[go: up one dir, main page]

CN209601953U - A sliding spreader for complete replacement of wheels of ladle car reducer in steelmaking system - Google Patents

A sliding spreader for complete replacement of wheels of ladle car reducer in steelmaking system Download PDF

Info

Publication number
CN209601953U
CN209601953U CN201821762124.3U CN201821762124U CN209601953U CN 209601953 U CN209601953 U CN 209601953U CN 201821762124 U CN201821762124 U CN 201821762124U CN 209601953 U CN209601953 U CN 209601953U
Authority
CN
China
Prior art keywords
chain block
ladle car
slide bar
sliding
speed reducer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821762124.3U
Other languages
Chinese (zh)
Inventor
陈生学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Original Assignee
Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd filed Critical Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Priority to CN201821762124.3U priority Critical patent/CN209601953U/en
Application granted granted Critical
Publication of CN209601953U publication Critical patent/CN209601953U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a steel-making system buggy ladle speed reducer wheel is built-up and is changed slip hoist, including the jib that rises, the both ends of jib that rises are connected with the slide bar through the lifting rope, the slide bar is located the below of jib that rises, is equipped with chain block I and chain block II on the slide bar, and chain block I is connected with the speed reducer on the buggy ladle, and chain block II is connected with the bearing package of buggy ladle last speed reducer wheel, and the top of jib that rises is equipped with rings, and rings pass through the lifting rope and are connected with the jib that rises, rings are connected with hoisting device; this buggy ladle speed reducer wheel is installed entirely through designing and is changed slip hoist, and it has solved because buggy ladle space is limited, the technical problem of unable normal hoist and mount operation, and it is through slide bar and chain block's cooperation, wholly dismantles buggy ladle speed reducer wheel in narrow and small space, and rethread hoisting accessory dismantles, also can install buggy ladle speed reducer wheel through the device, labour saving and time saving.

Description

一种炼钢系统钢包车减速机车轮整装更换滑动吊具A sliding spreader for complete replacement of wheels of ladle car reducer in steelmaking system

技术领域technical field

本实用新型属于冶金机械检修炼钢系统钢包车减速机车轮整装更换和安装技术领域,具体涉及一种炼钢系统钢包车减速机车轮整装更换滑动吊具。The utility model belongs to the technical field of complete replacement and installation of wheels of a ladle car reducer in a steelmaking system for metallurgical machinery, and specifically relates to a sliding spreader for the complete replacement of wheels of a ladle car reducer in a steelmaking system.

背景技术Background technique

目前,工业生产中更换炼钢系统中钢包车车体框架内的钢包车减速机车轮时,其整装的更换即不拆卸钢包车减速机车轮的同时,将钢包车减速机车轮从钢包车车体框架内拆卸和安装是及其困难的,是冶金机械检修过程中的难题,其现在一般通过人工拆卸和安装,工作效率为6个人需要8小时左右完成,费时费力。At present, when replacing the wheels of the ladle car reducer in the frame of the ladle car body in the steelmaking system in industrial production, the replacement of the package does not dismantle the wheels of the ladle car reducer, and at the same time remove the wheels of the ladle car reducer from the ladle car It is extremely difficult to disassemble and install within the body frame, which is a difficult problem in the maintenance process of metallurgical machinery. Now it is generally disassembled and installed manually, and the work efficiency is about 8 hours for 6 people to complete, which is time-consuming and laborious.

实用新型内容Utility model content

本实用新型的目的是提供一种炼钢系统钢包车减速机车轮整装更换滑动吊具。The purpose of the utility model is to provide a steelmaking system ladle car reducer wheel complete replacement sliding spreader.

为了满足上述目的,本实用新型采取的技术方案为:In order to meet the above-mentioned purpose, the technical scheme that the utility model takes is:

一种炼钢系统钢包车减速机车轮整装更换滑动吊具,包括起吊杆,所述起吊杆的两端通过吊绳连接有滑杆,所述滑杆位于起吊杆的下方,所述滑杆上设有手拉葫芦I和手拉葫芦II,所述手拉葫芦I与钢包车上的减速机连接,所述手拉葫芦II与钢包车车轮上的轴承包连接,所述起吊杆的上方设有吊环,所述吊环通过吊绳与起吊杆连接,所述吊环与起吊装置连接。A sliding spreader for complete replacement of wheels of a ladle car reducer in a steelmaking system, including a lifting rod, the two ends of the lifting rod are connected with sliding rods through hanging ropes, the sliding rod is located under the lifting rod, and the sliding rod There are a chain block I and a chain block II on it, the chain block I is connected with the reducer on the ladle car, the chain block II is connected with the bearing package on the wheel of the ladle car, the upper part of the lifting rod A suspension ring is provided, the suspension ring is connected with the lifting rod through the suspension rope, and the suspension ring is connected with the lifting device.

优选的,所述滑杆上设有滑套,所述手拉葫芦II固定在滑杆的滑套上。Preferably, a sliding sleeve is provided on the sliding rod, and the chain hoist II is fixed on the sliding sleeve of the sliding rod.

优选的,所述滑杆的中间部位设有凹槽,所述滑套能够固定在滑杆中间部位的凹槽内。Preferably, a groove is provided at the middle part of the sliding rod, and the sliding sleeve can be fixed in the groove at the middle part of the sliding rod.

本实用新型的有益效果为:该实用新型通过设计该钢包车减速机车轮整装更换滑动吊具,其解决了由于钢包车空间受限,无法正常吊装作业的技术问题,其通过滑杆和手拉葫芦的配合,在狭小的空间内将钢包车减速机车轮整体拆卸,再通过起吊装置拆卸,也可以通过该装置进行安装钢包车减速机车轮,省时省力。The beneficial effects of the utility model are: the utility model solves the technical problem that the ladle car cannot be normally hoisted due to the limited space of the ladle car by designing the wheel of the ladle car reducer to replace the sliding spreader. With the cooperation of the chain hoist, the wheels of the ladle car reducer can be disassembled in a small space, and then disassembled by the lifting device, and the wheels of the ladle car reducer can also be installed through this device, saving time and effort.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图中:1. 起吊杆,2. 滑杆,3. 手拉葫芦I,4. 手拉葫芦II,5. 减速机,6. 轴承包,7. 吊环,8. 滑套,9.车轮,10.传动轴,11.钢包车。In the figure: 1. lifting rod, 2. sliding rod, 3. chain hoist I, 4. chain hoist II, 5. reducer, 6. bearing package, 7. lifting ring, 8. sliding sleeve, 9. wheel, 10. Transmission shaft, 11. Ladle car.

具体实施方式Detailed ways

下面结合附图和工作原理对本实用新型作进一步描述:Below in conjunction with accompanying drawing and working principle, the utility model is further described:

如图1所示的一种炼钢系统钢包车减速机车轮整装更换滑动吊具,包括起吊杆1,起吊杆1的两端通过吊绳连接有滑杆2,滑杆2位于起吊杆1的下方,滑杆2上设有手拉葫芦I3和手拉葫芦II4,手拉葫芦I3与钢包车11上的减速机5连接,手拉葫芦II4与钢包车11车轮9上的轴承包6连接,起吊杆1的上方设有吊环7,吊环7通过吊绳与起吊杆1连接,吊环7与起吊装置连接。滑杆2上设有滑套8,手拉葫芦II4固定在滑杆2的滑套8上,滑杆2的中间部位设有凹槽,滑套8能够固定在滑杆2中间部位的凹槽内,其作用是能够移动和固定手拉葫芦II4使得能够与减速机5和车轮9之间的传动轴连接,放置减速机5过重,起吊时两端不平稳。As shown in Figure 1, a steelmaking system ladle car reducer wheel complete replacement sliding spreader, including a lifting rod 1, the two ends of the lifting rod 1 are connected with a sliding rod 2 through a hanging rope, and the sliding rod 2 is located on the lifting rod 1 Below, the slide bar 2 is provided with a chain block I3 and a chain block II4, the chain block I3 is connected with the reducer 5 on the ladle car 11, and the chain block II4 is connected with the bearing package 6 on the wheel 9 of the ladle car 11 , the top of the lifting rod 1 is provided with a suspension ring 7, the suspension ring 7 is connected with the lifting rod 1 through a suspension rope, and the suspension ring 7 is connected with the lifting device. There is a sliding sleeve 8 on the sliding rod 2, and the chain hoist II4 is fixed on the sliding sleeve 8 of the sliding rod 2. There is a groove in the middle part of the sliding rod 2, and the sliding sleeve 8 can be fixed in the groove in the middle part of the sliding rod 2. Inside, its function is to be able to move and fix the chain hoist II4 so that it can be connected with the transmission shaft between the reducer 5 and the wheel 9, and the reducer 5 is too heavy to place, and the two ends are not stable when lifting.

使用时,首先通过起吊装置将该吊具吊至钢包车11的上方,然后将滑杆2上的手拉葫芦I3和手拉葫芦II4分别与钢包车11上的减速机5和车轮9的轴承包6连接,然后手摇两个手拉葫芦将减速机5和车轮9的轴承包6微微吊起,取出钢包车11与车轮9轴承包6之间的螺栓,手拉葫芦再缓速下放,当车轮9上轮沿与钢包车11分离和下轮沿着地后,解开手拉葫芦II4,将滑杆2上的滑套8和手拉葫芦II4同时移至滑杆2的中间部位的凹槽内,再将手拉葫芦II4绑在减速机5与车轮9之间的传动轴10上,再将手拉葫芦I3和手拉葫芦II4受力,向上起吊,离地50mm后天起吊装置将吊具向钢包车11内侧水平移动,脱开车体后正常起吊,吊出。When in use, first lift the spreader to the top of the ladle car 11 by the lifting device, then connect the chain block I3 and the chain block II4 on the slide bar 2 to the bearings of the reducer 5 on the ladle car 11 and the wheel 9 respectively. Connect the package 6, then crank the two chain hoists to slightly lift the bearing package 6 of the reducer 5 and the wheel 9, take out the bolts between the ladle car 11 and the bearing package 6 of the wheel 9, and then lower the chain hoist slowly. When the upper wheel edge of the wheel 9 is separated from the ladle car 11 and the lower wheel is along the ground, untie the chain block II4, and move the sliding sleeve 8 on the slide bar 2 and the chain block II4 to the concave hole in the middle of the slide bar 2 at the same time. In the groove, tie the chain hoist II4 to the transmission shaft 10 between the reducer 5 and the wheel 9, and then force the chain hoist I3 and the chain hoist II4 to lift upwards. The tool moves horizontally to the inner side of the ladle car 11, lifts normally after breaking off the car body, and hangs out.

Claims (3)

1.一种炼钢系统钢包车减速机车轮整装更换滑动吊具,其特征在于:包括起吊杆(1),所述起吊杆(1)的两端通过吊绳连接有滑杆(2),所述滑杆(2)位于起吊杆(1)的下方,所述滑杆(2)上设有手拉葫芦I(3)和手拉葫芦II(4),所述手拉葫芦I(3)与钢包车(11)上的减速机(5)连接,所述手拉葫芦II(4)与钢包车(11)车轮(9)上的轴承包(6)连接,所述起吊杆(1)的上方设有吊环(7),所述吊环(7)通过吊绳与起吊杆(1)连接,所述吊环(7)与起吊装置连接。1. A sliding spreader for complete replacement of wheels of a ladle car reducer in a steelmaking system, characterized in that it includes a lifting rod (1), and the two ends of the lifting rod (1) are connected with a sliding rod (2) by a lifting rope , the slide bar (2) is located below the lifting bar (1), the slide bar (2) is provided with a chain block I (3) and a chain block II (4), and the chain block I ( 3) It is connected with the reducer (5) on the ladle car (11), the chain hoist II (4) is connected with the bearing package (6) on the wheel (9) of the ladle car (11), and the lifting rod ( 1) is provided with a suspension ring (7), the suspension ring (7) is connected to the lifting rod (1) through a suspension rope, and the suspension ring (7) is connected to the lifting device. 2.根据权利要求1所述的一种炼钢系统钢包车减速机车轮整装更换滑动吊具,其特征在于:所述滑杆(2)上设有滑套(8),所述手拉葫芦II(4)固定在滑杆(2)的滑套(8)上。2. A sliding spreader for complete replacement of wheels of a ladle car reducer in a steelmaking system according to claim 1, characterized in that: the sliding rod (2) is provided with a sliding sleeve (8), and the hand pull The gourd II (4) is fixed on the sliding sleeve (8) of the slide bar (2). 3.根据权利要求2所述的一种炼钢系统钢包车减速机车轮整装更换滑动吊具,其特征在于:所述滑杆(2)的中间部位设有凹槽,所述滑套(8)能够固定在滑杆(2)中间部位的凹槽内。3. A sliding spreader for complete replacement of wheels of a ladle car reducer in a steelmaking system according to claim 2, characterized in that: the middle part of the sliding rod (2) is provided with a groove, and the sliding sleeve ( 8) It can be fixed in the groove in the middle part of the slide bar (2).
CN201821762124.3U 2018-10-29 2018-10-29 A sliding spreader for complete replacement of wheels of ladle car reducer in steelmaking system Expired - Fee Related CN209601953U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821762124.3U CN209601953U (en) 2018-10-29 2018-10-29 A sliding spreader for complete replacement of wheels of ladle car reducer in steelmaking system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821762124.3U CN209601953U (en) 2018-10-29 2018-10-29 A sliding spreader for complete replacement of wheels of ladle car reducer in steelmaking system

Publications (1)

Publication Number Publication Date
CN209601953U true CN209601953U (en) 2019-11-08

Family

ID=68394964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821762124.3U Expired - Fee Related CN209601953U (en) 2018-10-29 2018-10-29 A sliding spreader for complete replacement of wheels of ladle car reducer in steelmaking system

Country Status (1)

Country Link
CN (1) CN209601953U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112173970A (en) * 2020-09-30 2021-01-05 广州黄船海洋工程有限公司 Hoisting tool for lifting gear box of self-elevating wind power installation platform and use method
CN113758554A (en) * 2021-08-18 2021-12-07 广东韶钢工程技术有限公司 Auxiliary device and method for disassembling and calibrating weighing sensor of buggy ladle
CN114291730A (en) * 2022-01-06 2022-04-08 中国一冶集团有限公司 Crane travelling wheel mounting device and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112173970A (en) * 2020-09-30 2021-01-05 广州黄船海洋工程有限公司 Hoisting tool for lifting gear box of self-elevating wind power installation platform and use method
CN113758554A (en) * 2021-08-18 2021-12-07 广东韶钢工程技术有限公司 Auxiliary device and method for disassembling and calibrating weighing sensor of buggy ladle
CN114291730A (en) * 2022-01-06 2022-04-08 中国一冶集团有限公司 Crane travelling wheel mounting device and method

Similar Documents

Publication Publication Date Title
CN209601953U (en) A sliding spreader for complete replacement of wheels of ladle car reducer in steelmaking system
CN205577896U (en) Novel high -efficient mechatronic workover machine
CN202643085U (en) Adjustable hanging tool for casting unmolding turning box
CN104192681B (en) A kind of building hoist integration actuating device
CN204162319U (en) High strength crane-car
CN106395696A (en) Hydraulic type lifting device for ship maintenance
CN205616428U (en) A hoist device for scraper engine
CN201442795U (en) Automatic unhooking type lifting hook
CN206665944U (en) A kind of aluminium sheet production hoisting mechanism
CN204847791U (en) Four -wheel coordinated type lifting hook
CN214298961U (en) Light crane with function of quickly disassembling and assembling lifting hook
CN103420265A (en) Adjustable hanging tool for casting unmolding turning box
CN210619984U (en) Special device for wire feeding and spheroidizing of nodular cast iron
CN209210255U (en) A kind of swivel bearing of continuous casting machine revolving platform more changing device
CN207404687U (en) A kind of heavy truck rivet line vehicle frame suspender
CN203112385U (en) Large movable arm tower crane introduction mechanism
CN202880680U (en) Four-rope remote control grab bucket
CN208037866U (en) A kind of Architectural Equipment hanging apparatus
CN201354298Y (en) Equalizing beam for hoisting rotor
CN202011709U (en) Installation work platform for wind turbine generator set
CN207595820U (en) A kind of inner bearing type motor stator core Conveyer
CN201809046U (en) Hoisting device
CN206038199U (en) Static load testing arrangement for winch
CN203660778U (en) Multifunctional motor overhauling device
CN204265214U (en) A kind of maintenance hanger for screw conveyor of cold-rolled shot blasting machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191108

Termination date: 20201029

CF01 Termination of patent right due to non-payment of annual fee