CN209651673U - A kind of construction elevator attaching structure of lifting platform - Google Patents
A kind of construction elevator attaching structure of lifting platform Download PDFInfo
- Publication number
- CN209651673U CN209651673U CN201920165038.2U CN201920165038U CN209651673U CN 209651673 U CN209651673 U CN 209651673U CN 201920165038 U CN201920165038 U CN 201920165038U CN 209651673 U CN209651673 U CN 209651673U
- Authority
- CN
- China
- Prior art keywords
- wall
- platform
- lifting platform
- construction elevator
- attached
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 73
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 41
- 239000010959 steel Substances 0.000 claims abstract description 41
- 244000261422 Lysimachia clethroides Species 0.000 claims abstract description 23
- 238000009415 formwork Methods 0.000 abstract description 6
- 230000009194 climbing Effects 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000005611 electricity Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model discloses a kind of construction elevator attaching structure of lifting platform, can solve traditional way first is that, construction elevator overall height by the way of double standard knots, the disadvantage is that, high hundreds of meters of distance needs to increase a set of standard knots more;Traditional way second is that, construction elevator can only arrive lifting platform hanger bottom, additionally need the hydraulic climbing formwork platform that design connects construction elevator, then from climb formwork platform in hanger, at high cost and trouble problem.Including construction elevator, steel platform, wall-attached frame and lifting platform, the steel platform is located in lifting platform top sidewall, wall-attached frame is provided on the lifting platform side wall, it is connected at the top of the wall-attached frame with steel platform, and the wall-attached frame bottom is fixed on Core Walls Structure wall by gooseneck, it is fixedly connected between the wall-attached frame bottom and gooseneck by connection frame, connects elevator standard section by three sets of sliding attached walls on the wall-attached frame side wall.
Description
Technical field
The utility model relates to super high-rise building Core Walls Structure lifting platform fields, are a kind of lifting platforms specifically
Construction elevator attaching structure.
Background technique
Lifting platform system is a kind of mechanical equipment suitable for the vertical wall construction of super high-rise building Core Walls Structure, is one
A integrated constructing operation place, material stockyard, the safety of the facilities such as material distributing machine, tower crane, hands-off operation platform.Serve jacking
The construction elevator of platform needs directly to reach the steel platform at the top of lifting platform, transports constructing operation personnel lifting platform system up and down
System.
When in order to facilitate lifting platform construction, lifting platform system above and below constructing operation personnel, highly desired construction elevator
The steel platform face of lifting platform can directly be reached.It realizes the function, then has to solve from the formal attached wall of construction elevator highest
Attached wall method of the position to this section of steel platform top distance.The attached wall needs to carry generated level when construction elevator operation
Power guarantees safety, it is also necessary to be rapidly separated when meeting platform jacking, quickly connection after the completion of jacking restores construction elevator operation
Demand.
Traditional way first is that, construction elevator overall height by the way of double standard knots, the disadvantage is that, it is hundreds of meters high away from
From need increases a set of standard knots.
Traditional way second is that, construction elevator can only arrive lifting platform hanger bottom, additionally need design and connect construction elevator
Hydraulic climbing formwork platform, then from climb formwork platform in hanger, at high cost and trouble.
Utility model content
The purpose of this utility model is to provide a kind of construction elevator attaching structures of lifting platform, can solve traditional
Way first is that, construction elevator overall height by the way of double standard knots, the disadvantage is that, high hundreds of meters of distance, need increase it is a set of
Standard knot;Traditional way second is that, construction elevator can only arrive lifting platform hanger bottom, additionally need design and connect construction elevator
Hydraulic climbing formwork platform, then from climb formwork platform in hanger, at high cost and trouble problem.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of construction elevator attaching structure of lifting platform, including construction elevator, steel platform, wall-attached frame and jacking are flat
Platform, the steel platform are located in lifting platform top sidewall, and wall-attached frame, the wall-attached frame are provided on the lifting platform side wall
Top is connected with steel platform, and the wall-attached frame bottom is fixed on Core Walls Structure wall by gooseneck, the wall-attached frame bottom
It is fixedly connected between portion and gooseneck by connection frame, connects elevator standard by three sets of sliding attached walls on the wall-attached frame side wall
It saves, construction elevator is installed on the elevator standard section, and if being connected between elevator standard section lower part and lifting platform
Dry elevator attached wall.
Preferably, the strut being obliquely installed is connected between the connection frame and wall-attached frame.
Preferably, the lifting platform is from steel platform top to the formal attached wall distance being arranged between bottom more than 20m.
Preferably, the wall-attached frame lower part that the lifting platform provides is connected by quickly assembled and disassembled gooseneck and main structure
It connects.
Preferably, the wall-attached frame top that the lifting platform provides directly is welded with the steel platform of lifting platform, and attached wall
Frame top jacks together with steel platform.
The utility model has the following beneficial effects:
There is biggish rigidity using lifting platform itself, the horizontal force that construction elevator operation generates can be born, thus can
To add the wall-attached frame of construction elevator, certainly construction elevator attachment issue is solved, construction elevator is enable directly to reach lifting platform
Table top.
The wall-attached frame lower part that lifting platform provides is connect by quickly assembled and disassembled gooseneck with main structure, lifting platform
The wall-attached frame top of offer is directly welded with the steel platform on lifting platform, can be jacked together with steel platform, construction elevator passes through
Elevator standard section and three sets of sliding attached walls realize being rapidly separated and connecting when attached wall and platform jacking when elevator operation.
Construction elevator is passed to the horizontal force that elevator is run by three sets of sliding attached walls using elevator standard section attached
Horizontal force is passed to lifting platform by gooseneck, directly passes to horizontal force at the top of wall-attached frame by wall stand, wall-attached frame lower part
Steel platform, lifting platform rigidity itself is larger, can bear the load that construction elevator operation generates, keep construction elevator direct
It rises in the steel platform of lifting platform.The wall-attached frame can carry generated horizontal force when construction elevator operation, guarantee peace
Entirely, additionally it is possible to be rapidly separated when meeting platform jacking, quickly connection, restores the operation of construction elevator after the completion of jacking.
Detailed description of the invention
In order to facilitate the understanding of those skilled in the art, the utility model will be further described below with reference to the accompanying drawings.
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the utility model wall-attached frame structural schematic diagram;
In figure: 1, construction elevator;2, steel platform;3, wall-attached frame;4, gooseneck;5, elevator standard section;6, elevator attached wall;7,
Lifting platform;8, connection frame;9, strut;10, attached wall is slided.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with embodiment, it is clear that described
Embodiment be only the utility model a part of the embodiment, instead of all the embodiments.Based on the reality in the utility model
Example is applied, all other embodiment obtained by those of ordinary skill in the art without making creative efforts all belongs to
In the range of the utility model protection.
Please refer to shown in Fig. 1-2, a kind of construction elevator attaching structure of lifting platform, including construction elevator 1, steel platform 2,
Wall-attached frame 3 and lifting platform 7, steel platform 2 are located in 7 top sidewall of lifting platform, are provided with attached wall on 7 side wall of lifting platform
Frame 3,3 top of wall-attached frame is connected with steel platform 2, and 3 bottom of wall-attached frame is fixed on Core Walls Structure wall by gooseneck 4, attached
It is fixedly connected between 3 bottom of wall stand and gooseneck 4 by connection frame 8, passes through three sets of sliding attached wall 10 connections on 3 side wall of wall-attached frame
Elevator standard section 5 is equipped with construction elevator 1 on elevator standard section 5, and connects between 5 lower part of elevator standard section and lifting platform 7
There are several elevator attached walls 6.
The strut 9 being obliquely installed is connected between connection frame 8 and wall-attached frame 3, so that between wall-attached frame 3 and gooseneck 4
Connection is more firm.
Lifting platform 7, more than 20m, is applied from 2 top of steel platform to the formal attached wall distance being arranged between bottom to meet
The standard knot jib-length of work elevator 1 at most no more than 7.5m, will enable construction elevator reach steel platform top, then must be herein
The condition of 1 attached wall structure of construction elevator is added in the range of 20m.
3 lower part of wall-attached frame that lifting platform 7 provides is connect by quickly assembled and disassembled gooseneck 4 with main structure.
3 top of wall-attached frame that lifting platform 7 provides directly is welded with the steel platform 2 of lifting platform 7, and 3 top of wall-attached frame
It is jacked together with steel platform 2.
Construction elevator 1, is first mounted on elevator standard section 5, elevator standard by the construction elevator adherence method of lifting platform
Section 5 is mounted on 3 side wall of wall-attached frame by three sets of sliding attached walls 10, and 3 lower part of wall-attached frame is fixed on lifting platform by gooseneck 4
On 7 side walls, 3 top of wall-attached frame is directly connected with steel platform 2, and gooseneck 4 needs to prepare two sets, before lifting platform 7 jacks, first
Upper beam is installed, horizontal force is passed to lifting platform 7 by gooseneck 4 by 3 lower part of wall-attached frame, and 3 top of wall-attached frame is straight
It connecing and horizontal force is passed into steel platform 2, the rigidity of lifting platform 7 itself is larger, the load that construction elevator operation generates can be born,
Construction elevator 1 is set directly to rise in the steel platform 2 of lifting platform 7.When the wall-attached frame 3 can carry construction elevator operation
Generated horizontal force guarantees safety, additionally it is possible to be rapidly separated when meeting platform jacking, quickly connection, restores after the completion of jacking
The operation of construction elevator 1.
The utility model has the following beneficial effects: having biggish rigidity in itself using lifting platform 7, construction elevator can be born
The horizontal force generated is run, thus the wall-attached frame 3 of construction elevator 1 can be added, certainly construction elevator attachment issue has been solved, has made to apply
Work elevator 1 can directly reach 7 table top of lifting platform.
3 lower part of wall-attached frame that lifting platform 7 provides is connect by quickly assembled and disassembled gooseneck 4 with main structure, is jacked
3 top of wall-attached frame that platform 7 provides directly is welded with the steel platform 2 on lifting platform 7, can be jacked together with steel platform 2, is constructed
It is quick de- when attached wall and platform when elevator 1 realizes that elevator is run by elevator standard section 5 and three sets of sliding attached walls 10 jack
From and connection.
Construction elevator is passed to the horizontal force that elevator is run by three sets of sliding attached walls 10 using elevator standard section 5
Horizontal force is passed to lifting platform 7 by gooseneck 4 by wall-attached frame 3,3 lower part of wall-attached frame, and 3 top of wall-attached frame is directly by horizontal force
Steel platform 2 is passed to, the rigidity of lifting platform 7 itself is larger, can bear the load that construction elevator operation generates, make construction elevator
1 can directly rise in the steel platform 2 of lifting platform 7.The wall-attached frame 3 can carry generated water when construction elevator operation
Flat power guarantees safety, additionally it is possible to be rapidly separated when meeting platform jacking, quickly connection, restores construction elevator 1 after the completion of jacking
Operation.
When the utility model is used, a kind of construction elevator adherence method of lifting platform described in the utility model,
Principle is that have biggish rigidity in itself using lifting platform 7, can bear the horizontal force that construction elevator operation generates, thus can
To add the wall-attached frame 3 of construction elevator 1, it is a kind of solution construction elevator attachment issue, construction elevator 1 is enable directly to reach top
The construction method of peaceful 7 table tops.When construction elevator 1 realizes elevator operation by elevator standard section 5 and three sets of sliding attached walls 10
Attached wall and platform jack when be rapidly separated and connect.Construction elevator 1 is run on elevator standard section 5 to 10 sections of attached wall of sliding
When, the safe operation speed that the speed of service to elevator producer requires need to be reduced.3 lower part of wall-attached frame that lifting platform 7 provides passes through
Quickly assembled and disassembled gooseneck 4 is connect with main structure, and 3 top of wall-attached frame that lifting platform 7 provides is directly and on lifting platform 7
Steel platform 2 weld, can be jacked together with steel platform 2.Construction elevator passes through three sets of sliding attached walls using elevator standard section 5
The horizontal force of elevator operation is passed to wall-attached frame 3 by 10, and horizontal force is passed to jacking by gooseneck 4 and put down by 3 lower part of wall-attached frame
Horizontal force is directly passed to steel platform 2 by platform 7,3 top of wall-attached frame, the rigidity of lifting platform 7 itself is larger, can bear construction electricity
The load that ladder operation generates, enables construction elevator 1 directly to rise in the steel platform 2 of lifting platform 7.Gooseneck 4 needs standard
It is 2 sets standby, it is conveniently used in turn, before lifting platform 7 jacks, first installs upper beam.
The preferred embodiment in the utility model disclosed above is only intended to help to illustrate the utility model.Preferred embodiment is simultaneously
There is no the details that detailed descriptionthe is all, also not limiting the utility model is only the specific embodiment.Obviously, according to this theory
The content of bright book can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to preferably
The principles of the present invention and practical application are explained, so that skilled artisan be enable to better understand and utilize this
Utility model.The utility model is limited only by the claims and their full scope and equivalents.
Claims (5)
1. a kind of construction elevator attaching structure of lifting platform, including construction elevator (1), steel platform (2), wall-attached frame (3) and
Lifting platform (7), which is characterized in that the steel platform (2) is located in lifting platform (7) top sidewall, the lifting platform (7)
It is provided with wall-attached frame (3), is connected at the top of the wall-attached frame (3) with steel platform (2), and the wall-attached frame (3) bottom on side wall
It is fixed on Core Walls Structure wall by gooseneck (4), passes through connection frame (8) between wall-attached frame (3) bottom and gooseneck (4)
It is fixedly connected, connects elevator standard section (5) by three sets of sliding attached walls (10) on wall-attached frame (3) side wall, the elevator mark
It is equipped with construction elevator (1), and is connected between elevator standard section (5) lower part and lifting platform (7) several on quasi- section (5)
A elevator attached wall (6).
2. a kind of construction elevator attaching structure of lifting platform according to claim 1, which is characterized in that the connection frame
(8) strut (9) being obliquely installed is connected between wall-attached frame (3).
3. a kind of construction elevator attaching structure of lifting platform according to claim 1, which is characterized in that the jacking is flat
Platform (7) is at the top of steel platform (2) to the formal attached wall distance being arranged between bottom more than 20m.
4. a kind of construction elevator attaching structure of lifting platform according to claim 1, which is characterized in that the jacking is flat
Wall-attached frame (3) lower part that platform (7) provides is connect by quickly assembled and disassembled gooseneck (4) with main structure.
5. a kind of construction elevator attaching structure of lifting platform according to claim 1, which is characterized in that the jacking is flat
Wall-attached frame (3) top that platform (7) provides directly is welded with the steel platform (2) of lifting platform (7), and wall-attached frame (3) top is with steel
Platform (2) jacks together.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920165038.2U CN209651673U (en) | 2019-01-30 | 2019-01-30 | A kind of construction elevator attaching structure of lifting platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920165038.2U CN209651673U (en) | 2019-01-30 | 2019-01-30 | A kind of construction elevator attaching structure of lifting platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209651673U true CN209651673U (en) | 2019-11-19 |
Family
ID=68523415
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920165038.2U Expired - Fee Related CN209651673U (en) | 2019-01-30 | 2019-01-30 | A kind of construction elevator attaching structure of lifting platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209651673U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109775511A (en) * | 2019-01-30 | 2019-05-21 | 中建四局第六建筑工程有限公司 | A kind of the construction elevator attaching structure and adherence method of lifting platform |
-
2019
- 2019-01-30 CN CN201920165038.2U patent/CN209651673U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109775511A (en) * | 2019-01-30 | 2019-05-21 | 中建四局第六建筑工程有限公司 | A kind of the construction elevator attaching structure and adherence method of lifting platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101537976B (en) | Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof | |
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN103993728B (en) | A kind of assembling shaped steel is encorbelmented protection canopy | |
CN205558304U (en) | Hoist and mount system of large -scale steel gallery truss | |
CN106759909B (en) | Bearing structure system and its construction method are hung up under one kind | |
CN204781881U (en) | Elevartor shaft structure construction handling frame | |
CN201376848Y (en) | Large-scale double-tower automatic-elevation hoisting equipment | |
CN202689495U (en) | Self-elevating chimney and water tower construction tower frame | |
CN101503908B (en) | Construction method for spacing suspension cable structural template support platform | |
CN203891441U (en) | Assembly type section steel overhung protective shed | |
CN205531399U (en) | Interim support frame is installed in high -order steel truss segmentation | |
CN202401769U (en) | Detachable concrete cloth machine for self-elevating creeping formwork system | |
CN207048345U (en) | Construction discharge platform device | |
CN203173749U (en) | Assembled integral type vertical self-jacking device of hydraulic double-type crane tower | |
CN209651673U (en) | A kind of construction elevator attaching structure of lifting platform | |
CN107055367A (en) | The central jack-up system of internally climbing tower crane | |
CN109775511A (en) | A kind of the construction elevator attaching structure and adherence method of lifting platform | |
CN208039864U (en) | The attached lift-type discharging platform of Guiding Support Elevating Scaffold | |
CN205116883U (en) | Mast hoisting device of superelevation layer steel construction launching tower | |
CN204780601U (en) | Bed -jig is assembled to reinforcing bar festival section | |
CN202831628U (en) | Combined type bailey frame load-bearing shelving for pouring large span concrete beam | |
CN208152583U (en) | A kind of high-building construction ancillary equipment | |
CN103601081B (en) | Support system is climbed in tower crane | |
CN201092521Y (en) | Inner-climbing tower crane hydraulic supporting arrangement | |
CN206971394U (en) | The automatic lifting system of Steel Structure Installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191119 Termination date: 20210130 |
|
CF01 | Termination of patent right due to non-payment of annual fee |