[go: up one dir, main page]

CN209413944U - A kind of hangers victory assembling device - Google Patents

A kind of hangers victory assembling device Download PDF

Info

Publication number
CN209413944U
CN209413944U CN201822199469.9U CN201822199469U CN209413944U CN 209413944 U CN209413944 U CN 209413944U CN 201822199469 U CN201822199469 U CN 201822199469U CN 209413944 U CN209413944 U CN 209413944U
Authority
CN
China
Prior art keywords
bolt
hole
sliding slot
hangers
external
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822199469.9U
Other languages
Chinese (zh)
Inventor
彭健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Peng Jian
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201822199469.9U priority Critical patent/CN209413944U/en
Application granted granted Critical
Publication of CN209413944U publication Critical patent/CN209413944U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of hangers victory assembling device, the hangers victory assembling devices, comprising: hangers component, external sliding slot, the first bolt assembly and the second bolt assembly;Wherein, hangers component, comprising: auricle, pendant groove, the first bolt hole and the second bolt hole;Auricle and pendant groove are arranged in set angle, and the first bolt hole and the second bolt hole are arranged in pendant groove bottom, and the first bolt hole and the second bolt hole are counterbore;An external conduit, first through hole and the second through-hole are provided on external sliding slot bottom surface;External sliding slot nesting is mounted in pendant groove, and the first bolt assembly is tightened after passing through first through hole by the first bolt hole, and the second bolt assembly is tightened after passing through the second through-hole by the second bolt hole, and external sliding slot is connect with hangers component.The Fast Installation of Shield-bored tunnels electromechanical equipment and pipeline is realized by the utility model.

Description

A kind of hangers victory assembling device
Technical field
The utility model belongs to shield tunnel construction technology field more particularly to a kind of hangers victory assembling device.
Background technique
As various regions large- and-medium size cities metro project starts successively, shield method has determined absolutely in city tunnel construction Dominant position, someone is referred to as city tunnel engineering method.Original subway pipeline, mechanical and electric equipment installation mostly use chemically-planted steel bar or Person beats the mode of expansion bolt, but these assembled architecture modes are relatively easy in design, and systematicness is of less demanding, and has Have significant limitation: chemically-planted steel bar or expansion bolt require to drill on existing structure, are likely to be encountered during drilling Structure reinforcing bars cause certain damage to structure itself, influence structure durability;Chemically-planted steel bar or expansion bolt itself the service life have Limit, easily corrodes, generally using no more than 15 years will be maintained or replaced, and subway is much not achieved under metro environment Life requirement in 100 years;The reinforcing bar or expansion bolt of implantation are contacted with steel mesh, are easily caused structure reinforcing bars corrosion, are influenced to tie Structure safety.The construction of underground tunnel period how is reduced, construction quality is improved, extends tunnel service life, reduces complete period synthesis Cost, prevent dust, noise pollution, mitigate construction labor intensity the problems such as will become industry project urgently to be solved.How to subtract Few construction of underground tunnel period, improve construction quality, extend tunnel service life, reduce complete period overall cost, prevent dust, The problems such as noise pollution, mitigation construction labor intensity, will become industry project urgently to be solved.
Utility model content
The technology of the utility model solves the problems, such as: a kind of hangers victory assembling device is overcome the deficiencies of the prior art and provide, with reality The Fast Installation of existing Shield-bored tunnels electromechanical equipment and pipeline.
In order to solve the above-mentioned technical problem, the utility model discloses a kind of hangers victory assembling devices, comprising: hangers component (1-0), external sliding slot (2-0), the first bolt assembly (3-0) and the second bolt assembly (5-0);Wherein, hangers component (1-0), It include: auricle (1-1), pendant groove (1-3), the first bolt hole (1-4) and the second bolt hole (1-5);Auricle (1-1) and pendant groove (1-3) is arranged in set angle, and the first bolt hole (1-4) and the second bolt hole (1-5) are arranged on the bottom surface pendant groove (1-3), First bolt hole (1-4) and the second bolt hole (1-5) are counterbore;An external conduit (2- is provided on external sliding slot (2-0) bottom surface 1), first through hole (2-2) and the second through-hole (2-3);
External sliding slot (2-0) nesting is mounted in pendant groove (1-3), and the first bolt assembly (3-0) passes through first through hole (2- 2) it is tightened afterwards by the first bolt hole (1-4), the second bolt assembly (5-0) passes through the second through-hole (2-3) and passes through second afterwards Bolt hole (1-5) is tightened, and external sliding slot (2-0) is connect with hangers component (1-0).
Preferably,
First bolt assembly (3-0), comprising: the first bolt (3-1), the first tight lock washer (3-2) and the first square washer (3-3);Wherein, the first bolt (3-1) sequentially passes through the external conduit (2-1) and first through hole (2-2) of external sliding slot (2-0) Afterwards, it is tightened by the first bolt hole (1-4);First square washer (3-3) be mounted on the bolt head of the first bolt (3-1) with Between external sliding slot (2-0);First tight lock washer (3-2) is mounted on the bolt head and the first square washer of the first bolt (3-1) Between (3-3);
Second bolt assembly (5-0), comprising: the second bolt (5-1), the second tight lock washer (5-2) and the second square washer (5-3);Wherein, the second bolt (5-1) sequentially passes through the external conduit (2-1) and the second through-hole (2-3) of external sliding slot (2-0) Afterwards, it is tightened by the second bolt hole (1-5);Second square washer (5-3) be mounted on the bolt head of the second bolt (5-1) with Between external sliding slot (2-0);Second tight lock washer (5-2) is mounted on the bolt head and the second square washer of the second bolt (5-1) Between (5-3).
Preferably,
First bolt assembly (3-0), comprising: the first bolt (3-1) and the first tight lock washer (3-2);Wherein, the first bolt (3-1) is tightened after the first through hole (2-2) of external sliding slot (2-0) by the first bolt hole (1-4);First tight lock Washer (3-2) is mounted between the bolt head of the first bolt (3-1) and the lower surface of first through hole (2-2);
Second bolt assembly (5-0), comprising: the second bolt (5-1) and the second tight lock washer (5-2);Wherein, the second bolt (5-1) is tightened after second through-hole (2-3) of external sliding slot (2-0) by the second bolt hole (1-5);Second tight lock Washer (5-2) is mounted between the bolt head of the second bolt (5-1) and the lower surface of the second through-hole (2-3).
Preferably, hangers component (1-0), further includes: earhole (1-2);Wherein, earhole (1-2) is arranged at auricle (1-1) On;
Earhole (1-2) is connect with the anchor rod bolt (4-3) of shield tunnel concrete pipe sheet (4-0), and hangers victory is filled It sets and is mounted on shield tunnel concrete pipe sheet (4-0).
Preferably, shield tunnel concrete pipe sheet (4-0), comprising: shield duct piece left member (4-1), shield duct piece right member (4- 2), anchor rod bolt (4-3), segment bolt fastening nut left member (4-4) and segment bolt fastening nut right member (4-5);
Shield duct piece left member (4-1) and shield duct piece right member (4-2) are connected by anchor rod bolt (4-3), and are passed through respectively Segment bolt fastening nut left member (4-4) and segment bolt fastening nut right member (4-5) are connected and fixed.
Preferably, earhole (1-2) passes through the left end of anchor rod bolt (4-3), passes through segment bolt fastening nut left member (4-4) It is connected and fixed with shield duct piece left member (4-1).
Preferably, earhole (1-2) passes through the right end of anchor rod bolt (4-3), passes through segment bolt fastening nut right member (4-5) It is connected and fixed with shield duct piece right member (4-2).
The utility model has the advantage that
1) not damaged, it is opposite to be not necessarily to the steel planting in structure with traditional anchor bolt technique or beat expansion bolt, to structure without Destroy, the integrality and durability of shield tunnel itself is greatly improved, prevent because intensively punch caused by section of jurisdiction crack, infiltration, etc. Security risk.
2) installation tool and mounting process are simple, install fixing bolt and nut is unified, be easy to normal process and be turned into industry.
3) flexible for installation, it is ensured that the installation accuracy of equipment in tunnel, it is circumferential easy to adjust.
4) at low cost, prevent 30% or more waste of material low cost without 360 degree of arrangements relative to built-in sliding chute technique, together When also significantly reduce the operation maintenance expense of equipment, equipment installation and maintenance are more single, and maintenance cost is greatly reduced.
5) short time limit, equipment installation effectiveness significantly improve, and can at least contract relative to traditional anchor bolt technique hydromechanical installer phase It is short by 50% or more.
6) environmentally friendly, the construction environment of pipeline and mechanical and electric equipment installation process without dust, noiseless very big improvement equipment installation, Labor intensity of workers is reduced, typical " green construction " is belonged to.
7) highly integrated, each professional equipment in tunnel it is mountable on the chute, convenient for the operation phase replace and increase various Equipment.
8) maintenance is simple, and the component of external part is replaceable, and maintenance cost is low.
9) applicability is wide, can use in concrete compression area and tensile region.
10) have a wide range of application, could be applicable to city integrated underground pipe gallery, prefabricated casting plate, cast-in-situ wall, all kinds of buildings Electromechanical equipment and pipeline installation in object.
Detailed description of the invention
Fig. 1 is a kind of three-dimensional assembling schematic diagram of hangers victory assembling device in the utility model embodiment;
Fig. 2 is the three-dimensional assembling schematic diagram of another hangers victory assembling device in the utility model embodiment;
Fig. 3 is a kind of lateral plan of hangers component in the utility model embodiment;
Fig. 4 is a kind of bottom view of hangers component in the utility model embodiment;
Fig. 5 is a kind of structural schematic diagram of external sliding slot in the utility model embodiment;
Fig. 6 is a kind of separation distributed architecture schematic diagram of hangers victory assembling device in the utility model embodiment;
Fig. 7 is a kind of mounting structure schematic diagram of shield tunnel concrete pipe sheet in the utility model embodiment;
It is hangers component 1-0, auricle 1-1, earhole 1-2, pendant groove 1-3, the first bolt hole 1-4, the second bolt hole 1-5, outer Set sliding slot 2-0, external conduit 2-1, first through hole 2-2, the second through-hole 2-3, the first bolt assembly 3-0, the first bolt 3-1, One tight lock washer 3-2, the first square washer 3-3, the second bolt assembly 5-0, the second bolt 5-1, the second tight lock washer 5-2, the Two square washer 5-3, shield tunnel concrete pipe sheet 4-0, shield duct piece left member 4-1, shield duct piece right member 4-2, anchor rod bolt 4-3, segment bolt fastening nut left member 4-4, segment bolt fastening nut right member 4-5.
Specific embodiment
It is practical new to this below in conjunction with attached drawing to keep the purpose of this utility model, technical solution and advantage clearer Type disclosed embodiment is described in further detail.
The utility model discloses a kind of hangers victory assembling devices, can be used for the prompt dress of subway tunnel electromechanical equipment and pipeline, The part that shield duct piece combines specially on component.The anchor pole spiral shell that the earhole opened on auricle can be used directly with concrete pipe sheet It tethers and connects, this under the premise of not destroying concrete pipe sheet it is ensured that install hangers component, so that it is outer to reach smoothly installation Set the effect of sliding slot.External conduit reserved in advance facilitates bolt assembly to pass through and connects on external sliding slot convenient for the fine tuning of external sliding slot It connects, is fixed on external sliding slot in the pendant groove of hangers component, improve the integrality and durability of shield tunnel, realize subway The Fast Installation of tunnel electromechanical equipment and pipeline.
Such as Fig. 1~7, the hangers victory assembling device, comprising: hangers component 1-0, external sliding slot 2-0, the first bolt assembly 3-0 With the second bolt assembly 5-0.Wherein, hangers component 1-0, comprising: auricle 1-1, pendant groove 1-3, the first bolt hole 1-4 and second Bolt hole 1-5;Auricle 1-1 and pendant groove 1-3 is arranged in set angle, and the first bolt hole 1-4 and the second bolt hole 1-5 setting exist On the bottom surface pendant groove 1-3, the first bolt hole 1-4 and the second bolt hole 1-5 are counterbore.External sliding slot 2-0 is provided with one on bottom surface External conduit 2-1, first through hole 2-2 and the second through-hole 2-3.
In the present embodiment, external sliding slot 2-0 nesting is mounted in pendant groove 1-3, and the first bolt assembly 3-0 passes through first It is tightened after through-hole 2-2 by the first bolt hole 1-4, the second bolt assembly 5-0 passes through the second spiral shell after passing through the second through-hole 2-3 Keyhole 1-5 is tightened, and external sliding slot 2-0 is connect with hangers component 1-0.
One is preferred, such as Fig. 1 and Fig. 6, the first bolt assembly 3-0, comprising: the first bolt 3-1, the first tight lock washer 3-2 With the first square washer 3-3;Wherein, the first bolt 3-1 sequentially passes through the external conduit 2-1 and first through hole of external sliding slot 2-0 After 2-2, it is tightened by the first bolt hole 1-4;First square washer 3-3 is mounted on the bolt head of the first bolt 3-1 and outer It sets between sliding slot 2-0;First tight lock washer 3-2 is mounted between the bolt head of the first bolt 3-1 and the first square washer 3-3. Second bolt assembly 5-0, comprising: the second bolt 5-1, the second tight lock washer 5-2 and the second square washer 5-3;Wherein, the second spiral shell After bolt 5-1 sequentially passes through the external conduit 2-1 and the second through-hole 2-3 of external sliding slot 2-0, screwed by the second bolt hole 1-5 solid It is fixed;Second square washer 5-3 is mounted between the bolt head of the second bolt 5-1 and external sliding slot 2-0;Second tight lock washer 5-2 It is mounted between the bolt head of the second bolt 5-1 and the second square washer 5-3.
It is another preferred, such as Fig. 2, the first bolt assembly 3-0, comprising: the first bolt 3-1 and first tightly locks washer 3-2;Its In, the first bolt 3-1 is tightened after the first through hole 2-2 of external sliding slot 2-0 by the first bolt hole 1-4;First is tight Lock washer 3-2 is mounted between the bolt head of the first bolt 3-1 and the lower surface of first through hole 2-2.Second bolt assembly 5-0, It include: the tightly lock washer 5-2 of the second bolt 5-1 and second;Wherein, the second bolt 5-1 passes through the second through-hole 2- of external sliding slot 2-0 After 3, it is tightened by the second bolt hole 1-5;Second tight lock washer 5-2 is mounted on the bolt head and second of the second bolt 5-1 Between the lower surface of through-hole 2-3.
In the present embodiment, hangers component 1-0 can also include: earhole 1-2;Wherein, earhole 1-2 is arranged in auricle 1-1 On.Earhole 1-2 is connect with the anchor rod bolt 4-3 of shield tunnel concrete pipe sheet 4-0, and hangers victory assembling device is mounted on shield On tunnel concrete pipe sheet 4-0.
In the present embodiment, such as Fig. 7, shield tunnel concrete pipe sheet 4-0, comprising: shield duct piece left member 4-1, shield pipe Piece right member 4-2, anchor rod bolt 4-3, segment bolt fastening nut left member 4-4 and segment bolt fastening nut right member 4-5;Shield pipe Piece left member 4-1 is connected with shield duct piece right member 4-2 by anchor rod bolt 4-3, and passes through segment bolt fastening nut left member respectively 4-4 and segment bolt fastening nut right member 4-5 are connected and fixed.For example, earhole 1-2 can pass through the left end of anchor rod bolt 4-3, lead to Segment bolt fastening nut left member 4-4 and shield duct piece left member 4-1 is crossed to be connected and fixed.In another example earhole 1-2 can pass through anchor pole The right end of bolt 4-3 is connected and fixed by segment bolt fastening nut right member 4-5 and shield duct piece right member 4-2.
As it can be seen that in the present embodiment, earhole can directly can not destroyed with the bolt connection that concrete pipe sheet uses The installation of hangers component is carried out under the premise of concrete pipe sheet, and then can smoothly complete the installation of external sliding slot, and installation is simple just Victory can rapidly and effectively complete construction task.In addition, the bolt that hangers component is directly used with shield tunnel concrete pipe sheet Connection, increases the structural stability between hangers victory assembling device and shield duct piece.Wherein, it should be noted that external conduit It can be put into pendant groove and be finely adjusted in advance, facilitate the connection of bolt assembly.
On the basis of the above embodiments, the installation procedure of hangers victory assembling device is illustrated below:
(1) external sliding slot 2-0 nesting is put into the pendant groove 1-3 of hangers component 1-0, and external sliding slot 2-0 is adjusted To setting position;Wherein, hangers component 1-0, comprising: auricle 1-1, pendant groove 1-3, the first bolt hole 1-4 and the second bolt hole 1-5;Auricle 1-1 and pendant groove 1-3 is arranged in set angle, and the first bolt hole 1-4 and the second bolt hole 1-5 are arranged in pendant groove On the bottom surface 1-3;An external conduit 2-1, first through hole 2-2 and the second through-hole 2-3 are provided on the bottom surface external sliding slot 2-0;By One bolt assembly 3-0 is tightened after passing through first through hole 2-2 by the first bolt hole 1-4, and the second bolt assembly 5-0 is across the It is tightened after two through-hole 2-3 by the second bolt hole 1-5, external sliding slot 2-0 is connect with hangers component 1-0.
(2) the earhole 1-2 of hangers component 1-0 is connect with the anchor rod bolt 4-3 of shield tunnel concrete pipe sheet 4-0, is adjusted It is fixed after whole hangers component 1-0 to design position by segment bolt fastening nut, hangers victory assembling device is mounted on shield On tunnel concrete pipe sheet 4-0;Pipeline suspension and support is installed by external sliding slot 2-0, and tunnel pipeline and its are installed on bracket Its equipment.It preferably, can be by the anchor rod bolt 4-3 of the earhole 1-2 of hangers component 1-0 and shield tunnel concrete pipe sheet 4-0 Left end connection, adjust hangers component 1-0 to design position after fixed by segment bolt fastening nut left member 4-4, make hangers Component 1-0 is fitted closely with shield duct piece left member 4-1, and hangers victory assembling device is mounted on shield tunnel concrete pipe sheet 4-0 On.It preferably, can be by the right side of the earhole 1-2 of hangers component 1-0 and the anchor rod bolt 4-3 of shield tunnel concrete pipe sheet 4-0 End connection, is fixed by segment bolt fastening nut right member 4-5 after adjusting hangers component 1-0 to design position, makes hangers component 1-0 is fitted closely with shield duct piece right member 4-2, and hangers victory assembling device is mounted on shield tunnel concrete pipe sheet 4-0.
Below with reference to being illustrated for an actual installation scene, installation steps be can be such that
Step 1: first reserving the size of bolt notch according to concrete pipe sheet to determine the apparent size and shape of hangers component Shape guarantees that conduit can be close to the installation of section of jurisdiction surface.Step 2: the installation of hangers component, installation is hung while section of jurisdiction is installed Ear component guarantees that construction is primary and completes, and does not need to unclamp bolt again and installs hangers again.Step 3: according to the position of hangers component It sets and external sliding slot is put into pendant groove.Step 4: external sliding slot is fixed with hangers component by bolt assembly.This installation Mode dismounts simple and convenient, can rapidly and effectively complete construction task.The structure of external conduit and shield duct piece can also be enhanced Stability, moreover it is possible to ensure to collide with tunnel gut line etc..
Various embodiments are described in a progressive manner in this explanation, the highlights of each of the examples are with its The difference of his embodiment, the same or similar parts between the embodiments can be referred to each other.
The optimal specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art within the technical scope disclosed by the utility model, can readily occur in Change or replacement, should be covered within the scope of the utility model.
The content being not described in detail in the utility model specification belongs to the well-known technique of professional and technical personnel in the field.

Claims (7)

1. a kind of hangers victory assembling device characterized by comprising hangers component (1-0), external sliding slot (2-0), the first bolt group Part (3-0) and the second bolt assembly (5-0);Wherein, hangers component (1-0), comprising: auricle (1-1), pendant groove (1-3), first Bolt hole (1-4) and the second bolt hole (1-5);Auricle (1-1) and pendant groove (1-3) are arranged in set angle, the first bolt hole (1-4) and the second bolt hole (1-5) are arranged on the bottom surface pendant groove (1-3), the first bolt hole (1-4) and the second bolt hole (1- It 5) is counterbore;An external conduit (2-1), first through hole (2-2) and the second through-hole (2- are provided on external sliding slot (2-0) bottom surface 3);
External sliding slot (2-0) nesting is mounted in pendant groove (1-3), after the first bolt assembly (3-0) passes through first through hole (2-2) It is tightened by the first bolt hole (1-4), the second bolt assembly (5-0) passes through the second through-hole (2-3) and passes through the second bolt afterwards (1-5) is tightened in hole, and external sliding slot (2-0) is connect with hangers component (1-0).
2. hangers victory assembling device according to claim 1, which is characterized in that
First bolt assembly (3-0), comprising: the first bolt (3-1), the first tight lock washer (3-2) and the first square washer (3- 3);Wherein, after the first bolt (3-1) sequentially passes through external conduit (2-1) and the first through hole (2-2) of external sliding slot (2-0), lead to The first bolt hole (1-4) is crossed to be tightened;First square washer (3-3) be mounted on the bolt head of the first bolt (3-1) with it is external Between sliding slot (2-0);First tight lock washer (3-2) is mounted on the bolt head and the first square washer (3-3) of the first bolt (3-1) Between;
Second bolt assembly (5-0), comprising: the second bolt (5-1), the second tight lock washer (5-2) and the second square washer (5- 3);Wherein, after the second bolt (5-1) sequentially passes through the external conduit (2-1) and the second through-hole (2-3) of external sliding slot (2-0), lead to The second bolt hole (1-5) is crossed to be tightened;Second square washer (5-3) be mounted on the bolt head of the second bolt (5-1) with it is external Between sliding slot (2-0);Second tight lock washer (5-2) is mounted on the bolt head and the second square washer (5-3) of the second bolt (5-1) Between.
3. hangers victory assembling device according to claim 1, which is characterized in that
First bolt assembly (3-0), comprising: the first bolt (3-1) and the first tight lock washer (3-2);Wherein, the first bolt (3- 1) it after the first through hole (2-2) of external sliding slot (2-0), is tightened by the first bolt hole (1-4);First tight lock washer (3-2) is mounted between the bolt head of the first bolt (3-1) and the lower surface of first through hole (2-2);
Second bolt assembly (5-0), comprising: the second bolt (5-1) and the second tight lock washer (5-2);Wherein, the second bolt (5- 1) it after second through-hole (2-3) of external sliding slot (2-0), is tightened by the second bolt hole (1-5);Second tight lock washer (5-2) is mounted between the bolt head of the second bolt (5-1) and the lower surface of the second through-hole (2-3).
4. hangers victory assembling device according to claim 1, which is characterized in that hangers component (1-0), further includes: earhole (1- 2);Wherein, earhole (1-2) is arranged on auricle (1-1);
Earhole (1-2) is connect with the anchor rod bolt (4-3) of shield tunnel concrete pipe sheet (4-0), and hangers victory assembling device is pacified On shield tunnel concrete pipe sheet (4-0).
5. hangers victory assembling device according to claim 4, which is characterized in that shield tunnel concrete pipe sheet (4-0), packet It includes: shield duct piece left member (4-1), shield duct piece right member (4-2), anchor rod bolt (4-3), segment bolt fastening nut left member (4- And segment bolt fastening nut right member (4-5) 4);
Shield duct piece left member (4-1) and shield duct piece right member (4-2) are connected by anchor rod bolt (4-3), and pass through section of jurisdiction respectively Bolt fastening nut left member (4-4) and segment bolt fastening nut right member (4-5) are connected and fixed.
6. hangers victory assembling device according to claim 5, which is characterized in that earhole (1-2) is across anchor rod bolt (4-3) Left end is connected and fixed by segment bolt fastening nut left member (4-4) with shield duct piece left member (4-1).
7. hangers victory assembling device according to claim 5, which is characterized in that earhole (1-2) is across anchor rod bolt (4-3) Right end is connected and fixed by segment bolt fastening nut right member (4-5) with shield duct piece right member (4-2).
CN201822199469.9U 2018-12-26 2018-12-26 A kind of hangers victory assembling device Active CN209413944U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822199469.9U CN209413944U (en) 2018-12-26 2018-12-26 A kind of hangers victory assembling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822199469.9U CN209413944U (en) 2018-12-26 2018-12-26 A kind of hangers victory assembling device

Publications (1)

Publication Number Publication Date
CN209413944U true CN209413944U (en) 2019-09-20

Family

ID=67940564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822199469.9U Active CN209413944U (en) 2018-12-26 2018-12-26 A kind of hangers victory assembling device

Country Status (1)

Country Link
CN (1) CN209413944U (en)

Similar Documents

Publication Publication Date Title
CN206987887U (en) Subway tunnel electromechanical equipment and pipeline quick fixation structure
CN111594224B (en) Multifunctional embedded assembly of shield tunnel and implementation method
CN107882591B (en) Assembled hanging piece, rapid mounting device and mounting method
CN102797219A (en) Arch bridge suspender convenient to replace and method for replacing the same
CN109458219A (en) A kind of hangers victory assembling device and installation method
CN108590757A (en) A kind of victory assembling device and its installation method
CN109458221A (en) A kind of hangers victory assembling device and installation method
CN209413944U (en) A kind of hangers victory assembling device
CN208456667U (en) A kind of hangers victory assembling device
CN209687545U (en) A kind of hangers victory assembling device
CN209687544U (en) A kind of hangers victory assembling device
CN109736888A (en) A kind of hangers victory assembling device and installation method
CN209510390U (en) A kind of hangers victory assembling device
CN209413945U (en) A kind of hangers victory assembling device
CN208456666U (en) A kind of victory assembling device
CN108590758A (en) A kind of victory assembling device and its installation method
CN108915769A (en) A kind of hangers victory assembling device and its installation method
CN109000042A (en) A kind of horizontal air hose system through walls and its construction method
CN209510389U (en) A kind of hangers victory assembling device
CN109458220A (en) A kind of hangers victory assembling device and installation method
CN209510392U (en) A kind of external conduit device of shield tunnel
CN211648185U (en) Shield tunnel externally-hung channel structure with fire-proof plate
CN108590759A (en) A kind of hangers victory assembling device and its installation method
CN109441536A (en) A kind of hangers victory assembling device and installation method
CN208456618U (en) A kind of victory assembling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210831

Address after: 350001 room g, 20th floor, No. 71, Wusi Road, Wenquan street, Gulou District, Fuzhou City, Fujian Province

Patentee after: KANGYUAN TRACK TRAFFIC TECHNOLOGY (FUJIAN) Co.,Ltd.

Address before: 350000 unit B-1, 25 / F, Yuanhong building, No. 32, Wuyi Middle Road, Fuzhou, Fujian

Patentee before: Peng Jian

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230613

Address after: Unit 301, Building 2, No. 155 Yangqiao West Road, Gulou District, Fuzhou City, Fujian Province, 350001

Patentee after: Peng Jian

Address before: 350001 room g, 20th floor, No. 71, Wusi Road, Wenquan street, Gulou District, Fuzhou City, Fujian Province

Patentee before: KANGYUAN TRACK TRAFFIC TECHNOLOGY (FUJIAN) CO.,LTD.

TR01 Transfer of patent right