CN209874078U - Fast-spliced H-shaped steel concrete column and reinforced concrete beam connecting node - Google Patents
Fast-spliced H-shaped steel concrete column and reinforced concrete beam connecting node Download PDFInfo
- Publication number
- CN209874078U CN209874078U CN201920533150.7U CN201920533150U CN209874078U CN 209874078 U CN209874078 U CN 209874078U CN 201920533150 U CN201920533150 U CN 201920533150U CN 209874078 U CN209874078 U CN 209874078U
- Authority
- CN
- China
- Prior art keywords
- shaped steel
- column
- connecting plate
- stud
- reinforced concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 88
- 239000010959 steel Substances 0.000 title claims abstract description 88
- 239000004567 concrete Substances 0.000 title claims abstract description 33
- 239000011150 reinforced concrete Substances 0.000 title claims abstract description 16
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 11
- 230000002787 reinforcement Effects 0.000 claims description 8
- 239000003351 stiffener Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 7
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 7
- 238000000034 method Methods 0.000 description 7
- 238000003466 welding Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 2
- 238000012946 outsourcing Methods 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 238000004873 anchoring Methods 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000003313 weakening effect Effects 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
一种快拼式H型钢混凝土柱和钢筋混凝土梁连接节点,包括H型钢柱、连接板和加强筋;H型钢柱任意一个翼缘的表面平行固定设置有两个连接板,H型钢柱的一侧腹板上平行设置有两个连接板;连接板上设置有若干螺纹孔,所有连接板上均垂直设置有若干加强筋。本实用新型节点装配率高。节点所有构件,包括型钢柱、连接板、双头螺柱、套筒以及钢筋,均可在工厂预制,全部构件可模数化生产,生产效率高,且提高了现场施工效率,保证了施工质量,具有较高的经济效益。
A fast-split H-shaped steel concrete column and reinforced concrete beam connection node, including an H-shaped steel column, a connecting plate and a reinforcing bar; the surface of any flange of the H-shaped steel column is fixed in parallel with two connecting plates, and one of the H-shaped steel columns Two connecting plates are arranged in parallel on the side web; several threaded holes are arranged on the connecting plates, and several reinforcing ribs are vertically arranged on all the connecting plates. The utility model has a high node assembly rate. All components of the joints, including steel columns, connecting plates, double-ended studs, sleeves and steel bars, can be prefabricated in the factory, and all components can be produced in a modular manner, with high production efficiency, improved on-site construction efficiency, and guaranteed construction quality , with high economic benefits.
Description
技术领域technical field
本实用新型属于梁柱连接节点技术领域,特别涉及一种快拼式H型钢混凝土柱和钢筋混凝土梁连接节点。The utility model belongs to the technical field of beam-column connection nodes, in particular to a fast-assembled H-shaped steel concrete column-reinforced concrete beam connection node.
背景技术Background technique
从结构整体出发,型钢混凝土结构具有钢结构及混凝土结构的双重优势。与钢筋混凝土结构相比,因其含钢率较高,同等截面,型钢混凝土构件比钢筋混凝土构件承载力大;且具有良好的延性和抗震性能;H型钢骨架可在工厂预制,加快了现场施工速度。与钢结构相比,型钢混凝土构件其外包的混凝土提高了构件的刚度,含钢量相等的型钢混凝土和钢结构构件相比,型钢混凝土构件刚度大;型钢混凝土构件利用外包的混凝土提高了型钢构件的防火、防锈蚀能力;其次,其稳定性良好。Starting from the overall structure, the steel concrete structure has the dual advantages of steel structure and concrete structure. Compared with the reinforced concrete structure, because of its higher steel content and the same cross section, the bearing capacity of the steel concrete member is larger than that of the reinforced concrete member; and it has good ductility and seismic performance; the H-shaped steel skeleton can be prefabricated in the factory, which speeds up the on-site construction speed. Compared with the steel structure, the outsourcing concrete of the steel concrete member improves the rigidity of the member, and the steel concrete member with the same steel content is compared with the steel structure member, and the steel concrete member is more rigid; the steel concrete member uses the outsourcing concrete to improve the steel member. Excellent fire prevention and anti-corrosion capabilities; secondly, its stability is good.
从结构节点出发,目前,型钢混凝土结构梁柱连接节点方式,通常采用设置钢牛腿、连接板、型钢柱腹板穿孔以及梁主筋锚入混凝土柱等连接方式。但是现存的连接方式均会带来诸多问题,如设置钢牛腿会在末端产生截面承载力和刚度的突变,容易发生混凝土挤压破坏、穿孔对打孔定位精度要求高,且在开孔后柱的稳定性下降;将纵筋直接焊接在连接板或者型钢柱上的方式,造成型钢柱焊缝过多,焊接残余应力的累积会导致截面的削弱,从而降低节点强度;不同强度的钢筋与型钢焊接,因其含碳量不同,焊接质量受到影响,同样削弱节点强度。Starting from the structural nodes, at present, the beam-column connection methods of steel concrete structures usually adopt connection methods such as setting steel corbels, connecting plates, perforating the web plate of steel columns, and anchoring the main reinforcement of beams into concrete columns. However, the existing connection methods will bring many problems. For example, the installation of steel corbels will cause a sudden change in the cross-sectional bearing capacity and stiffness at the end, and concrete extrusion damage will easily occur. Decreased stability; the method of directly welding the longitudinal reinforcement to the connecting plate or the steel column will cause too many welding seams of the steel column, and the accumulation of welding residual stress will lead to the weakening of the section, thereby reducing the joint strength; steel bars of different strengths are welded to the steel , because of the different carbon content, the welding quality is affected, and the joint strength is also weakened.
实用新型内容Utility model content
本实用新型的目的在于提供一种快拼式H型钢混凝土柱和钢筋混凝土梁连接节点,以解决上述问题。The purpose of the utility model is to provide a fast assembly type H-shaped steel concrete column and reinforced concrete beam connection node to solve the above problems.
为实现上述目的,本实用新型采用以下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
一种快拼式H型钢混凝土柱和钢筋混凝土梁连接节点,包括H型钢柱、连接板和加强筋;H型钢柱任意一个翼缘的表面平行固定设置有两个连接板,H型钢柱的一侧腹板上平行设置有两个连接板;连接板上设置有若干螺纹孔,所有连接板上均垂直设置有若干加强筋。A fast-split H-shaped steel concrete column and reinforced concrete beam connection node, including an H-shaped steel column, a connecting plate and a reinforcing bar; the surface of any flange of the H-shaped steel column is fixed in parallel with two connecting plates, and one of the H-shaped steel columns Two connecting plates are arranged in parallel on the side web; several threaded holes are arranged on the connecting plates, and several reinforcing ribs are vertically arranged on all the connecting plates.
进一步的,加强筋包括双头螺柱、钢筋连接器和钢筋;钢筋连接器为套筒状,套筒内设置有正反螺纹,双头螺柱的一端与钢筋连接器的一端螺纹连接,双头螺柱的另一端与连接板螺纹连接;钢筋连接器的另一端和钢筋螺纹连接。Further, the reinforcing ribs include double-ended studs, steel bar connectors and steel bars; the steel bar connectors are in the shape of sleeves, and positive and negative threads are arranged in the sleeves, and one end of the double-ended studs is threadedly connected with one end of the steel bar connectors. The other end of the head stud is threaded with the connecting plate; the other end of the steel bar connector is threaded with the steel bar.
进一步的,双头螺柱包括第一螺柱和第二螺柱,第一螺柱长于第二螺柱,连接板上相邻的两个双头螺柱长度不相同。Further, the double-ended stud includes a first stud and a second stud, the first stud is longer than the second stud, and the two adjacent double-ended studs on the connecting plate have different lengths.
进一步的,连接板上螺纹孔为单排或双排,同一排相邻的两个螺纹孔间距相等。Further, the threaded holes on the connecting plate are in single or double rows, and the distance between two adjacent threaded holes in the same row is equal.
进一步的,H型钢柱腹板上的连接板垂直于上下翼缘设置,且连接板的端部与上下翼缘焊接,连接板与腹板焊接。Further, the connecting plate on the web of the H-shaped steel column is arranged perpendicular to the upper and lower flanges, and the ends of the connecting plate are welded to the upper and lower flanges, and the connecting plate is welded to the web.
进一步的,翼缘上的连接板和腹板上的连接板在同一平面。Further, the connecting plate on the flange and the connecting plate on the web are on the same plane.
进一步的,H型钢柱、连接板和加强筋所形成的节点外侧浇筑有混凝土。Further, concrete is poured on the outside of the node formed by the H-shaped steel column, the connecting plate and the reinforcing bar.
