[go: up one dir, main page]

CN209706079U - Cleaning type steam-smoke-gas preheater - Google Patents

Cleaning type steam-smoke-gas preheater Download PDF

Info

Publication number
CN209706079U
CN209706079U CN201822039102.0U CN201822039102U CN209706079U CN 209706079 U CN209706079 U CN 209706079U CN 201822039102 U CN201822039102 U CN 201822039102U CN 209706079 U CN209706079 U CN 209706079U
Authority
CN
China
Prior art keywords
heat exchange
flue gas
chamber
smoke
steam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822039102.0U
Other languages
Chinese (zh)
Inventor
钱晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Sushenger Machinery Equipment Co Ltd
Original Assignee
Wuxi Sushenger Machinery Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Sushenger Machinery Equipment Co Ltd filed Critical Wuxi Sushenger Machinery Equipment Co Ltd
Priority to CN201822039102.0U priority Critical patent/CN209706079U/en
Application granted granted Critical
Publication of CN209706079U publication Critical patent/CN209706079U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Supply (AREA)
  • Chimneys And Flues (AREA)
  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

本实用新型涉及垃圾焚烧烟气处理领域,尤其是涉及一种除尘式蒸汽‑烟气预热器,包括壳体,壳体包括烟气室和换热室,换热室内设有换热管,换热管上设有蒸汽进口和蒸汽出口,烟气室上设有烟气进口,换热室上设有烟气出口,所述烟气室内设有若干圆柱形的除尘滤筒,烟气室外设有烟气管。本实用新型具有提高换热管换热效率的优点。通过在烟气室中设置除尘滤筒,降低了进入换热室内烟气的含尘量,使换热管外壁不易结垢,因此提高了换热管的换热效率,延长了换热管的使用寿命;通过在烟气室与换热室之间的隔板顶部设置排气口,使部分高温烟气从排气口回流入烟气室中对低温烟气进行预热,间接提高了换热器的换热效率。

The utility model relates to the field of garbage incineration flue gas treatment, in particular to a dust-removing steam-flue gas preheater, which includes a shell, the shell includes a flue gas chamber and a heat exchange chamber, and a heat exchange tube is arranged in the heat exchange chamber. The heat exchange tube is provided with a steam inlet and a steam outlet, the flue gas chamber is provided with a flue gas inlet, and the heat exchange chamber is provided with a flue gas outlet. The flue gas chamber is provided with a number of cylindrical dust removal filter cartridges, and the flue gas chamber is equipped with With flue pipe. The utility model has the advantage of improving the heat exchange efficiency of the heat exchange tube. By setting the dust removal filter cartridge in the flue gas chamber, the dust content of the flue gas entering the heat exchange chamber is reduced, so that the outer wall of the heat exchange tube is not easy to scale, thus improving the heat exchange efficiency of the heat exchange tube and prolonging the service life of the heat exchange tube Service life; by setting an exhaust port on the top of the partition between the flue gas chamber and the heat exchange chamber, part of the high-temperature flue gas flows back into the flue gas chamber from the exhaust port to preheat the low-temperature flue gas, which indirectly improves the exchange rate. heat transfer efficiency of the heater.

Description

除尘式蒸汽-烟气预热器Dust removal steam-flue gas preheater

技术领域technical field

本实用新型涉及垃圾焚烧烟气处理领域,尤其是涉及一种除尘式蒸汽-烟气预热器。The utility model relates to the field of garbage incineration flue gas treatment, in particular to a dust removal type steam-flue gas preheater.

背景技术Background technique

蒸汽-烟气预热器(SGH)及烟气-烟气预热器(GGH)是垃圾焚烧炉尾部烟气处理设备SCR的主要辅助加热设备,按工况SCR低温脱硝SGH单独使用,SCR高温脱硝为节省热源蒸汽一般SGH与GGH组合使用。垃圾焚烧炉垃圾燃烧后放出的烟气经过除尘器除尘及脱硫塔脱硫,然后经过烟气-烟气预热器(GGH)及蒸汽-烟气预热器(SGH)将烟气温度提升至SCR催化剂脱硝所需的温度,再将烟气送入SCR来完成烟气中的NOX处理,使排放烟气NOX含量达到国家最新排放标准。Steam-flue gas preheater (SGH) and flue gas-flue gas preheater (GGH) are the main auxiliary heating equipment for the SCR tail gas treatment equipment of waste incinerator. Denitrification is generally used in combination with SGH and GGH to save heat source steam. The flue gas released by the waste incinerator after the waste is burned is dedusted by the dust collector and desulfurized by the desulfurization tower, and then the temperature of the flue gas is raised to SCR through the flue gas-flue gas preheater (GGH) and steam-flue gas preheater (SGH) The temperature required for catalyst denitrification, and then the flue gas is sent to the SCR to complete the NOX treatment in the flue gas, so that the NOX content of the exhaust flue gas can reach the latest national emission standards.

