CN209443316U - A kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set - Google Patents

A kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set Download PDF

Info

Publication number
CN209443316U
CN209443316U CN201821608858.6U CN201821608858U CN209443316U CN 209443316 U CN209443316 U CN 209443316U CN 201821608858 U CN201821608858 U CN 201821608858U CN 209443316 U CN209443316 U CN 209443316U
Authority
CN
China
Prior art keywords
layer
concrete layer
closely knit
asphalt macadam
pavement structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821608858.6U
Other languages
Chinese (zh)
Inventor
李辉
李昊臻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201821608858.6U priority Critical patent/CN209443316U/en
Application granted granted Critical
Publication of CN209443316U publication Critical patent/CN209443316U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

本实用新型涉及一种设置密实沥青碎石混凝土层的透水铺砖路面结构,从上往下依次包括透水铺砖面层、粗砂找平层、密实沥青碎石混凝土层以及级配碎石层,所述级配碎石层平铺在土基上,所述密实沥青碎石混凝土层中设有均匀布置的钻孔。与现有技术相比,本实用新型设计合理,结构简单,通过设置密实沥青碎石混凝土层,施工时可作为临时施工作业面,保证面层透水铺砖层的透水性能不受影响;面层施工时也可钻贯穿孔,以便入渗雨水下渗;整体结构兼顾强度、透水与施工工艺的要求。

The utility model relates to a permeable paving brick pavement structure provided with a dense asphalt macadam concrete layer, which successively comprises a permeable paving brick surface layer, a coarse sand leveling layer, a dense asphalt macadam concrete layer and a graded macadam layer from top to bottom. The graded crushed stone layer is flatly laid on the soil foundation, and the dense asphalt crushed stone concrete layer is provided with uniformly arranged drill holes. Compared with the prior art, the utility model has a reasonable design and a simple structure. By setting a dense asphalt macadam concrete layer, it can be used as a temporary construction work surface during construction to ensure that the water permeability of the permeable brick layer of the surface layer is not affected; During construction, through holes can also be drilled to facilitate infiltration of rainwater; the overall structure takes into account the requirements of strength, water permeability and construction technology.

Description

一种设置密实沥青碎石混凝土层的透水铺砖路面结构A permeable brick pavement structure with dense asphalt macadam concrete layer

技术领域technical field

本实用新型涉及路面结构技术领域,具体涉及一种设置密实沥青碎石混凝土层的透水铺砖路面结构。The utility model relates to the technical field of pavement structures, in particular to a permeable brick-paved pavement structure provided with a dense asphalt macadam concrete layer.

背景技术Background technique

随着海绵城市的普及,人们对于透水路面的意识越来越强。透水铺砖路面作为一种有效的海绵设施,多用于人行道、步行街道、园林道路等无机动车荷载道路,以及有轻型荷载要求的道路、广场、停车场等区域。传统的透水铺砖路面结构多为面层、(找平层)、碎石基层、原状土基的层状结构,其中面层功能为渗透雨水,碎石基层功能为蓄水,原状土基便于排水;虽然满足了透水功能的需求,但由于道路结构中级配碎石基层的薄弱而较少在中重载道路得到应用。极少部分应用于中重载区域的透水铺砖路面,常因为过于重视力学承载能力的提升,导致自身透水性能的降低,一旦出现暴雨天气,很容易出现积水,影响行人与交通。此外,现阶段透水铺装施工工艺简陋,施工过程中面层往往会被碎石粉尘阻塞,透水性能显著降低,这些问题在一定程度上影响了该技术的应用。With the popularity of sponge cities, people's awareness of permeable pavement is getting stronger and stronger. As an effective sponge facility, permeable brick pavement is mostly used for roads without motor vehicle loads such as sidewalks, pedestrian streets, and garden roads, as well as roads, squares, parking lots and other areas with light load requirements. The traditional permeable brick pavement structure is mostly a layered structure of surface layer, (leveling layer), crushed stone base, and undisturbed soil base. The function of the surface layer is to infiltrate rainwater, the function of the gravel base is to store water, and the undisturbed soil base is convenient for drainage ; Although it meets the needs of water permeability, it is rarely used in medium and heavy-duty roads due to the weakness of the graded gravel base in the road structure. Very few permeable brick pavements are used in medium and heavy-duty areas, often because too much attention is paid to the improvement of mechanical bearing capacity, resulting in a decrease in its own water permeability. Once there is a heavy rain, it is easy to accumulate water and affect pedestrians and traffic. In addition, the construction technology of permeable pavement at this stage is simple, and the surface layer is often blocked by gravel dust during construction, and the water permeability is significantly reduced. These problems affect the application of this technology to a certain extent.

实用新型内容Utility model content

本实用新型的目的就是为了克服上述现有技术存在的缺陷而提供一种强度好、透水性好的设置密实沥青碎石混凝土层的透水铺砖路面结构。The purpose of this utility model is to provide a permeable brick pavement structure with good strength and good water permeability to provide a dense asphalt macadam concrete layer in order to overcome the defects of the above-mentioned prior art.

本实用新型的目的可以通过以下技术方案来实现:一种设置密实沥青碎石混凝土层的透水铺砖路面结构,该路面结构从上往下依次包括透水铺砖面层、粗砂找平层、密实沥青碎石混凝土层以及级配碎石层,所述级配碎石层平铺在土基上,所述密实沥青碎石混凝土层中设有均匀布置的钻孔。The purpose of this utility model can be achieved through the following technical solutions: a permeable paving brick pavement structure with a dense asphalt macadam concrete layer. An asphalt macadam concrete layer and a graded macadam layer, the graded macadam layer is flatly laid on the soil foundation, and the dense asphalt macadam concrete layer is provided with uniformly arranged drill holes.

本实用新型专利通过设置密实沥青碎石混凝土层,一方面由于自身强度与模量较高,可以有效分担较多荷载,减少碎石薄弱层承载荷载大小与相应变形,而且沥青碎石混凝土层刚度相对较低,可以避免由下及上出现反射裂缝的情况,影响路面使用;另一方面为上层结构提供较为平整的平面,便于施工。此外,该透水铺砖路面结构也为密级配沥青路面改透水铺装路面提供了一种切实可行且成本低廉、施工简单的改造方案。The utility model patent sets up a dense asphalt macadam concrete layer. On the one hand, due to its high strength and modulus, it can effectively share more loads, reduce the load capacity and corresponding deformation of the weak gravel layer, and the stiffness of the asphalt macadam concrete layer It is relatively low, which can avoid reflection cracks from bottom to top and affect the use of the road surface; on the other hand, it provides a relatively flat plane for the upper structure, which is convenient for construction. In addition, the permeable brick pavement structure also provides a feasible, low-cost, and simple construction reconstruction plan for changing densely-graded asphalt pavement into permeable pavement.

优选地,所述密实沥青碎石混凝土层为密级配沥青混凝土,施工时根据需要选择AC或ATB,最大公称粒径小于20mm,粒径过大时飞散性较差;施工期间可作为道路车辆通行的临时路面材料层,以最大程度防止施工车辆和路面灰土堵塞透水路面结构表面的透水“通道”,其厚度依据施工期间的交通总量在15至20cm范围内;当面层施工时可在该层钻贯穿小孔以便透水,孔径在2至3cm,由于沥青柔性基层变形相对较大的特点,孔内不宜加入碎石,且孔径较大会影响该层承载能力;钻孔间距以及钻孔距离边缘的距离不小于3倍孔径,具体可根据当地降雨条件进行设计,间距较小会产生贯通裂缝等损害。Preferably, the dense asphalt macadam concrete layer is densely graded asphalt concrete, AC or ATB is selected according to needs during construction, the maximum nominal particle size is less than 20mm, and the scattering property is poor when the particle size is too large; it can be used as a road vehicle during construction Temporary pavement material layer, in order to prevent construction vehicles and pavement dust from clogging the permeable "channel" on the surface of the permeable pavement structure, its thickness is in the range of 15 to 20cm according to the total traffic volume during construction; Drill through small holes for water penetration. The diameter of the holes is 2 to 3 cm. Due to the relatively large deformation of the asphalt flexible base, it is not suitable to add gravel in the holes, and the large hole diameter will affect the bearing capacity of the layer; the distance between the holes and the distance between the holes The distance is not less than 3 times the aperture, and it can be designed according to the local rainfall conditions. If the distance is small, damage such as through cracks will occur.