与现有技术相比,本实用新型有以下技术效果:Compared with the prior art, the utility model has the following technical effects:
本实用新型与传统的型钢混凝土柱梁柱通用节点相比,钢筋与连接板连接,连接板与型钢柱焊接的方式,通过改变双头螺柱的长度,满足了钢筋接头错位连接的要求,避免了应力集中。同时钢筋接头面积百分率达50%,属于超强连接。其连接效率更高,提高了节点承载力和延性。Compared with the traditional joints of steel concrete columns, beams and columns, the utility model is connected with the connecting plate, and the connecting plate is welded with the shaped steel column. By changing the length of the studs, the utility model satisfies the requirements of the dislocation connection of the steel bar joints and avoids stress concentration. At the same time, the area percentage of the steel bar joint reaches 50%, which belongs to super strong connection. Its connection efficiency is higher, which improves the joint bearing capacity and ductility.
本实用新型节点装配率高。节点所有构件,包括型钢柱、连接板、双头螺柱、套筒以及钢筋,均可在工厂预制,全部构件可模数化生产,生产效率高,且提高了现场施工效率,保证了施工质量,具有较高的经济效益。The utility model has a high node assembly rate. All components of the joints, including steel columns, connecting plates, double-ended studs, sleeves and steel bars, can be prefabricated in the factory, and all components can be produced in a modular manner, with high production efficiency, improved on-site construction efficiency, and guaranteed construction quality , with high economic benefits.
本实用新型的正反丝套筒连接的方法,拧动套筒,钢筋便可拉紧。避免了钢筋穿过型钢,型钢开孔,削弱节点强度的问题。其安装方便,降低了现场焊接量,保障了施工质量。In the method for connecting positive and negative wire sleeves of the utility model, the steel bars can be tightened by twisting the sleeves. It avoids the problem that the steel bar passes through the section steel, the section steel opens holes, and weakens the strength of the node. It is easy to install, reduces the amount of on-site welding, and ensures the construction quality.
本实用新型以连接板连接的方式,加强了节点强度,且其排布方式更加灵活,不局限于柱面尺寸,可根据受力和构造要求调整为单排连接板或双排连接板。The utility model strengthens the node strength by means of connecting plates, and its arrangement is more flexible, not limited to the size of the cylindrical surface, and can be adjusted to a single row of connecting plates or a double row of connecting plates according to the force and structure requirements.
附图说明Description of drawings
图1为本实用新型整体结构图;Fig. 1 is the overall structure diagram of the utility model;
图2为本实用新型H型钢柱结构图;Fig. 2 is the structural diagram of the utility model H-shaped steel column;
图3为本实用新型连接板结构图;Fig. 3 is the structural diagram of the connecting plate of the present invention;
图4为本实用新型连接板安装示意图;Fig. 4 is the schematic diagram of installation of the utility model connecting plate;
图5为本实用新型双头螺柱连接图;Fig. 5 is the utility model stud connection diagram;
图6为本实用新型钢筋连接器与钢筋装配示意图;Fig. 6 is a schematic diagram of the assembly of the steel bar connector and the steel bar of the present invention;
图7为本实用新型浇筑混凝土的示意图。Fig. 7 is the schematic diagram of pouring concrete of the utility model.
其中:1-H型钢柱;2-连接板;3-双头螺柱;4-钢筋连接器(套筒);5-钢筋;6-混凝土。Among them: 1-H-shaped steel column; 2-Connecting plate; 3-Stud stud; 4-Rebar connector (sleeve); 5-Reinforcement bar; 6-Concrete.
具体实施方式Detailed ways
以下结合附图对本实用新型进一步说明:Below in conjunction with accompanying drawing, the utility model is further described:
请参阅图1至图7,一种快拼式H型钢混凝土柱和钢筋混凝土梁连接节点,包括H型钢柱1、连接板2和加强筋;H型钢柱1任意一个翼缘的表面平行固定设置有两个连接板2,H型钢柱1的一侧腹板上平行设置有两个连接板2;连接板2上设置有若干螺纹孔,所有连接板2上均垂直设置有若干加强筋。Please refer to Fig. 1 to Fig. 7, a fast-split H-shaped steel concrete column and reinforced concrete beam connection node, including H-shaped steel column 1, connecting plate 2 and reinforcing rib; the surface of any flange of H-shaped steel column 1 is fixed in parallel There are two connecting plates 2, two connecting plates 2 are arranged in parallel on one side of the web of the H-shaped steel column 1; several threaded holes are arranged on the connecting plates 2, and several reinforcing ribs are arranged vertically on all the connecting plates 2.
加强筋包括双头螺柱3、钢筋连接器4和钢筋5;钢筋连接器4为套筒状,套筒内设置有正反螺纹,双头螺柱3的一端与钢筋连接器4的一端螺纹连接,双头螺柱3的另一端与连接板2螺纹连接;钢筋连接器4的另一端和钢筋5螺纹连接。The reinforcing ribs include double-ended studs 3, steel bar connectors 4 and steel bars 5; Connection, the other end of the double-ended stud 3 is threaded with the connecting plate 2; the other end of the steel bar connector 4 is threaded with the steel bar 5.
双头螺柱3包括第一螺柱和第二螺柱,第一螺柱长于第二螺柱,连接板2上相邻的两个双头螺柱长度不相同。The double-ended studs 3 include a first stud and a second stud, the first stud is longer than the second stud, and two adjacent double-ended studs on the connecting plate 2 have different lengths.
连接板2上螺纹孔为单排或双排,同一排相邻的两个螺纹孔间距相等。The threaded holes on the connecting plate 2 are single or double rows, and the distance between two adjacent threaded holes in the same row is equal.
H型钢柱1腹板上的连接板垂直于上下翼缘设置,且连接板2的端部与上下翼缘焊接,连接板2与腹板焊接。The connecting plate on the web of the H-shaped steel column 1 is arranged perpendicular to the upper and lower flanges, and the end of the connecting plate 2 is welded to the upper and lower flanges, and the connecting plate 2 is welded to the web.
翼缘上的连接板2和腹板上的连接板2在同一平面。The connecting plate 2 on the flange and the connecting plate 2 on the web are on the same plane.
H型钢柱、连接板和加强筋所形成的节点外侧浇筑有混凝土6。Concrete 6 is poured on the outside of the node formed by the H-shaped steel column, the connecting plate and the reinforcement.
装配过程:Assembly process:
一种快拼式H型钢混凝土柱与钢筋混凝土梁通过连接节点,其全部组成部件由工厂预制,运送施工现场后,拼装连接。如图1所示,其特征在于:A quick-assembled H-shaped steel concrete column and a reinforced concrete beam pass through a connection node, and all its components are prefabricated in a factory, and assembled and connected after being transported to a construction site. As shown in Figure 1, it is characterized in that:
1、连接板2焊接在H型钢柱1上。所述的连接板2上分布有螺纹孔,螺纹孔数量可根据受力和构造要求,设置为单排螺纹孔或者是双排螺纹孔。如图3、4所示。1. The connecting plate 2 is welded on the H-shaped steel column 1. The connecting plate 2 is distributed with threaded holes, and the number of threaded holes can be set as a single row of threaded holes or a double row of threaded holes according to the force and structure requirements. As shown in Figure 3 and 4.
2、双头螺柱3与连接板2螺纹孔拧在一起。如图5所示。2. The double-ended stud 3 is screwed together with the threaded hole of the connecting plate 2. As shown in Figure 5.
3、通过套筒4,将双头螺柱3和钢筋5拧在一起。所述的钢筋5一端带有螺纹;双头螺柱3与钢筋5连接位置应互相错开,且同一区段内,钢筋接头面积百分率应满足国家规范要求。所述套筒4应满足《钢筋机械连接技术规程》(JGJ107-2010)关于连接接头的要求。如图6所示。3. Through the sleeve 4, screw the stud 3 and the steel bar 5 together. One end of the steel bar 5 is threaded; the connecting positions of the double-ended stud 3 and the steel bar 5 should be staggered from each other, and in the same section, the area percentage of the steel bar joints should meet the requirements of the national standard. The sleeve 4 should meet the requirements of the "Technical Regulations for Mechanical Connection of Steel Bars" (JGJ107-2010) regarding connection joints. As shown in Figure 6.
4、绑扎柱纵筋,梁箍筋以及梁受力钢筋,最终浇筑混凝土。如图7所示。4. Binding column longitudinal reinforcement, beam stirrups and beam stress reinforcement, and finally pouring concrete. As shown in Figure 7.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920533150.7U CN209874078U (en) | 2019-04-18 | 2019-04-18 | Fast-spliced H-shaped steel concrete column and reinforced concrete beam connecting node |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920533150.7U CN209874078U (en) | 2019-04-18 | 2019-04-18 | Fast-spliced H-shaped steel concrete column and reinforced concrete beam connecting node |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209874078U true CN209874078U (en) | 2019-12-31 |
Family
ID=68960798
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920533150.7U Active CN209874078U (en) | 2019-04-18 | 2019-04-18 | Fast-spliced H-shaped steel concrete column and reinforced concrete beam connecting node |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209874078U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111140011A (en) * | 2020-01-10 | 2020-05-12 | 广西建工集团联合建设有限公司 | Novel pre-positioning sleeve straight thread steel bar connection construction method |
CN114809298A (en) * | 2022-05-24 | 2022-07-29 | 中国十七冶集团有限公司 | Node structure of beam-column core area of steel reinforced concrete composite structure and construction method |
CN115419214A (en) * | 2022-09-29 | 2022-12-02 | 山东建筑大学 | Section steel concrete beam |
-
2019
- 2019-04-18 CN CN201920533150.7U patent/CN209874078U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111140011A (en) * | 2020-01-10 | 2020-05-12 | 广西建工集团联合建设有限公司 | Novel pre-positioning sleeve straight thread steel bar connection construction method |
CN114809298A (en) * | 2022-05-24 | 2022-07-29 | 中国十七冶集团有限公司 | Node structure of beam-column core area of steel reinforced concrete composite structure and construction method |
CN115419214A (en) * | 2022-09-29 | 2022-12-02 | 山东建筑大学 | Section steel concrete beam |
CN115419214B (en) * | 2022-09-29 | 2024-05-28 | 山东建筑大学 | A steel concrete beam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209874079U (en) | Quick-assembly type T-shaped steel concrete column-reinforced concrete beam connecting node | |
CN207919763U (en) | Assembled self-recovery circular concrete-filled steel tube combined node | |
CN109914598A (en) | A quick-joint H-shaped steel-concrete beam-column connecting node | |
CN207812686U (en) | Unilateral buckling-restrained formula concrete column-steel beam connecting node | |
CN209874078U (en) | Fast-spliced H-shaped steel concrete column and reinforced concrete beam connecting node | |
CN207436373U (en) | A kind of assembled is bolted steel core concrete column entirely | |
CN209874053U (en) | A fast-splicing H-shaped steel concrete beam-column connection node | |
CN211572019U (en) | Box shaped steel concrete column and concrete beam connected node | |
CN102828559B (en) | Node for combination beam and 45-degree arranged cross steel reinforced concrete column | |
CN104652704B (en) | Connected installation and calculation methods for inner pipes and outer pipes of pipe-in-pipe concrete-filled steel tube tension members | |
CN109914597A (en) | A quick-fit T-shaped steel-concrete beam-column connecting node | |
CN204753812U (en) | Reinforced concrete frame structure | |
CN209941897U (en) | Quick-assembly type T-shaped steel concrete beam column connecting node | |
CN109972510A (en) | A prefabricated composite bridge deck system with adjustable rod spacing U-bolt connection | |
CN212801948U (en) | High-strength stiff column-beam column connecting joint | |
CN209941911U (en) | Fast-assembly box-shaped steel concrete column-concrete beam connecting node | |
CN205035914U (en) | Mechanical anchoring type connected node structure of steel core concrete column and reinforced concrete roof beam | |
CN205189143U (en) | Muscle formula node is worn with girder steel to " Z " shaped steel connection type rectangle steel core concrete column | |
CN203878779U (en) | Rectangular concrete-filled steel tube column and I-steel beam rebar penetrating type joint | |
CN112302210A (en) | Assembled built-in corrugated steel plate reinforced concrete cross-section member and construction process | |
CN209837284U (en) | A steel-based beam-to-beam connection in a prefabricated reinforced concrete structure | |
CN209874052U (en) | A quick-fit box-shaped steel concrete column-H-shaped steel concrete beam connection node | |
CN112761278A (en) | Slotting energy-consuming steel pipe shear wall with hybrid damper | |
CN207959509U (en) | A kind of complete bolted steel structure node | |
CN207878666U (en) | Connecting assembly for special-shaped steel pipe concrete column and H-shaped steel beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |