CN209084688U - The reserved drilling mark mold of airfield pavement recessed light fixture lamp position - Google Patents

The reserved drilling mark mold of airfield pavement recessed light fixture lamp position Download PDF

Info

Publication number
CN209084688U
CN209084688U CN201822134512.3U CN201822134512U CN209084688U CN 209084688 U CN209084688 U CN 209084688U CN 201822134512 U CN201822134512 U CN 201822134512U CN 209084688 U CN209084688 U CN 209084688U
Authority
CN
China
Prior art keywords
steel pipe
light fixture
modulus
mold
adjustable positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822134512.3U
Other languages
Chinese (zh)
Inventor
郑来福
肖共和
何同元
沈刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jinghangan Airport Engineering Co Ltd
Original Assignee
Beijing Jinghangan Airport Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jinghangan Airport Engineering Co Ltd filed Critical Beijing Jinghangan Airport Engineering Co Ltd
Priority to CN201822134512.3U priority Critical patent/CN209084688U/en
Application granted granted Critical
Publication of CN209084688U publication Critical patent/CN209084688U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of reserved drilling mark molds of airfield pavement recessed light fixture lamp position, including Steel pipe mould, the Steel pipe mould includes 100 coating steel pipes, it is equipped with lamp outside 100 coating steel pipe and cheats deep-controlled plate, metal beam is equipped in 100 coating steel pipe, the metal beam is connected with horizon adjustable positioning screw, the lower end of the horizon adjustable positioning screw is equipped with baffle, the horizon adjustable positioning screw is threaded with adjusting nut, and the lower end of the horizon adjustable positioning screw is inserted into secondary spool;Utility model has the advantages that can effective position recessed light fixture position, it is convenient to remove, it is economical and practical, improve working efficiency.

Description

The reserved drilling mark mold of airfield pavement recessed light fixture lamp position
Technical field
The utility model relates to a kind of hole drilling die, specifically a kind of airfield pavement recessed light fixture lamp position is reserved to be bored Hole identifies mold, belongs to hole drilling die field.
Background technique
Currently, navigational lighting aid engineering reserves lamp hole in the recessed light fixture that road face is installed, reserved by past traditional mold Mode switchs to advanced machine drilling new process.When usually wanting road on the scene to carry out pavement concretec construction before the drilling of road face lamp position, The construction personnel secondary line protection pipe lamp position position pre-buried to early period carries out tracking and positioning construction, reserved for the drilling of next step lamp position It identifies out, generallys use the secondary spool of traditional approach and pinch flat outer plastic pipe-covered bolt and pre-buried 100PVC pipe box out method, constructing operation It is cumbersome, at high cost, low efficiency.
Summary of the invention
To solve the above-mentioned problems, the utility model devises a kind of reserved drilling mark of airfield pavement recessed light fixture lamp position Know mold, facilitates construction positioning, save the cost, high-efficient.
The reserved drilling of airfield pavement recessed light fixture lamp position identifies mold, including Steel pipe mould, the Steel pipe mould include 100 coating steel pipes, the 100 coating steel pipe outside are equipped with lamp and cheat deep-controlled plate, and metal cross is equipped in 100 coating steel pipe Beam, the metal beam are connected with horizon adjustable positioning screw, and the lower end of the horizon adjustable positioning screw is equipped with baffle, described Horizon adjustable positioning screw is threaded with adjusting nut, and the lower end of the horizon adjustable positioning screw is inserted into secondary spool It is interior.
Modulus pull rod is connected in the metal beam, modulus pull rod is an absolute construction, for taking out 100 galvanized steels Pipe mold.
The modulus pull rod includes modulus screw rod, and the modulus screw rod is arranged on screw rod fixed frame, and the screw rod is fixed Frame is arranged in 150 galvanized pipes, and the lower end of the modulus screw rod is equipped with hook, and the hook is mounted with the metal beam.
The elbow of the secondary spool is arranged in steel reinforcement cage.Steel reinforcement cage is located at around secondary spool, is that a road provides For reinforcing concrete strength, by mold fix stably, mold is caused not deviate excessive.
In use, need to take out Steel pipe mould after the completion of road face pours, taking out after-pouring road face, there are one small Cavity provides position to drilling, there is secondary line protection pipe in cavity, i.e. the lamp position drilling position that needs to look for.
Metal beam first is that for modulus pull rod hook support, reach take out 100 coating steel pipe molds be used;Second is that can The Steel pipe mould levelness face equal with road face is adjusted, is completed by adjusting nut and horizon adjustable positioning screw.
Further, the outer wall of the Steel pipe mould is equipped with foam isolation film, mainly facilitates the isolation of Steel pipe mould, light It slides and takes out, then cycling and reutilization.
The baffle is aperture mantle fiber, is used to fixedly adjustable horizontal location screw rod and adjusting nut, can by adjusting nut Keep Steel pipe mould consistent with road face die plate lower planes;The horizon adjustable positioning screw is inserted into pre-buried secondary spool early period In elbow, using its height as basic point, adjustment reaches mold and road face die plate with high;In addition adjustment screw is inserted into secondary spool Interior, using the effect of baffle, concrete will not enter 100 coating steel pipe molds, keep cavity;
In use, construction personnel is curved by pre-buried secondary spool early period first when blocking the way surface concrete construction meets lamp position Head erects, and will shift to an earlier date ready Steel pipe mould with iron wire and be fixed on steel reinforcement cage suitable position, while lamp is cheated deep-controlled plate Required drilling depth size positions are put into, horizon adjustable positioning screw lower end is directly inserted into secondary spool, heap training is a little Concrete fixes mold, makes the concrete basic forming around mold.With concrete around steel reinforcement cage and at the beginning of Steel pipe mould After step is fixed, correction Steel pipe mould plane is consistent with field road form height, method be by cotton rope lodge between two templates, be placed on Mold middle line (and lamp position middle line) is adjusted to consistent with form height by adjusting key screw steel mold height, then with soil Work cloth is sealed mold is suitable for reading, and concrete is avoided to enter.
Carry out concrete construction in, into receive face process after, can be to plucking after, grasp opportunity, utilize wraping plate Manually Steel pipe mould is taken out, Steel pipe mould taking-up is can to determine to take according to construction busy situation to touch the time, because of steel pipe mould Have housing foam isolation film, mold is isolated with concrete.When modulus, by the gold for hanging over reserved mold of modulus pull rod Belong on crossbeam, rotate modulus pull rod pull rod handle, moves up pull rod hook, the steel pipe mould being gradually reserved in foam isolation film Tool is pulled out by draw.
The reserved drilling mark mold advantage of airfield pavement recessed light fixture lamp position is: help improves setting accuracy, mentions Rise construction quality;Semi-automatic modulus pull rod promotes modulus efficiency, saves human cost;Device is simple, and design is reasonable, manufacturing cost It is low.
The utility model is described in further detail with example with reference to the accompanying drawing.
Detailed description of the invention
Fig. 1 is the structure chart of the reserved drilling mark mold of the example of the utility model;
Fig. 2 is the structure chart of the example of the utility model modulus pull rod;
Fig. 3 puts figure for 100 coating steel pipe mold of the example of the utility model;
Fig. 4 is that the example of the utility model adjusts level intention.
Specific embodiment
The preferred embodiment of the utility model is illustrated below, described preferred embodiment is only used for describing and explaining this Utility model is not used to limit the utility model.
As shown in Figure 1, a kind of reserved drilling mark mold of airfield pavement recessed light fixture lamp position, including Steel pipe mould 1, institute Stating Steel pipe mould 1 includes 100 coating steel pipes 11, and lamp is equipped with outside 100 coating steel pipe 11 and cheats deep-controlled plate (for coal tar Felt separation layer, lamp cheat the general 170mm of drilling depth, and being measured or made marks with ruler, it is deep-controlled to carry out) 12, described 100 is zinc-plated Metal beam 13 is equipped in steel pipe 11, the metal beam 13 is connected with horizon adjustable positioning screw 14, and the adjusting water is calmed down The lower end of position screw rod 14 is equipped with baffle 15, and the horizon adjustable positioning screw 14 is threaded with adjusting nut 16, described adjustable The lower end of horizontal location screw rod 14 is inserted into secondary spool 3.
Modulus pull rod (as shown in Figure 2) 2 is connected in the metal beam 13, modulus pull rod 2 is an absolute construction, is used In 100 coating steel pipe molds of taking-up.
The modulus pull rod 2 includes modulus screw rod 21, and the modulus screw rod 21 is arranged on screw rod fixed frame 22, the spiral shell Bar fixed frame 22 is arranged in 150 galvanized pipes 23, and the lower end of the modulus screw rod 2 is equipped with hook 24, the hook 24 with it is described Metal beam 13 mounts.
The elbow of the secondary spool 3 is arranged in steel reinforcement cage 4.Steel reinforcement cage 4 is located at around secondary spool, is that a road provides For reinforcing concrete strength, by mold fix stably, cause mold not deviate excessive.
In use, need to take out Steel pipe mould after the completion of road face pours, taking out after-pouring road face, there are one small Cavity provides position to drilling, there is secondary line protection pipe in cavity, i.e. the lamp position drilling position that needs to look for.
Metal beam first is that for modulus pull rod hook support, reach take out 100 coating steel pipe molds be used;Second is that can The Steel pipe mould levelness face equal with road face is adjusted, is completed by adjusting nut and horizon adjustable positioning screw.
The outer wall of the Steel pipe mould 1 is equipped with foam isolation film 17, mainly facilitates the isolation of Steel pipe mould, smooth to take Out, then cycling and reutilization.
The baffle is aperture mantle fiber, is used to fixedly adjustable horizontal location screw rod and adjusting nut, can by adjusting nut Keep Steel pipe mould consistent with road face die plate lower planes;The horizon adjustable positioning screw is inserted into pre-buried secondary spool early period In elbow, using its height as basic point, adjustment reaches mold and road face die plate with high;In addition adjustment screw is inserted into secondary spool Interior, using the effect of baffle, concrete will not enter 100 coating steel pipe molds, keep cavity.
In use, construction personnel is curved by pre-buried secondary spool early period first when blocking the way surface concrete construction meets lamp position Head erects, and will shift to an earlier date ready Steel pipe mould (Fig. 1) with iron wire and be fixed on steel reinforcement cage suitable position, while lamp is cheated depth control Making sheet (malthoid separation layer) is put into required drilling depth size (170mm) position, and horizon adjustable positioning screw lower end is directly inserted Enter into secondary spool, heap trains a little concrete and mold is fixed, and makes the concrete basic forming around mold, sees Fig. 3.With mixed Solidifying soil is, the method consistent with field road form height that around steel reinforcement cage and after Steel pipe mould is tentatively fixed, correct Steel pipe mould plane Be by 5 lodge of cotton rope between two templates 6, be placed on mold middle line (and lamp position middle line), it is high by adjusting key screw steel mold Degree is adjusted to consistent with form height, is then sealed with geotextiles mold is suitable for reading, avoids concrete from entering, see Fig. 4.
Carry out concrete construction in, into receive face process after, can be to plucking after, grasp opportunity, utilize wraping plate Manually Steel pipe mould is taken out, Steel pipe mould taking-up is can to determine to take according to construction busy situation to touch the time, because of steel pipe mould Have housing foam isolation film, mold is isolated with concrete.When modulus, by the gold for hanging over reserved mold of modulus pull rod Belong on crossbeam, rotate modulus pull rod pull rod handle, moves up pull rod hook, the steel pipe mould being gradually reserved in foam isolation film Tool is pulled out by draw.

Claims (4)

1. the reserved drilling mark mold of airfield pavement recessed light fixture lamp position, it is characterised in that: including Steel pipe mould, the steel pipe Mold includes 100 coating steel pipes, and lamp is equipped with outside 100 coating steel pipe and cheats deep-controlled plate, is set in 100 coating steel pipe There is metal beam, the metal beam is connected with horizon adjustable positioning screw, and the lower end of the horizon adjustable positioning screw is equipped with Baffle, the horizon adjustable positioning screw are threaded with adjusting nut, and the lower end of the horizon adjustable positioning screw is inserted into In secondary spool.
2. the reserved drilling mark mold of airfield pavement recessed light fixture lamp position according to claim 1, it is characterised in that: institute It states and is connected with modulus pull rod in metal beam.
3. the reserved drilling mark mold of airfield pavement recessed light fixture lamp position according to claim 2, it is characterised in that: institute Stating modulus pull rod includes modulus screw rod, and the modulus screw rod is arranged on screw rod fixed frame, and the screw rod fixed mount setting is 150 In galvanized pipe, the lower end of the modulus screw rod is equipped with hook, and the hook is mounted with the metal beam.
4. the reserved drilling mark mold of airfield pavement recessed light fixture lamp position according to claim 1, it is characterised in that: institute The elbow for stating secondary spool is arranged in steel reinforcement cage.
CN201822134512.3U 2018-12-19 2018-12-19 The reserved drilling mark mold of airfield pavement recessed light fixture lamp position Active CN209084688U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822134512.3U CN209084688U (en) 2018-12-19 2018-12-19 The reserved drilling mark mold of airfield pavement recessed light fixture lamp position

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822134512.3U CN209084688U (en) 2018-12-19 2018-12-19 The reserved drilling mark mold of airfield pavement recessed light fixture lamp position

Publications (1)

Publication Number Publication Date
CN209084688U true CN209084688U (en) 2019-07-09

Family

ID=67126937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822134512.3U Active CN209084688U (en) 2018-12-19 2018-12-19 The reserved drilling mark mold of airfield pavement recessed light fixture lamp position

Country Status (1)

Country Link
CN (1) CN209084688U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113146808A (en) * 2021-04-06 2021-07-23 四川华西安装工程有限公司 Shallow barrel lamp mold and lamp pit forming method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113146808A (en) * 2021-04-06 2021-07-23 四川华西安装工程有限公司 Shallow barrel lamp mold and lamp pit forming method

Similar Documents

Publication Publication Date Title
CN103061504A (en) Concrete board pipeline installation reserved hole construction mould and construction method
CN209084688U (en) The reserved drilling mark mold of airfield pavement recessed light fixture lamp position
CN107227816A (en) A construction method of through-wall casing based on prefabricated blocks of through-wall casing
CN204343677U (en) Detachable sleeve pipe die with reserved holes in construction site
CN217420505U (en) Flanging one-step pouring forming formwork supporting device
CN108468348B (en) The porous piping lane construction technology of box quick assembly and disassembly mould
CN201406834Y (en) Reserved opening die for top plate
CN209440495U (en) A kind of concrete tubular pile molding machine
CN206034925U (en) Control stopper of cast -in -place concrete floor thickness
CN209163455U (en) A kind of telescopic shaper of Bars In Poured Concrete Slab water stopping type reserving hole
CN204551173U (en) Pull bar locating support
CN219864664U (en) Anti-leakage structure of window auxiliary frame
CN207535060U (en) For the built-in fitting fixing device of prefabricated board die
CN216851120U (en) A device that is used for electromechanical spool assistance-localization real-time of beam bottom plank sheathing
CN211320855U (en) Prefabricated wall line box frock frame
CN113431300B (en) Construction device for building outer vertical surface concrete decoration hollow structure
CN214658911U (en) Adjustable cast-in-place slab concrete thickness control instrument
CN212053813U (en) Prefabricated wall body split bolt hole built-in fitting
CN108729456A (en) It is a kind of one concrete revetment pour mold and its pouring construction method
CN212170779U (en) Partition plate mould trowelling mechanism
CN212428082U (en) Electromechanical pre-buried device of high-rise apartment building
CN209066876U (en) A kind of structure for fixing pre-buried box body on aluminum alloy mould plate
CN210616866U (en) Building engineering construction pouring template
CN205975617U (en) Prestressing force pre -embedded steel pipe device
CN206220500U (en) Shear wall feedwater tube seat pre-embedded device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant