passes through the galvanizing post-processing box, the bellows, the water-cooling box, the drying box, and the galvanizing post-processing box, the bellows, the water-cooling box, the drying box, and the The dry boxes are respectively sealingly connected to the conveyor belts.

优选地,所述加热装置与传送带间设有多个支撑杆。Preferably, a plurality of support rods are arranged between the heating device and the conveyor belt.

优选地,所述分流盘设有进风口和出风口,所述进风口与所述鼓风机连通,所述出风口连接分流管,所述分流管出口端正对所述传送带。Preferably, the air distribution plate is provided with an air inlet and an air outlet, the air inlet communicates with the blower, and the air outlet is connected to a distribution pipe, and the outlet end of the distribution pipe faces the conveyor belt.

优选地,所述水冷箱底部设置换水口,所述换水口内设置开关阀。Preferably, a water exchange port is provided at the bottom of the water cooling box, and an on-off valve is provided in the water exchange port.

优选地,所述传送带通过伸缩杆连接夹板,所述夹板底端开有并排设置的定位槽,所述定位槽正对待处理螺钉的一端,所述待处理螺钉的另外一端抵接所述传送带。Preferably, the conveyor belt is connected to the splint through a telescopic rod, and the bottom end of the splint is provided with positioning grooves arranged side by side, the positioning grooves are facing one end of the screw to be processed, and the other end of the screw to be processed abuts the conveyor belt.

优选地,所述镀锌后处理箱上端开口处设有铰接端,所述铰接端铰接镀锌后处理箱与铰接盖,所述铰接盖横截面为弧形,所述铰接盖的顶端设置一抓手。Preferably, a hinged end is provided at the upper opening of the galvanized post-processing box, the hinged end is hinged to the galvanized post-processing box and the hinged cover, the cross-section of the hinged cover is arc-shaped, and the top of the hinged cover is provided with a hinged end. Grasp.

本实用新型的有益效果是:The beneficial effects of the present utility model are:

本实用新型的一种螺钉镀锌后处理装置,通过将镀锌待处理螺钉置于传送带上,在传动轮的传输下依次经过镀锌后处理箱进行二次镀锌处理、风箱风冷却处理、水冷箱冷却处理及烘干箱烘干处理,整个处理过程完整,且采用流线式操作,节省时间,不仅保证良好的镀锌效果并且采用流线式处理,对经过热浸式镀锌处理后螺钉的后处理完善、有序,保证镀锌螺钉的加工质量。The utility model relates to a screw galvanizing post-processing device. By placing the galvanized screws to be processed on a conveyor belt, the galvanizing post-processing box is sequentially transmitted through the transmission wheel to carry out secondary galvanizing treatment, bellows air cooling treatment, Water cooling box cooling treatment and drying box drying treatment, the entire treatment process is complete, and the streamlined operation is adopted to save time. It not only ensures good galvanizing effect, but also adopts streamlined treatment. After hot-dip galvanizing treatment The post-processing of the screws is perfect and orderly to ensure the processing quality of the galvanized screws.

附图说明Description of drawings

下面结合附图和具体实施方式对本实用新型作进一步详细的说明。The present utility model will be described in further detail below with reference to the accompanying drawings and specific embodiments.

图1是本实用新型实施例提供的一种螺钉镀锌后处理装置的结构示意图;1 is a schematic structural diagram of a screw galvanized post-processing device provided by an embodiment of the present invention;

图2是本实用新型实施例提供的传送带与夹板连接图;2 is a connection diagram of a conveyor belt and a splint provided by an embodiment of the present utility model;

图3是本实用新型实施例提供的夹板局部结构图。3 is a partial structural diagram of a splint provided by an embodiment of the present invention.

附图标记说明Description of reference numerals

1-传动轮;2-传送带;3-镀锌后处理箱;4-铰接端;5-铰接盖;6-抓手;7-喷管;8-风箱;9-水冷箱;10-烘干箱;11-支架;12-从动轮;13-烘干板;14-换水口;15-鼓风机;16-分流盘;17-分流管;18-加热装置;19-支撑杆;20-夹板;22-镀锌待处理螺钉;23-定位槽;24-伸缩杆。1- Transmission wheel; 2- Conveyor belt; 3- Galvanized post-processing box; 4- Hinged end; 5- Hinged cover; 6- Gripper; 7- Nozzle; Box; 11-bracket; 12-driven wheel; 13-drying plate; 14-water exchange port; 15-blower; 16-split plate; 17-split pipe; 18-heating device; 19-support rod; 20-splint; 22- Galvanized screw for treatment; 23- Positioning slot; 24- Telescopic rod.

具体实施方式Detailed ways

下面结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述。在下面的描述中阐述了很多具体细节以便于充分理解本实用新型,但是本实用新型还可以采用其他不同于在此描述的其它方式来实施,本领域技术人员可以在不违背本实用新型内涵的情况下做类似推广,因此本实用新型不受下面公开的具体实施例的限制。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. In the following description, many specific details are set forth in order to fully understand the present utility model, but the present utility model can also be implemented in other ways different from those described herein, and those skilled in the art can do so without departing from the connotation of the present utility model. Therefore, the present invention is not limited by the specific embodiments disclosed below.

请一并参阅图1、图2和图3,本实用新型提供了一种螺钉镀锌后处理装置,包括用于传输镀锌待处理螺钉22的传动机构、用于对传送带2上的镀锌待处理螺钉22实现二次镀锌的镀锌后处理箱3、用于风吹冷却经二次镀锌操作后的镀锌螺钉的风箱8、用于水冷并清洗经风吹冷却后的二次镀锌螺钉的水冷箱9和用于烘干经过水冷后的二次镀锌螺钉的烘干箱10。Please refer to FIG. 1 , FIG. 2 and FIG. 3 together. The utility model provides a screw galvanizing post-processing device, including a transmission mechanism for transmitting galvanized screws 22 to be treated, and a galvanizing mechanism for galvanizing the conveyor belt 2 The galvanized post-processing box 3 for the screws to be treated 22 realizes secondary galvanizing, the bellows 8 for air-cooling the galvanized screws after the secondary galvanizing operation, and the secondary galvanizing for water cooling and cleaning. A water cooling box 9 for galvanized screws and a drying box 10 for drying the water-cooled secondary galvanized screws.

本装置用于对采用热浸镀锌后螺钉的后处理,由于采用热浸镀锌方式处理的镀锌螺钉表面镀锌容易不均匀,影响使用效果,因此采用本装置进行二次处理。采用热浸镀锌方式处理时,采用的是将待镀锌螺钉整个浸入锌液中,再从锌液中取出的螺钉至于本装置中的传动机构当中,进行后处理;传入本装置后在镀锌后处理箱3内是对已经经过热浸式镀锌螺钉的二次镀锌及后处理。二次镀锌的作用是采用热浸式镀锌螺钉后,由于螺钉表面容易附着气泡且热浸式镀锌进入时间较短,首次镀锌后容易产生镀锌堆积或部分缺锌料的现象。This device is used for post-treatment of screws after hot-dip galvanizing. Since the surface of galvanized screws treated by hot-dip galvanizing is prone to uneven galvanization, which affects the use effect, this device is used for secondary treatment. When the hot-dip galvanizing method is used, the whole screw to be galvanized is immersed in the zinc liquid, and then the screw taken out from the zinc liquid is placed in the transmission mechanism of the device for post-processing; The post-galvanizing treatment box 3 is for secondary galvanizing and post-processing of the hot-dip galvanized screws. The function of secondary galvanizing is that after hot-dip galvanizing screws are used, because the surface of the screw is easy to adhere to air bubbles and the entry time of hot-dip galvanizing is short, it is easy to produce galvanized accumulation or partial zinc deficiency after the first galvanizing.

首先,用于传输镀锌待处理螺钉22的传动机构包括传送带2和带动所述传送带2运动的传动轮1,所述传动轮1通过电机驱动,所述传动轮1置于所述传送带2两端并通过支架11支撑,其中,所述传动轮1包括主动传动轮和从动传动轮,所述主动传动轮由电机驱动。First, the transmission mechanism for transmitting the galvanized screws 22 to be processed includes a conveyor belt 2 and a transmission wheel 1 that drives the conveyor belt 2 to move. The transmission wheel 1 is driven by a motor, and the transmission wheel 1 is placed on the conveyor belt 2. The transmission wheel 1 includes a driving transmission wheel and a driven transmission wheel, and the driving transmission wheel is driven by a motor.

所述传动轮1带动的传送带2依次经过镀锌后处理箱3、风箱8、水冷箱9和烘干箱10。镀锌后处理箱3、风箱8、水冷箱9和烘干箱10均为内部中空的壳体,他们彼此相连与传送带2密封连接,并且顶部侧壁处设有铰接端,例如本实施例提供的镀锌后处理箱3上端开口处设有铰接端4,所述铰接端4铰接镀锌后处理箱3与铰接盖5,所述铰接盖5横截面为弧形,所述铰接盖5的顶端设置一抓手6,这样当镀锌后处理箱3内部出现故障时,可以及时进行修理,其他的风箱8、水冷箱9和烘干箱10均可采用与镀锌后处理箱3相类似的结构,由于使用原理类似,在此不再赘述。The conveyor belt 2 driven by the transmission wheel 1 passes through the galvanizing post-processing box 3 , the bellows 8 , the water cooling box 9 and the drying box 10 in sequence. The galvanized post-processing box 3, the bellows 8, the water cooling box 9 and the drying box 10 are all hollow shells, which are connected to each other in a sealed connection with the conveyor belt 2, and are provided with hinged ends at the top and side walls. For example, this embodiment provides The upper opening of the galvanized post-processing box 3 is provided with a hinged end 4, and the hinged end 4 is hinged to the galvanized post-processing box 3 and the hinged cover 5. The cross-section of the hinged cover 5 is arc-shaped, and the hinged cover 5 A gripper 6 is provided at the top, so that when a fault occurs inside the galvanized post-processing box 3, it can be repaired in time. The structure, since the principle of use is similar, will not be repeated here.

所述传送带2穿过所述镀锌后处理箱3并靠近所述传送带2的进口端,所述镀锌后处理箱3内部设置二次喷射镀锌层的喷管7和对二次镀锌均匀加热的加热装置18,喷管7可采用花洒状的喷管,保证均匀的对置于传送带2上的镀锌待处理螺钉22二次喷洒镀锌,镀锌后处理箱3内部设置盛有镀锌源的箱体,喷管7通过泵连接承载镀锌源的箱体,当需要二次镀锌时,打开泵的开关,锌料经由喷管7喷洒;其中的加热装置18保证初次镀锌后螺钉表面再进行二次镀锌的均匀性及有效性,所述加热装置18与传送带2间设有多个支撑杆19,多个支撑杆19保证在螺钉运输过程中的稳定性,避免螺钉滑落。所述传送带2带着经过二次镀锌过程处理的螺钉穿过所述风箱8,所述风箱8紧挨所述镀锌后处理箱3,所述风箱8内部设置鼓风机15,所述鼓风机15出口连接分流盘16,经过二次镀锌操作的螺钉,带有较高温度,所述分流盘16设有进风口和出风口,所述进风口与所述鼓风机15连通,所述出风口连接分流管17,所述分流管17出口端正对所述传送带2,由此保证对经过二次镀锌处理的螺钉风吹冷却;所述传送带2再次带着经过风吹冷却的二次镀锌螺钉穿过所述水冷箱9,所述水冷箱9紧挨所述风箱8,所述水冷箱9内部装有液态水,此处的液态水有两种作用,其一是冷却,其二是清洗;所述水冷箱9底部设有换水口14,换水口14内设置开关阀,当水冷箱9内的水太脏或温度过高需要更换时,打开换水口14内的开关阀即可实现水冷箱9内液态水的更换。The conveyor belt 2 passes through the galvanizing post-processing box 3 and is close to the inlet end of the conveyor belt 2. Inside the galvanizing post-processing box 3, a nozzle 7 for secondary spraying of the galvanized layer and a secondary galvanized coating are arranged. The heating device 18 for uniform heating, and the spray pipe 7 can be a shower-shaped nozzle to ensure that the galvanized screws 22 to be treated on the conveyor belt 2 are evenly sprayed with galvanizing twice. For the box with galvanized source, the nozzle 7 is connected to the box carrying the galvanized source through the pump. When secondary galvanizing is required, the switch of the pump is turned on, and the zinc material is sprayed through the nozzle 7; the heating device 18 ensures the first The uniformity and effectiveness of secondary galvanizing on the surface of the screw after galvanizing, a plurality of support rods 19 are arranged between the heating device 18 and the conveyor belt 2, and the plurality of support rods 19 ensure the stability of the screw during transportation. Avoid the screws from slipping off. The conveyor belt 2 passes through the bellows 8 with the screws processed by the secondary galvanizing process, and the bellows 8 is adjacent to the post-galvanizing treatment box 3. Inside the bellows 8, a blower 15 is arranged, and the blower 15 The outlet is connected to the shunt plate 16, which has been subjected to secondary galvanizing operation and has a higher temperature. The shunt plate 16 is provided with an air inlet and an air outlet, the air inlet is communicated with the blower 15, and the air outlet is connected to The shunt pipe 17, the outlet end of the shunt pipe 17 is facing the conveyor belt 2, thereby ensuring the wind cooling of the screws that have undergone secondary galvanizing treatment; the conveyor belt 2 again carries the secondary galvanized screws that have undergone air cooling Passing through the water-cooled box 9, the water-cooled box 9 is adjacent to the bellows 8, and the water-cooled box 9 is filled with liquid water. The liquid water here has two functions, one for cooling, and the other for cleaning. The bottom of the water-cooling box 9 is provided with a water-exchange port 14, and an on-off valve is set in the water-exchange port 14. When the water in the water-cooled box 9 is too dirty or the temperature is too high and needs to be replaced, open the on-off valve in the water-exchange port 14 to realize water cooling Replacement of liquid water in tank 9.

