CN209378749U - Flue gas dewhitening treatment device - Google Patents

Flue gas dewhitening treatment device Download PDF

Info

Publication number
CN209378749U
CN209378749U CN201920055854.8U CN201920055854U CN209378749U CN 209378749 U CN209378749 U CN 209378749U CN 201920055854 U CN201920055854 U CN 201920055854U CN 209378749 U CN209378749 U CN 209378749U
Authority
CN
China
Prior art keywords
flue gas
tower body
layer
spray
takes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920055854.8U
Other languages
Chinese (zh)
Inventor
戚秀云
张丽霞
孙洪志
王海军
张胜超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HARBIN WEILAN ENVIRONMENTAL PROTECTION EQUIPMENT MANUFACTURING Co Ltd
Original Assignee
HARBIN WEILAN ENVIRONMENTAL PROTECTION EQUIPMENT MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HARBIN WEILAN ENVIRONMENTAL PROTECTION EQUIPMENT MANUFACTURING Co Ltd filed Critical HARBIN WEILAN ENVIRONMENTAL PROTECTION EQUIPMENT MANUFACTURING Co Ltd
Priority to CN201920055854.8U priority Critical patent/CN209378749U/en
Application granted granted Critical
Publication of CN209378749U publication Critical patent/CN209378749U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

烟气脱白处理装置,属于环境治理技术领域。本实用新型为了解决现有工业废气脱白处理效果差,影响环境的问题。本实用新型包括塔体和塔座,塔体为圆形塔体,塔体的下端安装在塔座上,塔体的侧壁上具有烟气入气管和液体排出管,塔体的顶端具有气体排出口,塔体的内层由下至上依次布置有烟气喷淋层、烟气脱水除雾层和烟气吸附层,烟气喷淋层内安装有烟气喷淋装置,烟气脱水除雾层内安装有烟气除雾装置,烟气吸附层内安装有烟气吸附装置,烟气入气管与烟气喷淋装置连通,经由烟气入气管进入到塔体内的烟气依次进入烟气喷淋装置、烟气除雾装置和烟气吸附装置处理后,经过气体排出口排出。本实用新型能够有效提高空气质量,有利于减轻雾霾。

A flue gas dewhitening treatment device belongs to the technical field of environmental treatment. The utility model aims to solve the problem that the existing industrial waste gas has poor dewhitening treatment effect and affects the environment. The utility model comprises a tower body and a tower base, the tower body is a circular tower body, the lower end of the tower body is installed on the tower base, the side wall of the tower body has a smoke inlet pipe and a liquid discharge pipe, and the top of the tower body has a gas At the outlet, the inner layer of the tower body is arranged with a flue gas spraying layer, a flue gas dehydration and demisting layer, and a flue gas adsorption layer in sequence from bottom to top. A flue gas spraying device is installed in the flue gas spraying layer, and the flue gas dehydration A flue gas defogging device is installed in the fog layer, and a flue gas adsorption device is installed in the flue gas adsorption layer. After being treated by the gas spraying device, the flue gas demisting device and the flue gas adsorption device, it is discharged through the gas outlet. The utility model can effectively improve the air quality and is beneficial to lighten the haze.

Description

烟气脱白处理装置Flue gas dewhitening treatment device

技术领域technical field

本实用新型涉及烟气脱白处理装置,属于环境治理技术领域。The utility model relates to a flue gas dewhitening treatment device, which belongs to the technical field of environmental treatment.

背景技术Background technique

在我国火电、钢铁、建材、有色、水泥、玻璃、石化、焦化等行业,烟气脱硫大多采用湿法脱硫工艺,尤其以石灰石-石膏法、氨法脱硫等工艺为主。烟气经脱硫系统净化后,一般会形成45-55℃的低温饱和湿烟气。这些湿烟气经烟囱直接排入大气环境中,由于温度降低,部分气态水很快会和烟气中的污染物(粉尘、SO3气溶胶、NH3气溶胶、石膏浆液等)凝结成液滴,在烟囱周围形成雾状水汽。在阳光照射下发生散射,形成人们常说的“有色烟羽”,在不同视角下,一般呈现为白色、灰白色、蓝色或者黄色,严重时会在附近形成石膏雨或者氨逃逸。In my country's thermal power, steel, building materials, nonferrous metals, cement, glass, petrochemical, coking and other industries, wet desulfurization processes are mostly used for flue gas desulfurization, especially limestone-gypsum and ammonia desulfurization processes. After the flue gas is purified by the desulfurization system, it will generally form a low-temperature saturated wet flue gas at 45-55°C. The wet flue gas is directly discharged into the atmosphere through the chimney. Due to the temperature drop, part of the gaseous water will soon condense into liquid with the pollutants in the flue gas (dust, SO 3 aerosol, NH 3 aerosol, gypsum slurry, etc.) Drops, forming a mist of water vapor around the chimney. Scattering occurs under sunlight, forming what is often called a "colored plume". Under different viewing angles, it generally appears white, off-white, blue or yellow. In severe cases, it will form gypsum rain or ammonia escape nearby.

目前,各地火电领域、非电领域在推进超低排放的同时,已经将治理“有色烟羽”列入地方环保政策。At present, while promoting ultra-low emissions in thermal power and non-electric fields in various places, the control of "colored plume" has been included in local environmental protection policies.

有色烟羽会对周围居民生活造成困扰,环保局也经常会受到类似的投诉。因此许多配备湿法烟气脱硫装置的企业、把消除“白色烟羽”作为超低排放改造的重要内容之一。国电环境保护研究院调研了全国火电厂95座,涉及235台机组,在所有调研的122根烟囱中,有107根出现湿烟羽,占88%,未出现湿烟羽的电厂多采用半干法脱硫、烟气加热技术或“烟塔合一”技术。The colored smoke plume will cause troubles to the lives of the surrounding residents, and the Environmental Protection Agency often receives similar complaints. Therefore, many enterprises equipped with wet flue gas desulfurization devices regard the elimination of "white plume" as one of the important contents of ultra-low emission transformation. Guodian Environmental Protection Research Institute surveyed 95 thermal power plants across the country, involving 235 units. Of the 122 chimneys investigated, 107 had wet plumes, accounting for 88%. Power plants that did not have wet plumes mostly used semi-dry chimneys. desulfurization, flue gas heating technology or "tower integration" technology.

通常来讲,烟气经过脱硫脱硝除尘处理后,都已经达到了国家要求的排放标准,但有色烟羽的雾滴仍然夹带着氮氧化物、硫化物、各种烟尘颗粒物、SO3气溶胶、NH3气溶胶、超细结晶盐颗粒物等污染物,对烟气进行脱白处理,在脱除大部分雾滴同时,还可以脱除大量污染物,有利于减轻雾霾。Generally speaking, after desulfurization, denitrification and dust removal, the flue gas has reached the emission standard required by the state, but the droplets of the colored plume still carry nitrogen oxides, sulfides, various soot particles, SO 3 aerosols, Pollutants such as NH 3 aerosol and ultrafine crystalline salt particles are dewhitened for flue gas. While removing most of the fog droplets, it can also remove a large number of pollutants, which is conducive to reducing smog.

实用新型内容Utility model content

本实用新型针对现有技术中上述的不足,提供了烟气脱白处理装置。在下文中给出了关于本实用新型的简要概述,以便提供关于本实用新型的某些方面的基本理解。应当理解,这个概述并不是关于本实用新型的穷举性概述。它并不是意图确定本实用新型的关键或重要部分,也不是意图限定本实用新型的范围。The utility model provides a flue gas whitening treatment device aiming at the above-mentioned deficiencies in the prior art. A brief overview of the present invention is given below in order to provide a basic understanding of certain aspects of the present invention. It should be understood that this summary is not an exhaustive summary of the invention. It is not intended to identify the key or important part of the present invention, nor is it intended to limit the scope of the present invention.

本实用新型的技术方案:Technical scheme of the utility model:

烟气脱白处理装置,包括塔体和塔座,塔体为圆形塔体,塔体的下端安装在塔座上,塔体的侧壁上具有烟气入气管和液体排出管,塔体的顶端具有气体排出口,塔体的内层由下至上依次布置有烟气喷淋层、烟气脱水除雾层和烟气吸附层,烟气喷淋层内安装有烟气喷淋装置,烟气脱水除雾层内安装有烟气除雾装置,烟气吸附层内安装有烟气吸附装置,烟气入气管与烟气喷淋装置连通,经由烟气入气管进入到塔体内的烟气依次进入烟气喷淋装置、烟气除雾装置和烟气吸附装置处理后,经过气体排出口排出。The flue gas dewhitening treatment device includes a tower body and a tower base. The tower body is a circular tower body. The lower end of the tower body is installed on the tower base. There are flue gas inlet pipes and liquid discharge pipes on the side walls of the tower body. The top of the tower has a gas outlet, and the inner layer of the tower body is arranged in sequence from bottom to top with a smoke spray layer, a smoke dehydration and demisting layer, and a smoke adsorption layer, and a smoke spray device is installed in the smoke spray layer. A flue gas demisting device is installed in the flue gas dehydration and demisting layer, and a flue gas adsorption device is installed in the flue gas adsorption layer. The flue gas inlet pipe is connected with the flue gas spraying device, and the flue gas entering the tower body is After the gas enters the flue gas spraying device, the flue gas demisting device and the flue gas adsorption device in sequence, it is discharged through the gas outlet.

进一步地、所述的烟气喷淋装置包括烟气流通箱体、喷淋管、喷淋头和连通管,所述的烟气流通箱体内部中心位置安装有多个喷淋管,相邻的两个喷淋管通过连通管建立连通,所述的烟气流通箱体的侧壁上安装有喷淋液接管,喷淋液接管与连通管建立连通,所述的喷淋管的外壁交错安装有多个喷淋头,烟气流通箱体的进气口与烟气入气管连通,烟气流通箱体的出气口与塔体内部连通。Further, the flue gas spraying device includes a flue gas circulation box, a spray pipe, a spray head and a connecting pipe, and a plurality of spray pipes are installed at the center of the interior of the flue gas circulation box, adjacent to each other. The two spray pipes are connected through the connecting pipe, the side wall of the flue gas circulation box is installed with a spray liquid connecting pipe, the spray liquid connecting pipe is connected with the connecting pipe, and the outer walls of the spray pipes are staggered A plurality of spray heads are installed, the air inlet of the flue gas circulation box communicates with the flue gas inlet pipe, and the gas outlet of the flue gas circulation box communicates with the inside of the tower body.

进一步地、所述的烟气流通箱体包括箱本体和箱盖板,箱盖板扣装在箱本体上,箱盖板的横截面采用弯曲成复合抛物面形状。Further, the flue gas circulation box includes a box body and a box cover plate, the box cover plate is buckled on the box body, and the cross section of the box cover plate is bent into a compound paraboloid shape.

进一步地、所述的烟气除雾装置包括支撑梁、轴承座、传动轴、从动皮带轮、烟气除雾转轮体、转动电机和主动皮带轮,所述的支撑梁安装在塔体的内壁上,支撑梁的中心位置安装有轴承座,所述的轴承座内部安装有传动轴,传动轴的一端安装有从动皮带轮,传动轴的另一端安装有烟气除雾转轮体,所述的塔体外侧壁上还安装有转动电机,转动电机的输出轴上安装有主动皮带轮,主动皮带轮通过皮带与从动皮带轮建立安装。Further, the flue gas demisting device includes a supporting beam, a bearing seat, a transmission shaft, a driven pulley, a flue gas defogging wheel body, a rotating motor and a driving pulley, and the supporting beam is installed on the inner wall of the tower body Above, a bearing seat is installed at the center of the support beam, a drive shaft is installed inside the bearing seat, a driven pulley is installed at one end of the drive shaft, and a smoke defogging wheel body is installed at the other end of the drive shaft. A rotating motor is also installed on the outer wall of the tower body, and a driving pulley is installed on the output shaft of the rotating motor, and the driving pulley is installed by a belt and a driven pulley.

进一步地、所述的烟气除雾转轮体包括上板、下板和轮片,上板和下板均为圆形板体,上板和下板形成一个雾气处理空腔,雾气处理空腔内部安装有折弯状的波纹板,所述的上板上呈逆时针布置有多个轮片,在上板的板体上加工有气体流通入口,下板的板体上加工有气体流通出口。Further, the described flue gas defogging wheel body includes an upper plate, a lower plate and a wheel piece, the upper plate and the lower plate are circular plates, the upper plate and the lower plate form a mist treatment cavity, and the mist treatment cavity A bent corrugated plate is installed inside the cavity, and the upper plate is arranged with a plurality of wheels counterclockwise. The upper plate is processed with a gas flow inlet, and the lower plate is processed with a gas flow inlet. Export.

进一步地、所述的轮片包括轮片根部、轮片弧形部和轮片顶部,轮片的厚度沿径向方向从轮片根部至轮片顶部呈减薄趋势。Further, the wheel includes a root of the wheel, an arc portion of the wheel and a top of the wheel, and the thickness of the wheel tends to decrease from the root of the wheel to the top of the wheel in the radial direction.

进一步地、所述的气体流通入口设在相邻两个轮片之间。Further, the gas circulation inlet is provided between two adjacent wheels.

进一步地、所述的塔体的底端安装有一个倾斜设置的导流板。Further, the bottom end of the tower body is installed with an inclined deflector.

进一步地、所述的烟气吸附装置包括圆形吸附箱,圆形吸附箱的上下端面加工有若干通气孔,圆形吸附箱的内部装有活性炭。Further, the flue gas adsorption device includes a circular adsorption box, the upper and lower ends of the circular adsorption box are processed with a number of ventilation holes, and the inside of the circular adsorption box is equipped with activated carbon.

烟气脱白处理方法,包括以下步骤:The flue gas dewhitening treatment method comprises the following steps:

步骤一、烟气进入烟气喷淋装置中通过与碱液进行充分混合接触并发生化学反应,去除烟气中的NO2、SO2、HCl、HF酸性气体和可溶性有机气体;Step 1. The flue gas enters the flue gas spraying device and is fully mixed and contacted with lye and undergoes a chemical reaction to remove NO 2 , SO 2 , HCl, HF acid gas and soluble organic gas in the flue gas;

步骤二、经过步骤一处理的烟气进入到烟气除雾装置内,通过烟气除雾装置减小排烟中的水分;Step 2. The flue gas processed in step 1 enters the flue gas demisting device, and the moisture in the exhaust gas is reduced through the flue gas demisting device;

步骤三、经过步骤二处理的烟气进入烟气吸附装置,在烟气吸附装置的作用下去除经过步骤一和步骤二处理后,烟气中残余夹带的氮氧化物、硫化物、各种烟尘颗粒物、SO3 气溶胶、NH3气溶胶、超细结晶盐颗粒物。Step 3. The flue gas treated in step 2 enters the flue gas adsorption device, and under the action of the flue gas adsorption device, the residual nitrogen oxides, sulfides, and various dusts entrained in the flue gas after the treatment in step 1 and step 2 are removed. Particulate matter, SO 3 aerosol, NH 3 aerosol, ultrafine crystalline salt particles.

步骤四、经过步骤三处理后的烟气自塔体的气体排出口排出。Step 4: The flue gas treated in Step 3 is discharged from the gas outlet of the tower body.

本实用新型具有以下有益效果:The utility model has the following beneficial effects:

1、本实用新型依次通过烟气喷淋处理、雾气处理和吸附处理三种方式实现烟气脱白,其中烟气喷淋处理装置的结构,能够充分将烟气与碱液进行充分混合,实现化学反应,去除烟气中的NO2、SO2、HCl、HF酸性气体和可溶性有机气体;1. The utility model realizes flue gas dewhitening through three methods of flue gas spray treatment, mist treatment and adsorption treatment in sequence. The structure of the flue gas spray treatment device can fully mix the flue gas and lye to realize Chemical reaction to remove NO 2 , SO 2 , HCl, HF acid gas and soluble organic gas in flue gas;

2、本实用新型具有结构简单、紧凑,运行故障率低,运行稳定可靠且费用低,有利于减少企业的资金投入,提高企业的经济效益;2. The utility model has the advantages of simple and compact structure, low operation failure rate, stable and reliable operation and low cost, which is conducive to reducing the capital investment of enterprises and improving the economic benefits of enterprises;

3、本实用新型可以彻底净化烷类、芳香烃类、酸酯类、醛类物质的排放,有效提高人们对空气质量的要求;3. The utility model can thoroughly purify the emissions of alkanes, aromatic hydrocarbons, esters, and aldehydes, effectively improving people's requirements for air quality;

4、本实用新型的烟气除雾装置能够分离并回收烟气带入大气的水分,回收大量宝贵的水资源。4. The flue gas defogging device of the utility model can separate and recover the moisture brought into the atmosphere by the flue gas, and recover a large amount of precious water resources.

附图说明Description of drawings

图1是本实用新型整体结构布置图;Fig. 1 is the overall structural layout diagram of the utility model;

图2是烟气喷淋装置的结构示意图;Fig. 2 is a structural schematic diagram of the flue gas spraying device;

图3是烟气除雾转轮体的结构视图;Fig. 3 is a structural view of the flue gas demisting runner body;

图4是烟气除雾转轮体的侧剖图;Fig. 4 is a side sectional view of the flue gas demisting runner body;

图5是下板与波纹板的结构安装示意图;Fig. 5 is a schematic diagram of the structural installation of the lower plate and the corrugated plate;

图6是烟气吸附装置的结构示意图;Fig. 6 is a schematic structural view of the smoke adsorption device;

图中:1-塔体,2-塔座,3-烟气入气管,4-液体排出管,5-气体排出口,6-烟气喷淋层,7-烟气脱水除雾层,8-烟气吸附层,9-烟气喷淋装置,10-烟气除雾装置,11-烟气吸附装置,12-烟气流通箱体,13-喷淋管,14喷淋头,15-连通管,16-喷淋液接管,17-支撑梁,18-轴承座,19-传动轴,20-从动皮带轮,21-烟气除雾转轮体,22-转动电机,23- 主动皮带轮,24-上板,25-下板,26-轮片,27-雾气处理空腔,28-波纹板,29-气体流通入口,30-气体流通出口,31-轮片根部,32-轮片弧形部,33-轮片顶部,34-导流板,35-圆形吸附箱,36-通气孔,121-箱本体,122-箱盖板。In the figure: 1- tower body, 2- tower base, 3- flue gas inlet pipe, 4- liquid discharge pipe, 5- gas outlet, 6- flue gas spray layer, 7- flue gas dehydration and defogging layer, 8 - Smoke adsorption layer, 9 - smoke spraying device, 10 - smoke demisting device, 11 - smoke adsorption device, 12 - smoke circulation box, 13 - spray pipe, 14 spray head, 15 - Connecting pipe, 16-spray liquid connection pipe, 17-support beam, 18-bearing seat, 19-transmission shaft, 20-driven pulley, 21-smoke defogging wheel body, 22-rotating motor, 23-driving pulley , 24-upper plate, 25-lower plate, 26-wheel piece, 27-mist treatment cavity, 28-corrugated plate, 29-gas flow inlet, 30-gas flow outlet, 31-wheel root, 32-wheel Arc portion, 33-wheel top, 34-deflector, 35-circular adsorption box, 36-air vent, 121-box body, 122-box cover plate.

具体实施方式Detailed ways

具体实施方式一:结合图1-图6说明本实施方式,本实施方式的烟气脱白处理装置,包括塔体1和塔座2,塔体1为圆形塔体,塔体1的下端安装在塔座2上,塔体1的侧壁上具有烟气入气管3和液体排出管4,塔体1的顶端具有气体排出口5,塔体1的内层由下至上依次布置有烟气喷淋层6、烟气脱水除雾层7和烟气吸附层8,烟气喷淋层6内安装有烟气喷淋装置9,烟气脱水除雾层7内安装有烟气除雾装置10,烟气吸附层8内安装有烟气吸附装置11,烟气入气管3与烟气喷淋装置9连通,经由烟气入气管3进入到塔体1内的烟气依次进入烟气喷淋装置9、烟气除雾装置10和烟气吸附装置11处理后,经过气体排出口5排出。如此设置,工业排放的烟气经过烟气入气管3进入到塔体1内,经过烟气喷淋装置9喷淋,使之烟气中的NO2、SO2、HCl、HF等酸性气体和可溶性有机气体与烟气喷淋装置9喷出的处理液(碱液)发生化学反应去除有害物,经过处理后的烟气由烟气喷淋装置9排出,并进入烟气脱水除雾层7的烟气除雾装置10内,实现烟气与水分的脱离,有效减少排出空气内部的烟气掺杂有大量的水分,经过脱水处理后的烟气随后进入到烟气吸附层8经过烟气吸附装置11吸附处理后,去除了粉尘、SO3气溶胶、 NH3气溶胶、石膏浆液等烟气中掺杂的污染物,进而实现了烟气的脱白处理。Specific Embodiment 1: This embodiment is described in conjunction with FIGS. 1-6 . The flue gas dewhitening treatment device of this embodiment includes a tower body 1 and a tower base 2. The tower body 1 is a circular tower body. The lower end of the tower body 1 Installed on the tower base 2, the side wall of the tower body 1 has a flue gas inlet pipe 3 and a liquid discharge pipe 4, the top of the tower body 1 has a gas outlet 5, and the inner layer of the tower body 1 is arranged in sequence from bottom to top. Gas spraying layer 6, flue gas dehydration and defogging layer 7 and flue gas adsorption layer 8, flue gas spraying device 9 is installed in the flue gas spraying layer 6, and flue gas demisting is installed in the flue gas dehydration and defogging layer 7 Device 10, a smoke adsorption device 11 is installed in the smoke adsorption layer 8, the smoke gas inlet pipe 3 communicates with the smoke gas spraying device 9, and the flue gas entering the tower body 1 through the smoke gas inlet pipe 3 enters the flue gas in sequence After being treated by the spraying device 9 , the flue gas demisting device 10 and the flue gas adsorption device 11 , it is discharged through the gas outlet 5 . In this way, the flue gas discharged from the industry enters the tower body 1 through the flue gas inlet pipe 3, and is sprayed by the flue gas spraying device 9, so that acid gases such as NO 2 , SO 2 , HCl, HF in the flue gas and The soluble organic gas reacts chemically with the treatment liquid (lye) sprayed by the flue gas spraying device 9 to remove harmful substances, and the treated flue gas is discharged from the flue gas spraying device 9 and enters the flue gas dehydration and defogging layer 7 In the flue gas demisting device 10, the separation of flue gas and moisture is realized, and the flue gas inside the exhaust air is effectively reduced to be mixed with a large amount of water. After the dehydration treatment, the flue gas then enters the flue gas adsorption layer 8 and passes through the flue gas After the adsorption treatment by the adsorption device 11, pollutants doped in the flue gas such as dust, SO 3 aerosol, NH 3 aerosol, and gypsum slurry are removed, thereby realizing the dewhitening treatment of the flue gas.

具体实施方式二:结合图1-图6说明本实施方式,本实施方式的烟气脱白处理装置,所述的烟气喷淋装置9包括烟气流通箱体12、喷淋管13、喷淋头14和连通管15,所述的烟气流通箱体12内部中心位置安装有多个喷淋管13,相邻的两个喷淋管13通过连通管15建立连通,所述的烟气流通箱体12的侧壁上安装有喷淋液接管16,喷淋液接管16 与连通管15建立连通,所述的喷淋管13的外壁交错安装有多个喷淋头14,烟气流通箱体12的进气口与烟气入气管3连通,烟气流通箱体12的出气口与塔体1内部连通。如此设置,为了充分说明烟气流通箱体12和喷淋管13的安装,本实施方式作出如下说明:Specific embodiment two: this embodiment is described in conjunction with Fig. 1-Fig. The shower head 14 and the communication pipe 15. A plurality of shower pipes 13 are installed in the center of the flue gas circulation box 12. Two adjacent spray pipes 13 are connected through the communication pipe 15. The flue gas The side wall of the circulation box 12 is installed with a spray liquid connection pipe 16, which establishes communication with the communication pipe 15, and the outer wall of the spray pipe 13 is staggered with a plurality of spray heads 14, so that the smoke flows The air inlet of the box body 12 communicates with the flue gas inlet pipe 3 , and the gas outlet of the flue gas circulation box body 12 communicates with the inside of the tower body 1 . In this way, in order to fully explain the installation of the flue gas circulation box 12 and the spray pipe 13, this embodiment makes the following description:

首先,烟气流通箱体12为圆形箱体,烟气流通箱体12的侧壁采用焊接方式焊接固定在塔体1的内壁上;其次,喷淋管13焊接在烟气流通箱体12的内壁上,且相邻的喷淋管 12通过连通管15连通,连通管15与喷淋液接管16,在实现处理液喷淋时,通过外设在塔体1外侧的泵体将处理液抽取到喷淋管13内,并加压,进而实现喷淋作业;First, the flue gas circulation box 12 is a circular box, and the side wall of the flue gas circulation box 12 is welded and fixed on the inner wall of the tower body 1 by welding; secondly, the spray pipe 13 is welded to the flue gas circulation box 12 and the adjacent spray pipe 12 communicates through the communication pipe 15, the communication pipe 15 and the spray liquid connection pipe 16, when the treatment liquid is sprayed, the treatment liquid is pumped by the pump outside the tower body 1 Extract it into the spray pipe 13 and pressurize it to realize the spray operation;

为了更进一步的说明本实施方式二,如图1所示,烟气流通箱体12在塔体中的布置方式为倾斜布置,这种倾斜布置方式便于烟气在烟气流通箱体12内的流通,同时采用倾斜的方式减缓了烟气的流速,增大了烟气与处理液的接触时间,进而使得烟气中混杂的有害物质充分与喷淋管喷出的碱液接触,更加充分的实现化学反应,去除烟气中有害杂质。In order to further illustrate the second embodiment, as shown in Figure 1, the arrangement of the flue gas circulation box 12 in the tower body is an inclined arrangement, which facilitates the flow of flue gas in the flue gas circulation box 12. At the same time, the flow velocity of the flue gas is slowed down by an inclined method, and the contact time between the flue gas and the treatment liquid is increased, so that the harmful substances mixed in the flue gas can fully contact with the lye sprayed from the spray pipe, and the Realize chemical reaction and remove harmful impurities in flue gas.

具体实施方式三:结合图1-图6说明本实施方式,本实施方式的烟气脱白处理装置,所述的烟气流通箱体12包括箱本体121和箱盖板122,箱盖板122扣装在箱本体121上,箱盖板122的横截面采用弯曲成复合抛物面形状。如此设置,箱盖板122的横截面采用弯曲成复合抛物面形状设计的优点如下:Specific embodiment three: this embodiment is described in conjunction with Fig. 1-Fig. Buckled on the box body 121, the cross section of the box cover plate 122 is bent into a compound paraboloid shape. So set, the cross-section of the box cover plate 122 adopts the advantages of being bent into a compound paraboloid shape design as follows:

1、烟气进入烟气流通箱体12后,在复合抛物面形状的箱盖板122作用下,烟气被聚集在喷淋管13外周围,在喷淋管13喷出处理液后,烟气能够与处理液充分接触反应,增大了烟气中有害气体的处理效果,节省处理时间;1. After the flue gas enters the flue gas circulation box 12, under the action of the compound parabolic-shaped box cover 122, the flue gas is gathered around the spray pipe 13, and after the spray pipe 13 sprays the treatment liquid, the flue gas It can fully contact and react with the treatment liquid, which increases the treatment effect of harmful gases in the flue gas and saves treatment time;

2、由于箱盖板122采用复合抛物面形状,因此其箱盖板122的顶端也形成了一个导流槽形状结构,这样在烟气除雾装置10实现烟气中水分分离后的水滴散落在箱盖板122 的顶部,有利于水滴顺着箱盖板122顶端形成的导流槽流到塔体1的底部。2. Since the tank cover 122 adopts a compound paraboloid shape, a diversion groove structure is also formed on the top of the tank cover 122, so that the water droplets after the separation of moisture in the flue gas by the flue gas demisting device 10 are scattered on the tank. The top of the cover plate 122 is beneficial for water droplets to flow to the bottom of the tower body 1 along the diversion groove formed on the top of the tank cover plate 122 .

具体实施方式四:结合图1-图6说明本实施方式,本实施方式的烟气脱白处理装置,所述的烟气除雾装置10包括支撑梁17、轴承座18、传动轴19、从动皮带轮20、烟气除雾转轮体21、转动电机22和主动皮带轮23,所述的支撑梁安装在塔体1的内壁上,支撑梁17的中心位置安装有轴承座18,所述的轴承座18内部安装有传动轴19,传动轴19 的一端安装有从动皮带轮20,传动轴19的另一端安装有烟气除雾转轮体21,所述的塔体 1外侧壁上还安装有转动电机22,转动电机22的输出轴上安装有主动皮带轮23,主动皮带轮23通过皮带与从动皮带轮20建立安装;所述的烟气除雾转轮体21包括上板24、下板25和轮片26,上板24和下板25均为圆形板体,上板24和下板25形成一个雾气处理空腔27,雾气处理空腔27内部安装有折弯状的波纹板28,所述的上板24上呈逆时针布置有多个轮片26,在上板24的板体上加工有气体流通入口29,下板25的板体上加工有气体流通出口30。如此设置,相邻的两个轮片26之间形成了一个气道,便于经过喷淋处理后的烟气通入,同时采用轮片式的烟气除雾转轮体21结构设计带来的优点如下:Specific Embodiment Four: This embodiment is described in conjunction with Fig. 1-Fig. The moving pulley 20, the smoke demisting wheel body 21, the rotating motor 22 and the driving pulley 23, the support beam is installed on the inner wall of the tower body 1, and the center position of the support beam 17 is equipped with a bearing seat 18. A transmission shaft 19 is installed inside the bearing seat 18, a driven pulley 20 is installed on one end of the transmission shaft 19, and a smoke defogging runner body 21 is installed on the other end of the transmission shaft 19, and the outer wall of the tower body 1 is also installed There is a rotating motor 22, a driving pulley 23 is installed on the output shaft of the rotating motor 22, and the driving pulley 23 is installed with the driven pulley 20 through a belt; the described smoke demist runner body 21 includes an upper plate 24 and a lower plate 25 And the wheel 26, the upper plate 24 and the lower plate 25 are circular plates, the upper plate 24 and the lower plate 25 form a mist treatment cavity 27, and the inside of the mist treatment cavity 27 is equipped with a bent corrugated plate 28, The upper plate 24 is provided with a plurality of wheels 26 counterclockwise, the upper plate 24 is processed with a gas circulation inlet 29 , and the lower plate 25 is processed with a gas circulation outlet 30 . In such a setting, an air passage is formed between two adjacent wheels 26, which facilitates the passage of the flue gas after spraying treatment, and at the same time adopts the structural design of the wheel-type flue gas demisting runner body 21. The advantages are as follows:

1、轮片26能够增大塔体1内的气体旋流,进而增大烟气中水分分离处理效率;1. The wheel piece 26 can increase the gas swirl in the tower body 1, thereby increasing the efficiency of moisture separation in the flue gas;

2、轮片26能够增大喷淋处理后掺杂在烟气中的雾水击打面积,经过击打的雾水在轮片上形成水滴,并降落到塔体1的塔底,随后经液体排出管4排出;2. The wheel 26 can increase the hitting area of the mist mixed in the flue gas after the spray treatment, and the hit mist forms water droplets on the wheel, and falls to the bottom of the tower body 1, and then passes through the liquid Discharge pipe 4 discharges;

3、在下板26的板体上加工有气体流通出口30,经过轮片26的烟气进入到雾气处理空腔27内部,并经过烟气除雾转轮体21转动作用下,烟气中掺杂的雾水经过波纹板22 的不断击打作用下不断结合,形成水滴,并顺轮片26再次流入塔内,为此实现了烟气脱水处理。3. A gas circulation outlet 30 is processed on the body of the lower plate 26. The flue gas passing through the wheel 26 enters the inside of the mist treatment cavity 27, and under the action of the rotation of the flue gas demisting runner body 21, the flue gas is mixed with Miscellaneous mist water is continuously combined under the continuous impact of the corrugated plate 22 to form water droplets, and flows into the tower again along the wheel blade 26, thereby realizing the dehydration treatment of the flue gas.

具体实施方式五:结合图1-图6说明本实施方式,本实施方式的烟气脱白处理装置,所述的轮片26包括轮片根部31、轮片弧形部32和轮片顶部33,轮片的厚度沿径向方向从轮片根部31至轮片顶部33呈减薄趋势。如此设置,轮片26包括轮片根部31、轮片弧形部32和轮片顶部33,轮片26的结构设计能够实现气体变成液体过程的与轮片全面接触撞击,经过撞击形成的水滴可顺轮片26再次流入塔内,便于液态水的回收利用。Specific embodiment five: This embodiment is described in conjunction with Fig. 1-Fig. 6, the flue gas dewhitening treatment device of this embodiment, the wheel 26 includes the root 31 of the wheel, the arc portion 32 of the wheel and the top 33 of the wheel , the thickness of the wheel shows a thinning trend from the root 31 of the wheel to the top 33 of the wheel along the radial direction. Set in this way, the wheel 26 includes the root 31, the arc 32 and the top 33 of the wheel. The structural design of the wheel 26 can realize the full contact and impact of the gas into the liquid, and the water droplets formed after the impact It can flow into the tower again along the wheel blade 26, which is convenient for the recycling of liquid water.

具体实施方式六:结合图1-图6说明本实施方式,本实施方式的烟气脱白处理装置,所述的气体流通入口29设在相邻两个轮片26之间。Embodiment 6: This embodiment is described with reference to FIGS. 1-6 . In the flue gas dewhitening treatment device of this embodiment, the gas circulation inlet 29 is provided between two adjacent wheel pieces 26 .

具体实施方式七:结合图1-图6说明本实施方式,本实施方式的烟气脱白处理装置,所述的塔体1的底端安装有一个倾斜设置的导流板34。如此设置,塔底具有倾斜导流板34的作用是具有一个导向的作用,便于脱离的水分向排出口方向流动,提高排出速度和排出效果。Embodiment 7: This embodiment is described with reference to FIGS. 1-6 . In the flue gas dewhitening treatment device of this embodiment, an oblique deflector 34 is installed at the bottom of the tower body 1 . So set, the role of the inclined deflector 34 at the bottom of the tower is to have a guiding effect, to facilitate the detached water to flow toward the discharge port, and to improve the discharge speed and discharge effect.

具体实施方式八:结合图1-图6说明本实施方式,本实施方式的烟气脱白处理装置,所述的烟气吸附装置11包括圆形吸附箱35,圆形吸附箱35的上下端面加工有若干通气孔36,圆形吸附箱35的内部装有活性炭。如此设置,圆形吸附箱35的内部装有活性炭能够吸收经过处理后仍掺杂在烟气中的粉尘、SO3气溶胶、NH3气溶胶、石膏浆液等影响空气质量的残留污染物。Embodiment 8: This embodiment is described in conjunction with FIGS. 1-6 . The flue gas dewhitening treatment device of this embodiment, the flue gas adsorption device 11 includes a circular adsorption box 35, and the upper and lower end surfaces of the circular adsorption box 35 Processing has some ventilation holes 36, and the inside of circular adsorption box 35 is equipped with gac. So set, the inside of the circular adsorption box 35 is equipped with activated carbon, which can absorb the dust, SO3 aerosol, NH3 aerosol , gypsum slurry and other residual pollutants that affect the air quality that are still mixed in the flue gas after treatment.

具体实施方式九:结合图1-图6说明本实施方式,本实施方式的烟气脱白处理装置,烟气脱白处理方法,包括以下步骤:Ninth specific embodiment: This embodiment is described in conjunction with Figures 1-6. The flue gas dewhitening treatment device and the flue gas dewhitening treatment method of this embodiment include the following steps:

步骤一、烟气进入烟气喷淋装置9中通过与碱液进行充分混合接触并发生化学反应,去除烟气中的NO2、SO2、HCl、HF酸性气体和可溶性有机气体;Step 1. The flue gas enters the flue gas spraying device 9 and is fully mixed and contacted with lye and undergoes a chemical reaction to remove NO 2 , SO 2 , HCl, HF acid gas and soluble organic gas in the flue gas;

步骤二、经过步骤一处理的烟气进入到烟气除雾装置10内,通过烟气除雾装置10减小排烟中的水分;Step 2, the flue gas processed in step 1 enters the flue gas demisting device 10, and the moisture in the exhausted smoke is reduced through the flue gas demisting device 10;

步骤三、经过步骤二处理的烟气进入烟气吸附装置11,在烟气吸附装置11的作用下去除经过步骤一和步骤二处理后,烟气中残余夹带的氮氧化物、硫化物、各种烟尘颗粒物、 SO3气溶胶、NH3气溶胶、超细结晶盐颗粒物。Step 3: The flue gas treated in step 2 enters the flue gas adsorption device 11, and under the action of the flue gas adsorption device 11, the residual nitrogen oxides, sulfides, and various A variety of soot particles, SO 3 aerosol, NH 3 aerosol, ultrafine crystalline salt particles.

步骤四、经过步骤三处理后的烟气自塔体1的气体排出口5排出。Step 4: The flue gas treated in Step 3 is discharged from the gas outlet 5 of the tower body 1 .

本实施方式只是对本专利的示例性说明,并不限定它的保护范围,本领域技术人员还可以对其局部进行改变,只要没有超出本专利的精神实质,都在本专利的保护范围内。This embodiment is only an exemplary description of this patent, and does not limit its protection scope. Those skilled in the art can also make partial changes to it, as long as it does not exceed the spirit and essence of this patent, all within the protection scope of this patent.

Claims (9)

1. flue gas takes off white processing unit, it is characterised in that: including tower body (1) and tower seat (2), tower body (1) is round tower body, tower body (1) lower end is mounted on tower seat (2), on the side wall of tower body (1) there is flue gas to enter tracheae (3) and liquid discharge tube (4), tower body (1) top has gas discharge outlet (5), and the internal layer of tower body (1) has been sequentially arranged flue gas spraying layer (6), flue gas from the bottom to top Dehydrating demisting layer (7) and flue gas adsorption layer (8), flue gas spraying layer (6) is interior to be equipped with flue gas spray equipment (9), and fume-dehydrating removes It is equipped with flue gas demister (10) in mist layer (7), flue gas adsorption device (11) is installed in flue gas adsorption layer (8), flue gas enters Tracheae (3) is connected to flue gas spray equipment (9), is entered the flue gas that tracheae (3) enters in tower body (1) via flue gas and is sequentially entered cigarette After gas blowout shower device (9), flue gas demister (10) and flue gas adsorption device (11) processing, it is discharged by gas discharge outlet (5).
2. flue gas according to claim 1 takes off white processing unit, it is characterised in that: flue gas spray equipment (9) packet Flue gas circulation cabinet (12), spray tube (13), spray head (14) and communicating pipe (15) are included, flue gas circulation cabinet (12) is interior Portion center is equipped with multiple spray tubes (13), and two adjacent spray tubes (13) establish connection, institute by communicating pipe (15) Spray liquid adapter tube (16) is installed, spray liquid adapter tube (16) is built with communicating pipe (15) on the side wall for flue gas circulation cabinet (12) stated Vertical connection, the outer wall of the spray tube (13) are interleaved and installed with multiple spray heads (14), the air inlet of flue gas circulation cabinet (12) Mouth enters tracheae (3) with flue gas and is connected to, and is connected to inside the gas outlet of flue gas circulation cabinet (12) and tower body (1).
3. flue gas according to claim 2 takes off white processing unit, it is characterised in that: flue gas circulation cabinet (12) packet Case ontology (121) and cover plate (122) are included, cover plate (122) spiral-lock is on case ontology (121), the cross section of cover plate (122) Using bending to composite parabolic shape.
4. flue gas according to claim 1 takes off white processing unit, it is characterised in that: flue gas demister (10) packet Include supporting beam (17), bearing block (18), transmission shaft (19), driven pulley (20), flue gas demisting web (21), rotary electric machine (22) it is mounted on the inner wall of tower body (1) with drive pulley (23), the supporting beam, the center peace of supporting beam (17) Is equipped with transmission shaft (19) equipped with bearing block (18), inside the bearing block (18), one end of transmission shaft (19) be equipped with from Dynamic belt pulley (20), the other end of transmission shaft (19) are equipped with flue gas demisting web (21), on the tower body (1) lateral wall It is also equipped with rotary electric machine (22), drive pulley (23), drive pulley is installed on the output shaft of rotary electric machine (22) (23) it is established and is installed by belt and driven pulley (20).
5. flue gas according to claim 4 takes off white processing unit, it is characterised in that: the flue gas demisting web (21) Including upper plate (24), lower plate (25) and wheel piece (26), upper plate (24) and lower plate (25) are round plate body, upper plate (24) and lower plate (25) fog processing cavity (27) is formed, the corrugated plating (28) of bending-like, institute are installed inside fog processing cavity (27) In multiple wheel pieces (26) are disposed with counterclockwise on the upper plate (24) stated, gas circulation entrance is machined on the plate body of upper plate (24) (29), gas flow outlets (30) are machined on the plate body of lower plate (25).
6. flue gas according to claim 5 takes off white processing unit, it is characterised in that: the wheel piece (26) includes wheel piece root At the top of portion (31), wheel piece curved portion (32) and wheel piece (33), the thickness of piece is taken turns radially from wheel piece root (31) to wheel piece Top (33) is in the trend that is thinned.
7. flue gas according to claim 5 takes off white processing unit, it is characterised in that: gas circulation entrance (29) is set Between two neighboring wheel piece (26).
8. flue gas according to claim 1 or 4 takes off white processing unit, it is characterised in that: pacify the bottom end of the tower body (1) Equipped with a deflector being obliquely installed (34).
9. flue gas according to claim 1 takes off white processing unit, it is characterised in that: flue gas adsorption device (11) packet It includes round adsorption box (35), the upper and lower end face of round adsorption box (35) is machined with several ventholes (36), round adsorption box (35) Inside be equipped with active carbon.
CN201920055854.8U 2019-01-14 2019-01-14 Flue gas dewhitening treatment device Expired - Fee Related CN209378749U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920055854.8U CN209378749U (en) 2019-01-14 2019-01-14 Flue gas dewhitening treatment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920055854.8U CN209378749U (en) 2019-01-14 2019-01-14 Flue gas dewhitening treatment device

Publications (1)

Publication Number Publication Date
CN209378749U true CN209378749U (en) 2019-09-13

Family

ID=67853283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920055854.8U Expired - Fee Related CN209378749U (en) 2019-01-14 2019-01-14 Flue gas dewhitening treatment device

Country Status (1)

Country Link
CN (1) CN209378749U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109569215A (en) * 2019-01-14 2019-04-05 哈尔滨蔚蓝环保设备制造有限公司 Flue gas takes off white processing unit and processing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109569215A (en) * 2019-01-14 2019-04-05 哈尔滨蔚蓝环保设备制造有限公司 Flue gas takes off white processing unit and processing method

Similar Documents

Publication Publication Date Title
CN101716463B (en) Simultaneous removing device and method of various pollutants by electrocatalytical oxidation combining lime-gypsum method
CN202129016U (en) Multifunctional desulfurization and denitrification integration device
CN205886486U (en) Spray paint waste gas treatment system
CN205269378U (en) Industrial waste gas dust removal desulfurization denitrogenation waste heat reutilization processing system
CN212215103U (en) An industrial kiln flue gas desulfurization, denitrification and dust removal device
CN110252036A (en) Roasting flue gas defluorination, dust removal, deasphalting fume, desulfurization, denitrification integrated treatment method and system
CN106474886A (en) A kind of industrial waste-gas purifier of low temperature plasma joint two-stage dynamic wave
CN206404519U (en) A kind of exhaust treatment system
CN209378749U (en) Flue gas dewhitening treatment device
CN206295748U (en) Desulfurization and dedusting demisting minimum discharge device
CN109569215B (en) Flue gas whitening treatment device and treatment method
CN111632760A (en) A device for strengthening SO3 agglomeration and removal based on charged water mist phase transition
CN118543241B (en) A method and device for purifying tail gas produced by denitration catalyst production
CN107998860A (en) A kind of new waste gas processing system for being used to handle coal-fired flue-gas
CN214233346U (en) Waste gas treatment equipment
CN212548813U (en) Flue gas purification ultralow emission treatment system
CN211328870U (en) Spraying device for flue gas desulfurization and denitrification
CN101927125B (en) Dual-circulation absorption tower
CN205182493U (en) A absorption tower device for SOx/NOx control
CN207187462U (en) A kind of industrial waste-gas purifier of low temperature plasma combined power ripple
CN109107347A (en) A kind of system for desulfuration and denitration and its technique
CN2468567Y (en) Spraying and rotating film type apparatus for purifying flue gas
CN114950093A (en) A purification device suitable for boiler flue gas emissions
CN205042356U (en) Wet or dry of organic flue gas mixes gas sprinkler
CN210613353U (en) Ventilation purification device for mine site

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190913