CN210133839U - Lifting device for supporting equipment between double split conductor lines - Google Patents
Lifting device for supporting equipment between double split conductor lines Download PDFInfo
- Publication number
- CN210133839U CN210133839U CN201920797835.2U CN201920797835U CN210133839U CN 210133839 U CN210133839 U CN 210133839U CN 201920797835 U CN201920797835 U CN 201920797835U CN 210133839 U CN210133839 U CN 210133839U
- Authority
- CN
- China
- Prior art keywords
- rod
- fixed
- support
- lifting device
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
Description
技术领域technical field
本实用新型属于供电线路工具技术领域,具体涉及一种双分裂导线线间支撑设备提升装置。The utility model belongs to the technical field of power supply line tools, in particular to a lifting device for supporting equipment between double split wires.
背景技术Background technique
近年来同塔双回、同塔多回线路占比增多。为了保证线路正常运行,需要对线路进行缺陷处理,比如安装线间支撑设备,安装线间支撑设备必须开展同塔多回线路带电作业。在带电作业双分裂导线线作业过程中会使用到线间绝缘支撑设备,提升装置将绝缘支撑设备提升到双分裂导线上,在同塔双回路导线档距内任意一点带电作业时,当把绝缘支撑设备通过滑轮拉至双分裂导线附近时,由于其自身的重力作用绝缘支撑设备会来回翻转,很难使绝缘支撑设备快速的卡在导线上,增加了作业难度和作业时间。同时根据不同情况使用吊车作业,随着电线杆周围环境的变化以及土地使用者赔偿意识的提高,常常导致吊车无法进入农田并靠近电线杆对横担进行安装,即使吊车能够进入农田也是要付出巨额的经济赔偿。这样,进一步地增加了安装难度和安装成本。目前没有专门的工具对支撑设备进行提升。所以一种有效的线间支撑设备的提升装置的研发是有必要,而且意义重大。In recent years, the proportion of double-circuit lines on the same tower and multi-circuit lines on the same tower has increased. In order to ensure the normal operation of the line, it is necessary to deal with the defects of the line, such as installing the support equipment between the lines, and the installation of the support equipment between the lines must carry out live work on the multi-circuit line on the same tower. In the process of live operation of double split conductors, the insulation support equipment between lines will be used. The lifting device lifts the insulation support equipment to the double split conductors. When live work is performed at any point within the span of the double circuit conductors on the same tower, when the insulation support equipment is lifted When the supporting equipment is pulled to the vicinity of the double-split wire by the pulley, the insulating supporting equipment will flip back and forth due to its own gravity, which makes it difficult to quickly clamp the insulating supporting equipment on the wire, which increases the difficulty and time of operation. At the same time, cranes are used according to different situations. With the changes in the surrounding environment of the utility poles and the improvement of land users' awareness of compensation, the cranes often cannot enter the farmland and install the crossarms close to the utility poles. Even if the cranes can enter the farmland, it will cost a huge amount of money. economic compensation. In this way, the installation difficulty and installation cost are further increased. There are currently no special tools for lifting the support equipment. Therefore, it is necessary and significant to develop an effective lifting device for inter-line support equipment.
发明内容SUMMARY OF THE INVENTION
本实用新型的目的在于针对现有技术中存在的问题提供一种双分裂导线线间支撑设备提升装置,该提升设备能够根据不同支撑设备的大小调整挡板使其固定不旋转,实现快速安装支撑设备到位,提高了带电作业的效率。The purpose of the present utility model is to provide a lifting device for supporting equipment between double-split wires in view of the problems existing in the prior art. The lifting equipment can adjust the baffle according to the size of different supporting equipment to make it fixed and not rotate, so as to realize rapid installation and support The equipment is in place to improve the efficiency of live work.
本实用新型的技术方案是:The technical scheme of the present utility model is:
一种双分裂导线线间支撑设备提升装置,包括两个平行设置的固定架,两个固定架之间通过可伸缩的连接支撑杆固定连接,所述的固定架包括竖杆,所述的竖杆上端部固定设置有固定定滑轮的固定杆,竖杆内侧开设有滑道,所述的两固定架之间设置有能沿滑道滑行的可伸缩提升杆,所述的定滑轮上环绕的滑轮绳的固定端与提升杆的非伸缩部分连接,所述的提升杆的非伸缩部上滑动设置有放置线间支撑材料的支撑挡架提升杆上开设有供支撑挡架滑动的轨道。A lifting device for supporting equipment between double-split wires, comprising two fixed frames arranged in parallel, the two fixed frames are fixedly connected by a retractable connecting support rod, the fixed frame comprises a vertical rod, and the vertical The upper end of the rod is fixedly provided with a fixed rod for fixing the fixed pulley, the inner side of the vertical rod is provided with a slideway, and a retractable lifting rod that can slide along the slideway is arranged between the two fixed frames. The fixed end of the pulley rope is connected with the non-telescopic part of the lifting rod, and the non-telescopic part of the lifting rod is slidably provided with a support block for placing the support material between the lines. A rail for the support block to slide is opened on the lifting rod.
具体的,所述的支撑挡架有两个且对称设置在提升杆伸缩部的两侧,每个所述的支撑挡架都包括底板,所述的底板的下表面固定设置有沿提升杆上滑槽滑动的限位滑块一,每个所述的底板的与固定架紧挨的侧面上滑动设置有侧挡板一。Specifically, there are two support blocks and are symmetrically arranged on both sides of the telescopic part of the lift rod, each of the support blocks includes a bottom plate, and the lower surface of the bottom plate is fixedly arranged along the lift rod. For the first limit slider of the sliding slot, a side baffle is slidably arranged on the side of each of the bottom plates that is close to the fixing frame.
具体的,每个所述的底板的另两个相对的侧面上分别滑动设置有侧挡板二。Specifically, two side baffles are respectively slidably arranged on the other two opposite sides of each of the bottom plates.
具体的,所述的底板的上表面两侧边缘分别设置有与侧挡板一活动方向相同的滑槽一,所述的侧挡板一的两个端部分别设置有沿滑槽一滑动的限位滑块三,所述的底板的中部设置有与滑槽一垂直的滑槽二,所述的侧挡板二的底部设置有沿滑槽一和滑槽二滑动的限位滑块二。Specifically, the two edges of the upper surface of the bottom plate are respectively provided with a
具体的,两个所述的固定架的竖杆上固定定滑轮的固定杆相对设置。Specifically, the fixing rods for fixing the fixed pulley on the vertical rods of the two fixing frames are arranged opposite to each other.
每个所述的固定架包括两根斜杆,两个斜杆的一端同时与水平杆的两端端部固定连接,两根斜杆的另一端与竖杆的上端固定连接,所述的竖杆下端固定设置在水平杆的中部。Each of the fixing frames includes two inclined rods, one end of the two inclined rods is fixedly connected to the two ends of the horizontal rod at the same time, and the other end of the two inclined rods is fixedly connected to the upper end of the vertical rod. The lower end of the rod is fixedly arranged in the middle of the horizontal rod.
具体的,所述的定滑轮上环绕的滑轮绳的活动端与气缸的伸缩杆连接,所述的气缸固定设置在连接支撑杆上。Specifically, the movable end of the pulley rope surrounding the fixed pulley is connected with the telescopic rod of the air cylinder, and the air cylinder is fixedly arranged on the connecting support rod.
本实用新型的有益效果是:该提升装置包括两个平行设置的固定架,两个固定架之间通过可伸缩的连接支撑杆固定连接,所述的固定架1包括竖杆,竖杆内侧开设有滑道,所述的两固定架之间设置有能沿滑道滑行的可伸缩提升杆,可伸缩提升杆能够根据不同导线之间的间距调整固定架之间的间距,从而可以准确地将支撑设备提升到导线处进行准确快速的安装;另外所述的提升杆的非伸缩部上滑动设置有放置线间支撑材料的支撑挡架,提升杆上开设有供支撑挡架滑动的轨道,此种设置的目的是便于支撑挡架能够适应不同尺寸支撑设备的放置,使得支撑设备放置在支撑挡架上时不偏移,不滑动,提升到导线处时安装快速准确;支撑挡架的具体结构设置如下:支撑挡架有两个且对称设置在提升杆伸缩部的两侧,每个所述的支撑挡架都包括底板,所述的底板的下表面固定设置有沿提升杆上滑槽滑动的限位滑块一,每个所述的底板的另两个相对的侧面上分别滑动设置有侧挡板二,每个所述的底板的与固定架紧挨的侧面上滑动设置有侧挡板一所述的底板的上表面两侧边缘分别设置有与侧挡板一活动方向相同的滑槽一,所述的侧挡板一的两个端部分别设置有沿滑槽滑动的限位滑块三,所述的底板的中部设置有与滑槽一垂直的滑槽二,所述的侧挡板二的底部设置有沿滑槽一和滑槽二滑动的限位滑块三,根据支撑设备的长度通过限位滑块三在两个滑槽一上的滑动调整两个侧挡板一的相对距离,然后根据支撑设备的宽度调整每个底板上的两相对的侧挡板二的相对距离,具体是通过侧挡板二上的限位滑块三在滑槽一和滑槽二上的滑动来调整相对设置的侧挡板二之间的间距,达到紧紧卡着支撑设备使其不偏移的目的。The beneficial effects of the present invention are as follows: the lifting device includes two fixed frames arranged in parallel, and the two fixed frames are fixedly connected by a telescopic connecting support rod. The
附图说明Description of drawings
图1是实施例1提供的双分裂导线线间支撑材料提升装置的结构示意图;Fig. 1 is the structural schematic diagram of the support material lifting device between the double-split wires provided in
图2是固定架的侧面结构示意图;Fig. 2 is the side structure schematic diagram of the fixing frame;
图3是实施例2提供的双分裂导线线间支撑材料提升装置的结构示意图;3 is a schematic structural diagram of a supporting material lifting device between double-split wires provided in
图4是支撑挡架的结构示意图;FIG. 4 is a schematic structural diagram of a support baffle;
图5是支撑挡架的平面结构示意图。FIG. 5 is a schematic plan view of a support baffle.
1 固定架、2连接支撑杆、3提升杆、4定滑轮、5滑轮绳、6支撑挡架、7气缸、8斜杆、9竖杆、10滑道、6-1底板、6-2限位滑块一、6-3侧挡板一、6-4侧挡板二、6-5滑槽一、6-6限位滑块二、6-7限位滑块三、6-8滑槽二。1 fixed frame, 2 connecting support rod, 3 lifting rod, 4 fixed pulley, 5 pulley rope, 6 supporting block, 7 cylinder, 8 inclined rod, 9 vertical rod, 10 slideway, 6-1 base plate, 6-2 limit Position slider one, 6-3 side baffle one, 6-4 side baffle two, 6-5 chute one, 6-6 limit slider two, 6-7 limit slider three, 6-8 slider Slot two.
具体实施方式Detailed ways
下面根据附图具体详细说明本实用新型的技术方案。The technical solutions of the present utility model will be described in detail below according to the accompanying drawings.
实施例1Example 1
如图1所示为本实施例1提供的一种双分裂导线线间支撑设备提升装置的结构示意图,包括两个平行设置的固定架1,如图2为固定架的侧面结构示意图,两个固定架1之间通过可伸缩的连接支撑杆2固定连接,所述的固定架1包括竖杆9,所述的竖杆9上端部固定设置有固定定滑轮4的固定杆,竖杆9内侧开设有滑道10,所述的两固定架1之间设置有能沿滑道10滑行的可伸缩提升杆3,所述的定滑轮4上环绕的滑轮绳5的固定端与提升杆3的非伸缩部分连接,所述的提升杆3的非伸缩部上滑动设置有放置线间支撑材料的支撑挡架6提升杆3上开设有供支撑挡架6滑动的轨道。FIG. 1 is a schematic structural diagram of a double-split wire-to-line supporting equipment lifting device provided in the
所述的支撑挡架6有两个且对称设置在提升杆3伸缩部的两侧,如图4和图5所示,每个所述的支撑挡架6都包括底板6-1,所述的底板6-1的下表面固定设置有沿提升杆上滑槽滑动的限位滑块一6-2,每个所述的底板6-1的与固定架1紧挨的侧面上滑动设置有侧挡板一6-3,每个所述的底板6-1的另两个相对的侧面上分别滑动设置有侧挡板二6-4。所述的底板6-1的上表面两侧边缘分别设置有与侧挡板一6-3活动方向相同的滑槽一6-5,所述的侧挡板一6-3的两个端部分别设置有沿滑槽6-5滑动的限位滑块三6-7,所述的底板6-1的中部设置有与滑槽一6-5垂直的滑槽二6-8,所述的侧挡板二6-4的底部设置有沿滑槽一6-5和滑槽二6-8滑动的限位滑块二6-6。两个所述的固定架1的竖杆9上固定定滑轮4的固定杆相对设置。伸缩连接支撑杆的伸缩作用可调整固定杆的间距,使得两个固定杆位于导线外侧便于支撑设备的安装,每个所述的固定架1包括两根斜杆8,两个斜杆8的一端同时与水平杆的两端端部固定连接,两根斜杆8的另一端与竖杆9的上端固定连接,所述的竖杆下端固定设置在水平杆的中部。There are two supporting
使用本实施例提供的提升装置时,首先根据需要安装支撑设备的双分裂导线间距调整两个固定架1之间的间距,从而可以准确地将支撑设备提升到导线处进行准确快速的安装;然后为了使得支撑设备放置在支撑挡架6上时不偏移,不滑动,提升到导线处时安装快速准确使通过提升杆3的非伸缩部上滑动设置有放置线间支撑材料的支撑挡架6,提升杆3上开设有供支撑挡架6滑动的轨道,便于支撑挡架6能够适应不同尺寸支撑设备的放置;最后根据支撑设备的长度通过限位滑块三6-7在两个滑槽一6-5上的滑动调整两个侧挡板一6-3的相对距离,然后根据支撑设备的宽度调整每个底板6-1上的两相对的侧挡板二6-4的相对距离,具体是通过侧挡板二6-4上的限位滑块三6-6在滑槽一6-5和滑槽二6-8上的滑动来调整相对设置的侧挡板二6-4之间的间距,达到紧紧卡着支撑设备使其不偏移的目的,准确调整好间距之后给予滑轮绳的活动端拉力使得支撑设备提升到导线处,快速安装。When using the lifting device provided in this embodiment, firstly, adjust the distance between the two fixing
实施例2Example 2
如图3所示为本实施例的机构示意图,为了解放劳力,本实施例在连接支撑杆2上设置气缸7,而气缸7的伸缩杆与滑轮绳5的活动端连接,通过气缸7的伸缩杆的伸缩作用达到拉动滑轮绳5的目的,从而可以解放劳力,节省人力。Figure 3 shows the schematic diagram of the mechanism of this embodiment. In order to relieve labor, a cylinder 7 is provided on the connecting
最后应当说明的是:以上实施例仅用以说明本实用新型的技术方案而非对其限制;尽管参照较佳实施例对本实用新型进行了详细的说明,所属领域的普通技术人员应当理解:依然可以对本实用新型的具体实施方式进行修改或者对部分技术特征进行等同替换;而不脱离本实用新型技术方案的精神,其均应涵盖在本实用新型请求保护的技术方案范围当中。Finally it should be noted that: the above embodiment is only used to illustrate the technical scheme of the present invention and not to limit it; although the present invention has been described in detail with reference to the preferred embodiment, those of ordinary skill in the art should understand: still The specific embodiments of the present invention can be modified or some technical features can be equivalently replaced; without departing from the spirit of the technical solutions of the present invention, all of them should be included in the scope of the technical solutions claimed in the present invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920797835.2U CN210133839U (en) | 2019-05-30 | 2019-05-30 | Lifting device for supporting equipment between double split conductor lines |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920797835.2U CN210133839U (en) | 2019-05-30 | 2019-05-30 | Lifting device for supporting equipment between double split conductor lines |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210133839U true CN210133839U (en) | 2020-03-10 |
Family
ID=69705588
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920797835.2U Expired - Fee Related CN210133839U (en) | 2019-05-30 | 2019-05-30 | Lifting device for supporting equipment between double split conductor lines |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210133839U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112209286A (en) * | 2020-11-01 | 2021-01-12 | 王艺涵 | Multifunctional overturning device for mounting electromechanical equipment |
-
2019
- 2019-05-30 CN CN201920797835.2U patent/CN210133839U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112209286A (en) * | 2020-11-01 | 2021-01-12 | 王艺涵 | Multifunctional overturning device for mounting electromechanical equipment |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN114751258B (en) | A support frame for power substation engineering | |
| CN210133839U (en) | Lifting device for supporting equipment between double split conductor lines | |
| CN210866999U (en) | Insulated bucket arm truck vehicle-mounted insulation cross arm | |
| CN111564791A (en) | Overhead line inlet device | |
| CN206820364U (en) | Distribution line Special line laying tool | |
| CN210485177U (en) | A kind of water pipe, the bridge frame shares the anti-seismic bracket | |
| CN217530603U (en) | Supporting device for multi-degree-of-freedom adjustment for auxiliary installation of water heating pipeline | |
| CN218878665U (en) | Suspension type clamping jaw mechanism | |
| CN204144792U (en) | Far-end operation changes the device of straight line list insulator string | |
| CN209675867U (en) | A snap-in cable tray | |
| CN116864266A (en) | Isolation transformer applied to special occasion | |
| CN205791355U (en) | A kind of cable support bracket easy to use | |
| CN212050293U (en) | Slide rail type electric tool for moving cable | |
| CN103010955B (en) | Bridge crane power supply sliding antenna device and current collector installation fixing device thereof | |
| CN208883437U (en) | Cable channel cover plate device for opening | |
| CN211056647U (en) | Operation maintenance device for isolating switch of power system | |
| CN221812256U (en) | Assembled cable bracket | |
| CN221080870U (en) | Cable conduit support hanger | |
| CN222441286U (en) | A cable tray for conveniently placing cables | |
| CN222229674U (en) | Ground pipe mounting bracket | |
| CN206471753U (en) | A kind of novel electric power line guy fixing-line device | |
| CN201191741Y (en) | Three-phase wire insulation fixing bracket | |
| CN221767460U (en) | Cable erection device | |
| CN219409081U (en) | Electrical engineering positioning and mounting device | |
| CN220341880U (en) | A kind of line bottle carrying rack |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200310 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |