CN209370608U - A kind of twoport PPR pipe card fixing pipe - Google Patents
A kind of twoport PPR pipe card fixing pipe Download PDFInfo
- Publication number
- CN209370608U CN209370608U CN201822246867.1U CN201822246867U CN209370608U CN 209370608 U CN209370608 U CN 209370608U CN 201822246867 U CN201822246867 U CN 201822246867U CN 209370608 U CN209370608 U CN 209370608U
- Authority
- CN
- China
- Prior art keywords
- card
- ppr
- iron card
- pipe
- moulding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 155
- 229910052742 iron Inorganic materials 0.000 claims abstract description 77
- 238000000465 moulding Methods 0.000 claims abstract description 36
- 125000006850 spacer group Chemical group 0.000 claims description 8
- 230000000694 effects Effects 0.000 abstract description 6
- 230000006378 damage Effects 0.000 abstract description 5
- 208000027418 Wounds and injury Diseases 0.000 abstract description 4
- 208000014674 injury Diseases 0.000 abstract description 4
- 238000005299 abrasion Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000004378 air conditioning Methods 0.000 description 1
- 230000000739 chaotic effect Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000009931 harmful effect Effects 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 239000012943 hotmelt Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000008213 purified water Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model relates to a kind of twoport PPR pipe card fixing pipes, including two PPR pipes disposed in parallel, it is linked together between two PPR pipes by iron card moulding, the iron card moulding includes upper iron card and lower iron card, PPR pipe is fixed between iron card and lower iron card, resilient cushion is provided between the PPR pipe and iron card moulding, it is fixed together between the upper iron card and lower iron card by locking member, sunpender is connected between two PPR pipes on the locking member of iron card moulding, the top of the sunpender is fixed on furred ceiling by fixing piece.The utility model has and can mostly will fix in parallel with PPR pipe, reaches the contact friction that pipeline arrangement is orderly, between reduction Guan Yuguan, protects tubing not by the effect of pressure injury.
Description
Technical field
The utility model relates to the technical fields that pipeline is fixed, more particularly, to a kind of twoport PPR pipe card fixing pipe.
Background technique
PPR pipe has the characteristics that light-weight, corrosion-resistant, non-scaling, long service life, is widely used in the cold and hot of building
Water system, heating system, the purified water supply system directly drunk, air-conditioning system, conveying or discharge chemical mediator etc. are industrial
Pipe-line system.PPR pipe interface uses hot-melt technology, different angle elbow can be cooperated to change route, therefore pass through in practical application
Often it is related to more PPR pipes side by side, existing pipeline arrangement is chaotic, is unfavorable for later maintenance, and the contact friction between Guan Yuguan
Tube wall can be damaged, service life is influenced.
Utility model content
The purpose of the utility model is to provide a kind of twoport PPR pipe card fixing pipes, and having can will be mostly parallel with PPR pipe
It is fixed, reach the contact friction that pipeline arrangement is orderly, between reduction Guan Yuguan, protects tubing not by the effect of pressure injury.
The above-mentioned purpose of utility model of the utility model has the technical scheme that
A kind of twoport PPR pipe card fixing pipe, including more PPR pipes disposed in parallel pass through iron between the more PPR pipes
Card moulding links together, and the iron card moulding includes upper iron card and lower iron card, PPR pipe be fixed on iron card and lower iron card it
Between, it is provided with resilient cushion between the PPR pipe and iron card moulding, is fixed between the upper iron card and lower iron card by locking member
Together, sunpender is connected between adjacent two PPR pipes on the locking member of iron card moulding, the top of the sunpender is solid by fixing piece
Determine on the wall.
By using above-mentioned technical proposal, more PPR pipes are linked together by the moulding of iron card, so that adjacent PPR
Keeping parallelism is arranged between pipe, so that pipeline arrangement is orderly, and is provided with resilient cushion between the moulding of iron card and PPR pipe,
The abrasion between PPR pipe and iron card moulding can be reduced, the service life of PPR pipe is improved, sunpender consolidates the moulding of iron card with metope
It is scheduled on together, so that the moulding of iron card will not move, reduces the contact friction between Guan Yuguan, tubing is protected not hurt by external force
Harmful effect.
The utility model is further arranged to: the locking member is specially bolt.
By using above-mentioned technical proposal, upper iron card and lower iron card are fixed together using bolt, it is easy for installation, and just
In disassembly.
The utility model is further arranged to: the fixing piece is specially expansion bolt.
By using above-mentioned technical proposal, the expansion-head of expansion bolt is inserted into the fixation hole of metope, will then be hung
One end of bar is tightened with expansion bolt, so that sunpender and metope be fixed.
The utility model is further arranged to: the resilient cushion is specially Rubber shock-absorbing pad.
By using above-mentioned technical proposal, Rubber shock-absorbing pad can reduce the friction between the moulding of iron card and PPR pipe, improve
The service life of PPR pipe.
The utility model is further arranged to: the resilient cushion is being made of two arc spacers, and arc spacer is distinguished
It is arranged at the position that PPR pipe is contacted with upper iron card, lower iron card.
By using above-mentioned technical proposal, when upper iron card, lower iron card are fixed by PPR pipe, two arc spacers contact with each other
The resilient cushion for constituting a completion is reduced iron card by resilient cushion and made so that being not directly contacted between PPR pipe and iron card moulding
Friction between type and PPR pipe.
The utility model is further arranged to: the sunpender is specially telescopic rod, is made of support rod and slide bar, support rod
It is inside provided with sliding slot, slide bar is arranged in sliding slot, locking hole is provided on the support rod, is equipped with clamping screw in locking hole.
By using above-mentioned technical proposal, it can adjust slide bar by difference of the PPR pipe at a distance from metope and be located at support
Length in bar sliding slot adjusts the length of sunpender, after the completion of adjustment, is fixed by clamping screw.
The utility model is further arranged to: the both ends of the sunpender are provided with helicitic texture, and pass through spiral shell respectively
Line is fixed together with fixing piece, locking member.
By using above-mentioned technical proposal, the fixed effect of sunpender and fixing piece, locking member is improved.
In conclusion the advantageous effects of the utility model are as follows:
1. more PPR pipes are linked together by the moulding of iron card, so that keeping parallelism is arranged between adjacent PPR pipe,
So that pipeline arrangement is orderly;
2. the mill between PPR pipe and iron card moulding can be reduced by being provided with resilient cushion between the moulding of iron card and PPR pipe
Damage, improves the service life of PPR pipe;
3. the moulding of iron card is fixed together with metope by sunpender, so that the moulding of iron card will not move, pipe is reduced
Contact friction between pipe protects tubing not by the effect of pressure injury.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
In figure, 1, PPR pipe;2, iron card moulding;3, upper iron card;4, lower iron card;5, resilient cushion;6, locking member;7, sunpender;8,
Fixing piece;9, support rod;10, slide bar;11, clamping screw.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
It referring to Fig.1, is a kind of twoport PPR pipe card fixing pipe disclosed by the utility model, including two PPR disposed in parallel
Pipe 1 is linked together between two PPR pipes 1 by iron card moulding 2, in the present embodiment, between iron card moulding 2 and PPR pipe 1
It is provided with resilient cushion 5, and the resilient cushion 5 is Rubber shock-absorbing pad 5, can reduce the abrasion between PPR pipe 1 and iron card moulding 2, mention
The service life of high PPR pipe 1.
Referring to Fig.1, iron card moulding 2 includes upper iron card 3 and lower iron card 4, PPR pipe 1 be fixed on iron card 3 and lower iron card 4 it
Between, it is fixed together between the upper iron card 3 and lower iron card 4 by locking member 6, in the present embodiment, locking member 6 is specially spiral shell
Upper iron card 3 and lower iron card 4 can be fixed together by bolt, be bolted by bolt, with what is be easily installed and dismantle
Advantage.
Referring to Fig.1, it is connected with sunpender 7 on the locking member 6 of iron card moulding 2 between two PPR pipes 1, the top of sunpender 7 passes through
Fixing piece 8 is fixed on furred ceiling, and in the present embodiment, fixing piece 8 is specially expansion bolt, in use, by the swollen of expansion bolt
Swollen head is inserted into the fixation hole of metope, then tightens one end of sunpender 7 with expansion bolt, so that sunpender 7 be consolidated with metope
It is fixed.
Referring to Fig.1, resilient cushion 5 is being made of two arc spacers, and arc spacer is separately positioned on PPR pipe 1 and upper iron
At the position that card 3, lower iron card 4 contact, in the present embodiment, resilient cushion 5 is Rubber shock-absorbing pad 5, and upper iron card 3, lower iron card 4 will
When PPR pipe 1 is fixed, two arc spacers, which contact with each other, constitutes the resilient cushion 5 of a completion, so that PPR pipe 1 and iron card moulding 2
Between be not directly contacted with, the friction between iron card moulding 2 and PPR pipe 1 is reduced by resilient cushion 5.
Referring to Fig.1, sunpender 7 is specially telescopic rod, is made of support rod 9 and slide bar 10, is provided with sliding slot in support rod 9,
Slide bar 10 is arranged in sliding slot, and locking hole is provided on the support rod 9, clamping screw 11 is equipped in locking hole.
Referring to Fig.1, the both ends of sunpender 7 are provided with helicitic texture, and pass through screw thread and fixing piece 8, locking member 6 respectively
It is fixed together.
The implementation principle of the present embodiment are as follows: more PPR pipes 1 are linked together by iron card moulding 2, so that adjacent
Keeping parallelism is arranged between PPR pipe 1, so that pipeline arrangement is orderly, and is provided with and subtracts between iron card moulding 2 and PPR pipe 1
Pad 5 is shaken, the abrasion between PPR pipe 1 and iron card moulding 2 can be reduced, improves the service life of PPR pipe 1, sunpender 7 makes iron card
Type 2 is fixed together with metope, so that iron card moulding 2 will not move, reduces the contact friction between Guan Yuguan, protection pipe
Material is not by the effect of pressure injury.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this
The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical
Within novel protection scope.
Claims (7)
1. a kind of twoport PPR pipe card fixing pipe, including two PPR pipes (1) disposed in parallel, it is characterised in that: two PPR
It being linked together between pipe (1) by iron card moulding (2), the iron card moulding (2) includes upper iron card (3) and lower iron card (4),
PPR pipe (1) is fixed between iron card (3) and lower iron card (4), is provided with and is subtracted between the PPR pipe (1) and iron card moulding (2)
Shake pad (5) is fixed together, between two PPR pipes (1) by locking member (6) between the upper iron card (3) and lower iron card (4)
It is connected with sunpender (7) on the locking member (6) of iron card moulding (2), the top of the sunpender (7) is fixed on by fixing piece (8) hangs
On top.
2. a kind of twoport PPR pipe card fixing pipe according to claim 1, it is characterised in that: the locking member (6) is specially
Bolt.
3. a kind of twoport PPR pipe card fixing pipe according to claim 1, it is characterised in that: the fixing piece (8) is specially
Expansion bolt.
4. a kind of twoport PPR pipe card fixing pipe according to claim 1, it is characterised in that: the resilient cushion (5) is specially
Rubber shock-absorbing pad (5).
5. a kind of twoport PPR pipe card fixing pipe according to claim 1, it is characterised in that: the resilient cushion (5) is by two
Arc spacer is forming, and arc spacer is separately positioned at the position that PPR pipe (1) is contacted with upper iron card (3), lower iron card (4).
6. a kind of twoport PPR pipe card fixing pipe according to claim 1, it is characterised in that: the sunpender (7) is specially to stretch
Contracting bar is made of support rod (9) and slide bar (10), and sliding slot is provided in support rod (9), and slide bar (10) is arranged in sliding slot, should
It is provided with locking hole on support rod (9), clamping screw (11) are installed in locking hole.
7. a kind of twoport PPR pipe card fixing pipe according to claim 1, it is characterised in that: the both ends of the sunpender (7) are equal
It is provided with helicitic texture, and is fixed together respectively by screw thread with fixing piece (8), locking member (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822246867.1U CN209370608U (en) | 2018-12-27 | 2018-12-27 | A kind of twoport PPR pipe card fixing pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822246867.1U CN209370608U (en) | 2018-12-27 | 2018-12-27 | A kind of twoport PPR pipe card fixing pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209370608U true CN209370608U (en) | 2019-09-10 |
Family
ID=67828394
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822246867.1U Active CN209370608U (en) | 2018-12-27 | 2018-12-27 | A kind of twoport PPR pipe card fixing pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209370608U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115978304A (en) * | 2022-12-02 | 2023-04-18 | 南京运享通信息科技有限公司 | Intelligent stadium distributed ventilating duct and construction method thereof |
-
2018
- 2018-12-27 CN CN201822246867.1U patent/CN209370608U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115978304A (en) * | 2022-12-02 | 2023-04-18 | 南京运享通信息科技有限公司 | Intelligent stadium distributed ventilating duct and construction method thereof |
CN115978304B (en) * | 2022-12-02 | 2023-12-01 | 南京运享通信息科技有限公司 | Intelligent stadium distributed ventilating duct and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201915461U (en) | Water pipe clamp | |
CN205560000U (en) | Pipeline hanger | |
CN104964096A (en) | Constant-force spring support and hanger | |
CN209370608U (en) | A kind of twoport PPR pipe card fixing pipe | |
CN213871681U (en) | Pipeline positioning and mounting equipment | |
CN207609896U (en) | A kind of stainless steel flexible hose of quick release installation | |
CN205745826U (en) | A kind of compound pipeline complex pipeline tensioning joint | |
CN209164874U (en) | Pipeline compensator fixing device | |
CN215721621U (en) | High-efficiency wear-resistant expansion joint | |
CN207406919U (en) | A kind of pipe clamp type sunpender hanger | |
CN208503725U (en) | A kind of both ends flange limiting anti-slip press disc type expansion bend | |
CN201363487Y (en) | Water air pipe supporting frame | |
CN108071744A (en) | A kind of good utility pipes suspension and support of stability | |
CN205371923U (en) | Metallic bellow expansion joint | |
CN212226379U (en) | A compensator protection device | |
CN103267060A (en) | Double-roller structure for thermal insulation bracket | |
CN210118729U (en) | Boiler suspension pipe and horizontal pipe wear-proof device | |
CN204026022U (en) | The axial FlexbleJoint of self-supporting | |
CN208311734U (en) | A kind of fluid circuit changing-over head | |
CN105351913B (en) | A kind of shoe of boiler heating surface pipeline | |
CN205972642U (en) | Novel transfer chain | |
CN210566689U (en) | Four-way valve fixing device | |
CN203757267U (en) | Expansion joint | |
CN220186070U (en) | Dust collecting equipment pipeline stabilizing mean | |
CN222351639U (en) | Municipal pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200120 Address after: Room 921, floor 1, building 3, No. 10, guaxiang Road, Panggezhuang Town, Daxing District, Beijing 100000 Patentee after: Boroni Home Decoration (Beijing) Co., Ltd. Address before: 510000 Room 701, 185 Haibin Road, Nansha District, Guangzhou City, Guangdong Province (office only) Patentee before: Guangzhou Ouhao Decoration Engineering Co., Ltd. |
|
TR01 | Transfer of patent right |