优选地,所述级配碎石层的厚度在20至40cm范围内、孔隙率为35~50%、粒径在2至5cm。Preferably, the graded gravel layer has a thickness in the range of 20 to 40 cm, a porosity of 35 to 50%, and a particle size of 2 to 5 cm.

优选地,所述土基为素土压实层,所述素土压实层的土基压实度在90%~95%左右。Preferably, the soil foundation is a plain soil compaction layer, and the soil foundation compaction degree of the plain soil compaction layer is about 90% to 95%.

优选地,所述找平层为粗砂层,所述粗砂层的厚度在2至3cm范围内且碎石粒径在0.5至1cm范围内。Preferably, the leveling layer is a coarse sand layer, the thickness of the coarse sand layer is in the range of 2 to 3 cm and the grain size of the gravel is in the range of 0.5 to 1 cm.

优选地,铺砖路面包括相互拼接的多块高强度铺砖,相邻两块所述高强度铺砖之间具有1至2cm透水缝隙,所述高强度铺砖的抗压强度大于或等于50MPa且抗折强度不低于5Mpa。Preferably, the paving pavement includes a plurality of high-strength paving bricks spliced with each other, there is a 1 to 2 cm permeable gap between two adjacent high-strength paving bricks, and the compressive strength of the high-strength paving bricks is greater than or equal to 50 MPa And the flexural strength is not less than 5Mpa.

优选地,铺砖相互拼接图案可按照结构性能差异分为三类,人字形图案、拼花图案与顺砖砌合图案,更优选为人字形图案。Preferably, the splicing pattern of paving bricks can be divided into three types according to the difference in structural performance, herringbone pattern, mosaic pattern and brick laying pattern, more preferably herringbone pattern.

与现有技术相比,本实用新型的有益效果体现在:该透水铺砖路面结构,设计合理,结构简单。通过设置密实沥青碎石混凝土层,显著提高路面的承载能力,同时作为施工期间道路车辆通行的临时路面材料层,以最大程度防止施工车辆和路面灰土堵塞透水路面结构表面的透水“通道”;而当最后铺设面层材料层时,可以在其上打孔,让渗入的雨水继续下渗,保证足够的雨水渗透能力,路面不积水,顺畅排放至路面以下及周围绿地中。Compared with the prior art, the beneficial effect of the utility model is embodied in that the permeable brick pavement structure has a reasonable design and a simple structure. By setting a dense asphalt macadam concrete layer, the bearing capacity of the pavement is significantly improved, and at the same time, it is used as a temporary pavement material layer for road vehicles to pass through during construction, so as to prevent construction vehicles and road dust from blocking the permeable "channel" on the surface of the permeable pavement structure; and When the surface material layer is finally laid, holes can be drilled on it to allow the infiltrated rainwater to continue to infiltrate, ensuring sufficient rainwater penetration capacity, no water accumulation on the road surface, and smooth discharge to the road below the road and the surrounding green space.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型密实沥青碎石混凝土层的孔径分布图;Fig. 2 is the pore size distribution diagram of the compact asphalt macadam concrete layer of the present invention;

图3为实施例1中透水铺砖面层铺装形式示意图;Fig. 3 is the schematic diagram of the pavement form of the permeable brick surface layer in embodiment 1;

图4为拼花图案的铺装形式示意图;Fig. 4 is the pavement form schematic diagram of mosaic pattern;

图5为顺砖砌合图案的铺装形式示意图。Fig. 5 is a schematic diagram of the pavement form of the brick laying pattern.

其中,1为透水铺砖面层,2为粗砂找平层,3为密实沥青碎石混凝土层;4为级配碎石层,5为反滤土工布,6为土基,7为钻孔,8为高强度地砖,9为透水缝隙。Among them, 1 is the permeable brick surface layer, 2 is the coarse sand leveling layer, 3 is the dense asphalt macadam concrete layer; 4 is the graded gravel layer, 5 is the filter geotextile, 6 is the soil foundation, and 7 is the drill hole , 8 is a high-strength floor tile, and 9 is a permeable gap.

具体实施方式Detailed ways

下面对本实用新型的实施例作详细说明,本实施例在以本实用新型技术方案为前提下进行实施,给出了详细的实施方式和具体的操作过程,但本实用新型的保护范围不限于下述的实施例。The following is a detailed description of the embodiments of the present utility model. This embodiment is implemented on the premise of the technical solution of the present utility model, and detailed implementation methods and specific operating procedures are provided, but the protection scope of the present utility model is not limited to the following the described embodiment.

实施例1Example 1

一种设置密实沥青碎石混凝土层的透水铺砖路面结构,如图1所示,包括土基6、级配碎石层4、密实沥青碎石混凝土层3与透水铺砖面层1,土基6与级配碎石层4之间铺设有反滤土工布5,透水铺砖面层与密实沥青碎石混凝土层3之间设有粗砂找平层2,透水铺砖面层1铺设于粗砂找平层2上。A permeable paving brick pavement structure with a dense asphalt macadam concrete layer, as shown in Figure 1, comprising a soil foundation 6, a graded macadam layer 4, a dense asphalt macadam concrete layer 3 and a permeable paving brick surface layer 1, soil A reverse filter geotextile 5 is laid between the foundation 6 and the graded crushed stone layer 4, a coarse sand leveling layer 2 is set between the permeable brick surface layer and the dense asphalt macadam concrete layer 3, and the permeable brick surface layer 1 is laid on Coarse sand leveling layer 2 on.

具体地,密实沥青碎石混凝土层3铺设于级配碎石层4上。铺砖路面1包括相互拼接的多块高强度铺砖,相邻两块高强度铺砖之间具有1至2cm透水缝隙9,高强度铺砖的抗压强度大于或等于50MPa且抗折强度不低于5Mpa,如图3所示,本实施例中高强度地砖8相互拼接的图案为人字形图案;根据需要,高强度地砖8相互拼接的图案还可以为拼花图案(如图4所示)与顺砖砌合图案(如图5所示)。Specifically, the dense asphalt macadam concrete layer 3 is laid on the graded macadam layer 4 . The brick pavement 1 includes a plurality of high-strength paving bricks spliced with each other. There is a 1 to 2 cm water-permeable gap 9 between two adjacent high-strength paving bricks. The compressive strength of the high-strength paving bricks is greater than or equal to 50 MPa and the flexural strength is less than Below 5Mpa, as shown in Figure 3, the pattern that high-strength floor tiles 8 are spliced together is a herringbone pattern among the present embodiment; Brickwork pattern (as shown in Figure 5).

密实沥青碎石混凝土层3为密级配沥青混凝土,施工时根据需要选择AC或ATB,最大公称粒径小于20mm,其厚度依据施工期间的交通总量在12至20cm范围内。级配碎石层4的厚度在20至40cm范围内、孔隙率为40%、粒径在2至5cm。土基6为素土压实层,素土压实层6的土基压在93%左右。粗砂找平层2的厚度在2至3cm范围内且碎石粒径在0.5至1cm范围内。The dense asphalt macadam concrete layer 3 is densely graded asphalt concrete, AC or ATB is selected according to the needs during construction, the maximum nominal particle size is less than 20mm, and its thickness is within the range of 12 to 20cm according to the total traffic volume during construction. The graded gravel layer 4 has a thickness in the range of 20 to 40 cm, a porosity of 40%, and a particle size of 2 to 5 cm. The soil foundation 6 is a plain soil compaction layer, and the soil foundation pressure of the plain soil compaction layer 6 is about 93%. The thickness of the coarse sand leveling layer 2 is in the range of 2 to 3 cm and the particle size of the gravel is in the range of 0.5 to 1 cm.

如图2所示,施工时,可在密实沥青碎石混凝土层3上设置钻孔7,钻孔7贯穿整个密实沥青碎石混凝土层3,钻孔7的孔径在2至3cm,钻孔间距与距离路边不小于3倍孔径。As shown in Figure 2, during construction, boreholes 7 can be set on the dense asphalt macadam concrete layer 3, and the boreholes 7 run through the entire dense asphalt macadam concrete layer 3. The aperture of the boreholes 7 is 2 to 3 cm. The distance from the roadside is not less than 3 times the aperture.

