CN2092562U - Auxiliary pressurizing device of fluidic pump - Google Patents
Auxiliary pressurizing device of fluidic pump Download PDFInfo
- Publication number
- CN2092562U CN2092562U CN 91208506 CN91208506U CN2092562U CN 2092562 U CN2092562 U CN 2092562U CN 91208506 CN91208506 CN 91208506 CN 91208506 U CN91208506 U CN 91208506U CN 2092562 U CN2092562 U CN 2092562U
- Authority
- CN
- China
- Prior art keywords
- water
- pump
- pipe
- pressure pump
- valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Landscapes
- Jet Pumps And Other Pumps (AREA)
Abstract
The utility model provides an auxiliary pressurizing device for a fluidic pump, which is a device suitable for saving the energy consumption and keeping the satisfaction of sufficient water supply requirements by making use of the pressure in the water supply pipe network in the water supply system of needing secondary pressurizing, comprising a water inlet pipeline of the pipe network, a water storage tank 3 with a float ball valve 2, a water outlet pipeline with a pressurizing water pump 6 and an elevated water tank. The water outlet pipe of the water storage pool 3 is provided with a check valve 4 and the space between a pressurizing pump 6 and the water outlet pipe passing through the check valve 4 is provided with a fluidic pump 5. The front portion of the inlet (the water inlet pipeline of the pipe network enters into the inlet) of the water storage pool 3 is provided with an electromagnetic valve 1 controlled by an electric control wire. The energy can be generally saved by 10% to 60%.
Description
The utility model provides a kind of jet pump to assist water booster system, is useful in high-rise building and needs to utilize in the water supply system water booster system of secondary pressurization pressure in the water supply network with energy efficient and keep fully satisfying the device of water supply requirement.
In the prior art, because it is very outstanding that the urban skyscraper thing increases water supply problem year by year, present most high building all adopts usually earlier the water in the pipe network to be injected in the storage cistern that is arranged on basement and raises in the roof high level cistern to supply with the way that full building uses with water pump, its shortcoming is that original head pressure can not obtain utilizing the pump head higher-wattage that is adopted big thereby how quite uneconomical power consumption is in the pipe network, and the easy dissipation of chlorine in the water." microcomputer control automatic speed regulation water supply facilities " that ground such as Shenyang, Jinzhou provides then need not be provided with high level cistern and can not utilize ductwork pressure too, in the water ebb or not during water,, the constant voltage water pump that keeps system consumes unnecessary electric energy for must keeping certain rotating speed.Utility model " building supply device " (patent No. CN87211155U) need be provided with pressurized tank between water pump and pipe network in addition, because pressurized tank generally can not be done to such an extent that very big its volume is very limited also often can not fully satisfy the water supply needs.
The purpose of this utility model provides the auxiliary water booster system of a kind of jet pump, and it is to increase by one group of jet pump to make energy efficient keep the fully device of feedwater with the pumping capacity of utilizing the most pressure head auxiliary water pump in the pipe network as far as possible between high-rise building underground storage tank outlet pipe and pressure pump.
The utility model provides the auxiliary water booster system of a kind of jet pump to be useful in the device that utilizes ductwork pressure fully to satisfy water supply requirement with energy efficient and maintenance in the water supply system that needs the secondary pressurization, it is by the pipe network inlet channel that total water valve and metering water meter are housed substantially, the storage cistern [ 3 ] of float valve [ 2 ] is housed, being provided with the high level cistern that the outlet conduit of pressure pump [ 6 ] and outlet conduit lead to the building top forms, it is characterized in that: a, described water storage tank [ 3 ] is provided with flap valve [ 4 ] on the outlet pipe that its adjacent bottom is adorned, be provided with jet pump [ 5 ] between outlet pipe of drawing behind the process flap valve [ 4 ] and the pressure pump [ 6 ]; Nozzle [ 12 ] rear end in the middle of b, its suction chamber of described jet pump [ 5 ] [ 11 ] is connected with the water inlet pipe [ 10 ] on the pipe network, suction chamber [ 11 ] joins with the water pipe that enters pressure pump [ 6 ] through the anemostat [ 14 ] of mixing tube [ 13 ] on the same center line in nozzle [ 12 ] the place ahead, then is connected with the suction pipe that passes to suction chamber [ 11 ] [ 15 ] through the outlet pipe of drawing behind the flap valve [ 4 ].The installation site of its described water-jet pump [ 5 ] should be as far as possible near storage cistern [ 3 ], and with pressure pump [ 6 ] between need leave and mix the long water pipe that spreads usefulness.Its described pipe network inlet channel is provided with electromagnetic valve [ 1 ] before the import that enters storage cistern [ 3 ], electromagnetic valve [ 1 ] is synchronoused working with pressure pump [ 6 ], electromagnetic valve [ 1 ] cuts out when pressure pump [ 6 ] turns round, and when pressure pump [ 6 ] when stopping electromagnetic valve [ 1 ] open.
The utility model compared with prior art, because it adopts jet pump to connect with water pump, can utilize partial pressure head in the pipe network, improved the intake pressure of water pump, that is the auxiliary pumping capacity that has increased water pump improves its lift that pumps up water, reduce thereby make water pump use power to reduce power consumption, reach the purpose (energy-conservation) of energy efficient about 10%~60%.And do not violate water-supplying unit and generally do not allow directly, the unlikely abrupt pressure reduction that causes the neighbouring area pipe network problem of other unit and resident family's water on every side that exerts an influence by the regulation of drawing water in the pipe network.Because pipe network is directly taken from the water source in the jet pump that is adopted in the nozzle, chlorine dissipation is few, and its jetting amount accounts for half of total inflow or quite most, helps keeping the water cleaning health.
Accompanying drawing:
One of Fig. 1, the auxiliary water booster system of jet pump schematic diagram.
Two schematic diagrames of Fig. 2, the auxiliary water booster system of jet pump.
Three schematic diagrames of Fig. 3, the auxiliary water booster system of jet pump.
Fig. 4, jet pump [ 5 ] sectional view.
Component title in the figure:
1, electromagnetic valve 2, float valve 3, storage cistern 4, flap valve 5, jet pump 6, pressure pump 7, pressure switch 8, adjustable speed water pump 9, speed Control case 10, water inlet pipe 11, suction chamber 12, nozzle 13, mixing tube 14, anemostat 15, suction pipe 16, water pump
Embodiment: on top the adjacent bottom outlet pipe of basement water storage room [ 3 ] of float valve [ 2 ] being housed as shown in Figure 1 water outlet only is installed and the flap valve [ 4 ] that can not intake, installing one group of jet pump [ 5 ] between outlet pipe that flap valve [ 4 ] is drawn and pressure pump [ 6 ].Nozzle [ 12 ] rear end in the middle of the suction chamber [ 11 ] of jet pump [ 5 ] is connected with the water inlet pipe [ 10 ] that the pipe network inlet channel is branched out.The pipe network inlet channel that is provided with total water valve and metering water meter is bifurcated into two tubes after pressure meter, its another pipe enters storage cistern [ 3 ] top and is provided with the electromagnetic valve [ 1 ] of being synchronoused working with pressure pump [ 6 ] by the automatically controlled circuit manipulation in import department, and moisturizing makes storage cistern often be in full water state successively.The pipe network inlet channel that has pressure makes the nozzle [ 12 ] of jet pump [ 5 ] be in the jetting state always, the water that can ceaselessly use the water in this barrel also suction chamber [ 11 ] to be full of is all the time taken away in the water inlet pipe that is injected into pressure pump [ 6 ] jointly and is pumped up water, expired till its liquid level relay shows that signal closely makes pressure pump [ 6 ] termination of pumping until roof high level cistern middle water level, can keep sufficient and continuous self water feeding.
Embodiment two, its basic structure is with accompanying drawing 1 embodiment as shown in Figure 2, in addition on the pipe network inlet channel by adorn a multidigit pressure switch [ 7 ], on storage cistern [ 3 ] outlet pipe by adorning an adjustable speed water pump [ 8 ], going up set about 5~6 different water pressure numerical value correspondences contacts by pressure switch [ 7 ] with automatically controlled circuit respectively by speed Control case [ 9 ] therebetween adjustable speed water pump [ 8 ] rotating speed is handled adjustment.(be assumed to 1.5Kgf/cm when for example pipe network water pressure is the minimum stage value
2) should make adjustable speed water pump [ 8 ] rotating speed reach maximum value also can to obtain H-Max, and (be assumed to 4Kgf/cm during for maximum Stage Value at pipe network water pressure
2) should make adjustable speed water pump [ 8 ] speed drop to zero-bit termination of pumping just.By jet pump [ 5 ] under big hydraulic head direct attack to pressure pump [ 6 ] pumped up water by another flap valve [ 4 ] through by-pass line this moment, its middle each set contact in turn corresponding matching.Jet pump [ 5 ] can be changed with ductwork pressure obtain necessary lift and to export enough flows, not only energy efficient but also can guarantee abundant feedwater.
Embodiment three, as shown in Figure 3 but the equal nozzle [ 12 ] by jet pump [ 5 ] of the current of its pipe network inlet channel, the water pump [ 16 ] of pressurization uses frequency conversion speed adjusting pump, the inflow of pipe network is greater than the pump-out of water pump [ 16 ] when the low discharge state, and the part current in the pipe network can backflow via suction pipe [ 15 ] inlet of jet pump [ 5 ] suction chamber [ 11 ] and enter storage cistern [ 3 ] along upright flap valve [ 4 ].And when water pump [ 16 ] pump-out during greater than the inflow of pipe network, the current of storage cistern [ 3 ] are inhaled in the jet pump [ 5 ] by flap valve horizontal on the outlet pipe of bottom [ 4 ] and enter water pump [ 16 ] jointly and raise in the system of building and supply water, and so circulation is carried out.
Claims (3)
1, the auxiliary water booster system of a kind of jet pump, be useful in the device that utilizes ductwork pressure fully to satisfy water supply requirement with energy efficient and maintenance in the water supply system that needs the secondary pressurization, it is made up of the high level cistern that the pipe network inlet channel that total water valve and metering water meter are housed, the storage cistern [3] that float valve [2] are housed, the outlet conduit that is provided with pressure pump [6] and outlet conduit lead to building top substantially, it is characterized in that:
A, described water storage tank [3] are provided with flap valve [4] on the outlet pipe that its adjacent bottom is adorned, be provided with jet pump [5] between outlet pipe of drawing behind the process flap valve [4] and the pressure pump [6];
Nozzle [12] rear end in the middle of b, its suction chamber of described jet pump [5] [11] is connected with the water inlet pipe [10] on the pipe network, suction chamber [11] is connected with the water pipe that enters pressure pump [6] through the anemostat [14] of mixing tube [13] on the same center line in nozzle [12] the place ahead, then is connected with the suction pipe that passes to suction chamber [11] [15] through the outlet pipe of drawing behind the flap valve [4].
2, water booster system according to claim 1 is characterized in that the installation site of described water-jet pump [ 5 ] should be as far as possible near storage cistern [ 3 ], and with pressure pump [ 6 ] between need leave and mix the long water pipe that spreads usefulness.
3, water booster system according to claim 1, it is characterized in that described pipe network inlet channel is provided with electromagnetic valve [ 1 ] before the import that enters storage cistern [ 3 ], electromagnetic valve [ 1 ] is synchronoused working with pressure pump [ 6 ], electromagnetic valve [ 1 ] cuts out when pressure pump [ 6 ] turns round, and when pressure pump [ 6 ] when stopping electromagnetic valve [ 1 ] open.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 91208506 CN2092562U (en) | 1991-05-16 | 1991-05-16 | Auxiliary pressurizing device of fluidic pump |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 91208506 CN2092562U (en) | 1991-05-16 | 1991-05-16 | Auxiliary pressurizing device of fluidic pump |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2092562U true CN2092562U (en) | 1992-01-08 |
Family
ID=4917712
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 91208506 Withdrawn CN2092562U (en) | 1991-05-16 | 1991-05-16 | Auxiliary pressurizing device of fluidic pump |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2092562U (en) |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100445480C (en) * | 2005-09-30 | 2008-12-24 | 姜全德 | Water-inlet pressure pretreatment of direct running-water pipeline pressurizer |
CN102877509A (en) * | 2011-07-15 | 2013-01-16 | 开利泵业(集团)有限公司 | Water injection-type water supply device |
CN103912038A (en) * | 2014-02-28 | 2014-07-09 | 赵汝杰 | Jet pressurizing energy-saving auxiliary water supply device |
CN104712014A (en) * | 2013-12-12 | 2015-06-17 | 孙玉伟 | Pressurized water-supply energy-saving system |
US10990114B1 (en) | 2019-12-30 | 2021-04-27 | Marathon Petroleum Company Lp | Methods and systems for inline mixing of hydrocarbon liquids |
US11247184B2 (en) | 2019-12-30 | 2022-02-15 | Marathon Petroleum Company Lp | Methods and systems for spillback control of in-line mixing of hydrocarbon liquids |
US11559774B2 (en) | 2019-12-30 | 2023-01-24 | Marathon Petroleum Company Lp | Methods and systems for operating a pump at an efficiency point |
US11596910B2 (en) | 2019-12-30 | 2023-03-07 | Marathon Petroleum Company Lp | Methods and systems for in-line mixing of hydrocarbon liquids |
US11754225B2 (en) | 2021-03-16 | 2023-09-12 | Marathon Petroleum Company Lp | Systems and methods for transporting fuel and carbon dioxide in a dual fluid vessel |
US11808013B1 (en) | 2022-05-04 | 2023-11-07 | Marathon Petroleum Company Lp | Systems, methods, and controllers to enhance heavy equipment warning |
US11807945B2 (en) | 2021-08-26 | 2023-11-07 | Marathon Petroleum Company Lp | Assemblies and methods for monitoring cathodic protection of structures |
US11815227B2 (en) | 2021-03-16 | 2023-11-14 | Marathon Petroleum Company Lp | Scalable greenhouse gas capture systems and methods |
US12006014B1 (en) | 2023-02-18 | 2024-06-11 | Marathon Petroleum Company Lp | Exhaust vent hoods for marine vessels and related methods |
US12012082B1 (en) | 2022-12-30 | 2024-06-18 | Marathon Petroleum Company Lp | Systems and methods for a hydraulic vent interlock |
US12012883B2 (en) | 2021-03-16 | 2024-06-18 | Marathon Petroleum Company Lp | Systems and methods for backhaul transportation of liquefied gas and CO2 using liquefied gas carriers |
US12043361B1 (en) | 2023-02-18 | 2024-07-23 | Marathon Petroleum Company Lp | Exhaust handling systems for marine vessels and related methods |
US12043905B2 (en) | 2021-08-26 | 2024-07-23 | Marathon Petroleum Company Lp | Electrode watering assemblies and methods for maintaining cathodic monitoring of structures |
US12087002B1 (en) | 2023-09-18 | 2024-09-10 | Marathon Petroleum Company Lp | Systems and methods to determine depth of soil coverage along a right-of-way |
US12129559B2 (en) | 2021-08-26 | 2024-10-29 | Marathon Petroleum Company Lp | Test station assemblies for monitoring cathodic protection of structures and related methods |
US12180597B2 (en) | 2021-08-26 | 2024-12-31 | Marathon Petroleum Company Lp | Test station assemblies for monitoring cathodic protection of structures and related methods |
US12203401B2 (en) | 2021-03-16 | 2025-01-21 | Marathon Petroleum Company Lp | Scalable greenhouse gas capture systems and methods |
-
1991
- 1991-05-16 CN CN 91208506 patent/CN2092562U/en not_active Withdrawn
Cited By (43)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100445480C (en) * | 2005-09-30 | 2008-12-24 | 姜全德 | Water-inlet pressure pretreatment of direct running-water pipeline pressurizer |
CN102877509A (en) * | 2011-07-15 | 2013-01-16 | 开利泵业(集团)有限公司 | Water injection-type water supply device |
CN104712014A (en) * | 2013-12-12 | 2015-06-17 | 孙玉伟 | Pressurized water-supply energy-saving system |
CN103912038A (en) * | 2014-02-28 | 2014-07-09 | 赵汝杰 | Jet pressurizing energy-saving auxiliary water supply device |
US11596910B2 (en) | 2019-12-30 | 2023-03-07 | Marathon Petroleum Company Lp | Methods and systems for in-line mixing of hydrocarbon liquids |
US11752472B2 (en) | 2019-12-30 | 2023-09-12 | Marathon Petroleum Company Lp | Methods and systems for spillback control of in-line mixing of hydrocarbon liquids |
US11247184B2 (en) | 2019-12-30 | 2022-02-15 | Marathon Petroleum Company Lp | Methods and systems for spillback control of in-line mixing of hydrocarbon liquids |
US11416012B2 (en) | 2019-12-30 | 2022-08-16 | Marathon Petroleum Company Lp | Methods and systems for inline mixing of hydrocarbon liquids |
US11559774B2 (en) | 2019-12-30 | 2023-01-24 | Marathon Petroleum Company Lp | Methods and systems for operating a pump at an efficiency point |
US11565221B2 (en) | 2019-12-30 | 2023-01-31 | Marathon Petroleum Company Lp | Methods and systems for operating a pump at an efficiency point |
US12011697B2 (en) | 2019-12-30 | 2024-06-18 | Marathon Petroleum Company Lp | Methods and systems for spillback control of in-line mixing of hydrocarbon liquids |
US11607654B2 (en) | 2019-12-30 | 2023-03-21 | Marathon Petroleum Company Lp | Methods and systems for in-line mixing of hydrocarbon liquids |
US11662750B2 (en) | 2019-12-30 | 2023-05-30 | Marathon Petroleum Company Lp | Methods and systems for inline mixing of hydrocarbon liquids |
US11132008B2 (en) | 2019-12-30 | 2021-09-28 | Marathon Petroleum Company Lp | Methods and systems for inline mixing of hydrocarbon liquids |
US12197238B2 (en) | 2019-12-30 | 2025-01-14 | Marathon Petroleum Company Lp | Methods and systems for inline mixing of hydrocarbon liquids |
US12128369B2 (en) | 2019-12-30 | 2024-10-29 | Marathon Petroleum Company Lp | Methods and systems for in-line mixing of hydrocarbon liquids |
US11774990B2 (en) | 2019-12-30 | 2023-10-03 | Marathon Petroleum Company Lp | Methods and systems for inline mixing of hydrocarbon liquids based on density or gravity |
US11794153B2 (en) | 2019-12-30 | 2023-10-24 | Marathon Petroleum Company Lp | Methods and systems for in-line mixing of hydrocarbon liquids |
US12109543B2 (en) | 2019-12-30 | 2024-10-08 | Marathon Petroleum Company Lp | Methods and systems for operating a pump at an efficiency point |
US12066843B2 (en) | 2019-12-30 | 2024-08-20 | Marathon Petroleum Company Lp | Methods and systems for inline mixing of hydrocarbon liquids based on density or gravity |
US10990114B1 (en) | 2019-12-30 | 2021-04-27 | Marathon Petroleum Company Lp | Methods and systems for inline mixing of hydrocarbon liquids |
US11815227B2 (en) | 2021-03-16 | 2023-11-14 | Marathon Petroleum Company Lp | Scalable greenhouse gas capture systems and methods |
US11774042B2 (en) | 2021-03-16 | 2023-10-03 | Marathon Petroleum Company Lp | Systems and methods for transporting fuel and carbon dioxide in a dual fluid vessel |
US12000538B2 (en) | 2021-03-16 | 2024-06-04 | Marathon Petroleum Company Lp | Systems and methods for transporting fuel and carbon dioxide in a dual fluid vessel |
US12203598B2 (en) | 2021-03-16 | 2025-01-21 | Marathon Petroleum Company Lp | Systems and methods for transporting fuel and carbon dioxide in a dual fluid vessel |
US12203401B2 (en) | 2021-03-16 | 2025-01-21 | Marathon Petroleum Company Lp | Scalable greenhouse gas capture systems and methods |
US11754225B2 (en) | 2021-03-16 | 2023-09-12 | Marathon Petroleum Company Lp | Systems and methods for transporting fuel and carbon dioxide in a dual fluid vessel |
US12012883B2 (en) | 2021-03-16 | 2024-06-18 | Marathon Petroleum Company Lp | Systems and methods for backhaul transportation of liquefied gas and CO2 using liquefied gas carriers |
US11988336B2 (en) | 2021-03-16 | 2024-05-21 | Marathon Petroleum Company Lp | Scalable greenhouse gas capture systems and methods |
US12163625B2 (en) | 2021-03-16 | 2024-12-10 | Marathon Petroleum Company Lp | Scalable greenhouse gas capture systems and methods |
US12180597B2 (en) | 2021-08-26 | 2024-12-31 | Marathon Petroleum Company Lp | Test station assemblies for monitoring cathodic protection of structures and related methods |
US11807945B2 (en) | 2021-08-26 | 2023-11-07 | Marathon Petroleum Company Lp | Assemblies and methods for monitoring cathodic protection of structures |
US12043905B2 (en) | 2021-08-26 | 2024-07-23 | Marathon Petroleum Company Lp | Electrode watering assemblies and methods for maintaining cathodic monitoring of structures |
US12129559B2 (en) | 2021-08-26 | 2024-10-29 | Marathon Petroleum Company Lp | Test station assemblies for monitoring cathodic protection of structures and related methods |
US12043906B2 (en) | 2021-08-26 | 2024-07-23 | Marathon Petroleum Company Lp | Assemblies and methods for monitoring cathodic protection of structures |
US12195861B2 (en) | 2021-08-26 | 2025-01-14 | Marathon Petroleum Company Lp | Test station assemblies for monitoring cathodic protection of structures and related methods |
US11808013B1 (en) | 2022-05-04 | 2023-11-07 | Marathon Petroleum Company Lp | Systems, methods, and controllers to enhance heavy equipment warning |
US11965317B2 (en) | 2022-05-04 | 2024-04-23 | Marathon Petroleum Company Lp | Systems, methods, and controllers to enhance heavy equipment warning |
US12012082B1 (en) | 2022-12-30 | 2024-06-18 | Marathon Petroleum Company Lp | Systems and methods for a hydraulic vent interlock |
US12043361B1 (en) | 2023-02-18 | 2024-07-23 | Marathon Petroleum Company Lp | Exhaust handling systems for marine vessels and related methods |
US12195158B2 (en) | 2023-02-18 | 2025-01-14 | Marathon Petroleum Company Lp | Exhaust vent hoods for marine vessels and related methods |
US12006014B1 (en) | 2023-02-18 | 2024-06-11 | Marathon Petroleum Company Lp | Exhaust vent hoods for marine vessels and related methods |
US12087002B1 (en) | 2023-09-18 | 2024-09-10 | Marathon Petroleum Company Lp | Systems and methods to determine depth of soil coverage along a right-of-way |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2092562U (en) | Auxiliary pressurizing device of fluidic pump | |
CN204811321U (en) | Solar energy siphon suction pipe pump | |
CN200971526Y (en) | Non-negative water supply equipment for spare water of water tank | |
CN209908781U (en) | Water wheel pump type pressure-superposed water supply device | |
CN205156379U (en) | Solar water heater | |
CN215977511U (en) | Water tank type pipe network pressure-superposed water supply equipment with cleaning and pressurizing functions | |
CN104846937A (en) | Pipe network pressure-superposed water supply equipment with auxiliary energy-saving small-flow pump | |
CN2461968Y (en) | Non-negative pressure water supply appts. | |
CN208108442U (en) | A kind of air conditioner condensate water replaces water supplying unit | |
CN207228233U (en) | Variable quantity and pressure non-negative pressure water-supply installation | |
CN201288356Y (en) | Full-automatic pipe network direct-connection non negative-pressure water-supply installation | |
CN2186261Y (en) | Automatic constant pressure water-supply device for high-building water pool | |
CN217329430U (en) | Water treatment facilities inflow control adjustment device | |
CN219315867U (en) | Energy-saving water supply device | |
CN2175791Y (en) | Automatic water make-up apparatus for high building | |
CN2134517Y (en) | Efficience negative pressure pumping apparatus | |
CN213682303U (en) | Special movable water taking pump ship for tailing backwater system | |
CN217275006U (en) | Workshop cooling water circulating device | |
CN2583413Y (en) | Pipe network overbottom pressure utilization device | |
CN2761896Y (en) | All low frame steam jet vacuum system | |
CN2491781Y (en) | Indoor water sucking feedback water valve auto feeder of solar water heater | |
CN220237952U (en) | Invariable low-flow intermittent water inlet device for wastewater treatment | |
CN217682417U (en) | Improved water diversion device of suction type water pump | |
CN2397287Y (en) | Jet type water pump self-sucking device | |
CN219028434U (en) | Cooling water inlet device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C15 | Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993) | ||
RN01 | Renewal of patent term | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |