The utility model belongs to shield tunnel construction technology field more particularly to a kind of hangers victory assembling device.
Background technique
As various regions large- and-medium size cities metro project starts successively, shield method has determined absolutely in city tunnel construction
Dominant position, someone is referred to as city tunnel engineering method.Original subway pipeline, mechanical and electric equipment installation mostly use chemically-planted steel bar or
Person beats the mode of expansion bolt, but these assembled architecture modes are relatively easy in design, and systematicness is of less demanding, and has
Have significant limitation: chemically-planted steel bar or expansion bolt require to drill on existing structure, are likely to be encountered during drilling
Structure reinforcing bars cause certain damage to structure itself, influence structure durability;Chemically-planted steel bar or expansion bolt itself the service life have
Limit, easily corrodes, generally using no more than 15 years will be maintained or replaced, and subway is much not achieved under metro environment
Life requirement in 100 years;The reinforcing bar or expansion bolt of implantation are contacted with steel mesh, are easily caused structure reinforcing bars corrosion, are influenced to tie
Structure safety.The construction of underground tunnel period how is reduced, construction quality is improved, extends tunnel service life, reduces complete period synthesis
Cost, prevent dust, noise pollution, mitigate construction labor intensity the problems such as will become industry project urgently to be solved.How to subtract
Few construction of underground tunnel period, improve construction quality, extend tunnel service life, reduce complete period overall cost, prevent dust,
The problems such as noise pollution, mitigation construction labor intensity, will become industry project urgently to be solved.
Utility model content
The technology of the utility model solves the problems, such as: a kind of hangers victory assembling device is overcome the deficiencies of the prior art and provide, with reality
The Fast Installation of existing Shield-bored tunnels electromechanical equipment and pipeline.
In order to solve the above-mentioned technical problem, the utility model discloses a kind of hangers victory assembling devices, comprising: hangers component
(1-0), external sliding slot (2-0), the first bolt assembly (3-0) and the second bolt assembly (5-0);Wherein, hangers component (1-0),
It include: auricle (1-1), pendant groove (1-3), the first bolt hole (1-4) and the second bolt hole (1-5);Auricle (1-1) and pendant groove
(1-3) is arranged in set angle, and the first bolt hole (1-4) and the second bolt hole (1-5) are arranged on the bottom surface pendant groove (1-3),
First bolt hole (1-4) and the second bolt hole (1-5) are counterbore;An external conduit (2- is provided on external sliding slot (2-0) bottom surface
1), first through hole (2-2) and the second through-hole (2-3);
External sliding slot (2-0) nesting is mounted in pendant groove (1-3), and the first bolt assembly (3-0) passes through first through hole (2-
2) it is tightened afterwards by the first bolt hole (1-4), the second bolt assembly (5-0) passes through the second through-hole (2-3) and passes through second afterwards
Bolt hole (1-5) is tightened, and external sliding slot (2-0) is connect with hangers component (1-0).
Preferably,
First bolt assembly (3-0), comprising: the first bolt (3-1), the first tight lock washer (3-2) and the first square washer
(3-3);Wherein, the first bolt (3-1) sequentially passes through the external conduit (2-1) and first through hole (2-2) of external sliding slot (2-0)
Afterwards, it is tightened by the first bolt hole (1-4);First square washer (3-3) be mounted on the bolt head of the first bolt (3-1) with
Between external sliding slot (2-0);First tight lock washer (3-2) is mounted on the bolt head and the first square washer of the first bolt (3-1)
Between (3-3);
Second bolt assembly (5-0), comprising: the second bolt (5-1), the second tight lock washer (5-2) and the second square washer
(5-3);Wherein, the second bolt (5-1) sequentially passes through the external conduit (2-1) and the second through-hole (2-3) of external sliding slot (2-0)
Afterwards, it is tightened by the second bolt hole (1-5);Second square washer (5-3) be mounted on the bolt head of the second bolt (5-1) with
Between external sliding slot (2-0);Second tight lock washer (5-2) is mounted on the bolt head and the second square washer of the second bolt (5-1)
Between (5-3).
Preferably,
First bolt assembly (3-0), comprising: the first bolt (3-1) and the first tight lock washer (3-2);Wherein, the first bolt
(3-1) is tightened after the first through hole (2-2) of external sliding slot (2-0) by the first bolt hole (1-4);First tight lock
Washer (3-2) is mounted between the bolt head of the first bolt (3-1) and the lower surface of first through hole (2-2);
Second bolt assembly (5-0), comprising: the second bolt (5-1) and the second tight lock washer (5-2);Wherein, the second bolt
(5-1) is tightened after second through-hole (2-3) of external sliding slot (2-0) by the second bolt hole (1-5);Second tight lock
Washer (5-2) is mounted between the bolt head of the second bolt (5-1) and the lower surface of the second through-hole (2-3).
Preferably, hangers component (1-0), further includes: earhole (1-2);Wherein, earhole (1-2) is arranged at auricle (1-1)
On;
Earhole (1-2) is connect with the anchor rod bolt (4-3) of shield tunnel concrete pipe sheet (4-0), and hangers victory is filled
It sets and is mounted on shield tunnel concrete pipe sheet (4-0).
Preferably, shield tunnel concrete pipe sheet (4-0), comprising: shield duct piece left member (4-1), shield duct piece right member (4-
2), anchor rod bolt (4-3), segment bolt fastening nut left member (4-4) and segment bolt fastening nut right member (4-5);
Shield duct piece left member (4-1) and shield duct piece right member (4-2) are connected by anchor rod bolt (4-3), and are passed through respectively
Segment bolt fastening nut left member (4-4) and segment bolt fastening nut right member (4-5) are connected and fixed.
Preferably, earhole (1-2) passes through the left end of anchor rod bolt (4-3), passes through segment bolt fastening nut left member (4-4)
It is connected and fixed with shield duct piece left member (4-1).
Preferably, earhole (1-2) passes through the right end of anchor rod bolt (4-3), passes through segment bolt fastening nut right member (4-5)
It is connected and fixed with shield duct piece right member (4-2).
The utility model has the advantage that
1) not damaged, it is opposite to be not necessarily to the steel planting in structure with traditional anchor bolt technique or beat expansion bolt, to structure without
Destroy, the integrality and durability of shield tunnel itself is greatly improved, prevent because intensively punch caused by section of jurisdiction crack, infiltration, etc.
Security risk.
2) installation tool and mounting process are simple, install fixing bolt and nut is unified, be easy to normal process and be turned into industry.
3) flexible for installation, it is ensured that the installation accuracy of equipment in tunnel, it is circumferential easy to adjust.
4) at low cost, prevent 30% or more waste of material low cost without 360 degree of arrangements relative to built-in sliding chute technique, together
When also significantly reduce the operation maintenance expense of equipment, equipment installation and maintenance are more single, and maintenance cost is greatly reduced.
5) short time limit, equipment installation effectiveness significantly improve, and can at least contract relative to traditional anchor bolt technique hydromechanical installer phase
It is short by 50% or more.
6) environmentally friendly, the construction environment of pipeline and mechanical and electric equipment installation process without dust, noiseless very big improvement equipment installation,
Labor intensity of workers is reduced, typical " green construction " is belonged to.
7) highly integrated, each professional equipment in tunnel it is mountable on the chute, convenient for the operation phase replace and increase various
Equipment.
8) maintenance is simple, and the component of external part is replaceable, and maintenance cost is low.
9) applicability is wide, can use in concrete compression area and tensile region.
10) have a wide range of application, could be applicable to city integrated underground pipe gallery, prefabricated casting plate, cast-in-situ wall, all kinds of buildings
Electromechanical equipment and pipeline installation in object.
Detailed description of the invention
Fig. 1 is a kind of three-dimensional assembling schematic diagram of hangers victory assembling device in the utility model embodiment;
Fig. 2 is the three-dimensional assembling schematic diagram of another hangers victory assembling device in the utility model embodiment;
Fig. 3 is a kind of lateral plan of hangers component in the utility model embodiment;
Fig. 4 is a kind of bottom view of hangers component in the utility model embodiment;
Fig. 5 is a kind of structural schematic diagram of external sliding slot in the utility model embodiment;
Fig. 6 is a kind of separation distributed architecture schematic diagram of hangers victory assembling device in the utility model embodiment;
Fig. 7 is a kind of mounting structure schematic diagram of shield tunnel concrete pipe sheet in the utility model embodiment;
It is hangers component 1-0, auricle 1-1, earhole 1-2, pendant groove 1-3, the first bolt hole 1-4, the second bolt hole 1-5, outer
Set sliding slot 2-0, external conduit 2-1, first through hole 2-2, the second through-hole 2-3, the first bolt assembly 3-0, the first bolt 3-1,
One tight lock washer 3-2, the first square washer 3-3, the second bolt assembly 5-0, the second bolt 5-1, the second tight lock washer 5-2, the
Two square washer 5-3, shield tunnel concrete pipe sheet 4-0, shield duct piece left member 4-1, shield duct piece right member 4-2, anchor rod bolt
4-3, segment bolt fastening nut left member 4-4, segment bolt fastening nut right member 4-5.
Specific embodiment
It is practical new to this below in conjunction with attached drawing to keep the purpose of this utility model, technical solution and advantage clearer
Type disclosed embodiment is described in further detail.
The utility model discloses a kind of hangers victory assembling devices, can be used for the prompt dress of subway tunnel electromechanical equipment and pipeline,
The part that shield duct piece combines specially on component.The anchor pole spiral shell that the earhole opened on auricle can be used directly with concrete pipe sheet
It tethers and connects, this under the premise of not destroying concrete pipe sheet it is ensured that install hangers component, so that it is outer to reach smoothly installation
Set the effect of sliding slot.External conduit reserved in advance facilitates bolt assembly to pass through and connects on external sliding slot convenient for the fine tuning of external sliding slot
It connects, is fixed on external sliding slot in the pendant groove of hangers component, improve the integrality and durability of shield tunnel, realize subway
The Fast Installation of tunnel electromechanical equipment and pipeline.
Such as Fig. 1~7, the hangers victory assembling device, comprising: hangers component 1-0, external sliding slot 2-0, the first bolt assembly 3-0
With the second bolt assembly 5-0.Wherein, hangers component 1-0, comprising: auricle 1-1, pendant groove 1-3, the first bolt hole 1-4 and second
Bolt hole 1-5;Auricle 1-1 and pendant groove 1-3 is arranged in set angle, and the first bolt hole 1-4 and the second bolt hole 1-5 setting exist
On the bottom surface pendant groove 1-3, the first bolt hole 1-4 and the second bolt hole 1-5 are counterbore.External sliding slot 2-0 is provided with one on bottom surface
External conduit 2-1, first through hole 2-2 and the second through-hole 2-3.
In the present embodiment, external sliding slot 2-0 nesting is mounted in pendant groove 1-3, and the first bolt assembly 3-0 passes through first
It is tightened after through-hole 2-2 by the first bolt hole 1-4, the second bolt assembly 5-0 passes through the second spiral shell after passing through the second through-hole 2-3
Keyhole 1-5 is tightened, and external sliding slot 2-0 is connect with hangers component 1-0.
One is preferred, such as Fig. 1 and Fig. 6, the first bolt assembly 3-0, comprising: the first bolt 3-1, the first tight lock washer 3-2
With the first square washer 3-3;Wherein, the first bolt 3-1 sequentially passes through the external conduit 2-1 and first through hole of external sliding slot 2-0
After 2-2, it is tightened by the first bolt hole 1-4;First square washer 3-3 is mounted on the bolt head of the first bolt 3-1 and outer
It sets between sliding slot 2-0;First tight lock washer 3-2 is mounted between the bolt head of the first bolt 3-1 and the first square washer 3-3.
Second bolt assembly 5-0, comprising: the second bolt 5-1, the second tight lock washer 5-2 and the second square washer 5-3;Wherein, the second spiral shell
After bolt 5-1 sequentially passes through the external conduit 2-1 and the second through-hole 2-3 of external sliding slot 2-0, screwed by the second bolt hole 1-5 solid
It is fixed;Second square washer 5-3 is mounted between the bolt head of the second bolt 5-1 and external sliding slot 2-0;Second tight lock washer 5-2
It is mounted between the bolt head of the second bolt 5-1 and the second square washer 5-3.
It is another preferred, such as Fig. 2, the first bolt assembly 3-0, comprising: the first bolt 3-1 and first tightly locks washer 3-2;Its
In, the first bolt 3-1 is tightened after the first through hole 2-2 of external sliding slot 2-0 by the first bolt hole 1-4;First is tight
Lock washer 3-2 is mounted between the bolt head of the first bolt 3-1 and the lower surface of first through hole 2-2.Second bolt assembly 5-0,
It include: the tightly lock washer 5-2 of the second bolt 5-1 and second;Wherein, the second bolt 5-1 passes through the second through-hole 2- of external sliding slot 2-0
After 3, it is tightened by the second bolt hole 1-5;Second tight lock washer 5-2 is mounted on the bolt head and second of the second bolt 5-1
Between the lower surface of through-hole 2-3.
In the present embodiment, hangers component 1-0 can also include: earhole 1-2;Wherein, earhole 1-2 is arranged in auricle 1-1
On.Earhole 1-2 is connect with the anchor rod bolt 4-3 of shield tunnel concrete pipe sheet 4-0, and hangers victory assembling device is mounted on shield
On tunnel concrete pipe sheet 4-0.
In the present embodiment, such as Fig. 7, shield tunnel concrete pipe sheet 4-0, comprising: shield duct piece left member 4-1, shield pipe
Piece right member 4-2, anchor rod bolt 4-3, segment bolt fastening nut left member 4-4 and segment bolt fastening nut right member 4-5;Shield pipe
Piece left member 4-1 is connected with shield duct piece right member 4-2 by anchor rod bolt 4-3, and passes through segment bolt fastening nut left member respectively
4-4 and segment bolt fastening nut right member 4-5 are connected and fixed.For example, earhole 1-2 can pass through the left end of anchor rod bolt 4-3, lead to
Segment bolt fastening nut left member 4-4 and shield duct piece left member 4-1 is crossed to be connected and fixed.In another example earhole 1-2 can pass through anchor pole
The right end of bolt 4-3 is connected and fixed by segment bolt fastening nut right member 4-5 and shield duct piece right member 4-2.
As it can be seen that in the present embodiment, earhole can directly can not destroyed with the bolt connection that concrete pipe sheet uses
The installation of hangers component is carried out under the premise of concrete pipe sheet, and then can smoothly complete the installation of external sliding slot, and installation is simple just
Victory can rapidly and effectively complete construction task.In addition, the bolt that hangers component is directly used with shield tunnel concrete pipe sheet
Connection, increases the structural stability between hangers victory assembling device and shield duct piece.Wherein, it should be noted that external conduit
It can be put into pendant groove and be finely adjusted in advance, facilitate the connection of bolt assembly.
On the basis of the above embodiments, the installation procedure of hangers victory assembling device is illustrated below:
(1) external sliding slot 2-0 nesting is put into the pendant groove 1-3 of hangers component 1-0, and external sliding slot 2-0 is adjusted
To setting position;Wherein, hangers component 1-0, comprising: auricle 1-1, pendant groove 1-3, the first bolt hole 1-4 and the second bolt hole
1-5;Auricle 1-1 and pendant groove 1-3 is arranged in set angle, and the first bolt hole 1-4 and the second bolt hole 1-5 are arranged in pendant groove
On the bottom surface 1-3;An external conduit 2-1, first through hole 2-2 and the second through-hole 2-3 are provided on the bottom surface external sliding slot 2-0;By
One bolt assembly 3-0 is tightened after passing through first through hole 2-2 by the first bolt hole 1-4, and the second bolt assembly 5-0 is across the
It is tightened after two through-hole 2-3 by the second bolt hole 1-5, external sliding slot 2-0 is connect with hangers component 1-0.
(2) the earhole 1-2 of hangers component 1-0 is connect with the anchor rod bolt 4-3 of shield tunnel concrete pipe sheet 4-0, is adjusted
It is fixed after whole hangers component 1-0 to design position by segment bolt fastening nut, hangers victory assembling device is mounted on shield
On tunnel concrete pipe sheet 4-0;Pipeline suspension and support is installed by external sliding slot 2-0, and tunnel pipeline and its are installed on bracket
Its equipment.It preferably, can be by the anchor rod bolt 4-3 of the earhole 1-2 of hangers component 1-0 and shield tunnel concrete pipe sheet 4-0
Left end connection, adjust hangers component 1-0 to design position after fixed by segment bolt fastening nut left member 4-4, make hangers
Component 1-0 is fitted closely with shield duct piece left member 4-1, and hangers victory assembling device is mounted on shield tunnel concrete pipe sheet 4-0
On.It preferably, can be by the right side of the earhole 1-2 of hangers component 1-0 and the anchor rod bolt 4-3 of shield tunnel concrete pipe sheet 4-0
End connection, is fixed by segment bolt fastening nut right member 4-5 after adjusting hangers component 1-0 to design position, makes hangers component
1-0 is fitted closely with shield duct piece right member 4-2, and hangers victory assembling device is mounted on shield tunnel concrete pipe sheet 4-0.
Below with reference to being illustrated for an actual installation scene, installation steps be can be such that
Step 1: first reserving the size of bolt notch according to concrete pipe sheet to determine the apparent size and shape of hangers component
Shape guarantees that conduit can be close to the installation of section of jurisdiction surface.Step 2: the installation of hangers component, installation is hung while section of jurisdiction is installed
Ear component guarantees that construction is primary and completes, and does not need to unclamp bolt again and installs hangers again.Step 3: according to the position of hangers component
It sets and external sliding slot is put into pendant groove.Step 4: external sliding slot is fixed with hangers component by bolt assembly.This installation
Mode dismounts simple and convenient, can rapidly and effectively complete construction task.The structure of external conduit and shield duct piece can also be enhanced
Stability, moreover it is possible to ensure to collide with tunnel gut line etc..
Various embodiments are described in a progressive manner in this explanation, the highlights of each of the examples are with its
The difference of his embodiment, the same or similar parts between the embodiments can be referred to each other.
The optimal specific embodiment of the above, only the utility model, but the protection scope of the utility model is not
It is confined to this, anyone skilled in the art within the technical scope disclosed by the utility model, can readily occur in
Change or replacement, should be covered within the scope of the utility model.
The content being not described in detail in the utility model specification belongs to the well-known technique of professional and technical personnel in the field.