Claims (9)

1. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is arranged, which is characterized in that the pavement structure from On down successively include permeable tile work surface layer, coarse sand screed-coat, closely knit asphalt macadam concrete layer and graded broken stone layer, it is described Graded broken stone layer is laid on soil matrix, and the drilling being evenly arranged is equipped in the closely knit asphalt macadam concrete layer.
2. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is arranged according to claim 1, special Sign is that the material of the closely knit asphalt macadam concrete layer is dense-graded asphalt concrete, and the closely knit asphalt macadam is mixed Solidifying the thickness of the layer is 12~20cm.
3. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set according to claim 1 or 2, It is characterized in that, the aperture of the drilling is 2~3cm, and the hole heart of two neighboring drilling is away from not less than 3 times of boring apertures.
4. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is arranged according to claim 1, special Sign is that the permeable tile work surface layer is spliced by the high-intensitive floor tile of muti-piece rectangle, adjacent two pieces of high-intensitive floor tiles it Between be equipped with 1~2cm permeable gap.
5. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is arranged according to claim 4, special Sign is that the laying shape of the high intensity floor tile is in herringbone pattern, parquets pattern or running bond pattern.
6. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is arranged according to claim 1, special Sign is that the coarse sand screed-coat uses partial size for the rubble of 0.5~1cm, the coarse sand screed-coat with a thickness of 2~3cm.
7. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is arranged according to claim 1, special Sign is that the graded broken stone layer uses partial size for the rubble of 2~5cm, the porosity of the graded broken stone layer is 35%~ 50%, the graded broken stone layer with a thickness of 20~40cm.
8. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is arranged according to claim 1, special Sign is, anti-filter geotextiles are equipped between the graded broken stone layer and soil matrix.
9. a kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is arranged according to claim 1, special Sign is that the soil compaction degree is 90%~95%.
CN201821608858.6U 2018-09-30 2018-09-30 A kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set Active CN209443316U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821608858.6U CN209443316U (en) 2018-09-30 2018-09-30 A kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821608858.6U CN209443316U (en) 2018-09-30 2018-09-30 A kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set

Publications (1)

Publication Number Publication Date
CN209443316U true CN209443316U (en) 2019-09-27

Family

ID=68009387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821608858.6U Active CN209443316U (en) 2018-09-30 2018-09-30 A kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set

Country Status (1)

Country Link
CN (1) CN209443316U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110904946B (en) * 2019-12-11 2021-11-16 安徽三联学院 Foundation reinforcing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110904946B (en) * 2019-12-11 2021-11-16 安徽三联学院 Foundation reinforcing method

Similar Documents

Publication Publication Date Title
CN209227320U (en) A kind of permeable tile work pavement structure that solid cement concrete layer is set
CN211596246U (en) Permeable pavement structure
CN108532406A (en) Can rapid construction high-bearing capacity pervious surface and laying method
CN104480829B (en) Pavement structure internal draining system for eliminating road surface water seepage
CN109958018A (en) A kind of heavy rainfall urban road water-permeable pavement structure and its construction method
CN109944125B (en) Asphalt concrete pavement structure and paving process thereof
CN108532407A (en) One kind is anti-blocking to ooze aggregate size selection method in water-permeable brick and anti-blocking surface layer soon
CN109972475A (en) An ecological permeable pavement structure
CN211815260U (en) Permeable pavement convenient for recovering water permeability
CN209443316U (en) A kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set
CN207484193U (en) Permeable road structure
CN108221533A (en) A kind of laying method in backroad face
CN207244389U (en) A kind of shallow-layer water storage road surface water-permeable brick
CN108411728A (en) Surface drainage
CN107794822A (en) A kind of porous pavement based on sponge the idea of the city
CN210341528U (en) Gardens brick road surface structure that permeates water
CN211256535U (en) A concrete road surface structure that permeates water for heavy-duty traffic
CN209211198U (en) A kind of urban environmental protection road surface
CN217710186U (en) Water permeability pavement of urban road
CN218373102U (en) Assembled retaining road surface structure with water purification effect
CN105803888A (en) Sponge type road paving structure
CN207159749U (en) A kind of high intensity high water-permeability road paving structure for sponge city
CN206157520U (en) Highway road antiskid structure
CN205839503U (en) A kind of block-stone pavement structure being applicable to heavy traffic
CN211571250U (en) A permeable pedestrian road pavement structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant