[go: up one dir, main page]

CN209287495U - Construction waste crushing equipment for construction engineering - Google Patents

Construction waste crushing equipment for construction engineering Download PDF

Info

Publication number
CN209287495U
CN209287495U CN201822215882.XU CN201822215882U CN209287495U CN 209287495 U CN209287495 U CN 209287495U CN 201822215882 U CN201822215882 U CN 201822215882U CN 209287495 U CN209287495 U CN 209287495U
Authority
CN
China
Prior art keywords
fixedly connected
crushing
construction waste
runner
shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822215882.XU
Other languages
Chinese (zh)
Inventor
王渊辉
王杰
王卫勇
魏志猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Co Ltd Of Jun An Construction Engineering Group
Henan Kaida Engineering Management Co Ltd
Kaifeng University
Original Assignee
Henan Co Ltd Of Jun An Construction Engineering Group
Henan Kaida Engineering Management Co Ltd
Kaifeng University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Co Ltd Of Jun An Construction Engineering Group, Henan Kaida Engineering Management Co Ltd, Kaifeng University filed Critical Henan Co Ltd Of Jun An Construction Engineering Group
Priority to CN201822215882.XU priority Critical patent/CN209287495U/en
Application granted granted Critical
Publication of CN209287495U publication Critical patent/CN209287495U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Crushing And Pulverization Processes (AREA)

Abstract

本实用新型涉及垃圾处理设备技术领域,且公开了一种建筑工程用建筑垃圾粉碎设备,包括粉碎箱,所述粉碎箱的顶部固定连接有入料斗,所述入料斗的外侧固定连接有顶架,所述顶架的底部固定连接有机箱,所述机箱的内部固定安装有伺服电机,所述伺服电机的输出轴固定连接有螺旋轴,所述螺旋轴的外侧固定连接有螺旋叶片,所述粉碎箱的正面固定连接有两个第一固定板。该建筑工程用建筑垃圾粉碎设备,通过匀速的入料,使粉碎机不会堵塞,同时使下方的粉碎结构能够进行彻底的粉碎,然后通过先破碎后粉碎的操作,能有效提高建筑垃圾粉碎的效果,大大的提升了该建筑垃圾粉碎设备的工作效率,满足了人们将建筑垃圾进行彻底粉碎的要求。

The utility model relates to the technical field of waste treatment equipment, and discloses a construction waste crushing device for construction engineering, comprising a crushing box, the top of the crushing box is fixedly connected with a hopper, and the outer side of the hopper is fixedly connected with a top frame , the bottom of the top frame is fixedly connected with an organic case, the interior of the case is fixedly installed with a servo motor, the output shaft of the servo motor is fixedly connected with a screw shaft, and the outer side of the screw shaft is fixedly connected with a screw blade, the The front of the crushing box is fixedly connected with two first fixing plates. The construction waste crushing equipment used in construction projects, through uniform feeding, prevents the crusher from clogging, and at the same time enables the crushing structure below to be completely crushed, and then through the operation of crushing first and then crushing, the crushing efficiency of construction waste can be effectively improved. As a result, the working efficiency of the construction waste crushing equipment is greatly improved, and people's requirements for thoroughly crushing construction waste are met.

Description

一种建筑工程用建筑垃圾粉碎设备Construction waste crushing equipment for construction engineering

技术领域technical field

本实用新型涉及垃圾处理设备技术领域,具体为一种建筑工程用建筑垃圾粉碎设备。The utility model relates to the technical field of garbage disposal equipment, in particular to a construction garbage crushing equipment for construction engineering.

背景技术Background technique

建筑垃圾是指建设、施工单位或个人对各类建筑物、构筑物和管网等进行建设、铺设、拆除或修缮过程中所产生的渣土、弃土、弃料、淤泥及其他废弃物。Construction waste refers to the dregs, spoils, waste materials, silt and other wastes generated during the construction, laying, demolition or repair of various buildings, structures and pipe networks by construction units or individuals.

现有建筑工程用建筑垃圾粉碎设备在使用时仍然存在着一定的不足,一般建筑垃圾粉碎设备只是将建筑垃圾进行一个简单的粉碎,粉碎后的建筑垃圾还是存在着许多大小不一的料块,粉碎效果差,导致工作效率低下,不能满足人们将建筑垃圾进行彻底粉碎的要求,故而提出一种建筑工程用建筑垃圾粉碎设备来解决上述所提出的问题。There are still some deficiencies in the existing construction waste crushing equipment for construction projects. The general construction waste crushing equipment only simply crushes the construction waste. After crushing, there are still many pieces of different sizes in the construction waste. The crushing effect is poor, resulting in low work efficiency, and it cannot meet people's requirements for thoroughly crushing construction waste. Therefore, a construction waste crushing equipment for construction projects is proposed to solve the above-mentioned problems.

实用新型内容Utility model content

(一)解决的技术问题(1) Solved technical problems

针对现有技术的不足,本实用新型提供了一种建筑工程用建筑垃圾粉碎设备,具备能提高建筑垃圾的粉碎效果等优点,解决了现有建筑垃圾粉碎设备工作效率低下的问题。Aiming at the deficiencies of the prior art, the utility model provides a construction waste crushing equipment for construction engineering, which has the advantages of improving the crushing effect of construction waste, and solves the problem of low working efficiency of the existing construction waste crushing equipment.

(二)技术方案(2) Technical solutions

为实现上述能提高建筑垃圾的粉碎效果的目的,本实用新型提供如下技术方案:一种建筑工程用建筑垃圾粉碎设备,包括粉碎箱,所述粉碎箱的顶部固定连接有入料斗,所述入料斗的外侧固定连接有顶架,所述顶架的底部固定连接有机箱,所述机箱的内部固定安装有伺服电机,所述伺服电机的输出轴固定连接有螺旋轴,所述螺旋轴的外侧固定连接有螺旋叶片,所述粉碎箱的正面固定连接有两个第一固定板,所述第一固定板的内部转动连接有上转板,所述上转板的背面固定连接有第一转轴,所述第一转轴的外侧固定连接有第一转轮,所述第一转轮的外侧固定连接有均匀分布的破碎刀片,所述粉碎箱的正面固定连接有等距离排列的第二固定板,所述第二固定板的内部转动连接有下转板,所述下转板的背面固定连接有第二转轴,所述第二转轴的外侧固定连接有第二转轮,所述第二转轮的外侧固定连接有均匀分布的粉碎齿,两个所述第一转轴之间传动电连接有上传动带,左右两侧的两个所述第二转轴之间传动连接有下传动带,右侧所述第一转轴背面的一端固定连接在第一电机的输出轴上,右侧所述第二转轴背面的一端固定连接在第二电机的输出轴上,所述粉碎箱的底部开设有出料口,所述粉碎箱的左右两侧均固定连接有底架,两个所述底架之间固定连接有支板,所述支板的顶部活动安装有回收箱。In order to achieve the above purpose of improving the crushing effect of construction waste, the utility model provides the following technical proposal: a construction waste crushing equipment for construction engineering, including a crushing box, the top of the crushing box is fixedly connected with a hopper, and the input The outer side of the hopper is fixedly connected with a top frame, the bottom of the top frame is fixedly connected with a casing, the inside of the casing is fixedly installed with a servo motor, the output shaft of the servo motor is fixedly connected with a screw shaft, and the outside of the screw shaft The screw blade is fixedly connected, the front of the crushing box is fixedly connected with two first fixed plates, the inside of the first fixed plate is rotatably connected with an upper rotating plate, and the back of the upper rotating plate is fixedly connected with a first rotating shaft , the outer side of the first rotating shaft is fixedly connected with a first runner, the outer side of the first runner is fixedly connected with evenly distributed crushing blades, and the front of the crushing box is fixedly connected with second fixed plates arranged equidistantly , the inside of the second fixed plate is rotatably connected with a lower turning plate, the back of the lower turning plate is fixedly connected with a second rotating shaft, the outer side of the second rotating shaft is fixedly connected with a second runner, and the second turning The outer side of the wheel is fixedly connected with evenly distributed crushing teeth, the upper drive belt is electrically connected between the two first rotating shafts, and the lower driving belt is connected between the two second rotating shafts on the left and right sides. One end on the back of the first rotating shaft is fixedly connected to the output shaft of the first motor, one end on the back of the second rotating shaft on the right is fixedly connected to the output shaft of the second motor, and the bottom of the crushing box is provided with a discharge port , the left and right sides of the crushing box are fixedly connected with an underframe, a support plate is fixedly connected between the two underframes, and a recovery box is movably installed on the top of the support plate.

优选的,所述顶架由一个横板和横板左右两侧均固定连接的L形板组成,所述机箱位于横板的底部,且横板位于入料斗的上方。Preferably, the top frame is composed of a horizontal plate and an L-shaped plate fixedly connected to the left and right sides of the horizontal plate, the cabinet is located at the bottom of the horizontal plate, and the horizontal plate is located above the hopper.

优选的,所述入料斗和粉碎箱相连通,所述螺旋轴的底端依次贯穿机箱和入料斗并延伸至粉碎箱的内部。Preferably, the feeding hopper communicates with the crushing box, and the bottom end of the screw shaft passes through the cabinet and the feeding hopper in turn and extends to the inside of the crushing box.

优选的,所述第一转轮和第二转轮的宽度均等于粉碎箱的内侧宽度,所述螺旋轴位于两个第一转轮之间的正上方。Preferably, the widths of the first and second wheels are equal to the inner width of the crushing box, and the screw shaft is located directly above between the two first wheels.

优选的,所述第一固定板位于第二固定板的上方,所述第二转轴的数量共为六个,且六个第二转轴均与下传动带传动连接。Preferably, the first fixing plate is located above the second fixing plate, the number of the second rotating shafts is six in total, and the six second rotating shafts are all connected to the lower transmission belt.

优选的,左侧的所述第一转轴背面的一端依次贯穿第一固定板、粉碎箱和左侧的第一转轮并延伸至粉碎箱的外侧与上传动带传动连接。Preferably, one end of the back side of the first rotating shaft on the left passes through the first fixing plate, the crushing box and the first runner on the left in sequence, and extends to the outside of the crushing box to be connected with the upper transmission belt.

(三)有益效果(3) Beneficial effects

与现有技术相比,本实用新型提供了一种建筑工程用建筑垃圾粉碎设备,具备以下有益效果:Compared with the prior art, the utility model provides a construction waste crushing equipment for construction engineering, which has the following beneficial effects:

该建筑工程用建筑垃圾粉碎设备,通过将建筑垃圾从入料斗中倒入,启动顶架上机箱内的伺服电机,带动螺旋轴外侧固定连接的螺旋叶进行转动,在螺旋叶的旋转推力下,使入料斗中的建筑垃圾能匀速分散的送入粉碎箱中的两个第一转轮上,避免入料堵塞卡住入口,同时分散匀速送入的建筑垃圾能被更高效的进行粉碎,避免一大堆建筑垃圾送入粉碎箱中将粉碎箱中的工件卡住,启动第一电机,在第一固定板中上转板的转动支撑作用下,带动右侧的第一转轴转动,在上传动带的传动作用下,带动左侧的第一转轴转动,从而带动两个第一转轮转动,配合第一转轮外侧均匀分布的破碎刀片,将落入粉碎箱中的建筑垃圾进行初步的破碎,初步破碎后的建筑垃圾落入第二转轮上,启动第二电机,在第二固定板中下转板的转动支撑作用下,带动右侧的第二转轴进行转动,在下传动带的传动作用下,带动左侧通过下传动带传动连接的第二转轴进行转动,配合第二转轮外侧均匀分布的粉碎齿,将初步破碎后的建筑垃圾进行彻底的粉碎,彻底粉碎后的建筑垃圾通过出料口落入支板上的回收箱内,通过匀速的入料,保证粉碎机不会堵塞,同时保证下方的粉碎结构能够进行高效彻底的粉碎,然后通过先破碎后粉碎的操作,能有效提高建筑垃圾粉碎的效果,大大的提升了该建筑垃圾粉碎设备的工作效率,满足了人们将建筑垃圾进行彻底粉碎的要求。The construction waste crushing equipment used in this construction project pours the construction waste from the hopper, starts the servo motor in the chassis on the top frame, and drives the screw blade fixedly connected to the outside of the screw shaft to rotate. Under the rotating thrust of the screw blade, The construction waste in the hopper can be sent to the two first runners in the crushing box at a uniform speed, so as to avoid the jamming of the entrance by feeding materials, and at the same time, the construction waste sent in at a uniform speed can be crushed more efficiently, avoiding A large pile of construction waste is sent into the crushing box to block the workpieces in the crushing box, the first motor is started, and under the rotation support of the upper rotating plate in the first fixed plate, the first rotating shaft on the right is driven to rotate, and the upper Under the driving action of the transmission belt, it drives the first rotating shaft on the left to rotate, thereby driving the two first runners to rotate, and cooperates with the crushing blades evenly distributed on the outside of the first runners to perform preliminary crushing of the construction waste falling into the crushing box , the preliminarily crushed construction waste falls into the second runner, starts the second motor, and under the rotating support of the lower rotating plate in the second fixed plate, drives the second rotating shaft on the right to rotate, and the driving action of the lower transmission belt Down, it drives the second rotating shaft on the left side connected by the lower transmission belt to rotate, and cooperates with the crushing teeth evenly distributed on the outside of the second runner to completely crush the construction waste after the initial crushing. The mouth falls into the recovery box on the support plate, and through feeding materials at a uniform speed, it is ensured that the pulverizer will not be blocked, and at the same time, the crushing structure below can be crushed efficiently and thoroughly, and then the operation of crushing first and then crushing can effectively improve the construction efficiency. The effect of garbage crushing greatly improves the working efficiency of the construction waste crushing equipment and meets people's requirements for thoroughly crushing construction waste.

附图说明Description of drawings

图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型结构的右视图;Fig. 2 is the right view of structure of the present utility model;

图3为本实用新型结构中上转板连接结构的正视剖面图;Fig. 3 is the front sectional view of the connection structure of the upper rotating plate in the structure of the utility model;

图4为本实用新型结构中下转板连接结构的正视剖面图。Fig. 4 is a front sectional view of the connection structure of the lower rotating plate in the structure of the utility model.

图中:1粉碎箱、2入料斗、3顶架、4机箱、5伺服电机、6螺旋轴、7螺旋叶片、8第一固定板、9上转板、10第一转轴、11第一转轮、12破碎刀片、13第二固定板、14下转板、15第二转轴、16第二转轮、17粉碎齿、18上传动带、19下传动带、20第一电机、21第二电机、22出料口、23底架、24支板、25回收箱。In the figure: 1 crushing box, 2 feeding hopper, 3 top frame, 4 chassis, 5 servo motor, 6 screw shaft, 7 screw blade, 8 first fixed plate, 9 upper rotating plate, 10 first rotating shaft, 11 first rotating wheel, 12 broken blades, 13 second fixed plate, 14 lower rotating plate, 15 second rotating shaft, 16 second runner, 17 crushing teeth, 18 upper transmission belt, 19 lower transmission belt, 20 first motor, 21 second motor, 22 outlets, 23 chassis, 24 support boards, 25 recycling boxes.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

请参阅图1-4,本实用新型提供了一种技术方案:一种建筑工程用建筑垃圾粉碎设备,包括粉碎箱1,粉碎箱1的顶部固定连接有入料斗2,入料斗2和粉碎箱1相连通,入料斗2的外侧固定连接有顶架3,顶架3的底部固定连接有机箱4,顶架3由一个横板和横板左右两侧均固定连接的L形板组成,机箱4位于横板的底部,且横板位于入料斗2的上方,两个L形板分别固定连接在入料斗2的左右两侧,机箱4的内部固定安装有伺服电机5,伺服电机5的型号为RH80ST-M02430,伺服电机5的输出轴固定连接有螺旋轴6,螺旋轴6的底端依次贯穿机箱4和入料斗2并延伸至粉碎箱1的内部,螺旋轴6的外侧固定连接有螺旋叶片7,粉碎箱1的正面固定连接有两个第一固定板8,第一固定板8的内部转动连接有上转板9,上转板9的背面固定连接有第一转轴10,第一转轴10的外侧固定连接有第一转轮11,螺旋轴6位于两个第一转轮11之间的正上方,第一转轮11的外侧固定连接有均匀分布的破碎刀片12,粉碎箱1的正面固定连接有等距离排列的第二固定板13,第一固定板8位于第二固定板13的上方,第二固定板13的内部转动连接有下转板14,下转板14的背面固定连接有第二转轴15,第二转轴15的外侧固定连接有第二转轮16,第一转轮11和第二转轮16的宽度均等于粉碎箱1的内侧宽度,第二转轮16的外侧固定连接有均匀分布的粉碎齿17,两个第一转轴10之间传动电连接有上传动带18,左侧的第一转轴10背面的一端依次贯穿第一固定板8、粉碎箱1和左侧的第一转轮11并延伸至粉碎箱1的外侧与上传动带18传动连接,左右两侧的两个第二转轴15之间传动连接有下传动带19,第二转轴15的数量共为六个,且六个第二转轴15均与下传动带19传动连接,左侧的第二转轴15背面的一端依次贯穿第二固定板13、粉碎箱1和第二转轮16并延伸至粉碎箱1的外侧与下传动带19传动连接,右侧第一转轴10背面的一端固定连接在第一电机20的输出轴上,第一电机20的型号为YY5612,右侧第二转轴15背面的一端固定连接在第二电机21的输出轴上,第二电机21的型号为BWD09,第一电机20和第二电机21的底部均固定连接有与粉碎箱1固定连接的支撑板,粉碎箱1的底部开设有出料口22,粉碎箱1的左右两侧均固定连接有底架23,两个底架23之间固定连接有支板24,支板24的顶部活动安装有回收箱25,回收箱25位于出料口22的正下方,且回收箱25的长度和宽度均大于出料口22的长度和宽度,通过将建筑垃圾从入料斗2中倒入,启动顶架3上机箱4内的伺服电机5,带动螺旋轴6外侧固定连接的螺旋叶7进行转动,在螺旋叶7的旋转推力下,使入料斗2中的建筑垃圾能匀速分散的送入粉碎箱1中的两个第一转轮11上,避免入料堵塞卡住入口,同时分散匀速送入的建筑垃圾能被更高效的进行粉碎,避免一大堆建筑垃圾送入粉碎箱1中将粉碎箱1中的工件卡住,启动第一电机20,在第一固定板8中上转板9的转动支撑作用下,带动右侧的第一转轴10转动,在上传动带18的传动作用下,带动左侧的第一转轴10转动,从而带动两个第一转轮11转动,配合第一转轮11外侧均匀分布的破碎刀片12,将落入粉碎箱1中的建筑垃圾进行初步的破碎,初步破碎后的建筑垃圾落入第二转轮16上,启动第二电机21,在第二固定板13中下转板14的转动支撑作用下,带动右侧的第二转轴15进行转动,在下传动带19的传动作用下,带动左侧通过下传动带19传动连接的第二转轴15进行转动,配合第二转轮16外侧均匀分布的粉碎齿17,将初步破碎后的建筑垃圾进行彻底的粉碎,彻底粉碎后的建筑垃圾通过出料口22落入支板24上的回收箱25内,通过匀速的入料,保证粉碎机不会堵塞,同时保证下方的粉碎结构能够进行高效彻底的粉碎,然后通过先破碎后粉碎的操作,能有效提高建筑垃圾粉碎的效果,大大的提升了该建筑垃圾粉碎设备的工作效率,满足了人们将建筑垃圾进行彻底粉碎的要求。Please refer to Figures 1-4, the utility model provides a technical solution: a construction waste crushing equipment for construction engineering, including a crushing box 1, the top of the crushing box 1 is fixedly connected with a hopper 2, the hopper 2 and the crushing box 1 is connected, the outer side of the feeding hopper 2 is fixedly connected with a top frame 3, the bottom of the top frame 3 is fixedly connected with an organic case 4, the top frame 3 is composed of a horizontal plate and L-shaped plates that are fixedly connected to the left and right sides of the horizontal plate, and the chassis 4 is located at the bottom of the horizontal plate, and the horizontal plate is located above the hopper 2, and the two L-shaped plates are respectively fixedly connected to the left and right sides of the hopper 2, and the servo motor 5 is fixedly installed inside the chassis 4. The model of the servo motor 5 It is RH80ST-M02430, the output shaft of the servo motor 5 is fixedly connected with the screw shaft 6, the bottom end of the screw shaft 6 passes through the chassis 4 and the hopper 2 in turn and extends to the inside of the crushing box 1, and the outside of the screw shaft 6 is fixedly connected with a screw shaft The vane 7 is fixedly connected with two first fixed plates 8 on the front of the crushing box 1, and the inner rotation of the first fixed plate 8 is connected with an upper rotating plate 9, and the back of the upper rotating plate 9 is fixedly connected with a first rotating shaft 10. The outer side of the rotating shaft 10 is fixedly connected with a first runner 11, the screw shaft 6 is located directly above between the two first runners 11, and the outer side of the first runner 11 is fixedly connected with evenly distributed crushing blades 12, and the crushing box 1 The front of the front is fixedly connected with the second fixed plate 13 arranged equidistantly, the first fixed plate 8 is located above the second fixed plate 13, the inner rotation of the second fixed plate 13 is connected with the lower turning plate 14, and the back side of the lower turning plate 14 Fixedly connected with the second rotating shaft 15, the outside of the second rotating shaft 15 is fixedly connected with the second runner 16, the width of the first runner 11 and the second runner 16 are equal to the inner width of the crushing box 1, the second runner 16 Evenly distributed crushing teeth 17 are fixedly connected to the outer side of the two first rotating shafts 10, and an upper transmission belt 18 is electrically connected between the two first rotating shafts 10. One end of the back side of the first rotating shaft 10 on the left runs through the first fixed plate 8, the crushing box 1 and the The first runner 11 on the left side extends to the outside of the crushing box 1 and is connected with the transmission belt 18. The transmission belt 19 is connected between the two second rotating shafts 15 on the left and right sides. The number of the second rotating shafts 15 is Six, and the six second rotating shafts 15 are all connected to the lower transmission belt 19. One end of the left side of the second rotating shaft 15 runs through the second fixed plate 13, the crushing box 1 and the second runner 16 in sequence and extends to the crushing box The outer side of 1 is connected to the lower transmission belt 19, and one end on the back of the first rotating shaft 10 on the right is fixedly connected to the output shaft of the first motor 20. The model of the first motor 20 is YY5612, and one end on the back of the second rotating shaft 15 on the right is fixed Connected on the output shaft of the second motor 21, the model of the second motor 21 is BWD09, the bottoms of the first motor 20 and the second motor 21 are fixedly connected with the support plate fixedly connected with the crushing box 1, the bottom of the crushing box 1 A discharge port 22 is provided, and an underframe 23 is fixedly connected to the left and right sides of the crushing box 1, and a support plate 24 is fixedly connected between the two underframes 23, and a recovery box 25 is movably installed on the top of the support plate 24. 25 is located directly under the outlet 22 square, and the length and width of the recovery box 25 are greater than the length and width of the discharge port 22, by pouring construction waste from the hopper 2, start the servo motor 5 in the chassis 4 on the top frame 3, and drive the screw shaft 6 The spiral blade 7 fixedly connected to the outside rotates, and under the rotational thrust of the spiral blade 7, the construction waste in the hopper 2 can be uniformly dispersed and sent to the two first runners 11 in the crushing box 1 to avoid feeding The entrance is blocked and stuck, and the construction waste sent in at a uniform speed can be crushed more efficiently, so as to avoid a large amount of construction waste being sent into the crushing box 1 to block the workpiece in the crushing box 1, start the first motor 20, and Under the rotation support of the upper rotating plate 9 in the first fixed plate 8, the first rotating shaft 10 on the right side is driven to rotate, and under the transmission effect of the upper transmission belt 18, the first rotating shaft 10 on the left side is driven to rotate, thereby driving the two second rotating shafts. The first runner 11 rotates, cooperates with the crushing blades 12 evenly distributed on the outside of the first runner 11, the construction waste falling into the crushing box 1 is initially crushed, and the construction waste after the preliminary crushing falls on the second runner 16, Start the second motor 21, under the rotation support of the lower rotating plate 14 in the second fixed plate 13, drive the second rotating shaft 15 on the right side to rotate, and under the transmission effect of the lower transmission belt 19, drive the left side to pass through the lower transmission belt 19. The connected second rotating shaft 15 rotates, cooperates with the crushing teeth 17 evenly distributed on the outside of the second runner 16, and thoroughly crushes the construction waste after preliminary crushing, and the thoroughly crushed construction waste falls into the support plate through the discharge port 22 In the recovery box 25 on the 24, through the feeding at a uniform speed, it is ensured that the pulverizer will not be blocked, and at the same time, the crushing structure below can be efficiently and thoroughly crushed, and then the operation of crushing first and then crushing can effectively improve the crushing efficiency of construction waste As a result, the working efficiency of the construction waste crushing equipment is greatly improved, and people's requirements for thoroughly crushing construction waste are met.

在使用时,通过将建筑垃圾从入料斗2中倒入,启动顶架3上机箱4内的伺服电机5,带动螺旋轴6外侧固定连接的螺旋叶7进行转动,在螺旋叶7的旋转推力下,使入料斗2中的建筑垃圾能匀速分散的送入粉碎箱1中的两个第一转轮11上,启动第一电机20,在第一固定板8中上转板9的转动支撑作用下,带动右侧的第一转轴10转动,在上传动带18的传动作用下,带动左侧的第一转轴10转动,从而带动两个第一转轮11转动,配合第一转轮11外侧均匀分布的破碎刀片12,将落入粉碎箱1中的建筑垃圾进行初步的破碎,初步破碎后的建筑垃圾落入第二转轮16上,启动第二电机21,在第二固定板13中下转板14的转动支撑作用下,带动右侧的第二转轴15进行转动,在下传动带19的传动作用下,带动左侧通过下传动带19传动连接的第二转轴15进行转动,配合第二转轮16外侧均匀分布的粉碎齿17,将初步破碎后的建筑垃圾进行彻底的粉碎,彻底粉碎后的建筑垃圾通过出料口22落入支板24上的回收箱25内。When in use, pour the construction waste from the hopper 2, start the servo motor 5 in the chassis 4 on the top frame 3, and drive the screw blade 7 fixedly connected to the outside of the screw shaft 6 to rotate. Next, the construction waste in the hopper 2 can be uniformly dispersed and sent to the two first runners 11 in the crushing box 1, the first motor 20 is started, and the rotation support of the upper rotating plate 9 in the first fixed plate 8 Under the action, the first rotating shaft 10 on the right side is driven to rotate, and under the transmission effect of the upper transmission belt 18, the first rotating shaft 10 on the left side is driven to rotate, thereby driving the two first runners 11 to rotate, matching the outer sides of the first runners 11 The evenly distributed crushing blades 12 will preliminarily crush the construction waste falling into the crushing box 1, and the construction waste after the preliminary crushing will fall on the second runner 16, start the second motor 21, Under the rotating support action of lower rotating plate 14, the second rotating shaft 15 on the right side is driven to rotate, and under the driving action of the lower transmission belt 19, the second rotating shaft 15 connected by the transmission belt 19 on the left side is driven to rotate. The pulverizing teeth 17 evenly distributed on the outside of the wheel 16 completely pulverize the preliminary crushed construction waste, and the thoroughly pulverized construction waste falls into the recovery box 25 on the support plate 24 through the discharge port 22 .

综上所述,该建筑工程用建筑垃圾粉碎设备,通过将建筑垃圾从入料斗2中倒入,启动顶架3上机箱4内的伺服电机5,带动螺旋轴6外侧固定连接的螺旋叶7进行转动,在螺旋叶7的旋转推力下,使入料斗2中的建筑垃圾能匀速分散的送入粉碎箱1中的两个第一转轮11上,避免入料堵塞卡住入口,同时分散匀速送入的建筑垃圾能被更高效的进行粉碎,避免一大堆建筑垃圾送入粉碎箱1中将粉碎箱1中的工件卡住,启动第一电机20,在第一固定板8中上转板9的转动支撑作用下,带动右侧的第一转轴10转动,在上传动带18的传动作用下,带动左侧的第一转轴10转动,从而带动两个第一转轮11转动,配合第一转轮11外侧均匀分布的破碎刀片12,将落入粉碎箱1中的建筑垃圾进行初步的破碎,初步破碎后的建筑垃圾落入第二转轮16上,启动第二电机21,在第二固定板13中下转板14的转动支撑作用下,带动右侧的第二转轴15进行转动,在下传动带19的传动作用下,带动左侧通过下传动带19传动连接的第二转轴15进行转动,配合第二转轮16外侧均匀分布的粉碎齿17,将初步破碎后的建筑垃圾进行彻底的粉碎,彻底粉碎后的建筑垃圾通过出料口22落入支板24上的回收箱25内,通过匀速的入料,保证粉碎机不会堵塞,同时保证下方的粉碎结构能够进行高效彻底的粉碎,然后通过先破碎后粉碎的操作,能有效提高建筑垃圾粉碎的效果,大大的提升了该建筑垃圾粉碎设备的工作效率,满足了人们将建筑垃圾进行彻底粉碎的要求,解决了现有建筑垃圾粉碎设备工作效率低下的问题。To sum up, the construction waste crushing equipment used in the construction project pours the construction waste from the hopper 2, starts the servo motor 5 in the chassis 4 on the top frame 3, and drives the screw blade 7 fixedly connected to the outside of the screw shaft 6 Rotate, and under the rotating thrust of the screw blade 7, the construction waste in the hopper 2 can be dispersed at a uniform speed and sent to the two first runners 11 in the crushing box 1, so as to prevent the feeding from blocking the entrance and disperse at the same time The construction waste fed in at a constant speed can be crushed more efficiently, avoiding a large amount of construction waste being sent into the crushing box 1 to block the workpiece in the crushing box 1, start the first motor 20, and place it on the first fixing plate 8 Under the rotating support of the rotating plate 9, the first rotating shaft 10 on the right side is driven to rotate, and under the transmission effect of the upper transmission belt 18, the first rotating shaft 10 on the left side is driven to rotate, thereby driving the two first runners 11 to rotate. The crushing blades 12 evenly distributed on the outside of the first runner 11 will initially crush the construction waste falling into the crushing box 1, and the construction waste after the preliminary crushing will fall on the second runner 16, and start the second motor 21. Under the rotation support of the lower rotating plate 14 in the second fixed plate 13, the second rotating shaft 15 on the right side is driven to rotate, and under the transmission effect of the lower transmission belt 19, the second rotating shaft 15 on the left side is driven through the transmission connection of the lower transmission belt 19. Rotate, cooperate with the crushing teeth 17 evenly distributed on the outside of the second runner 16, thoroughly crush the construction waste after the initial crushing, and the construction waste after the thorough crushing falls into the recovery box 25 on the support plate 24 through the discharge port 22 , through feeding at a uniform speed, it is ensured that the pulverizer will not be blocked, and at the same time, the crushing structure below can be crushed efficiently and thoroughly, and then through the operation of crushing first and then crushing, the effect of crushing construction waste can be effectively improved, which greatly improves the construction waste. The working efficiency of the construction waste crushing equipment meets people's requirements for thoroughly crushing construction waste, and solves the problem of low working efficiency of the existing construction waste crushing equipment.

需要说明的是,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that the term "comprising", "comprising" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article or apparatus comprising a set of elements includes not only those elements, but also includes none other elements specifically listed, or also include elements inherent in such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article or apparatus comprising said element.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.

Claims (6)

1. a kind of architectural engineering building waste disintegrating apparatus, including crush box (1), it is characterised in that: the crush box (1) Top is fixedly connected with material bin (2), is fixedly connected with upper frame (3) on the outside of the material bin (2), the bottom of the upper frame (3) Portion is fixedly connected with cabinet (4), and the inside of the cabinet (4) is fixedly installed with servo motor (5), the servo motor (5) Output shaft is fixedly connected with helical axis (6), is fixedly connected with helical blade (7), the crush box on the outside of the helical axis (6) (1) front is fixedly connected there are two the first fixed plate (8), and the inner rotation of first fixed plate (8) is connected with upper rotating plate (9), the back side of the upper rotating plate (9) is fixedly connected with first rotating shaft (10), is fixedly connected on the outside of the first rotating shaft (10) Have the first runner (11), equally distributed broken blade (12), the powder are fixedly connected on the outside of first runner (11) The front of broken case (1) is fixedly connected with the second fixed plate (13) being spaced substantially equidistant, and the inside of second fixed plate (13) turns Dynamic to be connected with lower rotating plate (14), the back side of the lower rotating plate (14) is fixedly connected with the second shaft (15), second shaft (15) it is fixedly connected on the outside of the second runner (16), is fixedly connected with equally distributed powder on the outside of second runner (16) Broken tooth (17) is driven between two first rotating shafts (10) and is electrically connected with transmission belt (18), described in two of the left and right sides It is sequentially connected between second shaft (15) lower drive belts (19), the one end the at right side first rotating shaft (10) back side is fixedly connected On the output shaft of first motor (20), the one end at right side the second shaft (15) back side is fixedly connected on the second motor (21) Output shaft on, the bottom of the crush box (1) offers discharge port (22), and the left and right sides of the crush box (1) is fixed It is connected with chassis (23), is fixedly connected with supporting plate (24) between two chassis (23), the top movable of the supporting plate (24) Recycling bins (25) are installed.
2. a kind of architectural engineering building waste disintegrating apparatus according to claim 1, it is characterised in that: the upper frame (3) it being made of the L shaped plate being fixedly connected at left and right sides of a transverse slat and transverse slat, the cabinet (4) is located at the bottom of transverse slat, and Transverse slat is located at the top of material bin (2).
3. a kind of architectural engineering building waste disintegrating apparatus according to claim 1, it is characterised in that: the material bin (2) it is connected with crush box (1), the bottom end of the helical axis (6) sequentially passes through cabinet (4) and material bin (2) and extends to powder The inside of broken case (1).
4. a kind of architectural engineering building waste disintegrating apparatus according to claim 1, it is characterised in that: described first turn The width of wheel (11) and the second runner (16) is equal to the inboard width of crush box (1), and the helical axis (6) is located at two first Surface between runner (11).
5. a kind of architectural engineering building waste disintegrating apparatus according to claim 1, it is characterised in that: described first is solid Fixed board (8) is located at the top of the second fixed plate (13), and the quantity of second shaft (15) is six altogether, and six the second shafts (15) it is sequentially connected with lower drive belts (19).
6. a kind of architectural engineering building waste disintegrating apparatus according to claim 1, it is characterised in that: left side it is described The one end at first rotating shaft (10) back side sequentially passes through the first runner (11) of the first fixed plate (8), crush box (1) and left side and prolongs The outside and upper transmission belt (18) for extending to crush box (1) are sequentially connected.
CN201822215882.XU 2018-12-27 2018-12-27 Construction waste crushing equipment for construction engineering Expired - Fee Related CN209287495U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822215882.XU CN209287495U (en) 2018-12-27 2018-12-27 Construction waste crushing equipment for construction engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822215882.XU CN209287495U (en) 2018-12-27 2018-12-27 Construction waste crushing equipment for construction engineering

Publications (1)

Publication Number Publication Date
CN209287495U true CN209287495U (en) 2019-08-23

Family

ID=67649305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822215882.XU Expired - Fee Related CN209287495U (en) 2018-12-27 2018-12-27 Construction waste crushing equipment for construction engineering

Country Status (1)

Country Link
CN (1) CN209287495U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110801890A (en) * 2019-11-11 2020-02-18 衡东盛世商品混凝土有限公司 Gravel concrete reducing mechanism

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110801890A (en) * 2019-11-11 2020-02-18 衡东盛世商品混凝土有限公司 Gravel concrete reducing mechanism

Similar Documents

Publication Publication Date Title
CN211463296U (en) Screening device is smashed to building rubbish
CN209968601U (en) A hierarchical shredding device for building rubbish
CN107282190A (en) A kind of recovery lapping device for building fracture
CN108262141A (en) A kind of building waste fast-crushing device
CN209287495U (en) Construction waste crushing equipment for construction engineering
CN107649282A (en) A kind of civil engineering work disposal unit
CN210474190U (en) Rubbing crusher with noise control function
CN211865183U (en) Building engineering construction waste material automatic processing apparatus
CN216322231U (en) Multiple breaker of effect by force
CN217910823U (en) Building rubbish reducing mechanism for building engineering
CN216964753U (en) Waste recovery device is used in building material production
CN217315064U (en) Waste disposal pulverizer
CN213644433U (en) A soil breaker for soil remediation
CN210146095U (en) A municipal waste crushing device
CN212488401U (en) Kitchen waste mixed fermentation feed production all-in-one
CN104511355B (en) A kind of sandstone chipper
CN211887086U (en) An anti-clogging stone crusher
CN211563073U (en) Material crusher for building waste treatment
CN219051623U (en) Efficient crushing device based on construction waste treatment
CN217431810U (en) Waste recovery device is used in processing of wood door plant
CN217341711U (en) Water treatment agent preparation facilities
CN217221626U (en) A kind of comminutor
CN219702094U (en) Building rubbish rubbing crusher convenient to row material
CN214320399U (en) A construction waste recycling and processing device
CN211304209U (en) A civil engineering construction waste treatment device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190823

Termination date: 20191227

CF01 Termination of patent right due to non-payment of annual fee