授权公告号为CN208154515U的实用新型专利公开了一种对流换热式空气预热器,壳体外层设置有外保温层,壳体上部设有进风口,右端设有出风口,壳体内腔铺有一层耐火浇注料,耐火浇注料左端与壳体之间填充有保温浇注料,燃烧器安装在壳体左端中部位置,壳体底部设置有鞍座,人孔设置在壳体外侧中部。该实用新型采用直燃式加热,通过可调的燃料消耗及燃烧器的启停控制预热器出口温度的恒定,并且通过空气分级进入混合的方式降低了壳体的温度,增大了预热器的使用寿命。由于焚烧垃圾产生的烟气中含有大量粉尘,含粉尘的烟气长期通过换热管时,会使换热管外壁结垢,因而影响换热管的换热效率。The utility model patent with the authorized notification number CN208154515U discloses a convective heat exchange air preheater. The outer layer of the shell is provided with an outer insulation layer, the upper part of the shell is provided with an air inlet, and the right end is provided with an air outlet. A layer of refractory castable, heat-insulating castable is filled between the left end of the refractory castable and the shell, the burner is installed in the middle of the left end of the shell, the bottom of the shell is provided with a saddle, and the manhole is set in the middle of the outer shell. The utility model adopts direct-fired heating, controls the constant temperature of the outlet of the preheater through adjustable fuel consumption and the start and stop of the burner, and reduces the temperature of the shell through the way of air staging and mixing, increasing the preheating service life of the device. Because the flue gas produced by incineration of garbage contains a lot of dust, when the dust-containing flue gas passes through the heat exchange tube for a long time, it will cause scaling on the outer wall of the heat exchange tube, thus affecting the heat exchange efficiency of the heat exchange tube.

实用新型内容Utility model content

本实用新型的目的是提供一种除尘式蒸汽-烟气预热器,其具有提高换热管换热效率的优点。The purpose of the utility model is to provide a dust removal type steam-flue gas preheater, which has the advantage of improving the heat exchange efficiency of the heat exchange tube.

本实用新型的上述实用新型目的是通过以下技术方案得以实现的:一种除尘式蒸汽-烟气预热器,包括壳体,壳体包括烟气室和换热室,换热室内设有换热管,换热管上设有蒸汽进口和蒸汽出口,烟气室上设有烟气进口,换热室上设有烟气出口,所述烟气室内设有若干圆柱形的除尘滤筒,烟气室外设有烟气管,除尘滤筒的一端与烟气管连接,除尘滤筒的另一端固定有底封板,底封板上固定有电机,电机上驱动连接转轴,转轴贯穿底封板伸于除尘滤筒内,转轴位于除尘滤筒的中轴线上,除尘滤筒包括折板滤网,折板滤网围成圆柱形,转轴上固定有棒杆,棒杆用于拨动折板滤网。The purpose of the above-mentioned utility model of the utility model is achieved through the following technical solutions: a dust-removing steam-flue gas preheater, including a shell, the shell includes a flue gas chamber and a heat exchange chamber, and the heat exchange chamber is equipped with a heat exchanger The heat pipe, the heat exchange tube is provided with a steam inlet and a steam outlet, the flue gas chamber is provided with a flue gas inlet, and the heat exchange chamber is provided with a flue gas outlet, and the flue gas chamber is provided with a number of cylindrical dust filter cartridges, There is a flue gas pipe outside the flue gas chamber, one end of the dust removal filter cartridge is connected to the flue gas pipe, the other end of the dust removal filter cartridge is fixed with a bottom sealing plate, and a motor is fixed on the bottom sealing plate, the motor is driven to connect with the rotating shaft, and the rotating shaft runs through the bottom sealing The plate extends into the dust removal filter cartridge, and the rotating shaft is located on the central axis of the dust removal filter cartridge. The dust removal filter cartridge includes a folded plate filter screen, which is surrounded by a cylindrical shape, and a rod is fixed on the rotating shaft, and the rod rod is used to move the folding plate. plate strainer.

通过采用上述技术方案,焚烧垃圾产生的烟气从烟气进口进入若干除尘滤筒中,经除尘滤筒过滤后的含尘量少的烟气进入烟气室中,再流入换热室中与蒸汽换热,由于烟气中含尘量少,换热管外壁不易结垢,因此可提高换热管的换热效率,延长换热管的使用寿命。电机间歇启动驱动转轴旋转,转轴上的棒杆刮动折板滤芯的内壁,使折板滤芯上粘附的灰尘抖落,从而使除尘滤筒保持良好的除尘过滤效果。By adopting the above technical scheme, the flue gas generated by burning garbage enters several dust removal filter cartridges from the flue gas inlet, and the flue gas with less dust content filtered by the dust removal filter cartridges enters the flue gas chamber, and then flows into the heat exchange chamber to be mixed with steam Heat exchange, because the dust content in the flue gas is small, the outer wall of the heat exchange tube is not easy to scale, so the heat exchange efficiency of the heat exchange tube can be improved and the service life of the heat exchange tube can be extended. The motor starts intermittently to drive the rotating shaft to rotate, and the rod on the rotating shaft scrapes the inner wall of the folded plate filter element, shaking off the dust adhered to the folded plate filter element, so that the dust removal filter cartridge maintains a good dust removal and filtering effect.

优选的,所述除尘滤筒的端部固定设有安装法兰,安装法兰与烟气管的端部通过螺栓连接。Preferably, the end of the dust removal filter cartridge is fixedly provided with a mounting flange, and the mounting flange is connected to the end of the flue gas pipe through bolts.

通过采用上述技术方案,通过安装法兰连接除尘滤筒与烟气管,使除尘滤筒与烟气筒方便拆装,以便拆卸除尘滤筒清理积尘。By adopting the above technical scheme, the dust removal filter cartridge and the flue gas pipe are connected through the installation flange, so that the dust removal filter cartridge and the flue gas pipe can be easily disassembled, so that the dust removal filter cartridge can be disassembled to clean up the accumulated dust.

优选的,所述烟气室的外壁上设有人孔。Preferably, manholes are provided on the outer wall of the smoke chamber.

通过采用上述技术方案,在烟气室上设置人孔,可方便维修人员进入烟气室拆卸或安装除尘滤筒或进行其它维护。By adopting the above technical scheme, manholes are provided on the flue gas chamber, which can facilitate maintenance personnel to enter the flue gas chamber to remove or install the dust removal filter cartridge or perform other maintenance.

优选的,所述折板滤网的内壁上固定设有若干V型包角,棒杆的末端与V型包角接触。Preferably, several V-shaped corners are fixed on the inner wall of the folded plate filter, and the ends of the rods are in contact with the V-shaped corners.

通过采用上述技术方案,V型包角起到对折板滤网的保护作用,避免棒杆与折板滤网长时间直接接触而导致折板滤网磨损,间接延长了除尘滤筒的使用寿命。By adopting the above technical solution, the V-shaped wrapping angle plays a protective role for the folded plate filter, avoiding the long-term direct contact between the rod and the folded plate filter, which will cause the wear of the folded plate filter, and indirectly prolong the service life of the dust removal filter cartridge.

优选的,所述底封板上设有防尘轴承,转轴穿设于防尘轴承中。Preferably, the bottom sealing plate is provided with a dust-proof bearing, and the rotating shaft passes through the dust-proof bearing.

通过采用上述技术方案,防尘轴承两侧的挡尘结构不仅可保护轴承内进入杂物导致滚珠磨损,还可避免除尘滤筒内腔的含尘烟气从转轴与底封板的配合间隙处漏出。By adopting the above technical scheme, the dust-blocking structures on both sides of the dust-proof bearing can not only protect the balls from being worn due to debris entering the bearing, but also prevent the dust-laden smoke from the inner chamber of the dust-removing filter cartridge from passing through the gap between the rotating shaft and the bottom sealing plate. leakage.

优选的,所述换热室包括上室体和下室体,上室体内设有上换热管群,下室体内设有下换热管群;上换热管群的一端接通有第一管道,上换热管群的另一端接通有第二管道,下换热管群的一端接通有第三管道,下换热管群的另一端接通有第四管道;第一管道与第三管道上均设有蒸汽进口,第二管道与第四管道上均设有蒸汽出口。Preferably, the heat exchange chamber includes an upper chamber body and a lower chamber body, the upper chamber is provided with an upper heat exchange tube group, and the lower chamber is provided with a lower heat exchange tube group; one end of the upper heat exchange tube group is connected to a second One pipe, the other end of the upper heat exchange tube group is connected with the second pipe, one end of the lower heat exchange tube group is connected with the third pipe, and the other end of the lower heat exchange tube group is connected with the fourth pipe; the first pipe Both the third pipeline and the third pipeline are provided with steam inlets, and the second pipeline and the fourth pipeline are both provided with steam outlets.

通过采用上述技术方案,蒸汽通过两组换热管(上换热管群和下换热管群)与烟气进行换热,提高了换热效率,提高了对蒸汽热量的利用率,相对于用一组换热管(该组换热管的总长度等于两组换热管的总长度)缩短了蒸汽在换热管内的流动路径,降低了蒸汽的热量损耗。By adopting the above technical scheme, the steam exchanges heat with the flue gas through two sets of heat exchange tubes (upper heat exchange tube group and lower heat exchange tube group), which improves the heat exchange efficiency and the utilization rate of steam heat. Using a set of heat exchange tubes (the total length of the set of heat exchange tubes is equal to the total length of the two sets of heat exchange tubes) shortens the flow path of the steam in the heat exchange tubes and reduces the heat loss of the steam.

优选的,所述换热室与烟气室之间设有隔板,隔板上设有通孔。Preferably, a partition is provided between the heat exchange chamber and the flue gas chamber, and a through hole is provided on the partition.

通过采用上述技术方案,使烟气室中的烟气集中从通孔处进入换热室,烟气室中的烟气在通过通孔前可进一步沉降粉尘。By adopting the above technical solution, the flue gas in the flue gas chamber is concentrated and enters the heat exchange chamber from the through hole, and the flue gas in the flue gas chamber can further settle dust before passing through the through hole.

优选的,所述隔板顶部设有排气口。Preferably, an exhaust port is provided on the top of the separator.

通过采用上述技术方案,烟气在换热室中与蒸汽换热升温后大部分从烟气出口排出,小部分从排气口回流入烟气室中对低温烟气进行预热,间接提高了换热器的换热效率。由于热空气上升,因此换热室的顶部漂浮温度较高的烟气,这部分烟气通过排气口回流入烟气室中。By adopting the above technical scheme, most of the flue gas is discharged from the flue gas outlet after exchanging heat with steam in the heat exchange chamber, and a small part flows back into the flue gas chamber from the exhaust port to preheat the low-temperature flue gas, which indirectly improves the heat transfer efficiency of the heat exchanger. As the hot air rises, the flue gas with a higher temperature floats on the top of the heat exchange chamber, and this part of the flue gas flows back into the flue gas chamber through the exhaust port.

综上所述,本实用新型的有益技术效果为:In summary, the beneficial technical effects of the utility model are:

1.通过在烟气室中设置除尘滤筒,降低了进入换热室内烟气的含尘量,使换热管外壁不易结垢,因此提高了换热管的换热效率,延长了换热管的使用寿命;1. By setting the dust removal filter cartridge in the flue gas chamber, the dust content of the flue gas entering the heat exchange chamber is reduced, so that the outer wall of the heat exchange tube is not easy to scale, thus improving the heat exchange efficiency of the heat exchange tube and prolonging the heat exchange time. the service life of the tube;

2.利用电机间歇启动驱动棒杆刮动折板滤芯的内壁,使折板滤芯上粘附的灰尘抖落,从而使除尘滤筒保持良好的除尘过滤效果;2. Use the motor to start intermittently to drive the rod to scrape the inner wall of the folded plate filter element, so that the dust adhered to the folded plate filter element is shaken off, so that the dust removal filter cartridge maintains a good dust removal and filtration effect;

3.通过在烟气室与换热室之间的隔板顶部设置排气口,使部分高温烟气从排气口回流入烟气室中对低温烟气进行预热,间接提高了换热器的换热效率。3. By setting an exhaust port on the top of the partition between the flue gas chamber and the heat exchange chamber, part of the high-temperature flue gas flows back into the flue gas chamber from the exhaust port to preheat the low-temperature flue gas, which indirectly improves the heat transfer. The heat exchange efficiency of the device.

附图说明Description of drawings

图1是除尘式蒸汽-烟气预热器的整体结构示意图;Figure 1 is a schematic diagram of the overall structure of the dust removal type steam-flue gas preheater;

图2是图1的左侧结构示意图;Fig. 2 is a schematic diagram of the structure on the left side of Fig. 1;

图3是烟气室的内部结构示意图;Fig. 3 is a schematic diagram of the internal structure of the flue gas chamber;

图4是除尘滤筒的内部结构示意图;Fig. 4 is a schematic diagram of the internal structure of the dust removal filter cartridge;

图5是图1隐藏烟气室后的结构示意图。Fig. 5 is a schematic structural view of Fig. 1 with the smoke chamber hidden.

图中,1、烟气室;1a、人孔;2、换热室;21、上室体;22、下室体;3、蒸汽进口;4、蒸汽出口;5、烟气进口;6、烟气出口;7、除尘滤筒;71、折板滤网;711、V型包角;72、底封板;73、安装法兰;8、烟气管;9、电机;10、转轴;11、棒杆;12、防尘轴承;13、上换热管群;14、下换热管群;15、第一管道;16、第二管道;17、第三管道;18、第四管道;19、隔板;19a、通孔;19b、排气口。In the figure, 1, flue gas chamber; 1a, manhole; 2, heat exchange chamber; 21, upper chamber body; 22, lower chamber body; 3, steam inlet; 4, steam outlet; 5, flue gas inlet; 6, Flue gas outlet; 7. Dust removal filter cartridge; 71. Folded plate filter; 711. V-shaped wrap angle; 72. Bottom sealing plate; 73. Mounting flange; 8. Flue gas pipe; 9. Motor; 10. Rotating shaft; 11. Rod; 12. Dust-proof bearing; 13. Upper heat exchange tube group; 14. Lower heat exchange tube group; 15. First pipe; 16. Second pipe; 17. Third pipe; 18. Fourth pipe ; 19, partition; 19a, through hole; 19b, exhaust port.

具体实施方式Detailed ways

以下结合附图对本实用新型作进一步详细说明。Below in conjunction with accompanying drawing, the utility model is described in further detail.

实施例:图1为本实用新型公开的一种除尘式蒸汽-烟气预热器,包括壳体,壳体的左半部分为换热室2,换热室2内安装有密集的换热管,壳体的右半部分为烟气室1。换热管上设有蒸汽进口3和蒸汽出口4,蒸汽从蒸汽进口3进入换热管后对换热管加热;烟气室1的右侧面设有烟气进口5,换热室2的左侧面设有烟气出口6(见图2),焚烧垃圾产生的烟气从烟气进口5进入壳体,流经换热管时换热升温后从烟气出口6排出。Embodiment: Figure 1 is a dust-removing steam-flue gas preheater disclosed by the utility model, which includes a shell, and the left half of the shell is a heat exchange chamber 2, and a dense heat exchange chamber is installed in the heat exchange chamber 2 The right half of the housing is the flue gas chamber 1. The heat exchange tube is provided with a steam inlet 3 and a steam outlet 4, and the steam enters the heat exchange tube from the steam inlet 3 and heats the heat exchange tube; the right side of the flue gas chamber 1 is provided with a flue gas inlet 5, and the There is a flue gas outlet 6 on the left side (see Figure 2). The flue gas generated by incineration of garbage enters the shell from the flue gas inlet 5, and is discharged from the flue gas outlet 6 after heat exchange and temperature rise when flowing through the heat exchange tube.

结合图1与图5,换热室2与烟气室1通过竖直的隔板19隔开,隔板19上设有通孔19a供烟气从烟气室1排入换热室2,隔板19的顶部还设有排气口19b,在换热室2内与蒸汽换热升温后的烟气上升至换热室2的顶部,然后从排气口19b回流至烟气室1内,可预热烟气室1内的低温烟气,从而间接提高预热器的换热效率。1 and 5, the heat exchange chamber 2 and the flue gas chamber 1 are separated by a vertical partition 19, and the partition 19 is provided with a through hole 19a for the flue gas to be discharged from the flue gas chamber 1 into the heat exchange chamber 2, The top of the partition 19 is also provided with an exhaust port 19b, and the flue gas after heat exchange with steam in the heat exchange chamber 2 rises to the top of the heat exchange chamber 2, and then flows back into the flue gas chamber 1 from the exhaust port 19b , can preheat the low-temperature flue gas in the flue gas chamber 1, thereby indirectly improving the heat exchange efficiency of the preheater.

如图1所示,换热室2内隔出上室体21和下室体22,上室体21内安装有上换热管群13,下室体22内安装有下换热管群14,上换热管群13和下换热管群14均由若干换热管组成。上换热管群13的一端接通有第一管道15,上换热管群13的另一端接通有第二管道16;下换热管群14的一端接通有第三管道17,下换热管群14的另一端接通有第四管道18。第一管道15与第三管道17上均具有一个蒸汽进口3,第二管道16与第四管道18上均具有一个蒸汽出口4。蒸汽通过两组换热管(上换热管群13和下换热管群14)与烟气进行换热,提高了换热效率,提高了对蒸汽热量的利用率,相对于用一组换热管(该组换热管的总长度等于两组换热管的总长度)缩短了蒸汽在换热管内的流动路径,降低了蒸汽的热量损耗。As shown in Figure 1, the heat exchange chamber 2 is divided into an upper chamber body 21 and a lower chamber body 22, and an upper heat exchange tube group 13 is installed in the upper chamber body 21, and a lower heat exchange tube group 14 is installed in the lower chamber body 22. , the upper heat exchange tube group 13 and the lower heat exchange tube group 14 are composed of several heat exchange tubes. One end of the upper heat exchange tube group 13 is connected with the first pipeline 15, the other end of the upper heat exchange tube group 13 is connected with the second pipeline 16; one end of the lower heat exchange tube group 14 is connected with the third pipeline 17, and the lower The other end of the heat exchange tube group 14 is connected with a fourth tube 18 . Both the first pipe 15 and the third pipe 17 have a steam inlet 3 , and the second pipe 16 and the fourth pipe 18 have a steam outlet 4 . The steam exchanges heat with the flue gas through two sets of heat exchange tubes (upper heat exchange tube group 13 and lower heat exchange tube group 14), which improves the heat exchange efficiency and the utilization rate of steam heat. The heat pipe (the total length of this group of heat exchange tubes is equal to the total length of the two sets of heat exchange tubes) shortens the flow path of steam in the heat exchange tubes and reduces the heat loss of steam.

如图3所示,烟气室1内设有多个圆柱形的除尘滤筒7,除尘滤筒7由折板滤网71、安装法兰73和底封板72组成,安装法兰73和底封板72固定于折板滤网71的两端,折板滤网71围成空心圆柱形。烟气室1外设有烟气管8,烟气管8上分出与除尘滤筒7数量对应的支管,支管穿至烟气室1内与安装法兰73通过螺栓连接,通过安装法兰73连接除尘滤筒7与烟气管8,使除尘滤筒7与烟气筒方便拆装,以便拆卸除尘滤筒7清理积尘。烟气室1的外壁上设有人孔1a,方便维修人员进入烟气室1拆卸或安装除尘滤筒7。As shown in Figure 3, a plurality of cylindrical dust removal filter cartridges 7 are arranged in the flue gas chamber 1, and the dust removal filter cartridges 7 are composed of a folded plate filter screen 71, a mounting flange 73 and a bottom sealing plate 72, and the mounting flange 73 and The bottom sealing plate 72 is fixed on both ends of the folded plate filter screen 71, and the folded plate filter screen 71 is surrounded by a hollow cylinder. There is a flue gas pipe 8 outside the flue gas chamber 1, and branch pipes corresponding to the number of dust removal filter cartridges 7 are separated from the flue gas pipe 8. The branch pipes penetrate into the flue gas chamber 1 and are connected with the installation flange 73 by bolts. 73 connect the dust removal filter cartridge 7 and the flue gas pipe 8, so that the dust removal filter cartridge 7 and the flue gas cartridge are conveniently disassembled, so that the dust removal filter cartridge 7 is cleaned up. The outer wall of the flue gas chamber 1 is provided with a manhole 1a, which is convenient for maintenance personnel to enter into the flue gas chamber 1 to remove or install the dust removal filter cartridge 7.

结合图3与图4,底封板72上固定有电机9,电机9的旋转轴上联轴固定一根转轴10,转轴10位于折板滤网71的中轴线上,转轴10伸于折板滤网71内的一端上垂直固定有棒杆11,折板滤网71的内壁上固定有若干V型包角711,棒杆11的末端与V型包角711接触,棒杆11用于拨动折板滤网71。V型包角711起到对折板滤网71的保护作用,避免棒杆11与折板滤网71长时间直接接触而导致折板滤网71磨损,间接延长了除尘滤筒7的使用寿命。底封板72中央开设有圆孔,圆孔内固定有防尘轴承12,转轴10穿设于防尘轴承12中,防尘轴承12两侧的挡尘结构不仅可保护轴承内进入杂物导致滚珠磨损,还可避免除尘滤筒7内腔的含尘烟气从转轴10与底封板72的配合间隙处漏出。3 and 4, a motor 9 is fixed on the bottom sealing plate 72, and a rotating shaft 10 is fixed on the rotating shaft of the motor 9. The rotating shaft 10 is located on the central axis of the folded plate filter screen 71, and the rotating shaft 10 extends from the folded plate. One end in the filter screen 71 is vertically fixed with rods 11, and the inwall of the folded plate filter screen 71 is fixed with some V-shaped wrap angles 711, and the end of the rods 11 contacts with the V-shaped wrap angles 711, and the rods 11 are used to dial Moving flap filter screen 71. The V-shaped wrap angle 711 protects the folded plate filter screen 71, avoids long-term direct contact between the rod rod 11 and the folded plate filter screen 71 and causes the folded plate filter screen 71 to be worn, and indirectly prolongs the service life of the dust removal filter cartridge 7. There is a round hole in the center of the bottom sealing plate 72, and a dust-proof bearing 12 is fixed in the round hole, and the rotating shaft 10 is passed through the dust-proof bearing 12. The wear of the balls can also prevent the dust-laden smoke in the inner cavity of the dust removal filter cartridge 7 from leaking from the matching gap between the rotating shaft 10 and the bottom sealing plate 72 .

本实施例的实施原理为:焚烧垃圾产生的烟气从烟气进口5进入若干除尘滤筒7中,经除尘滤筒7过滤后的含尘量少的烟气进入烟气室1中,再流入换热室2中与蒸汽换热,由于烟气中含尘量少,换热管外壁不易结垢,因此可提高换热管的换热效率,延长换热管的使用寿命。电机9间歇启动驱动转轴10旋转,转轴10上的棒杆11刮动折板滤芯的内壁,使折板滤芯上粘附的灰尘抖落,从而使除尘滤筒7保持良好的除尘过滤效果。The implementation principle of this embodiment is: the flue gas produced by incineration of garbage enters a plurality of dust removal filter cartridges 7 from the flue gas inlet 5, and the flue gas with low dust content filtered by the dust removal filter cartridges 7 enters the flue gas chamber 1, and then The flue gas flows into the heat exchange chamber 2 to exchange heat with steam. Because the dust content in the flue gas is small, the outer wall of the heat exchange tube is not easy to scale, so the heat exchange efficiency of the heat exchange tube can be improved and the service life of the heat exchange tube can be extended. The motor 9 starts intermittently to drive the rotating shaft 10 to rotate, and the rod 11 on the rotating shaft 10 scrapes the inner wall of the folded plate filter element to shake off the dust adhered to the folded plate filter element, so that the dust removal filter cartridge 7 maintains a good dust removal and filtering effect.

本具体实施方式的实施例均为本实用新型的较佳实施例,并非依此限制本实用新型的保护范围,故:凡依本实用新型的结构、形状、原理所做的等效变化,均应涵盖于本实用新型的保护范围之内。The embodiments of this specific embodiment are all preferred embodiments of the present utility model, and are not intended to limit the protection scope of the present utility model accordingly: all equivalent changes made according to the structure, shape and principle of the present utility model are all valid. Should be covered within the protection scope of the present utility model.

Claims (8)

1. a kind of cleaning type steam-smoke-gas preheater, including shell, shell includes smoke chamber (1) and Heat Room (2), Heat Room (2) heat exchanger tube is equipped in, heat exchanger tube is equipped with steam inlet (3) and steam (vapor) outlet (4), and smoke chamber (1) is equipped with gas inlet (5), Heat Room (2) is equipped with exhanst gas outlet (6), it is characterised in that: the dedusting of several cylinders is equipped in the smoke chamber (1) Filter cylinder (7), smoke chamber (1) are externally provided with fume pipe (8), and one end of dedusting filter cylinder (7) is connect with fume pipe (8), dedusting filter cylinder (7) The other end be fixed with bottom sealing plate (72), be fixed on bottom sealing plate (72) motor (9), on motor (9) be drivingly connected shaft (10), Shaft (10) stretches in dedusting filter cylinder (7) through bottom sealing plate (72), and shaft (10) is located on the central axes of dedusting filter cylinder (7), removes Dirt filter cylinder (7) includes folded plate strainer (71), and folded plate strainer (71) surrounds cylinder, rod (11), stick are fixed in shaft (10) Bar (11) is for stirring folded plate strainer (71).
2. cleaning type steam-smoke-gas preheater according to claim 1, it is characterised in that: the end of the dedusting filter cylinder (7) Portion is fixed with mounting flange (73), and mounting flange (73) and the end of fume pipe (8) are bolted.
3. cleaning type steam-smoke-gas preheater according to claim 1, it is characterised in that: the outer wall of the smoke chamber (1) It is equipped with manhole (1a).
4. cleaning type steam-smoke-gas preheater according to claim 1, it is characterised in that: the folded plate strainer (71) Several V-type cornerites (711) are fixed on inner wall, the end of rod (11) is contacted with V-type cornerite (711).
5. cleaning type steam-smoke-gas preheater according to claim 1, it is characterised in that: set on the bottom sealing plate (72) Have shield bearing (12), shaft (10) is arranged in shield bearing (12).
6. cleaning type steam-smoke-gas preheater according to claim 1, it is characterised in that: the Heat Room (2) includes upper Chamber body (21) and lower chamber body (22), upper chamber body (21) is interior to be equipped with upper heat exchange pipe group (13), and lower heat exchanger tube is equipped in lower chamber body (22) Group (14);One end of upper heat exchange pipe group (13), which is connected, to be had first pipe (15), and the other end connection of upper heat exchange pipe group (13) has the Two pipelines (16), one end of lower heat exchange pipe group (14), which is connected, to be had third pipeline (17), and the other end of lower heat exchange pipe group (14) is connected There is the 4th pipeline (18);It is equipped with steam inlet (3) on first pipe (15) and third pipeline (17), second pipe (16) and the Steam (vapor) outlet (4) are equipped on four pipelines (18).
7. cleaning type steam-smoke-gas preheater according to claim 1, it is characterised in that: the Heat Room (2) and flue gas Partition (19) are equipped between room (1), partition (19) is equipped with through-hole (19a).
8. cleaning type steam-smoke-gas preheater according to claim 7, it is characterised in that: set at the top of the partition (19) There is exhaust outlet (19b).
CN201822039102.0U 2018-12-05 2018-12-05 Cleaning type steam-smoke-gas preheater Expired - Fee Related CN209706079U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822039102.0U CN209706079U (en) 2018-12-05 2018-12-05 Cleaning type steam-smoke-gas preheater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822039102.0U CN209706079U (en) 2018-12-05 2018-12-05 Cleaning type steam-smoke-gas preheater

Publications (1)

Publication Number Publication Date
CN209706079U true CN209706079U (en) 2019-11-29

Family

ID=68637211

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822039102.0U Expired - Fee Related CN209706079U (en) 2018-12-05 2018-12-05 Cleaning type steam-smoke-gas preheater

Country Status (1)

Country Link
CN (1) CN209706079U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111207406A (en) * 2020-01-19 2020-05-29 无锡苏胜尔机械设备有限公司 Steam-flue gas preheater with good heat exchange effect

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111207406A (en) * 2020-01-19 2020-05-29 无锡苏胜尔机械设备有限公司 Steam-flue gas preheater with good heat exchange effect

Similar Documents

Publication Publication Date Title
CN108325278A (en) A kind of brick field drying chamber tail gas energy conservation and environmental protection processing equipment
CN209706079U (en) Cleaning type steam-smoke-gas preheater
CN107185333A (en) A kind of biomass boiler filter
CN207342408U (en) A kind of biomass boiler filtration apparatus
CN117989506A (en) Energy-saving boiler
CN206831518U (en) A kind of incinerator of high combustion efficiency
CN207815342U (en) A kind of garbage burning boiler
CN216778259U (en) Biomass boiler flue gas processing apparatus
CN106402926B (en) A rotary air preheater and its preheating method
CN214158872U (en) Flue gas purifying equipment for gas-fired boiler
CN206474481U (en) A kind of municipal solid waste incinerator room vacuum cleaning system
CN105087854B (en) Converter high-temperature flue gas dry method dust and process waste heat staged reclaimer and method
CN211146550U (en) Rotary air preheater
CN212300022U (en) Coal-fired boiler waste heat recovery system
CN208519777U (en) A kind of heat-exchanger rig of waste incinerator
CN204240377U (en) A kind of oil burning boiler flue gas energy-saving duster
CN102698528A (en) Dust remover of coal-fired boiler
CN208983374U (en) A kind of three Room RTO emission-control equipments
CN217988803U (en) Environmental dust removal device with multiple purification effect
CN213810691U (en) Novel desulfurization flue gas MGGH system
CN204829883U (en) Novel smokeless boiler
CN222164773U (en) Vertical pulverized coal corner tube type boiler
CN220026414U (en) Filtering device for heat recovery
CN218846117U (en) Industrial boiler capable of effectively collecting coal ash
CN221673715U (en) High-dust SCR denitration device of garbage incinerator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191129