最后,所述传送带2带着经过水冷处理的镀锌螺钉穿过所述烘干箱10烘干,所述烘干箱10紧挨所述水冷箱9且靠近所述传送带2出口端,所述烘干箱10内部设置烘干板13。所述传送带2从左到右依次穿过所述镀锌后处理箱3、所述风箱8,所述水冷箱9、所述烘干箱10,且镀锌后处理箱3、风箱8、水冷箱9、烘干箱10分别与所述传送带2密封连接,防止异物落入,影响整个装置的正常运行。Finally, the conveyor belt 2 passes through the drying box 10 with water-cooled galvanized screws for drying. The drying box 10 is adjacent to the water-cooling box 9 and close to the outlet end of the conveyor belt 2. A drying plate 13 is arranged inside the drying box 10 . The conveyor belt 2 passes through the galvanizing post-processing box 3, the bellows 8, the water-cooling box 9, the drying box 10, and the galvanizing post-processing box 3, the bellows 8, the water-cooling box from left to right The box 9 and the drying box 10 are respectively connected with the conveyor belt 2 in a sealed manner to prevent foreign objects from falling in and affect the normal operation of the entire device.

另外,所述传送带2通过伸缩杆24连接夹板20,所述夹板20底端开有并排设置的定位槽23,所述定位槽23正对镀锌待处理螺钉22的一端,所述镀锌待处理螺钉22的另外一端抵接所述传送带2,这样避免镀锌待处理螺钉22在镀锌过程中乱动导致镀锌不全或镀锌不均的现象发生。In addition, the conveyor belt 2 is connected to the splint 20 through a telescopic rod 24, and the bottom end of the splint 20 is provided with positioning grooves 23 arranged side by side. The other end of the processing screw 22 is abutted against the conveyor belt 2, so as to avoid the phenomenon of incomplete or uneven galvanizing caused by the screw 22 to be processed galvanized moving around during the galvanizing process.

综上所述,本实用新型提供了一种螺钉镀锌后处理装置,通过将经过热浸镀锌处理后的待处理螺钉置于传送带,在传动轮的传输下依次经过镀锌后处理箱镀锌、风箱风冷却、水冷箱冷却及烘干箱烘干,整个处理过程完整,且采用流线式操作,节省时间,不仅保证良好的二次镀锌效果并且采用流线式处理,对镀锌后螺钉的后处理完善、有序;采用传送带与夹板通过伸缩杆配合,有效夹紧待处理镀锌螺钉,防止待处理镀锌螺钉的随意跑偏,避免镀锌不匀;采用鼓风机与分流盘及分流管配合,保证较好的风吹效果,增强风吹冷却效果。To sum up, the utility model provides a screw galvanizing post-processing device, by placing the hot-dip galvanized screw to be processed on the conveyor belt, and then passing through the galvanizing post-processing box in turn under the transmission of the transmission wheel. Zinc, bellows air cooling, water cooling box cooling and drying box drying, the whole process is complete, and the streamlined operation is adopted to save time, not only to ensure good secondary galvanizing effect, but also to use streamlined treatment The post-processing of the rear screws is perfect and orderly; the conveyor belt and the splint are matched with the telescopic rod to effectively clamp the galvanized screws to be processed, to prevent random deviation of the galvanized screws to be processed, and to avoid uneven galvanization; the blower and the shunt plate are used. Combined with the shunt pipe, it can ensure better wind blowing effect and enhance the cooling effect of wind blowing.

以上说明内容仅为本实用新型较佳实施例,显然,所描述的实施例仅仅是本实用新型的一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The above descriptions are only preferred embodiments of the present invention, and obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

Claims (7)

1.一种螺钉镀锌后处理装置,其特征在于,包括:1. a screw galvanized post-processing device, is characterized in that, comprises: 传动机构,包括传送带和带动所述传送带运动的传动轮,所述传动轮与电机连接,所述传动轮置于所述传送带两端并通过支架支撑;The transmission mechanism includes a conveyor belt and a transmission wheel that drives the conveyor belt to move, the transmission wheel is connected to a motor, and the transmission wheel is placed at both ends of the conveyor belt and supported by a bracket; 镀锌后处理箱,设置在靠近所述传送带的进口端,所述镀锌后处理箱内部根据传送方向依次两次喷射镀锌层的喷管和加热装置;The galvanizing post-processing box is arranged near the inlet end of the conveyor belt, and the inside of the galvanizing post-processing box sequentially sprays the nozzle and heating device of the galvanized layer twice according to the conveying direction; 风箱,所述风箱紧挨所述镀锌后处理箱设置在其后方,所述风箱内部设置鼓风机,所述鼓风机出口连接分流盘;a bellows, the bellows is arranged at the rear of the galvanized post-processing box, a blower is arranged inside the bellows, and the outlet of the blower is connected to a shunt plate; 水冷箱,所述水冷箱紧挨所述风箱,所述水冷箱内部装有水;以及a water-cooling box, the water-cooling box is adjacent to the bellows, and the water-cooling box is filled with water; and 烘干箱,所述烘干箱紧挨所述水冷箱且靠近所述传送带出口端,所述烘干箱内部设置烘干板。A drying box, the drying box is adjacent to the water cooling box and close to the outlet end of the conveyor belt, and a drying board is arranged inside the drying box. 2.根据权利要求1所述的一种螺钉镀锌后处理装置,其特征在于:所述传送带根据螺钉的传送顺序依次穿过所述镀锌后处理箱、所述风箱,所述水冷箱、所述烘干箱,且镀锌后处理箱、风箱、水冷箱、烘干箱分别与所述传送带密封连接。2. A screw galvanizing post-processing device according to claim 1, wherein the conveyor belt passes through the galvanizing post-processing box, the bellows, the water cooling box, the The drying box, and the galvanized post-processing box, the bellows, the water cooling box, and the drying box are respectively sealed and connected with the conveyor belt. 3.根据权利要求1所述的一种螺钉镀锌后处理装置,其特征在于:所述加热装置与传送带间设有多个支撑杆。3 . The screw galvanizing post-processing device according to claim 1 , wherein a plurality of support rods are arranged between the heating device and the conveyor belt. 4 . 4.根据权利要求1所述的一种螺钉镀锌后处理装置,其特征在于:所述分流盘设有进风口和出风口,所述进风口与所述鼓风机连通,所述出风口连接分流管,所述分流管出口端正对所述传送带。4. A screw galvanizing post-processing device according to claim 1, characterized in that: the diverter plate is provided with an air inlet and an air outlet, the air inlet is communicated with the blower, and the air outlet is connected to a shunt The outlet end of the shunt pipe is facing the conveyor belt. 5.根据权利要求1所述的一种螺钉镀锌后处理装置,其特征在于:所述水冷箱底部设置换水口,所述换水口内设置开关阀。5 . The screw galvanizing post-processing device according to claim 1 , wherein a water exchange port is arranged at the bottom of the water cooling box, and an on-off valve is arranged in the water exchange port. 6 . 6.根据权利要求1所述的一种螺钉镀锌后处理装置,其特征在于:所述传送带通过伸缩杆连接夹板,所述夹板底端开有并排设置的定位槽,所述定位槽正对待处理螺钉的一端,所述待处理螺钉的另外一端抵接所述传送带。6 . The screw galvanized post-processing device according to claim 1 , wherein the conveyor belt is connected to the splint by a telescopic rod, and the bottom end of the splint is provided with positioning grooves arranged side by side, and the positioning grooves are in the same direction. 7 . One end of the screw is processed, and the other end of the screw to be processed abuts the conveyor belt. 7.根据权利要求1所述的一种螺钉镀锌后处理装置,其特征在于:所述镀锌后处理箱上端开口处设有铰接端,所述铰接端铰接镀锌后处理箱与铰接盖,所述铰接盖横截面为弧形,所述铰接盖的顶端设置一抓手。7 . The screw galvanized post-processing device according to claim 1 , wherein the upper opening of the galvanized post-processing box is provided with a hinged end, and the hinged end is hinged to the galvanized post-processing box and the hinged cover. 8 . , the cross section of the hinged cover is arc-shaped, and the top of the hinged cover is provided with a gripper.
CN201920818997.XU 2019-05-31 2019-05-31 A screw galvanized post-processing device Expired - Fee Related CN210140619U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920818997.XU CN210140619U (en) 2019-05-31 2019-05-31 A screw galvanized post-processing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920818997.XU CN210140619U (en) 2019-05-31 2019-05-31 A screw galvanized post-processing device

Publications (1)

Publication Number Publication Date
CN210140619U true CN210140619U (en) 2020-03-13

Family

ID=69734834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920818997.XU Expired - Fee Related CN210140619U (en) 2019-05-31 2019-05-31 A screw galvanized post-processing device

Country Status (1)

Country Link
CN (1) CN210140619U (en)

Similar Documents

Publication Publication Date Title
CN206404959U (en) A hardware automatic surface spray paint treatment device
CN103409752B (en) A kind of wet-method etching equipment and wet etching method
US2279686A (en) Method and apparatus for cleaning and painting
CN210386340U (en) Coating production line
CN204463948U (en) Bare armored cable surface painting equipment
CN105880102A (en) Dacromet treatment production line for bridge threaded connecting pieces
CN106111633A (en) A kind of Full-automatic metal pipe Surface of profile processing method and device structure
US20190002213A1 (en) Process for continuously galvanizing elongated articles
CN208593751U (en) Acid solution device is dripped in a kind of pipe during acid cleaning of steel tube
CN210140619U (en) A screw galvanized post-processing device
CN115896662A (en) A copper wire tinning machine
CN102409350A (en) Dephosphorization equipment
CN108220854B (en) A kind of long material horizontal hot-dip plating equipment and hot-dip method
CN110102592A (en) A kind of high speed, which connects, draws heat treatment process line
CN206396307U (en) A kind of section bar and the device of tubing continuous zinc coating
CN209467673U (en) The conveying device of galvanized part
CN112359304A (en) Automatic hot-dip galvanizing production line equipment and process for radiator for transformer
CN206927938U (en) A kind of galvanizing equipment and zincincation
CN207839291U (en) Environmental-friendly leather spray equipment
CN209985624U (en) Automatic surface paint spraying treatment device for hardware
CN213977844U (en) Automatic hot dipping zinc production line equipment of radiator for transformer
CN212463667U (en) Vertical transmission equipment
KR20160032966A (en) Apparatus for removing polluter
US505132A (en) Apparatus for the man ufacture of sheet iron or steel
CN114318200A (en) Long material processing device, hot-dip production line based on long material processing device and hot-dip method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 056000 south side of west section of yongyang street, southwest development zone, Yongnian District, Handan City, Hebei Province

Patentee after: Deben Fastener Co.,Ltd.

Address before: 056000 south side of west section of yongyang street, southwest development zone, Yongnian District, Handan City, Hebei Province

Patentee before: Hebei zhongyun Traffic Engineering Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200313

CF01 Termination of patent right due to non-payment of annual fee