CN209907746U - A tile installation component - Google Patents
A tile installation component Download PDFInfo
- Publication number
- CN209907746U CN209907746U CN201822218818.7U CN201822218818U CN209907746U CN 209907746 U CN209907746 U CN 209907746U CN 201822218818 U CN201822218818 U CN 201822218818U CN 209907746 U CN209907746 U CN 209907746U
- Authority
- CN
- China
- Prior art keywords
- tile
- side wall
- mounting assembly
- groove
- roof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title abstract description 33
- 230000000392 somatic effect Effects 0.000 claims abstract 2
- 238000005452 bending Methods 0.000 claims description 16
- 230000000149 penetrating effect Effects 0.000 claims 2
- 238000010248 power generation Methods 0.000 description 12
- 239000011521 glass Substances 0.000 description 9
- 238000000034 method Methods 0.000 description 9
- 230000005484 gravity Effects 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 239000002356 single layer Substances 0.000 description 3
- 239000005341 toughened glass Substances 0.000 description 3
- KTSFMFGEAAANTF-UHFFFAOYSA-N [Cu].[Se].[Se].[In] Chemical compound [Cu].[Se].[Se].[In] KTSFMFGEAAANTF-UHFFFAOYSA-N 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 239000000853 adhesive Substances 0.000 description 1
- 238000004026 adhesive bonding Methods 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000000919 ceramic Substances 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000010410 layer Substances 0.000 description 1
- 238000010079 rubber tapping Methods 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- 230000037072 sun protection Effects 0.000 description 1
- 239000010409 thin film Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B10/00—Integration of renewable energy sources in buildings
- Y02B10/10—Photovoltaic [PV]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及安装零部件技术领域,尤其涉及一种瓦片的安装组件。The utility model relates to the technical field of installation parts, in particular to a tile installation assembly.
背景技术Background technique
在屋面安装光伏发电屋面瓦,可以利用屋面瓦进行光伏发电,使屋面瓦除了遮风、挡雨、防晒的功能外,还可以提供清洁能源,从而广泛的应用于建筑物的屋面。Installing photovoltaic power generation roof tiles on the roof can be used for photovoltaic power generation, so that in addition to the functions of wind, rain and sun protection, roof tiles can also provide clean energy, which is widely used in building roofs.
如图1所示,在现有技术中,为了将光伏发电屋面瓦11安装于屋面12,需要在屋面12预先安装顺水条13和固定于顺水条13上的挂瓦条14,使挂瓦条与屋面12之间具有间隙,这样,才能够利用与光伏发电屋面瓦11固定连接的连接件15,将光伏发电屋面瓦11挂接于挂瓦条14上。As shown in FIG. 1 , in the prior art, in order to install the photovoltaic power
其中,多个顺水条13沿垂直于屋檐的方向延伸且间隔设置,用于固定平行于屋檐方向延伸的多个间隔设置的挂瓦条14。连接件15呈U型结构,用于与光伏发电屋面瓦11固定之后卡接于连接件15,从而完成将光伏发电屋面瓦11安装于屋面。Wherein, a plurality of
相关技术中,需要在挂接光伏发电屋面瓦11之前,预先在屋面12安装顺水条13并在顺水条13上安装挂瓦条14,使光伏发电屋面瓦11的安装过程过于复杂。同时使光伏发电屋面瓦11与屋面之间的间距较大,从而使建筑物的高度大幅增加。In the related art, before the
由此可知,相关技术中瓦片的安装组件存在安装复杂的问题。It can be seen from this that the installation component of the tile in the related art has the problem of complicated installation.
实用新型内容Utility model content
本实用新型实施例提供一种瓦片的安装组件,以解决相关技术中瓦片的安装组件存在的安装复杂的问题。The embodiment of the present invention provides a tile installation assembly to solve the problem of complex installation of the tile installation assembly in the related art.
为解决以上技术问题,本实用新型采用如下技术方案:In order to solve the above technical problems, the utility model adopts the following technical solutions:
一种瓦片的安装组件,用于将瓦片安装于屋面,所述屋面设置有挂瓦条,所述安装组件包括:A tile installation assembly, used for installing the tile on a roof, the roof is provided with a hanging tile, and the installation assembly includes:
底座,所述底座具有固定连接的本体部和支撑部,所述本体部用于与所述挂瓦条固定连接,所述支撑部与所述本体部共同围绕形成第一凹槽;a base, the base has a fixedly connected main body part and a support part, the main body part is used for fixed connection with the tile strip, and the support part and the main body part together form a first groove;
连接件,所述连接件具有固定连接的固定部和卡接部,所述固定部延伸至所述第一凹槽外且远离所述本体部的一侧,用于与所述瓦片固定连接,所述卡接部可卡设于所述第一凹槽内。A connecting piece, the connecting piece has a fixed part and a clamping part for fixed connection, the fixed part extends to the side outside the first groove and away from the body part, and is used for fixed connection with the tile , the clamping portion can be clamped in the first groove.
可选的,所述本体部呈U型槽结构,包括第一侧壁和由所述第一侧壁的相对两侧分别弯折延伸形成的第二侧壁和第三侧壁,所述第二侧壁与所述第三侧壁分别用于与所述挂瓦条的相对两侧卡接。Optionally, the body portion has a U-shaped groove structure, and includes a first side wall, a second side wall and a third side wall formed by bending and extending from opposite sides of the first side wall, respectively. The two side walls and the third side wall are respectively used for engaging with the opposite sides of the battens.
可选的,所述第二侧壁和所述第三侧壁的远离所述第一侧壁的一端背向延伸,形成接触块,所述接触块用于与所述屋面抵接。Optionally, the ends of the second side wall and the third side wall away from the first side wall extend back to form a contact block, and the contact block is used for abutting with the roof.
可选的,所述底座的第二侧壁和第三侧壁上还设置有固定孔;Optionally, the second side wall and the third side wall of the base are further provided with fixing holes;
所述安装组件还包括穿设于所述固定孔的固定件,所述底座与所述挂瓦条之间通过所述固定件连接。The mounting assembly further includes a fixing piece passing through the fixing hole, and the base and the battens are connected by the fixing piece.
可选的,所述卡接部包括连接块和由所述连接块的一侧弯折延伸形成的卡接块;Optionally, the clamping part includes a connection block and a clamping block formed by bending and extending one side of the connection block;
所述固定部由所述连接块的远离所述卡接块的一侧弯折延伸形成,且所述固定部与所述卡接部共同围绕形成第二凹槽,所述支撑部延伸至所述第二凹槽内。The fixing portion is formed by bending and extending a side of the connecting block away from the clamping block, and the fixing portion and the clamping portion together form a second groove, and the supporting portion extends to the into the second groove.
可选的,所述固定部上还设置有紧固孔;Optionally, the fixing portion is further provided with a fastening hole;
所述安装组件还包括穿设于所述紧固孔的紧固件,所述连接件与所述瓦片通过所述紧固件连接。The installation assembly further includes a fastener passing through the fastening hole, and the connector and the tile are connected by the fastener.
可选的,所述安装组件还包括弹性垫片,所述弹性垫片设置于所述紧固件与所述瓦片之间。Optionally, the mounting assembly further includes an elastic washer disposed between the fastener and the tile.
可选的,所述第一凹槽的侧壁上设置有第一锯齿面;所述卡接部设置有用于与所述第一锯齿面啮合的第二锯齿面。Optionally, a first sawtooth surface is provided on the side wall of the first groove;
可选的,所述支撑部包括由所述第一侧壁延伸出的第一支撑臂,由所述第一支撑臂的远离所述第一侧壁的一端弯曲延伸形成的第二支撑臂,所述第一凹槽由所述第一支撑臂、所述第二支撑臂与所述第一侧壁围绕形成。Optionally, the support portion includes a first support arm extending from the first side wall, a second support arm formed by bending and extending from an end of the first support arm away from the first side wall, The first groove is formed around the first support arm, the second support arm and the first side wall.
可选的,所述支撑部还包括由所述第二支撑臂的远离所述第一支撑臂的一端弯曲延伸形成的第三支撑臂,所述第三支撑臂用于在所述卡接部卡设于所述第一凹槽内时,抵接于所述连接件的远离所述第一侧壁的一侧。Optionally, the support portion further includes a third support arm formed by bending and extending from one end of the second support arm away from the first support arm, and the third support arm is used for connecting to the latching portion. When clamped in the first groove, it abuts on the side of the connecting piece away from the first side wall.
可选的,所述瓦片为光伏发电屋面瓦。Optionally, the tiles are photovoltaic roof tiles.
在本实用新型实施例中,瓦片的安装组件包括可连接的底座和连接件,其中,底座包括本体部和支撑部,且支撑部与本体部共同围绕形成第一凹槽;连接件包括固定部和卡接部。这样,仅需要在屋面设置挂瓦条,并将底座固定于挂瓦条,然后将瓦片固定于连接件中的固定部,并通过卡接部卡设于第一凹槽内,便可以将瓦片安装于屋面。该瓦片的安装组件不需要挂瓦条与屋面之间具有间隙,从而不需要在屋面安装顺水条,从而简化瓦片安装的复杂程度。In the embodiment of the present invention, the tile installation assembly includes a connectable base and a connecting piece, wherein the base includes a body portion and a support portion, and the support portion and the body portion together form a first groove; the connecting piece includes a fixing portion part and snap-in part. In this way, it is only necessary to set the roof tile hanging strip, fix the base to the hanging tile strip, then fix the tile to the fixing part in the connecting piece, and clamp it in the first groove through the clamping part, then the The tiles are installed on the roof. The tile installation assembly does not require a gap between the tile and the roof, so it is not necessary to install a water-slung strip on the roof, thereby simplifying the complexity of tile installation.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solutions of the embodiments of the present invention more clearly, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the drawings in the following description are only for the present invention. For some embodiments of the present invention, for those of ordinary skill in the art, other drawings can also be obtained from these drawings without any creative effort.
图1是现有技术中瓦片安装于屋面的剖视图;1 is a cross-sectional view of a tile installed on a roof in the prior art;
图2是本实用新型实施例提供的一种瓦片的安装组件将瓦片安装于屋面的结构图;2 is a structural diagram of a tile installation assembly provided by an embodiment of the present utility model to install the tile on the roof;
图3是图2的拆分图;Fig. 3 is the split view of Fig. 2;
图4是沿图2中A-A方向的剖视图;Fig. 4 is a sectional view along the A-A direction in Fig. 2;
图5是沿图4中B-B方向的剖视图;Fig. 5 is a sectional view along the direction B-B in Fig. 4;
图6是图4中C区域的放大图。FIG. 6 is an enlarged view of area C in FIG. 4 .
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are part of the embodiments of the present utility model, not all of the embodiments. . Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
请请参阅图2或图3,其中,图2是本实用新型实施例提供的一种瓦片的安装组件将瓦片安装于屋面的结构图;图3是图2的拆分图。如图2和图3所示,本实用新型实施例提供的瓦片的安装组件用于将瓦片10安装于如图3中所示的屋面30,且所述屋面30设置有挂瓦条31。Please refer to FIG. 2 or FIG. 3 , wherein, FIG. 2 is a structural diagram of a tile installation assembly provided by an embodiment of the present invention to install the tiles on the roof; FIG. 3 is a disassembled view of FIG. 2 . As shown in FIG. 2 and FIG. 3 , the tile installation assembly provided by the embodiment of the present invention is used to install the
其中,瓦片的安装组件包括可连接的底座21和连接件22。Wherein, the installation assembly of the tile includes a connectable base 21 and a connecting
具体的,底座21具有本体部211和由本体部211弯曲延伸形成的支撑部212,本体部211用于与挂瓦条31固定连接,支撑部212与本体部211共同围绕形成第一凹槽213。Specifically, the base 21 has a
连接件22具有固定部221和由固定部221弯曲延伸形成的卡接部222,固定部221用于与瓦片10固定连接,卡接部222可卡设于第一凹槽213内。The connecting
另外,固定部221延伸至第一凹槽213外且远离本体部211的一侧,用于与瓦片10固定连接。In addition, the
需要说明的是,为了使图2与图3中的结构更加清晰,将附图中的瓦片10设置为透明状,在实际应用过程中,瓦片10也可以呈半透明或者不透明状,在此不作具体限定。It should be noted that, in order to make the structures in FIGS. 2 and 3 clearer, the
在实际应用中,屋面30呈倾斜状态,屋面30具有屋脊(未图示)和屋檐(未图示),且屋脊高于屋檐,从而使屋面30向屋檐的方向倾斜。这样,可以使第一凹槽213的开口方向朝向屋脊所在的方向,从而使固定有瓦片10的连接件22受到重力作用而抵接于第一凹槽213内,从而限制连接件22向低处滑动。In practical application, the
当然,还可以将第一凹槽213与卡接部222设置为相互匹配的卡扣结构,从而使第一凹槽213扣紧卡接部222,防止其发生相对移动。Of course, the
需要说明的是,可以预先在屋面30安装挂瓦条31,并将底座21的本体部211固定于挂瓦条31上,以及将瓦片10固定于连接件22的固定部221;在安装瓦片的过程中,仅需要将连接件22的卡接部222卡设于第一凹槽213内便可以实现将瓦片10挂设于屋面30上。It should be noted that the
在维修的过程中,可以使卡接部222由第一凹槽213的开口处脱离于第一凹槽213内,从而使连接件22脱离底座21,从而取下瓦片10。During the maintenance process, the engaging
这样,可以使瓦片的安装及维修过程更加简便,且相对于现有技术,省略了在屋面安装顺水条的过程,既节省了材料,又避免了顺水条的厚度增加了瓦片与屋面之间的架空距离后,容易形成安全隐患的问题,从而使本实用新型实施例提供的安装组件的安全可靠性高。In this way, the installation and maintenance process of the tiles can be made simpler, and compared with the prior art, the process of installing the water-flow strips on the roof is omitted, which not only saves materials, but also avoids the increase of the thickness of the water-flow strips and the difference between the tiles and the roof. After the overhead distance between them is increased, the problem of potential safety hazard is easily formed, so that the safety and reliability of the installation assembly provided by the embodiment of the present invention is high.
可选的,如图4所示,本体部211呈U型槽结构,包括第一侧壁2111和由第一侧壁2111的相对两侧分别弯折延伸形成的第二侧壁2112和第三侧壁2113,第二侧壁2112与第三侧壁2113分别用于与挂瓦条31的相对两侧卡接。Optionally, as shown in FIG. 4 , the
这样,可以使本体部包设挂瓦条的3个面,避免安装瓦片后,由于瓦片的重力、风力、雨雪重压等情况下,使本体部相对挂瓦条的轴向发生转动,从而提升了本体部与挂瓦条之间的连接可靠性。In this way, the main body can be covered with three surfaces of the tile hanging bar, so as to avoid the rotation of the main body part relative to the axial direction of the tile bar due to the gravity, wind force, rain and snow pressure of the tile after the tile is installed. , thereby improving the reliability of the connection between the main body and the battens.
当然,根据挂瓦条31的形状的不同,本体部211的形成也可以发生改变。Of course, according to the different shapes of the
另外,还可以将本体部211设置为穿设有固定孔的块状,以通过贯穿该固定孔的螺钉将其固定于挂瓦条31上。因此,对本体部211的形状不做具体限定。In addition, the
可选的,如图4所示,第二侧壁2112和第三侧壁2113的远离第一侧壁2111的一端背向延伸,形成接触块2114,接触块2114用于与屋面30抵接。Optionally, as shown in FIG. 4 , the ends of the
这样,本体部与屋面抵接,使本体部的相对两侧受到屋面的限位作用而不能相对挂瓦条的轴向发生转动,从而提升了本体部与挂瓦条之间的连接可靠性,进而提升了瓦片的安装组件的结构可靠性。In this way, the body part is in contact with the roof, so that the opposite sides of the body part are limited by the roof and cannot rotate relative to the axial direction of the battens, thereby improving the connection reliability between the body part and the battens. Further, the structural reliability of the tile mounting assembly is improved.
可选的,底座21的第二侧壁2112和第三侧壁2113上还设置有固定孔2115;Optionally, the
瓦片的安装组件还包括穿设于固定孔2115的固定件23,底座21与挂瓦条31之间通过固定件23连接。The installation assembly of the tile further includes a fixing
其中,固定件23可以是自攻螺钉,通过贯穿固定孔2115后钉入挂瓦条31内。Wherein, the fixing
这样,可以使底座与挂瓦条之间固定连接,从而提升瓦片安装的结构可靠性。In this way, the base and the tile hanging bar can be fixedly connected, thereby improving the structural reliability of tile installation.
当然,固定件23还可以是稍钉等其他结构,在此不作具体限定。Of course, the fixing
如图2所示,本实施方式中,第二侧壁2112和第三侧壁2113上分别设置有2个固定孔2115,以更加稳定地将底座21固定于挂瓦条31。As shown in FIG. 2 , in this embodiment, two fixing
当然,底座21与挂瓦条31之间还可以是其他连接方式,例如:将底座21设置为弹性结构,使底座21的第二侧壁2112和第三侧壁2113从挂瓦条31的相对两侧夹紧而固定于挂瓦条31。Of course, other connection methods are also possible between the base 21 and the
可选的,如图4所示,卡接部222包括连接块2221和由连接块2221的一侧弯折延伸形成的卡接块2222;Optionally, as shown in FIG. 4 , the clamping
固定部221由连接块2221的远离卡接块2222的一端弯折延伸形成,且固定部221与卡接部2222共同围绕形成第二凹槽223,支撑部212延伸至第二凹槽223内。The fixing
这样,可以使第一凹槽和第二凹槽形成互扣的连接结构,进一步防止连接件相对底座背向第一凹槽的开口侧移动,以提升连接件与底座的连接可靠性。In this way, the first groove and the second groove can form an interlocking connection structure, further preventing the connecting piece from moving relative to the base away from the opening side of the first groove, so as to improve the connection reliability of the connecting piece and the base.
可选的,如图4所示,支撑部212包括由第一侧壁2111延伸出的第一支撑臂2121,由第一支撑臂2121的远离第一侧壁2111的一端弯曲延伸形成的第二支撑臂2122,第一凹槽213由第一支撑臂2121、第二支撑臂2122与第一侧壁2111围绕形成。Optionally, as shown in FIG. 4 , the
其中,支撑部212还包括由第二支撑臂2122的远离第一支撑臂2121的一端弯曲延伸形成的第三支撑臂2123,第三支撑臂2123用于在卡接部222卡设于第一凹槽213内时,抵接于连接件22的远离第一侧壁2111的一侧。The
具体的,在卡接部222卡设于所述第一凹槽213内时,第三支撑臂2123抵接于连接块2221的远离所述第一侧壁2111的一侧。Specifically, when the engaging
而且,连接块2221靠近固定部221的一端向第一凹槽213的开口方向倾斜,第三支撑臂2123与连接块2221平行设置。Moreover, one end of the connecting
这样,第三支撑臂限制连接块向远离第一侧壁的方向移动,从而避免连接件将瓦片挂接于底座后,在重力、风力等作用下绕第三支撑臂旋转。从而提升了连接件与底座之间的连接可靠性。In this way, the third support arm restricts the movement of the connecting block away from the first side wall, so as to prevent the connecting piece from rotating around the third support arm under the action of gravity and wind force after hooking the tile to the base. Thus, the connection reliability between the connector and the base is improved.
可选的,固定部221上还设置有紧固孔2211;Optionally, the fixing
瓦片的安装组件还包括穿设于紧固孔2211的紧固件24,连接件22与瓦片10通过紧固件24连接。The tile installation assembly further includes a
这样,可以使紧固件同时贯穿瓦片和固定部,从而使瓦片固定于固定部。In this way, the fastener can pass through the tile and the fixing part at the same time, so that the tile is fixed to the fixing part.
其中,瓦片的安装组件还包括弹性垫片25,弹性垫片25设置于紧固件24与瓦片10之间。The tile mounting assembly further includes an
具体的,如图3所示,紧固件24可以是螺钉,弹性垫片25可以是具有弹性的螺帽,螺帽具有用于收容螺钉的中空部,从而使螺钉与瓦片10之间通过该中空部的侧壁隔开,避免螺钉与瓦片10直接接触。Specifically, as shown in FIG. 3 , the
当然,弹性垫片25还可以呈片状,且环绕设置于紧固件24的相对两端,以夹设于紧固件24的端部与瓦片10的侧面之间,避免紧固件24的相对两端直接挤压瓦片10的相对两侧。Of course, the
该垫片可以是橡胶、塑料、泡沫等材质中的任意一种,且该垫片可以设置于瓦片10的相对两侧,并夹设于瓦片10与紧固件24之间。The gasket can be any one of rubber, plastic, foam and other materials, and the gasket can be disposed on opposite sides of the
这样,当瓦片为玻璃、陶瓷等硬性较大的材质制造而成使,通过弹性垫片可以缓冲紧固件与瓦片之间的相互作用力,避免紧固件与瓦片之间的作用力过大而损坏瓦片。另外,弹性垫片还增加了紧固件与瓦片之间的摩擦力,避免瓦片绕紧固件的轴向旋转,从而提升了瓦片安装的结构可靠性。In this way, when the tiles are made of hard materials such as glass and ceramics, the elastic spacers can buffer the interaction force between the fasteners and the tiles to avoid the interaction between the fasteners and the tiles. Excessive force can damage the tiles. In addition, the elastic washer also increases the friction force between the fastener and the tile, preventing the tile from rotating in the axial direction of the fastener, thereby improving the structural reliability of the tile installation.
当然,瓦片10还可以通过胶粘、焊接等其他连接方式固定于固定部221,在此不作具体限定。Of course, the
可选的,如图5所示,瓦片10是光伏发电屋面瓦。Optionally, as shown in FIG. 5 , the
具体的,瓦片10包括曲面玻璃以及覆盖于该曲面玻璃上的光伏发电层(未图示)。Specifically, the
其中,如图5所示,曲面玻璃具有向屋面凹陷形成的波谷101,以及向远离屋面方向突出形成的波峰102,紧固件24贯穿曲面玻璃的波峰102位置。Wherein, as shown in FIG. 5 , the curved glass has a
例如:瓦片10为单玻汉瓦,该单玻汉瓦包括三曲面单层钢化玻璃与CIGS(铜铟镓硒)太阳能薄膜发电组件,且三曲面单层钢化玻璃包括3个波峰102和2个波谷101。则紧固件24可以穿设于位于三曲面单层钢化玻璃中轴线上的波峰102。For example, the
当然,根据瓦片形状的不同,紧固件24还可以贯穿于曲面玻璃的波谷101位置。对于面积较大的多曲玻璃,还可以在多个波峰102或者波谷101处穿设紧固件24,以使瓦片10与挂瓦条31之间具有多个连接点,以增加瓦片10的安装可靠性。Of course, depending on the shape of the tile, the
可选的,如图6所示,第一凹槽213的侧壁上设置有第一锯齿面2131;卡接部222设置有用于与第一锯齿面2131啮合的第二锯齿面2223。Optionally, as shown in FIG. 6 , a first
具体的,第一锯齿面2131可以设置于第一侧壁2111的朝向第一凹槽213内的一面,相应的第二锯齿面2223设置于卡接块2222的朝向第一侧壁2111的一面。Specifically, the first
由于,第三支撑臂限制连接块向远离第一侧壁的方向移动,从而确保卡接块卡设于第一凹槽内时,卡接块与第一侧壁之间没有间隙。从而可以增加连接件与底座之间的连接可靠性,避免连接件相对底座向第一凹槽的开口侧或者槽底部移动,进而增加瓦片安装的可靠性。Because the third support arm restricts the movement of the connecting block away from the first side wall, it is ensured that when the engaging block is clamped in the first groove, there is no gap between the engaging block and the first side wall. Therefore, the connection reliability between the connecting piece and the base can be increased, and the connecting piece can be prevented from moving relative to the base toward the opening side of the first groove or the bottom of the groove, thereby increasing the reliability of tile installation.
另外,卡接块2222与第二支撑臂2122之间具有间隙。In addition, there is a gap between the
而且,第二锯齿面2223设置于所述卡接块2222的远离连接块2221的一端,卡接块2222与连接块2221连接的一端向靠近第一侧壁2111的方向突出,形成突起部2224。In addition, the second
在取下瓦片10的过程中,可以将瓦片10远离固定于固定部221的一端向远离屋面30的方向抬起一定角度(例如:3°),从而使突起部2224抵接于第一侧壁2111上,且连第二锯齿面2223绕突起部2224向远离第一锯齿面2131的一侧旋转以脱离第一锯齿面2131。然后再向第一凹槽213的开口方向取下瓦片10和连接件22即可。In the process of removing the
这样,可以简便的取下瓦片。In this way, the tile can be easily removed.
当然,第一锯齿面2131还可以设置于第二支撑臂2122的朝向第一凹槽213内的一面,相应的第二锯齿面2223设置于卡接块2222的朝向第二支撑臂2122的一面。Of course, the first
例如:卡接块2222靠近连接块2221的第一端向靠近第一侧壁2111的方向延伸,远离连接块2221的第二端向远离第一侧壁2111的方向延伸,则可以在第二端朝向第二支撑臂2122的一面设置第二锯齿面2223,以确保卡接块2222卡设于第一凹槽213内时,第二端与第二支撑臂2122之间没有间隙,从而确保第一锯齿面2131与第二锯齿面2223啮合。For example, if the first end of the
取下瓦片10的过程中,可以向靠近屋面30的方向下压瓦片10远离固定部221的一端,使第二锯齿面2223脱离第一锯齿面2131后,向第一凹槽213的开口方向取下瓦片10和连接件22即可。In the process of removing the
在实际应用过程中,屋面30覆盖设置有大量的瓦片10,从而在屋面30设置有多个挂瓦条31,挂瓦条31可以平行于屋檐的方向设置,且相邻挂瓦条31之间的间距可以根据瓦片10的尺寸改变。In the actual application process, the
例如,瓦片10的沿屋脊到屋檐方向的长度为500mm,则相邻挂瓦条31之间的间距可以略小于瓦片10的长度,例如425mm,以使相邻挂瓦条100能够部分搭接。For example, if the length of the
如图4所示,相邻的瓦片10的搭接区域设置有密封条11,该密封条11可以是胶条,用于粘连相邻的两个瓦片10,并防止雨水沾染瓦片10的背面。As shown in FIG. 4 , a sealing
这样,可以避免光伏发电屋面瓦因雨水浸染而发生短路。In this way, the short circuit of the photovoltaic power generation roof tile due to the infiltration of rainwater can be avoided.
在本实用新型实施例中,瓦片的安装组件包括可连接的底座和连接件,其中,底座包括本体部和支撑部,且支撑部与本体部共同围绕形成第一凹槽;连接件包括固定部和卡接部。这样,仅需要在屋面设置挂瓦条,并将底座固定于挂瓦条,然后将瓦片固定于连接件中的固定部,并通过卡接部卡设于第一凹槽内,便可以将瓦片安装于屋面。该瓦片的安装组件不需要挂瓦条与屋面之间具有间隙,从而不需要在屋面安装顺水条,从而简化瓦片安装的复杂程度。In the embodiment of the present invention, the tile installation assembly includes a connectable base and a connecting piece, wherein the base includes a body portion and a support portion, and the support portion and the body portion together form a first groove; the connecting piece includes a fixing portion part and snap-in part. In this way, it is only necessary to set the roof tile hanging strip, fix the base to the hanging tile strip, then fix the tile to the fixing part in the connecting piece, and clamp it in the first groove through the clamping part, then the The tiles are installed on the roof. The tile installation assembly does not require a gap between the tile and the roof, so it is not necessary to install a water-slung strip on the roof, thereby simplifying the complexity of tile installation.
以上,仅为本实用新型的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本实用新型的保护范围之内。因此,本实用新型的保护范围应以权利要求的保护范围为准。The above are only specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art who is familiar with the technical field disclosed by the present invention can easily think of changes or replacements. All should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention should be subject to the protection scope of the claims.
Claims (11)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822218818.7U CN209907746U (en) | 2018-12-27 | 2018-12-27 | A tile installation component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822218818.7U CN209907746U (en) | 2018-12-27 | 2018-12-27 | A tile installation component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209907746U true CN209907746U (en) | 2020-01-07 |
Family
ID=69025531
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822218818.7U Active CN209907746U (en) | 2018-12-27 | 2018-12-27 | A tile installation component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209907746U (en) |
-
2018
- 2018-12-27 CN CN201822218818.7U patent/CN209907746U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10284136B1 (en) | Narrow flashing for waterproof mounting of solar panels to a roof | |
JP3299877B2 (en) | Mounting hardware used for mounting solar cell module, mounting structure of solar cell module, and roof mounted with solar cell module | |
JP2005517843A (en) | Roof plate system | |
JP2006500488A (en) | Roofing board assembly | |
JP2003056131A (en) | Solar energy utilization equipment and solar energy utilization array | |
US20120272591A1 (en) | Device for generating solar power | |
WO2012001162A3 (en) | Installation for absorbing solar energy | |
JP2013256802A (en) | Solar module mounting structure, solar module mounting method, and roof | |
CN209907746U (en) | A tile installation component | |
CN115749149A (en) | Photovoltaic tile | |
JP2013002244A (en) | Solar cell module | |
KR20090092750A (en) | Insulating roof-structure | |
AU2015203159A1 (en) | Photovoltaic assembly | |
JP2020094409A (en) | Light-shielding system, light-shielding metal fitting, and method for constructing light-shielding system | |
JP4684101B2 (en) | Solar power system | |
CN211499531U (en) | Roof structure | |
JP2019078095A (en) | Metal fitting and solar cell system | |
EP3571449A1 (en) | Anchoring bracket for covers | |
JP3177929U (en) | Solar module mounting structure and roof | |
JP2012140774A (en) | Base of mount for solar panel on slate roof | |
CN110266252A (en) | Photovoltaic tile | |
CN222541823U (en) | A rooftop photovoltaic device | |
JP2000226910A (en) | Roof material fixing device, roof structure using it, roof construction method | |
JP2002138638A (en) | Installation structure of solar cell module | |
CN217601897U (en) | Novel BIPV (building integrated photovoltaics) inverted-V-shaped purline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100176 Beijing Daxing District Beijing economic and Technological Development Zone Rongchang East Street 7 hospital 6 Building 3001 room. Patentee after: Beijing Dingrong Photovoltaic Technology Co.,Ltd. Address before: 100176 Beijing Daxing District Beijing economic and Technological Development Zone Rongchang East Street 7 hospital 6 Building 3001 room. Patentee before: BEIJING APOLLO DING RONG SOLAR TECHNOLOGY Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221125 Address after: Room 229, Annex Building, No. 111, Kexue Avenue, Huangpu District, Guangzhou, Guangdong Province, 510663 (office only) Patentee after: Hanwa Technology Co.,Ltd. Address before: 100176 Beijing Daxing District Beijing economic and Technological Development Zone Rongchang East Street 7 hospital 6 Building 3001 room. Patentee before: Beijing Dingrong Photovoltaic Technology Co.,Ltd. |
|
PP01 | Preservation of patent right | ||
PP01 | Preservation of patent right |