CN209384604U - Up-side down triangle installation part and up-side down triangle mounting operation platform - Google Patents

Up-side down triangle installation part and up-side down triangle mounting operation platform Download PDF

Info

Publication number
CN209384604U
CN209384604U CN201822099291.0U CN201822099291U CN209384604U CN 209384604 U CN209384604 U CN 209384604U CN 201822099291 U CN201822099291 U CN 201822099291U CN 209384604 U CN209384604 U CN 209384604U
Authority
CN
China
Prior art keywords
brace
side down
triangle
installation part
down triangle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822099291.0U
Other languages
Chinese (zh)
Inventor
刘巍
梁雪梅
李志伟
张来全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beikong New Energy Engineering Co Ltd
Original Assignee
Beikong New Energy Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beikong New Energy Engineering Co Ltd filed Critical Beikong New Energy Engineering Co Ltd
Priority to CN201822099291.0U priority Critical patent/CN209384604U/en
Application granted granted Critical
Publication of CN209384604U publication Critical patent/CN209384604U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model provides a kind of up-side down triangle installation part, it is made of horizon bar, the first brace, the second brace and middle upright bar;Horizon bar, the first brace and the second brace are interconnected with one another composition isosceles triangle;Middle upright bar is fixed in triangle, and one end is connected with vertex of a triangle, and the other end is connected with triangle base midpoint.The utility model also provides a kind of up-side down triangle mounting operation platform, if it is built by several up-side down triangle installation parts and a block pedal.The middle upright bar of up-side down triangle installation part is fixed on live tubular pole by anchor ear;Pedal is laid between adjacent inverted triangle installation part.Up-side down triangle installation part structure provided by the utility model is simple, easy to manufacture, at low cost.The job platform construction efficiency built using the up-side down triangle installation part is high, biggish operation side is provided for installer, and operation side is big and steady, the risk of photovoltaic panel installation is greatly reduced, it is ensured that the safety of construction personnel, construction speed are fast.

Description

Up-side down triangle installation part and up-side down triangle mounting operation platform
Technical field
The utility model relates to a kind of up-side down triangle installation parts, and the up-side down triangle installation built using the installation part is made Industry platform.The utility model belongs to aerial work platform technical field.
Background technique
Solar energy is a kind of clean energy resource, and solar energy power generating does not consume fuel, pollution-free, low cost, and traditional Thermal power generation compare be a kind of most sustainable development, renewable energy generation technology, native land man advocates solar energy energetically Photovoltaic power generation.But the disadvantage of solar energy power generating is: it takes up a large area, so, to reduce occupied area, country It is required that must build agricultural greenhouse below solar energy photovoltaic panel or build fishing light complementation engineering (is fish i.e. below solar energy photovoltaic panel The pool).
Currently, most 4 meters of ground level of solar energy photovoltaic panel mounting distances or more, apart from 2 meters of water surface elevation or more. Land installation, worker generally use double ladder installation, and operation foothold is relatively narrow, and double ladder stability is bad, can not ensure construction Safety, while again because being constructed using double ladder, it needs repeatedly up and down, seriously to restrict construction speed;Double ladder is carried repeatedly, is added Big operation person works' load.To improve construction speed, job platform, this mounting means pair are also built using scaffold sometimes Levelling of the land degree requires height, and material lease amount is bigger, it is long to build land period, while also needing multiple special operation workers (scaffolder) is responsible for implementation, and installation cost is high, and unsuitable photovoltaic is constructed the fast feature of short frequency, and construction speed is difficult to ensure.The water surface Upper installation solar energy photovoltaic panel generallys use ship and builds operation at sea platform, and ship is influenced by water wave, is easy to jolt or be moved Dynamic, construction operation platform is unstable.The shallow region of water is met, ship is easy stranded.There are security risk height, construction speed is slowly waited and is lacked Point.
Utility model content
In view of the foregoing, the purpose of the utility model is to provide a kind of up-side down triangle installation parts, and fall three using this The up-side down triangle mounting operation platform that angel mountings are built.
To achieve the above object, the utility model uses following technical scheme: a kind of up-side down triangle installation part, it is by level Bar, the first brace, the second brace and middle upright bar are constituted;
The horizon bar, the first brace and the second brace are interconnected with one another composition isosceles triangle;The middle upright bar It is fixed on down in isosceles triangle, one end is connected with the vertex of isosceles triangle, the other end and the bottom edge of falling isosceles triangle Midpoint is connected.
Preferably, one end that one end of the middle upright bar is connected with the first brace and the second brace is connected;Middle upright bar it is another One end is connected with the midpoint of horizon bar.
Preferentially, the horizon bar, the first brace, the second brace and middle upright bar are each other using welding, fastener or spiral shell It tethers and connects.
In the preferred embodiment of the utility model, adopted between the horizon bar, the first brace, the second brace and middle upright bar It is fixedly connected with the mode of being fully welded.
Preferentially, the both ends of the horizon bar are equipped with guardrail, which is fixed on using welding, fastener or bolt mode The end of horizon bar.
The invention also discloses a kind of up-side down triangle mounting operation platform, it by several up-side down triangle installation parts and If a block pedal is built,
The up-side down triangle installation part is made of horizon bar, the first brace, the second brace and middle upright bar;The horizon bar, First brace and the second brace are interconnected with one another composition isosceles triangle;The middle upright bar is fixed on down isosceles triangle Interior, one end is connected with the vertex of isosceles triangle, and the other end is connected with the bottom edge of falling isosceles triangle midpoint;
The middle upright bar of the up-side down triangle installation part is fixed on live tubular pole by anchor ear;
The pedal is laid between the adjacent inverted triangle installation part.
The up-side down triangle mounting operation platform further includes several pieces of protective plates, which is mounted on the horizon bar both ends Guard rail position.
Detailed description of the invention
Fig. 1 is the utility model up-side down triangle installation part structural schematic diagram;
Fig. 2 is the utility model up-side down triangle installation part scheme of installation;
Fig. 3 is the utility model up-side down triangle mounting operation platform structural schematic diagram;
Fig. 4 is the utility model up-side down triangle mounting operation platform structural representation Fig. 2.
Specific embodiment
The structure of the utility model and feature are described in detail with reference to the accompanying drawings and examples.It needs to illustrate It is that disclosed embodiments can be made with various modifications, therefore, embodiment disclosed in specification should not be considered as to this The limitation of utility model, and only as the example of embodiment, the purpose is to keep the feature of the utility model apparent.
As shown in Figure 1, up-side down triangle installation part disclosed by the utility model is by horizon bar 1, the first brace 2, the second brace 3 It is constituted with middle upright bar 4.Horizon bar 1, the first brace 2 and the second brace 3 are fixed each other to constitute isosceles triangle.Middle upright bar 4 are fixed on down in isosceles triangle, and one end is connected with the vertex A of isosceles triangle, the other end and the bottom of falling isosceles triangle Side midpoint B is connected.As shown, one end A that one end of middle upright bar 4 is connected with the first brace 2 and the second brace 3 is connected;It is neutral The other end of bar 4 is connected with the midpoint B of horizon bar 1.
Horizon bar 1, the first brace 2 and the second brace 3 using welding, fastener or can be bolted each other.At this In the preferred embodiment of utility model, connect between the horizon bar 1 and the first brace 2, the second brace 3 using the mode that is fully welded is fixed It connects;It is also fixedly connected using being fully welded mode between first brace 2 and the second brace 3.
To improve construction efficiency, up-side down triangle installation part disclosed by the utility model can be finished in factory's overall package, existing Field installation.As shown in Fig. 2, being transported to construction site after up-side down triangle installation part factory overall package.In general, existing in construction Tubular pole 5 has been buried at interval of 3 meters in field, and the middle upright bar 4 of inverted triangle installation part is fixed on tubular pole 5 by anchor ear 6, entirely falls Triangle installation part is fixed on tubular pole.
As shown in figure 3, being laid with pedal 7 between adjacent inverted triangle installation part, that is, form job platform.
To guarantee safety, as shown in Figure 1, it can be separately installed with guardrail 8 at the both ends of up-side down triangle installation part horizon bar 1, The end that welding, fastener or bolt mode are fixed on horizon bar 1 can be used in the guardrail 8.
As shown in figure 4, protective plate 9 is installed at the guardrails of both sides 8 for the effect platform put up, to ensure that construction operation is pacified Entirely.
Up-side down triangle installation part structure provided by the utility model is simple, easy to manufacture, at low cost.Three are fallen using this The job platform construction efficiency that angel mountings are built is high, provides biggish operation side, construction operation for installer Face is big and steady, the risk of photovoltaic panel installation can be greatly reduced, it is ensured that the safety of construction personnel, construction cost is low, construction speed Fastly.
In addition, up-side down triangle installation part disclosed by the utility model is processed and formed at one time, it can have enough to meet the need and be used for multiple times, construction cost It reduces, material lease is less.The up-side down triangle mounting operation platform put up does not need worker's upper and lower and materials hauling repeatedly, subtracts Light operating personnel's workload.Up-side down triangle installation part is in addition to prefabricated processing needs welder to carry out, in-site installation common laborer It is achievable, special operation workers are put into and are reduced.
Finally, it should be noted that above-described each embodiment is merely to illustrate the technical solution of the utility model, rather than It is limited;Although the utility model is described in detail with reference to the foregoing embodiments, those skilled in the art It is understood that it can still modify to technical solution documented by previous embodiment, or to part of or whole Technical characteristic is equivalently replaced;And these modifications or substitutions, it does not separate the essence of the corresponding technical solution the utility model The range of each embodiment technical solution.

Claims (10)

1. a kind of up-side down triangle installation part, it is characterised in that: it is made of horizon bar, the first brace, the second brace and middle upright bar;
The horizon bar, the first brace and the second brace are interconnected with one another composition isosceles triangle;
The middle upright bar 4 is fixed on down in isosceles triangle, and one end is connected with the vertex of isosceles triangle, the other end with fall etc. Lumbar triangle shape bottom edge midpoint is connected.
2. up-side down triangle installation part according to claim 1, it is characterised in that: one end of the middle upright bar and the first brace The one end being connected with the second brace is connected;The other end of middle upright bar is connected with the midpoint of horizon bar.
3. up-side down triangle installation part according to claim 2, it is characterised in that: the horizon bar, the first brace, second are tiltedly Bar and middle upright bar using welding, fastener or are bolted each other.
4. up-side down triangle installation part according to claim 3, it is characterised in that: the horizon bar, the first brace, second are tiltedly It is fixedly connected between bar and middle upright bar using being fully welded mode.
5. up-side down triangle installation part described in one of -4 according to claim 1, it is characterised in that: install at the both ends of the horizon bar There is guardrail, which is fixed on the end of the horizon bar using welding, fastener or bolt mode.
6. a kind of up-side down triangle mounting operation platform, it is characterised in that: if it is stepped on by several up-side down triangle installation parts and a block Plate is built,
The up-side down triangle installation part is made of horizon bar, the first brace, the second brace and middle upright bar;The horizon bar, first Brace and the second brace are interconnected with one another composition isosceles triangle;The middle upright bar is fixed on down in isosceles triangle, One end is connected with the vertex of isosceles triangle, and the other end is connected with the bottom edge of falling isosceles triangle midpoint;
The middle upright bar of the up-side down triangle installation part is fixed on live tubular pole by anchor ear;
The pedal is laid between the adjacent up-side down triangle installation part.
7. up-side down triangle mounting operation platform according to claim 6, it is characterised in that: the horizon bar, the first brace, Second brace and middle upright bar using welding, fastener or are bolted each other.
8. up-side down triangle mounting operation platform according to claim 7, it is characterised in that: the horizon bar, the first brace, It is fixedly connected between second brace and middle upright bar using being fully welded mode.
9. the up-side down triangle mounting operation platform according to one of claim 6-8, it is characterised in that: the two of the horizon bar End is equipped with guardrail, which is fixed on the end of the horizon bar using welding, fastener or bolt mode.
10. up-side down triangle mounting operation platform according to claim 9, it is characterised in that: it further includes several pieces of protection Plate, the protective plate are mounted on the guard rail position at the horizon bar both ends.
CN201822099291.0U 2018-12-13 2018-12-13 Up-side down triangle installation part and up-side down triangle mounting operation platform Active CN209384604U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822099291.0U CN209384604U (en) 2018-12-13 2018-12-13 Up-side down triangle installation part and up-side down triangle mounting operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822099291.0U CN209384604U (en) 2018-12-13 2018-12-13 Up-side down triangle installation part and up-side down triangle mounting operation platform

Publications (1)

Publication Number Publication Date
CN209384604U true CN209384604U (en) 2019-09-13

Family

ID=67871875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822099291.0U Active CN209384604U (en) 2018-12-13 2018-12-13 Up-side down triangle installation part and up-side down triangle mounting operation platform

Country Status (1)

Country Link
CN (1) CN209384604U (en)

Similar Documents

Publication Publication Date Title
CN201953134U (en) Self supporting maritime wind measurement tower structure
CN206481251U (en) A kind of photovoltaic bracket device of use truss string structure beam
CN206204986U (en) A kind of civil construction retaining wall structure
CN203394685U (en) Lattice wind turbine tower and wind turbine generator system comprising same
CN205779502U (en) A kind of marine wind electric field vertical axis aerogenerator arch (bridge) type supporting construction
CN209384604U (en) Up-side down triangle installation part and up-side down triangle mounting operation platform
CN105790679A (en) Telescopic solar energy power generation device with lightning protection, wind power generation and light collecting mirror functions
CN205792361U (en) Anti-lightning strike band wind-power electricity generation and the telescopic device of solar generating of condenser lens
CN207720056U (en) Floatation type photovoltaic power station system
CN203701622U (en) Sliding construction device for garbage storage span roof trusses of large-scale garbage incineration power plant
CN207553565U (en) A kind of crosshead of truss
CN206801792U (en) A kind of stable triangular type tension leg type base plate
CN202248995U (en) Rapid integration communication device suitable for mountainous regions
CN207686323U (en) Diamond shape installation part and diamond shape mounting operation platform
CN104278689A (en) Foundation device shared by box-type transformer substation and wind power generation facility and construction method of foundation device
CN211645937U (en) Lightweight bridge ETC plane truss structure
CN209211742U (en) A kind of roof truss and roof with grid structure
CN206640531U (en) Solar energy kinetic hydraulic energy integration generating device
CN205945605U (en) Distributing type photovoltaic module ground mounting structure
CN220786084U (en) Photovoltaic installation construction platform on water
CN219932344U (en) Floating type fan foundation
CN206655778U (en) Marine anemometer tower
CN222272310U (en) Support structure of floating photovoltaic power generation system
CN207686243U (en) Inverted T shaped installation part and inverted T shaped mounting operation platform
CN202645879U (en) Steel frame on wind power generation bottom of wind tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant