CN209397796U - Preassembling formula stone curtain wall - Google Patents
Preassembling formula stone curtain wall Download PDFInfo
- Publication number
- CN209397796U CN209397796U CN201822089125.2U CN201822089125U CN209397796U CN 209397796 U CN209397796 U CN 209397796U CN 201822089125 U CN201822089125 U CN 201822089125U CN 209397796 U CN209397796 U CN 209397796U
- Authority
- CN
- China
- Prior art keywords
- stone
- curtain wall
- steel joist
- prefabricated
- wall unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004575 stone Substances 0.000 title claims abstract description 101
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 64
- 239000010959 steel Substances 0.000 claims abstract description 64
- 239000000463 material Substances 0.000 claims abstract description 33
- 238000010276 construction Methods 0.000 claims abstract description 16
- 229910000838 Al alloy Inorganic materials 0.000 claims abstract description 5
- 238000003466 welding Methods 0.000 claims description 3
- 239000000565 sealant Substances 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 11
- 238000010586 diagram Methods 0.000 description 4
- 238000004026 adhesive bonding Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 229910000679 solder Inorganic materials 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model discloses a kind of preassembling formula stone curtain walls, it includes prefabricated stone material curtain wall unit, wherein: prefabricated stone material curtain wall unit includes steel joist, steel joist hook is welded on the inside of steel joist, aluminium alloy hanging piece for stone is installed on the outside of steel joist, splash guard is installed between hanging piece for stone and steel joist;The steel joist hook of prefabricated stone material curtain wall unit mounts on steel hanging seat pre-buried on the body construction and realizes the fixation of prefabricated stone material curtain wall unit on the body construction;Panel on the inside of stone panel is articulated on the hanging piece for stone of steel joist and realizes mounting of the stone panel on prefabricated stone material curtain wall unit.The utility model greatly improves installation effectiveness, improves installation environment, and construction quality is secure, substantially reduces the duration, and security risk is few.
Description
Technical field
The utility model relates to a kind of preassembling formula stone curtain walls, belong to stone curtain wall field.
Background technique
Existing stone curtain wall is as depicted in figs. 1 and 2 comprising the steel joist 11 being made of column, crossbeam and diagonal brace, steel
The inside of keel 11 is fixed with main structure 40 by pre-buried steel part 12, passes through aluminium alloy hanging piece for stone on the outside of steel joist 11
13 mounting stone panels 20, are equipped with splash guard 14 between hanging piece for stone 13 and steel joist 11.In construction and installation, usually first exist
Construction site good steel joist 11 in bulk, then splash guard 14 and hanging piece for stone 13 in bulk, finally lift stone panel 20, this peace
Dress mode low efficiency, difficulty are big, operational hazards, quality are difficult to ensure, specifically: thousands of when installing steel joist 11
Root steel joist 11 put on the ground one by one carry out wall welding or bolt, steel joist 11 is spelled in scaffold mostly
The defects of dress, it is small that there are working spaces, and operation difficulty is big, and material is easily fallen, and security risk is big, and quality not can guarantee.It is installing
When splash guard 14, and Pork-pieces progress is in bulk at the construction field (site), equally exists problem possessed by installation steel joist 11, separately
When outer scene carries out gluing to splash guard 14, the requirement to environment is also higher, if encountering that harsh climate may cause can not
Construction.When installing hanging piece for stone 13, hanging piece for stone 13 also needs in bulk on steel joist 11, therefore equally exists steel joist
11 and splash guard 14 possessed by problem, and complex procedures, scene punching substantial amounts, quality is difficult to ensure, hanging piece for stone
13 installation accuracies are unable to control.
Utility model content
The purpose of this utility model is to provide a kind of preassembling formula stone curtain walls, efficiently solve existing stone curtain wall
Many drawbacks caused by scene is in bulk.
To achieve the goals above, the utility model uses following technical scheme:
A kind of preassembling formula stone curtain wall, it is characterised in that: it includes prefabricated stone material curtain wall unit, in which: prefabricated stone material
Curtain wall unit includes steel joist, and steel joist hook is welded on the inside of steel joist, is equipped with aluminium alloy stone material on the outside of steel joist
Pendant is equipped with splash guard between hanging piece for stone and steel joist;The steel joist of prefabricated stone material curtain wall unit is articulated in main body
The fixation of prefabricated stone material curtain wall unit on the body construction is realized on pre-buried steel hanging seat in structure;Face on the inside of stone panel
Plate is articulated on the hanging piece for stone of steel joist and realizes mounting of the stone panel on prefabricated stone material curtain wall unit.
The utility model has the advantages that:
The utility model efficiently solves existing stone curtain wall scene caused many drawbacks in bulk, greatly improves installation
Efficiency improves installation environment, constructs not affected by environment, construction quality is secure, substantially reduces duration, security risk
Few, to large-stone engineering and for the higher engineering of live site requirements, effect is more obvious.
Detailed description of the invention
Fig. 1 is that the perpendicular of existing stone curtain wall cuts open node schematic diagram.
Fig. 2 is the cross-sectional node schematic diagram of existing stone curtain wall.
Fig. 3 is that the perpendicular of the utility model stone curtain wall cuts open node schematic diagram.
Fig. 4 is the cross-sectional node schematic diagram of the utility model stone curtain wall.
Specific embodiment
As shown in Figure 3 and Figure 4, if the utility model preassembling formula stone curtain wall includes in the good intervention of workshop pre-production
Stone curtain wall unit processed, in which: prefabricated stone material curtain wall unit includes steel joist 31, and steel joist 31 is welded with towards indoor inside
Steel joist hook 33, steel joist 31 is equipped with aluminium alloy hanging piece for stone 32, hanging piece for stone 32 and steel joist towards outdoor outside
Vertical splash guard 34 is installed between 31;The steel joist hook 33 of prefabricated stone material curtain wall unit is articulated in pre-buried in main structure 40
Steel hanging seat 41 on and realize fixation of the prefabricated stone material curtain wall unit in main structure 40;The panel of 20 inside of stone panel is hung
Hook 21 is articulated on the hanging piece for stone 32 of steel joist 31 and realizes mounting of the stone panel 20 on prefabricated stone material curtain wall unit.
In the present invention, steel joist 31 is formed by welding by column, crossbeam and diagonal brace in workshop in advance.
Such as figure, hanging piece for stone 32 includes the L-type first for being spirally connected fixed by the crossbeam 311 on 31 outside of bolt and steel joist
Hanging seat 321, the first hanging seat 321 are spirally connected fixation by bolt and the second hanging seat of L-type 322, the panel hook 21 on stone panel 20
It is articulated on the second hanging seat 322.
In actual design, the first hanging seat 321 is equipped with the bolted position of crossbeam 311 for adjusting stone panel
The vertical slotted hole of 20 height, the second hanging seat 322 and the bolted position of the first hanging seat 321 are equipped with for adjusting stone material surface
The horizontal slotted hole of spacing between plate 20 and main structure 40.In addition, the left and right adjusting of 20 horizontal direction of stone panel can pass through
Panel on stone panel 20 links up with 21 positioning on the crossbeam 311 of steel joist 31 to realize.
In practice of construction, the splash guard 34 of prefabricated stone material curtain wall unit above and following prefabricated stone material curtain wall unit
Splash guard 34 between stitching portion pass through sealant seal.
As Fig. 3 leads to after the steel joist hook 33 of prefabricated stone material curtain wall unit is articulated on the steel hanging seat 41 of main structure 40
It crosses fastening bolt 35 steel joist hook 33 is fixed on steel hanging seat 41.
During actual construction, in the good prefabricated stone material curtain wall unit of workshop pre-production, then by prefabricated stone material curtain wall unit
It transports to construction site, prefabricated stone material curtain wall unit is directly articulated in crane the steel hanging seat 41 of main structure 40 at the scene
On, during mounting deviation adjusting can be carried out to prefabricated stone material curtain wall unit.Then in the steel joist of prefabricated stone material curtain wall unit
Stone panel 20 is mounted on 31, can carry out three-dimensional adjustment to stone panel 20 during mounting.Each prefabricated stone curtain wall list
After installing stone panel 20 in member, it is just finally completed the construction of the utility model stone curtain wall.
The utility model has the advantages that:
The utility model efficiently solves existing stone curtain wall scene caused many drawbacks in bulk, greatly improves installation
Efficiency improves installation environment, constructs not affected by environment, construction quality is secure, substantially reduces duration, security risk
Few, to large-stone engineering and for the higher engineering of live site requirements, effect is more obvious.
1, the steel joist of the utility model is integral in the preparatory integral solder in workshop, is then transported again to scene, directly
It mounts on the body construction, scene is not required to weld job, and easy to operate, installation effectiveness is high.
2, the splash guard of the utility model is to be assembled on steel joist simultaneously gluing sealing in advance in workshop, with entire steel joist
It is transported together to scene and is installed in main structure, the splash guard problem in bulk is not present.
3, the hanging piece for stone of the utility model is pre-installed on steel joist also in workshop, with entire steel joist
The scene of transporting, hanging piece for stone cooperates panel hook that can realize three-dimensional regulation to stone panel, live a large amount of drillings are avoided,
Ensure installation accuracy.
The above is the utility model preferred embodiment and its technical principle used, for those skilled in the art
It is any based on technical solutions of the utility model basis without departing substantially from the spirit and scope of the utility model for member
On equivalent transformation, simple replacement etc. it is obvious change, belong within scope of protection of the utility model.
Claims (6)
1. a kind of preassembling formula stone curtain wall, it is characterised in that: it includes prefabricated stone material curtain wall unit, in which: prefabricated stone material curtain
Wall unit includes steel joist, and steel joist hook is welded on the inside of steel joist, is equipped with aluminium alloy stone hanging on the outside of steel joist
Part is equipped with splash guard between hanging piece for stone and steel joist;The steel joist of prefabricated stone material curtain wall unit is articulated in main body knot
The fixation of prefabricated stone material curtain wall unit on the body construction is realized on pre-buried steel hanging seat on structure;Panel on the inside of stone panel
It is articulated on the hanging piece for stone of steel joist and realizes mounting of the stone panel on prefabricated stone material curtain wall unit.
2. preassembling formula stone curtain wall as described in claim 1, it is characterised in that:
The steel joist is formed by welding by column, crossbeam and diagonal brace.
3. preassembling formula stone curtain wall as claimed in claim 2, it is characterised in that:
The hanging piece for stone include on the outside of the steel joist on the crossbeam be spirally connected the first hanging seat of fixed L-type, first
Hanging seat and the second hanging seat of L-type are spirally connected fixation, and the panel on the stone panel is articulated on the second hanging seat.
4. preassembling formula stone curtain wall as claimed in claim 3, it is characterised in that:
The position that first hanging seat is connect with the transom bolt is equipped with for adjusting the vertical of the stone panel height
Slotted hole, second hanging seat and the bolted position of the first hanging seat are equipped with for adjusting the stone panel and institute
State the horizontal slotted hole of spacing between main structure.
5. preassembling formula stone curtain wall as described in claim 1, it is characterised in that:
The splash guard of the prefabricated stone material curtain wall unit above is described with the following prefabricated stone material curtain wall unit
Stitching portion between splash guard is sealed by sealant.
6. preassembling formula stone curtain wall as described in claim 1, it is characterised in that:
After the steel joist of the prefabricated stone material curtain wall unit is articulated on the steel hanging seat of the main structure, lead to
It crosses fastening bolt steel joist hook is fixed on the steel hanging seat.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822089125.2U CN209397796U (en) | 2018-12-12 | 2018-12-12 | Preassembling formula stone curtain wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822089125.2U CN209397796U (en) | 2018-12-12 | 2018-12-12 | Preassembling formula stone curtain wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209397796U true CN209397796U (en) | 2019-09-17 |
Family
ID=67894416
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822089125.2U Active CN209397796U (en) | 2018-12-12 | 2018-12-12 | Preassembling formula stone curtain wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209397796U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114412192A (en) * | 2022-01-20 | 2022-04-29 | 中铁三局集团建筑安装工程有限公司 | Interlayer complex special-shaped aluminum veneer curtain wall and construction method thereof |
CN115506517A (en) * | 2022-10-18 | 2022-12-23 | 中国建筑第八工程局有限公司 | A unitized stone curtain wall and its assembly method |
-
2018
- 2018-12-12 CN CN201822089125.2U patent/CN209397796U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114412192A (en) * | 2022-01-20 | 2022-04-29 | 中铁三局集团建筑安装工程有限公司 | Interlayer complex special-shaped aluminum veneer curtain wall and construction method thereof |
CN115506517A (en) * | 2022-10-18 | 2022-12-23 | 中国建筑第八工程局有限公司 | A unitized stone curtain wall and its assembly method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209397796U (en) | Preassembling formula stone curtain wall | |
CN105507539A (en) | Light external wall point-hang heat-insulation and decorative plate combined anchoring system and method for constructing same | |
CN101759098B (en) | Crane beam frame construction method | |
CN109372174A (en) | Hood type ceiling system and its construction method for steel structure truss roof system | |
CN104120811A (en) | Metal panel unitized curtain wall system | |
CN202280266U (en) | Dismounting type wind-proof shed for full-automatic welding operation | |
CN108060731A (en) | Overhang big all-wing aircraft type unitized curtain wall system and its installation method | |
CN208267190U (en) | A kind of big face stone material or artificial board curtain wall construction | |
CN208267265U (en) | A kind of assembled curtain wall decoration rod structure | |
JP6271399B2 (en) | Exterior wall panel mounting structure | |
CN108487528A (en) | A kind of big face stone material or artificial board curtain wall construction and method | |
CN107587635A (en) | The vertical bolt-type construction technique of exterior wall ceramic plate | |
CN107178153A (en) | A kind of steel building assembling type outer wall is combined big plate connector and installation method | |
CN209293173U (en) | Module-type steel structure trestle external verandahs | |
CN202148619U (en) | Double steel plate structure scissors wall | |
CN108756259A (en) | A kind of the auxiliary mounting assembly and installation method of large-scale steel structure component | |
CN205955292U (en) | Assembled octagon operating room | |
JP2020002668A (en) | Starter member, exterior wall and exterior wall construction method | |
CN109518844A (en) | Semi-unit type stone curtain wall structure and its construction method | |
CN205663072U (en) | Aluminium honeycomb welt stainless steel curtain | |
CN208329562U (en) | A kind of safety escalator on girder steel and base oneself upon platform | |
CN103031915B (en) | A kind of fastening devices of confining bed of open stone curtain wall | |
CN203603389U (en) | Sunshade decorative sheet plate | |
CN206779778U (en) | Draw and insert-type overhead welding platform | |
CN105804331A (en) | Stable and high-efficiency annular fixing structure for metal roof and working method of stable and high-efficiency annular fixing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |