CN209413936U - An anti-clogging device applied to the drilling wall protection of soft coal seam drainage - Google Patents
An anti-clogging device applied to the drilling wall protection of soft coal seam drainage Download PDFInfo
- Publication number
- CN209413936U CN209413936U CN201822117997.5U CN201822117997U CN209413936U CN 209413936 U CN209413936 U CN 209413936U CN 201822117997 U CN201822117997 U CN 201822117997U CN 209413936 U CN209413936 U CN 209413936U
- Authority
- CN
- China
- Prior art keywords
- gas collecting
- collecting tube
- pipe
- extraction borehole
- constraint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000003245 coal Substances 0.000 title claims abstract description 34
- 238000005553 drilling Methods 0.000 title description 20
- 238000000605 extraction Methods 0.000 claims abstract description 49
- 230000008878 coupling Effects 0.000 claims abstract 5
- 238000010168 coupling process Methods 0.000 claims abstract 5
- 238000005859 coupling reaction Methods 0.000 claims abstract 5
- 239000008187 granular material Substances 0.000 claims abstract 2
- 239000002893 slag Substances 0.000 claims abstract 2
- 238000003032 molecular docking Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 description 7
- 238000010586 diagram Methods 0.000 description 5
- 238000007789 sealing Methods 0.000 description 4
- 238000009423 ventilation Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 238000005065 mining Methods 0.000 description 3
- 238000009530 blood pressure measurement Methods 0.000 description 2
- 239000003818 cinder Substances 0.000 description 2
- 239000002245 particle Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000000452 restraining effect Effects 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及煤炭开采技术领域,特别是一种应用于松软煤层抽采钻孔护壁防堵塞技术。The utility model relates to the technical field of coal mining, in particular to an anti-clogging technology applied to the drilling wall protection of soft coal seams.
背景技术Background technique
我国煤层赋存条件复杂,并有大量的突出危险煤层,而突出煤层和一些高瓦斯煤层一般都比较松软。在松软煤层尤其是地应力高的区域中施工钻孔时,容易出现垮孔卡钻、成功率低、成孔深度小等问题,多数矿井的顺层钻孔成孔深度都在百米以下。The occurrence conditions of coal seams in my country are complex, and there are a large number of outburst dangerous coal seams, while outburst coal seams and some high-gas coal seams are generally relatively soft. When drilling in soft coal seams, especially in areas with high ground stress, problems such as hole sticking, low success rate, and small hole depth are prone to occur. The depth of bedding drilling in most mines is below 100 meters.
即使钻孔成孔后,随着回采工作面的推进,煤层中应力不断发生变化,甚至由于孔壁煤体自重,孔壁发生局部塌落,在造成钻孔抽放装置的集气段发生堵塞,减少了钻孔的有效抽采时间,影响抽放效果。Even after the hole is drilled, as the mining face advances, the stress in the coal seam changes continuously, and even due to the self-weight of the coal body on the hole wall, the hole wall partially collapses, causing blockage in the gas-gathering section of the drilling drainage device , which reduces the effective extraction time of the borehole and affects the drainage effect.
实用新型内容Utility model content
为解决上述问题,本实用新型提出一种应用于松软煤层抽采钻孔护壁防堵塞装置,针对透气性较差的煤层,可以提高钻孔的有效抽采时间,保证有效抽采半径,提高抽采效果。In order to solve the above problems, the utility model proposes an anti-clogging device applied to the drainage of soft coal seams, which can improve the effective extraction time of the drilling holes, ensure the effective extraction radius, and increase the mining effect.
为实现上述目的,本实用新型采用的技术方案是:For realizing above-mentioned object, the technical scheme that the utility model adopts is:
在第一个技术方案中,一种应用于松软煤层抽采钻孔护壁防堵塞装置,用于插入到松软煤层抽采钻孔中,应用于松软煤层抽采钻孔护壁防堵塞装置包括防堵支撑端头、集气管、束缚管节、抽放管和透气篷布,其中集气管、束缚管节和抽放管依次收尾连接,集气管的主体表面密布集气孔,所述防堵支撑端头封堵在集气管的自由末端,所述防堵支撑端头包括位于头部的导向头,导向头设有若干等间隔分布的支撑杆,所述透气篷布连接在支撑杆和集气管尾部,使得透气篷布包裹集气管,实现透气并阻隔煤渣颗粒物。In the first technical proposal, an anti-clogging device applied to the drilling hole protection wall of soft coal seam extraction is used to be inserted into the drainage drilling hole of soft coal seam, and the anti-clogging device applied to the drilling hole protection wall of soft coal seam extraction The supporting end, the air collecting pipe, the binding pipe joint, the extraction pipe and the air-permeable tarpaulin, wherein the air collecting pipe, the binding pipe joint and the exhausting pipe are connected at the end in sequence, and the main surface of the air collecting pipe is densely covered with air collecting holes, and the anti-blocking support end Blocked at the free end of the air collection pipe, the anti-blocking support end includes a guide head located at the head, the guide head is provided with a number of support rods distributed at equal intervals, the breathable tarpaulin is connected to the support rod and the tail of the air collection pipe, The breathable tarpaulin wraps the air collecting pipe to achieve ventilation and block cinder particles.
在第一个技术方案中,作为优选的,所述束缚管节内壁的头部设有第二束缚圈,所述集气管尾部外壁设有第一束缚圈,所述束缚管节和集气管通过第二束缚圈和第一束缚圈配合固定插接,所述透气篷布固定在第二束缚圈和第一束缚圈的连接处。In the first technical solution, as a preference, the head of the inner wall of the binding tube section is provided with a second binding ring, and the outer wall of the tail of the air collecting pipe is provided with a first binding ring, and the binding pipe section and the collecting pipe pass through The second restraint ring and the first restraint ring are fixedly plugged together, and the air-permeable tarpaulin is fixed at the junction of the second restraint ring and the first restraint ring.
在第一个技术方案中,作为优选的,所述束缚管节和抽放管通过螺纹连接。In the first technical solution, preferably, the binding pipe joint and the drainage pipe are connected through threads.
在第一个技术方案中,作为优选的,所述抽放管末段设置在对应松软煤层抽采钻孔的孔口封堵端位置。In the first technical solution, preferably, the end section of the drainage pipe is arranged at the orifice plugging end of the drainage borehole corresponding to the soft coal seam.
在第一个技术方案中,作为优选的,所述防堵支撑端头包括端头管塞,所述端头管塞封闭的插装在集气管的头部,所述端头管塞表面密布透气孔洞。In the first technical solution, preferably, the anti-blocking supporting end includes an end pipe plug, and the end pipe plug is closed and inserted at the head of the gas collecting pipe, and the surface of the end pipe plug is densely covered with Breathable holes.
在第一个技术方案中,作为优选的,所述抽放管有多个,且多个抽放管可逐一收尾对接。In the first technical solution, preferably, there are multiple extraction pipes, and the multiple extraction pipes can be butted one by one.
使用本实用新型的有益效果是:The beneficial effects of using the utility model are:
本应用于松软煤层抽采钻孔护壁防堵塞装置,其结构新颖,操作简单,使用可靠性强,造价低,能有效增加钻孔的有效抽采时间,提高钻孔的抽采效果。可以增加钻孔有效抽采时间,提高钻孔的抽采效果。同时,该实用新型适用于测压钻孔,尤其是对于松软煤层。The anti-clogging device applied to drilling holes for drainage in soft coal seams has a novel structure, simple operation, high reliability in use, and low cost, and can effectively increase the effective extraction time of drilling holes and improve the extraction effect of drilling holes. It can increase the effective extraction time of the borehole and improve the extraction effect of the borehole. At the same time, the utility model is suitable for pressure measurement drilling, especially for soft coal seams.
附图说明Description of drawings
图1为本实用新型应用于松软煤层抽采钻孔护壁防堵塞装置的结构示意图。Fig. 1 is a structural schematic diagram of the utility model applied to the anti-clogging device of the drill hole protection wall in the extraction of soft coal seam.
图2为本实用新型应用于松软煤层抽采钻孔护壁防堵塞装置中防堵支撑端头结构示意图。Fig. 2 is a schematic diagram of the structure of the anti-blocking support end of the utility model applied to the anti-blocking device of the drilling wall protection in the extraction of soft coal seams.
图3为本实用新型应用于松软煤层抽采钻孔护壁防堵塞装置中集气管结构示意图。Fig. 3 is a schematic diagram of the gas collecting pipe structure of the utility model applied in the anti-clogging device of the drill hole protection wall of the soft coal seam drainage.
图4为本实用新型应用于松软煤层抽采钻孔护壁防堵塞装置中束缚管节结构示意图。Fig. 4 is a schematic diagram of the structure of the binding pipe joint used in the anti-clogging device of the drill hole protection wall of the soft coal seam drainage of the utility model.
图5为本实用新型应用于松软煤层抽采钻孔护壁防堵塞装置抽放管结构示意图。Fig. 5 is a schematic diagram of the structure of the drainage pipe of the utility model applied to the anti-clogging device of the drill hole protection wall in the extraction of soft coal seam.
附图标记包括:Reference signs include:
1-防堵支撑端头,11-端头管塞,12-导向头,13-支撑杆,2-集气管,21-集气管主体,22-集气管内头段,23-集气管外螺纹,24-集气孔,25-第一束缚圈,3-束缚管节,31-管节主体,32-管节主体内螺纹,33-第二束缚圈,4-抽放管,41-抽放管主体,42-抽放管外螺纹,43-抽放管内螺纹,5-透气篷布,6-封堵段。1-anti-blocking support end, 11-end pipe plug, 12-guiding head, 13-support rod, 2-collecting pipe, 21-collecting pipe main body, 22-inner head section of air collecting pipe, 23-external thread of air collecting pipe , 24-air collection hole, 25-the first binding ring, 3-binding pipe joint, 31-pipe joint main body, 32-pipe joint main internal thread, 33-second binding ring, 4-extraction pipe, 41-extraction Pipe main body, 42-extraction pipe external thread, 43-extraction pipe internal thread, 5-breathable tarpaulin, 6-blocking section.
具体实施方式Detailed ways
以下结合附图对本实用新型进行详细的描述。Below in conjunction with accompanying drawing, the utility model is described in detail.
实施例1Example 1
如图1-图5所示,本实施例提出一种应用于松软煤层抽采钻孔护壁防堵塞装置,用于插入到松软煤层抽采钻孔中,应用于松软煤层抽采钻孔护壁防堵塞装置包括防堵支撑端头1、集气管2、束缚管节3、抽放管4和透气篷布5,其中集气管2、束缚管节3和抽放管4依次收尾连接,集气管2的主体表面密布集气孔24,防堵支撑端头1封堵在集气管2的自由末端,防堵支撑端头1包括位于头部的导向头12,导向头12设有若干等间隔分布的支撑杆13,透气篷布5连接在支撑杆13和集气管2尾部,使得透气篷布5包裹集气管2,实现透气并阻隔煤渣颗粒物。As shown in Figures 1 to 5, this embodiment proposes an anti-clogging device for drilling holes in soft coal seam extraction, which is used for inserting into extraction holes in soft coal seams, and is applied to the protection wall protection for drilling holes in soft coal seams. The blockage device includes an anti-blocking support end 1, an air collecting pipe 2, a binding pipe section 3, a drainage pipe 4 and a breathable tarpaulin 5, wherein the air collecting pipe 2, the binding pipe section 3 and the exhausting pipe 4 are connected in sequence, and the air collecting pipe 2 The surface of the main body is densely covered with gas-collecting holes 24, and the anti-blocking support end 1 is blocked at the free end of the air collecting pipe 2. The anti-blocking support end 1 includes a guide head 12 located at the head, and the guide head 12 is provided with a number of supports distributed at equal intervals. The rod 13 and the air-permeable tarpaulin 5 are connected to the tail of the support rod 13 and the gas collecting pipe 2, so that the air-permeable tarpaulin 5 wraps the air collecting pipe 2 to realize ventilation and block cinder particles.
如图1所示,防堵支撑端头1、集气管2、束缚管节3和抽放管4逐一收尾对接。As shown in Figure 1, the anti-blocking support end 1, the gas collecting pipe 2, the restraining pipe section 3 and the exhaust pipe 4 are connected one by one.
如图2所示,防堵支撑端头1的头部设有半圆体状的导向头12,导向头12的平面端面上连接端头管塞11的头部,支撑杆13连接在导向头12的弧形壁,透气篷布5连接在支撑杆13上。As shown in Figure 2, the head of the anti-blocking support terminal 1 is provided with a semicircular guide head 12, the plane end surface of the guide head 12 is connected to the head of the end pipe plug 11, and the support rod 13 is connected to the guide head 12. The arc-shaped wall of the air-permeable tarpaulin 5 is connected on the support rod 13.
如图3所示,集气管2包括集气管主体21、集气管内头段22、集气管外螺纹23和第一束缚圈25,其中集气管主体21表面密布集气孔24,集气管内头段22用于和端头管塞11对接,第一束缚圈25末端具有集气管外螺纹23,第一束缚圈25设置在集气管外螺纹23和集气管主体21之间的过渡位置。其中第一束缚圈25为环形的凸起结构。As shown in Figure 3, the air collecting pipe 2 includes the air collecting pipe main body 21, the inner head section 22 of the air collecting pipe, the outer thread 23 of the air collecting pipe and the first binding ring 25, wherein the surface of the air collecting pipe main body 21 is densely covered with air collecting holes 24, and the inner head section of the air collecting pipe 22 is used for docking with the end pipe plug 11 , the end of the first binding ring 25 has the external thread 23 of the air collecting pipe, and the first binding ring 25 is arranged at the transition position between the external thread 23 of the air collecting pipe and the main body 21 of the air collecting pipe. Wherein the first binding ring 25 is an annular raised structure.
如图4所示,束缚管节3包括管状的管节主体31,管节主体31的头段内壁设有第二束缚圈33,管节主体31的主体内壁设有管节主体内螺纹32。其中第二束缚圈33为环形的凸起结构。As shown in FIG. 4 , the binding pipe joint 3 includes a tubular joint body 31 , the inner wall of the head section of the pipe joint main body 31 is provided with a second binding ring 33 , and the inner wall of the main body of the pipe joint main body 31 is provided with a pipe joint main body internal thread 32 . Wherein the second binding ring 33 is an annular raised structure.
如图5所示,抽放管4包括抽放管主体41,抽放管主体41的外壁的前段设有抽放管外螺纹42,抽放管主体41内壁的尾端设有抽放管内螺纹43,抽放管内螺纹43与外部抽气装置螺纹连接。As shown in Figure 5, the extraction pipe 4 comprises an extraction pipe main body 41, the front section of the outer wall of the extraction pipe main body 41 is provided with an extraction pipe external thread 42, and the tail end of the extraction pipe main body 41 inner wall is provided with an extraction pipe internal thread 43, the internal thread 43 of the exhaust pipe is threadedly connected with the external air extraction device.
在本实施例中,束缚管节3内壁的头部设有第二束缚圈33,集气管2尾部外壁设有第一束缚圈25,束缚管节3和集气管2通过第二束缚圈33和第一束缚圈25配合固定插接,透气篷布5固定在第二束缚圈33和第一束缚圈25的连接处,方便固定透气篷布5。In this embodiment, the head portion of the inner wall of the binding pipe section 3 is provided with a second binding ring 33, and the outer wall of the tail of the gas collecting pipe 2 is provided with a first binding ring 25, and the binding pipe section 3 and the gas collecting pipe 2 pass through the second binding ring 33 and The first binding ring 25 is fixedly inserted, and the air-permeable tarpaulin 5 is fixed at the junction of the second binding ring 33 and the first binding ring 25, which is convenient for fixing the air-permeable tarpaulin 5.
在本实施例中,束缚管节3和抽放管4通过螺纹连接。In this embodiment, the binding pipe section 3 and the extraction pipe 4 are connected by threads.
抽放管4末段设置在对应松软煤层抽采钻孔的孔口封堵端位置。抽放管4有多个,且多个抽放管4可逐一收尾对接。The end section of the drainage pipe 4 is arranged at the orifice plugging end position of the drainage borehole corresponding to the soft coal seam. There are a plurality of extraction pipes 4, and the plurality of extraction pipes 4 can be docked one by one.
防堵支撑端头1包括端头管塞11,端头管塞11封闭的插装在集气管2的头部,端头管塞11表面密布透气孔洞,增强透气效果。The anti-blocking support terminal 1 includes a terminal pipe plug 11, which is closed and inserted in the head of the air collecting pipe 2, and the surface of the terminal pipe plug 11 is densely covered with ventilation holes to enhance the ventilation effect.
实施例2Example 2
一种应用于松软煤层抽采钻孔护壁封孔方法,使用实施例1中的应用于松软煤层抽采钻孔护壁防堵塞装置,包括以下步骤,A method for sealing a borehole retaining wall applied to the extraction of soft coal seams, using the anti-clogging device applied to the extracting borehole retaining walls of soft coal seams in embodiment 1, comprising the following steps,
步骤1、封孔前将透气篷布5一端固定在防堵支撑端头1上;Step 1. Fix one end of the breathable tarpaulin 5 on the anti-blocking support end 1 before sealing the hole;
步骤2、将防堵支撑端头1插入集气管2顶端,然后将透气篷布5的另一端缠绕在集气管2尾部;Step 2. Insert the anti-blocking support end 1 into the top of the air collecting pipe 2, and then wrap the other end of the breathable tarpaulin 5 around the tail of the air collecting pipe 2;
步骤3、将集气管2和束缚管节3连接,使透气篷布5端部固定在集气管2和束缚管节3的连接处,透气篷布5包裹集气管2集气孔24;Step 3, connect the air collecting pipe 2 and the binding pipe section 3, fix the end of the breathable tarpaulin 5 at the joint between the air collecting pipe 2 and the binding pipe section 3, and wrap the air collecting pipe 2 with the air collecting hole 24 with the breathable tarpaulin 5;
步骤4、抽放管4放置完成后,将抽放管4向孔外拖拽一定距离,拖拽距离不大于防堵支撑端头1主体长度;Step 4. After the drainage pipe 4 is placed, drag the drainage pipe 4 to the outside of the hole for a certain distance, and the dragging distance is not greater than the length of the main body of the anti-blocking support end 1;
步骤5、利用封堵材料对松软煤层抽采钻孔孔口内壁和抽放管4外壁之间的空隙进行封堵,形成封堵段6,封孔完成。Step 5, using the plugging material to plug the gap between the inner wall of the soft coal seam drainage borehole and the outer wall of the drainage pipe 4 to form a plugging section 6, and the hole sealing is completed.
本实施例中,透气篷布5被固定在第二束缚圈33和第一束缚圈25配合位置。In this embodiment, the air-permeable tarpaulin 5 is fixed at the matching position between the second binding ring 33 and the first binding ring 25 .
本应用于松软煤层抽采钻孔护壁防堵塞装置和封孔方法,其结构新颖,操作简单,使用可靠性强,造价低,能有效增加钻孔的有效抽采时间,提高钻孔的抽采效果。可以增加钻孔有效抽采时间,提高钻孔的抽采效果。同时,该实用新型适用于测压钻孔,尤其是对于松软煤层。This device is applied to the anti-clogging device and sealing method of the drilling wall in the extraction of soft coal seams. It has novel structure, simple operation, high reliability and low cost, and can effectively increase the effective extraction time of the drilling and improve the extraction efficiency of the drilling. Effect. It can increase the effective extraction time of the borehole and improve the extraction effect of the borehole. At the same time, the utility model is suitable for pressure measurement drilling, especially for soft coal seams.
以上内容仅为本实用新型的较佳实施例,对于本领域的普通技术人员,依据本实用新型的思想,在具体实施方式及应用范围上可以作出许多变化,只要这些变化未脱离本实用新型的构思,均属于本实用新型的保护范围。The above content is only a preferred embodiment of the present utility model, for those of ordinary skill in the art, according to the idea of the present utility model, many changes can be made in the specific implementation and application scope, as long as these changes do not depart from the scope of the present utility model Design, all belong to the protection domain of the present utility model.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822117997.5U CN209413936U (en) | 2018-12-17 | 2018-12-17 | An anti-clogging device applied to the drilling wall protection of soft coal seam drainage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822117997.5U CN209413936U (en) | 2018-12-17 | 2018-12-17 | An anti-clogging device applied to the drilling wall protection of soft coal seam drainage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209413936U true CN209413936U (en) | 2019-09-20 |
Family
ID=67938569
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822117997.5U Active CN209413936U (en) | 2018-12-17 | 2018-12-17 | An anti-clogging device applied to the drilling wall protection of soft coal seam drainage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209413936U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109488365A (en) * | 2018-12-17 | 2019-03-19 | 煤科集团沈阳研究院有限公司 | One kind being applied to weak seam extraction borehole retaining wall preventing clogging up device and method for sealing |
-
2018
- 2018-12-17 CN CN201822117997.5U patent/CN209413936U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109488365A (en) * | 2018-12-17 | 2019-03-19 | 煤科集团沈阳研究院有限公司 | One kind being applied to weak seam extraction borehole retaining wall preventing clogging up device and method for sealing |
CN109488365B (en) * | 2018-12-17 | 2024-06-18 | 中煤科工集团沈阳研究院有限公司 | Blocking prevention device and hole sealing method applied to soft coal seam extraction drilling wall protection |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103046948B (en) | Device and method for preventing coal drilling and cutting or gas emission | |
CN103195471B (en) | Method for preventing drilling collapse of downhole coal bed | |
CN204984343U (en) | Split combined type bag hole sealing device | |
CN104278969A (en) | Gas extraction drill hole plugging method and device | |
CN103541663A (en) | Special three-hole tube for plugging device and use method thereof | |
CN203145996U (en) | Downward wet hole drainage | |
CN209413936U (en) | An anti-clogging device applied to the drilling wall protection of soft coal seam drainage | |
CN105114119A (en) | A structure and implementation method for improving gas drainage with vertical hole drainage | |
CN105804691B (en) | A kind of gas in mine mash gas pumping drilling is without pipe method for sealing | |
CN108798758B (en) | Process for extracting gas from goaf and upper corner along top large-diameter bedding drill hole | |
CN213450349U (en) | Device for promoting gas desorption during temperature rise of underground coal mine | |
CN114607312A (en) | A device and method for multiple sealing in real time | |
CN109488365B (en) | Blocking prevention device and hole sealing method applied to soft coal seam extraction drilling wall protection | |
CN205297457U (en) | A hole sealing device for determining gas pressure | |
CN205477739U (en) | Simple tubular slag discharge and water discharge device for coal mine gas drainage pipeline | |
CN205189929U (en) | A ventilation unit that is used for high gas long distance to combine digging tunnel | |
CN209115147U (en) | A kind of hole sealing device of coal bed gas extraction drilling | |
CN204200238U (en) | A kind of Novel down-hole height of water flowing fractured zone observation probe of real-time probing | |
CN204511370U (en) | A kind of controllable type discharges water drilling and sealing casing bit | |
CN206917623U (en) | A kind of Luoyang Spade inspecting hole sediment outflow equipment | |
CN205638390U (en) | Colliery is taken out and is put guard aperture screen pipe for gas | |
CN205297449U (en) | Hole packer | |
CN111911226B (en) | System and method for alternately extracting gas from return air corner of stope face | |
CN204405650U (en) | Single-loop single-end plugging device for testing overburden fracture zone | |
CN205117280U (en) | Colliery gas drainage adapter and colliery gas drainage hole sealing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 113122 No.11 Binhe Road, Shenfu demonstration area, Fushun City, Liaoning Province Patentee after: Shenyang Research Institute Co.,Ltd. Address before: 113122 No. 11 Binhe Road, Fushun Economic Development Zone, Fushun City, Liaoning Province Patentee before: CCTEG (China Coal Technology and Engineering Group Corp.) |