CN209636647U - The overhead pier column operation platform of assembled - Google Patents
The overhead pier column operation platform of assembled Download PDFInfo
- Publication number
- CN209636647U CN209636647U CN201920110337.6U CN201920110337U CN209636647U CN 209636647 U CN209636647 U CN 209636647U CN 201920110337 U CN201920110337 U CN 201920110337U CN 209636647 U CN209636647 U CN 209636647U
- Authority
- CN
- China
- Prior art keywords
- frame body
- support
- operation platform
- inside casing
- outline border
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to a kind of overhead pier column operation platforms of assembled, comprising: braced frame, the braced frame include: support outline border, support inside casing and coupling beam, the support outline border and/or the support inside casing upper stud;It walks guidance tape, at least one is offered on the walking guidance tape and climbs mouth;And, the ladder stand being erected at the climbing mouth, the ladder stand includes: the first terraced body and the second terraced body for being articulated with the described first terraced body, the bottom end of described first terraced body is connected to the walking guidance tape, top connection is located above the coupling beam, and the described second terraced body, which may be reversed, to be overlapped in the coupling beam and close to the support inside casing.Take tearing open by operation platform integral module, has saved and manually built cost, it is more convenient to take the process of tearing open, construction efficiency is improved, and operation platform is overall structure, stability and safety are higher, and can be repeatedly used in turn, there is higher economic benefit.
Description
Technical field
The utility model relates to technical field of road construction, in particular to a kind of overhead pier column operation platform of assembled.
Background technique
With the popularization and application of automobile, the traffic pressure in city is also increasing, and since overpass can make full use of
City space has very significant effect for alleviating urban traffic blocking, improving urban traffic environment, therefore in city
It is widely used.
Overpass is supported the road surface to be formed and have cause by high and low by pier stud, therefore the construction of pier stud is that building is high
One of the most important link built bridge.The construction of pier stud at present is both needed to set up scaffold as operation platform, and scaffold passes through
Steel pipe is built to be formed, and builds that requirement is high and to build the period longer, and every pier all needs one to take one to tear open, and construction efficiency is lower, even
It will affect the construction speed of overpass.
Utility model content
In order to solve the above technical problems, the utility model provides a kind of overhead pier column operation platform of assembled, have
Take tear open conveniently, it is highly-safe, improve construction efficiency the advantages of.
In order to achieve the above objectives, the technical solution of the utility model is as follows:
A kind of overhead pier column operation platform of assembled, comprising:
Braced frame, the braced frame include: support outline border, support inside casing and for connecting the support outline border and branch
The coupling beam of inside casing is supportted, the support outline border and/or the support inside casing are equipped with the spiral shell for connecting the adjacent braced frame
Column, and the space passed through for pier stud is formed on the inside of the support inside casing;
It is laid on the support outline border and supports the walking guidance tape between inside casing, offer at least one on the walking guidance tape
A climbing mouth;And
The ladder stand being erected at the climbing mouth, the ladder stand include: the first terraced body and are articulated with first ladder
The terraced body of the second of body, the bottom end of the described first terraced body is connected to the walking guidance tape, top connection is located above the coupling beam, institute
It states the second terraced body and may be reversed and be overlapped in the coupling beam and close to the support inside casing.
It realizes above-mentioned technical proposal, when carrying out pier stud construction, the operation platform that assembly is completed first is placed on predetermined position
Place can carry out the construction of first layer pier stud so that pier stud construction location is located in support inside casing, and the second ladder under normal circumstances
Body overlays on the first terraced body, and worker's walking is facilitated to pass through, and when pier stud construction is to certain altitude, can take the second terraced body overturning
It connects in coupling beam, by facilitating worker to construct in the first terraced body climbing to the second terraced body;The construction of first layer pier stud is completed
Afterwards, the operation platform that second splicing is completed is overlayed on the first operation platform by lifting appliance lifting, and by spiral shell
Column upper locking nut can mutually fix two operation platforms, and worker enters second layer operation platform, Ji Kejin by ladder stand
The construction of row second layer pier stud, and so on, until pier stud construction is completed;After the completion of construction, one by one by the spiral shell of each operation platform
Nut on column is hung out after removing, and the disassembly of operation platform can be completed, and can be applied directly to next pier stud and construct,
Manually cost is built to having saved, and it is more convenient to take the process of tearing open, improves construction efficiency, and operation platform is whole ties
Structure, stability and safety are higher, and can be repeatedly used in turn, and have higher economic benefit.
As a kind of preferred embodiment of the utility model, the support outline border include: the first lower frame body, the first upper frame body and
The first column being connected on the outside of first lower frame body and first upper frame body;The support inside casing includes: the second lower frame
Body, the second upper frame body and the second column being connected between second lower frame body and second upper frame body.
As a kind of preferred embodiment of the utility model, the climbing mouth is arranged in the walking guidance tape close to the support
The side of outline border.
It realizes above-mentioned technical proposal, so as to form passageway between support inside casing and climbing mouth, worker is facilitated to walk.
As a kind of preferred embodiment of the utility model, the climbing mouth and the ladder stand are symmetrically arranged with two groups.
Realize above-mentioned technical proposal, by symmetrical two groups of ladder stands, can two sides simultaneously to the higher pier stud in position into
Row construction, so that work progress is more convenient.
As a kind of preferred embodiment of the utility model, each climbing mouth is correspondingly provided with two ladder stands, and two
A ladder stand is symmetrical arranged and forms herringbone structure.
It realizes above-mentioned technical proposal, further increases the degree of convenience of construction, and two ladder stands can form stable triangular knot
Structure, so that the stability of ladder stand is higher.
As a kind of preferred embodiment of the utility model, first lower frame body, second lower frame body, on described first
Framework, second upper frame body and the walking guidance tape are disposed as the two parts being detachably connected.
It realizes above-mentioned technical proposal, operation platform can be splitted into two parts in disassembly, so that disassembly process is more square
Just, and assembled and transport is also more convenient.
As a kind of preferred embodiment of the utility model, the support outline border is equipped with fence.
It realizes above-mentioned technical proposal, improves the safety of operation platform.
In conclusion the utility model has the following beneficial effects:
The utility model embodiment is by providing a kind of overhead pier column operation platform of assembled, comprising: braced frame, institute
Stating braced frame includes: to support outline border, support inside casing and for connecting the support outline border and supporting the coupling beam of inside casing, the branch
Outline border and/or the support inside casing are supportted equipped with the stud for connecting the adjacent braced frame, and in the support inside casing
Side is formed with the space passed through for pier stud;It is laid on the support outline border and supports the walking guidance tape between inside casing, the walking
At least one climbing mouth is offered on guidance tape;And it is erected at the ladder stand at the climbing mouth, the ladder stand includes: the
One terraced body and the second terraced body for being articulated with the described first terraced body, the bottom end of the described first terraced body are connected to the walking guidance tape, top
End connection is located above the coupling beam, and the described second terraced body, which may be reversed, to be overlapped in the coupling beam and close to the support inside casing.
Take tearing open by operation platform integral module, saved and manually built cost, it is more convenient to take the process of tearing open, improves and applies
Work efficiency rate, and operation platform is overall structure, stability and safety are higher, and can be repeatedly used in turn, and have higher
Economic benefit.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor
Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram at the first visual angle of the utility model embodiment.
Fig. 2 is the structural schematic diagram at the second visual angle of the utility model embodiment.
Fig. 3 is structural schematic diagram when two operation platforms are stacked together in the utility model embodiment.
Number and corresponding component title represented by letter in figure:
1, braced frame;11, outline border is supported;111, the first lower frame body;112, the first upper frame body;113, the first column;12,
Support inside casing;121, the second lower frame body;122, the second upper frame body;123, the second column;13, coupling beam;14, stud;2, walking road
Plate;21, mouth is climbed;3, ladder stand;31, the first terraced body;32, the second terraced body;4, fence.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without creative efforts
Every other embodiment obtained, fall within the protection scope of the utility model.
Embodiment
A kind of overhead pier column operation platform of assembled, as shown in Figure 1 to Figure 3, comprising: braced frame 1, braced frame 1
It include: to support outline border 11, support inside casing 12 and for connecting support outline border 11 and supporting the coupling beam 13 of inside casing 12, support outline border 11
And/or support inside casing 12 is equipped with the stud 14 for connecting adjacent supports frame 1, and supports and be formed on the inside of inside casing 12 for pier
The space that column passes through;Be laid on support outline border 11 and support inside casing 12 between walking guidance tape 2, walk guidance tape 2 on offer to
A few climbing mouth 21;And it is erected at the ladder stand 3 at climbing mouth 21, ladder stand 3 includes: the first terraced body 31 and is articulated with
Second terraced body 32 of the first terraced body 31, the bottom end of the first terraced body 31 is connected to walking guidance tape 2, top connection is located above coupling beam
13, the second terraced body 32, which may be reversed, to be overlapped in coupling beam 13 and close to support inside casing 12.
Specifically, support outline border 11 includes: the first lower frame body 111, the first upper frame body 112 and is connected to the first lower frame body
111 and the outside of the first upper frame body 112 the first column 113, support inside casing 12 includes: the second lower frame body 121, the second upper frame body
122 and the second column 123 for being connected between the second lower frame body 121 and the second upper frame body 122;On first lower frame body 111, first
Between framework 112 and the first column 113, and, between the second lower frame body 121, the second upper frame body 122 and the second column 123
It can be fixed by welding or bolted mode, and the first column 113 and the second column 123 are contour, 113 He of the first column
Second column 123 is all made of standardization segment and is processed, and the height of the first column 113 and the second column 123 is 2m.
Walking guidance tape 2 is spliced to form by multiple plates, and is fastened by bolts in braced frame 1, and climbing mouth 21 is arranged
It is expert at walkway board 2 close to the side of support outline border 11, so as to form passageway between support inside casing 12 and climbing mouth 21, conveniently
Worker's walking;In the present embodiment, climbs mouth 21 and ladder stand 3 is symmetrically arranged with two groups, it, can by symmetrical two groups of ladder stands 3
It constructs simultaneously to the higher pier stud in position in two sides, so that work progress is more convenient, and each climbing mouth 21 correspondence is set
There are two ladder stand 3, two ladder stands 3, which are symmetrical arranged, forms herringbone structure, so that the degree of convenience of construction is further increased, and
Two ladder stands 3 can form stable triangular structure, so that the stability of ladder stand 3 is higher.
The bottom end of first terraced body 31, which is fastened by bolts, is expert on walkway board 2, and the top plate of the first terraced body 31 is tight by bolt
Gu first terraced body 31 is connected by hinge with the second terraced body 32 in coupling beam 13, so that the second ladder body 32 can be relative to
First terraced body 31 rotates, and the first terraced body 31 is equal with the second terraced width of body 32, and the length of the second terraced body 32 is less than the first ladder
The length of body 31.
Further, it being equipped with fence 4 on support outline border 11, fence 4 can be made of multi-sheets or protective net, from
And prevent construction personnel from falling outward, improve the safety of operation platform.
First lower frame body 111, the second lower frame body 121, the first upper frame body 112, the second upper frame body 122 and walking guidance tape 2 are equal
The two parts being detachably connected are set as, and on the first lower frame body 111, the second lower frame body 121, the first upper frame body 112, second
It is equipped with angle cleat on framework 122 and walking guidance tape 2, and is connected and fixed two parts by bolt;It can will be applied in disassembly
Work platform splits into two parts, so that disassembly process is more convenient, and assembled and transport is also more convenient.
When carrying out pier stud construction, the operation platform that assembly is completed first is placed on pre-position, the position so that pier stud is constructed
Setting in support inside casing 12, the construction of first layer pier stud can be carried out, and the second terraced body 32 overlays first under normal circumstances
On terraced body 31, worker's walking is facilitated to pass through, when pier stud construction is to certain altitude, the second terraced overturning of body 32 can be overlapped on coupling beam
On 13, by facilitating worker to construct in the first terraced climbing of body 31 to the second terraced body 32;After the completion of the construction of first layer pier stud,
The operation platform that second splicing is completed is overlayed on the first operation platform by lifting appliance lifting, and by stud 14
Upper locking nut can mutually fix two operation platforms, and worker enters second layer operation platform, Ji Kejin by ladder stand 3
The construction of row second layer pier stud, and so on, until pier stud construction is completed;After the completion of construction, one by one by the spiral shell of each operation platform
Nut on column 14 is hung out after removing, and the disassembly of operation platform can be completed, and can be applied directly to next pier stud and be applied
Work manually builds cost to save, and it is more convenient to take the process of tearing open, improves construction efficiency, and operation platform is whole
Body structure, stability and safety are higher, and can be repeatedly used in turn, and have higher economic benefit.
The foregoing description of the disclosed embodiments can be realized professional and technical personnel in the field or using originally practical new
Type.Various modifications to these embodiments will be readily apparent to those skilled in the art, and determine herein
The General Principle of justice can be realized in other embodiments without departing from the spirit or scope of the present utility model.Cause
This, the present invention will not be limited to the embodiments shown herein, and is to fit to and principles disclosed herein
The widest scope consistent with features of novelty.
Claims (7)
1. a kind of overhead pier column operation platform of assembled characterized by comprising
Braced frame, the braced frame include: support outline border, support inside casing and for connecting in the support outline border and support
The coupling beam of frame, the support outline border and/or the support inside casing are equipped with the stud for connecting the adjacent braced frame, and
The space passed through for pier stud is formed on the inside of the support inside casing;
It is laid on the support outline border and supports the walking guidance tape between inside casing, offer at least one on the walking guidance tape and climb
Climb mouth;And
The ladder stand being erected at the climbing mouth, the ladder stand include: the first terraced body and are articulated with the described first terraced body
Second terraced body, the bottom end of the described first terraced body is connected to the walking guidance tape, top connects and is located above the coupling beam, and described the
Two terraced bodies, which may be reversed, to be overlapped in the coupling beam and close to the support inside casing.
2. the overhead pier column operation platform of assembled according to claim 1, which is characterized in that the support outline border packet
It includes: the first lower frame body, the first upper frame body and the first column being connected on the outside of first lower frame body and first upper frame body;
The support inside casing includes: the second lower frame body, the second upper frame body and is connected to second lower frame body and second upper frame body
Between the second column.
3. the overhead pier column operation platform of assembled according to claim 2, which is characterized in that the climbing mouth setting exists
The walking guidance tape is close to the side of the support outline border.
4. the overhead pier column operation platform of assembled according to claim 3, which is characterized in that the climbing mouth and described
Ladder stand is symmetrically arranged with two groups.
5. the overhead pier column operation platform of assembled according to claim 4, which is characterized in that each climbing mouth is right
It should set there are two the ladder stand, two ladder stands, which are symmetrical arranged, forms herringbone structure.
6. the overhead pier column operation platform of assembled according to claim 5, which is characterized in that first lower frame body,
Second lower frame body, first upper frame body, second upper frame body and the walking guidance tape are disposed as being detachably connected
Two parts.
7. the overhead pier column operation platform of assembled according to claim 5, which is characterized in that set on the support outline border
There is fence.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920110337.6U CN209636647U (en) | 2019-01-23 | 2019-01-23 | The overhead pier column operation platform of assembled |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920110337.6U CN209636647U (en) | 2019-01-23 | 2019-01-23 | The overhead pier column operation platform of assembled |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209636647U true CN209636647U (en) | 2019-11-15 |
Family
ID=68478870
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920110337.6U Expired - Fee Related CN209636647U (en) | 2019-01-23 | 2019-01-23 | The overhead pier column operation platform of assembled |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209636647U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111636308A (en) * | 2020-06-11 | 2020-09-08 | 浙江兴土桥梁临时钢结构工程有限公司 | Tower type support |
CN113833263A (en) * | 2021-09-26 | 2021-12-24 | 中铁七局集团有限公司 | Integral lantern type support circulating hoisting construction method for frame column |
CN115095123A (en) * | 2022-06-24 | 2022-09-23 | 中铁十九局集团有限公司 | Lattice column construction device |
-
2019
- 2019-01-23 CN CN201920110337.6U patent/CN209636647U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111636308A (en) * | 2020-06-11 | 2020-09-08 | 浙江兴土桥梁临时钢结构工程有限公司 | Tower type support |
CN113833263A (en) * | 2021-09-26 | 2021-12-24 | 中铁七局集团有限公司 | Integral lantern type support circulating hoisting construction method for frame column |
CN115095123A (en) * | 2022-06-24 | 2022-09-23 | 中铁十九局集团有限公司 | Lattice column construction device |
CN115095123B (en) * | 2022-06-24 | 2024-02-23 | 中铁十九局集团有限公司 | Lattice column construction device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209636647U (en) | The overhead pier column operation platform of assembled | |
CN106193568A (en) | Mobile steel truss operating platform | |
CN101871259B (en) | Building method of integral slip type scaffold used for steel grid construction | |
CN204551224U (en) | emergency diversion portable bridge | |
CN107119576A (en) | Pier construction security protection platform | |
CN111927071B (en) | Portable operation platform | |
CN207032058U (en) | A kind of scalable Bridge Beam bottom job platform of continuous self-propelled | |
CN212103679U (en) | A construction platform for installation of assembled tower | |
CN109653076B (en) | Combined type flood control flood gate first bailey steel bridge and construction method | |
CN110863641A (en) | Ultrahigh floor type boarding scaffold in hyperbolic cooling tower and erection method thereof | |
CN205955164U (en) | Portable steel truss operation platform | |
CN207553565U (en) | A kind of crosshead of truss | |
CN211815605U (en) | Construction device for pile column type pier tie beam and capping beam | |
CN209652766U (en) | Safety climbing ladder is used in a kind of segmented packaged type bridges construction | |
CN215052024U (en) | Few support bearing structure of cable-stay bridge steel tower | |
CN206721675U (en) | A kind of open-close type crosses pier box beam maintenance construction trolley | |
CN214459622U (en) | A but multi-functional platform truck of walking for bridge detects and construction operation | |
CN212533700U (en) | Pin-connected panel staple bolt platform of bent cap construction usefulness | |
CN212053723U (en) | Fastener type combined steel pipe stair | |
CN211498488U (en) | Highway and railway dual-purpose bridge movable railway hard protection platform | |
CN211548699U (en) | Superelevation console mode scaffold on people in hyperbolic cooling tower | |
CN209924407U (en) | Combined working platform for steel structure high-altitude installation | |
CN201292512Y (en) | Suspended cable sliding table for spraying main steel box beam of overpass | |
CN211006345U (en) | A lattice ladder | |
CN222044995U (en) | A disc-type scaffolding assembly ladder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191115 Termination date: 20210123 |