CN209009920U - A kind of building hoist guide rail frame hanging device - Google Patents
A kind of building hoist guide rail frame hanging device Download PDFInfo
- Publication number
- CN209009920U CN209009920U CN201821659144.8U CN201821659144U CN209009920U CN 209009920 U CN209009920 U CN 209009920U CN 201821659144 U CN201821659144 U CN 201821659144U CN 209009920 U CN209009920 U CN 209009920U
- Authority
- CN
- China
- Prior art keywords
- arm
- suspension
- guide rail
- load cross
- base station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000725 suspension Substances 0.000 claims abstract description 48
- 239000000203 mixture Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 10
- 238000010586 diagram Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 2
- 235000008331 Pinus X rigitaeda Nutrition 0.000 description 1
- 235000011613 Pinus brutia Nutrition 0.000 description 1
- 241000018646 Pinus brutia Species 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The utility model discloses a kind of building hoist guide rail frame hanging devices, comprising: suspension lifter, suspension lifter guide rail bracket, the suspension lifter include suspension lifter base station, and the suspension lifter base station is equipped with suspension arrangement and elevator craning cage;The suspension arrangement is made of load cross-arm, guide wheel device, compressed spring, moving track, load cross-arm mechanical lock and crossbearer; load cross-arm two sides are respectively equipped with one group of guide wheel device; one compressed spring is respectively installed in the guide wheel device; wherein; the moving track and load cross-arm mechanical lock are fixedly connected by bolt with the crossbearer, and the suspension arrangement is on the crossbearer being assemblied at the top of base station;The suspension lifter is equipped with the guide rail bracket being used cooperatively.Complete machine all wt can all be undertaken by suspension arrangement in this programme, so that the safety that the type building hoist uses greatly improved.
Description
Technical field
The utility model relates to a kind of building hoist guide rail frame hanging devices, belong to building hoist equipment and technology neck
Domain.
Background technique
Traditional construction elevator is usually that a chassis is fixed above basis, and elevator guide bracket bottom is docked solid with chassis
Surely it is seated the surface on basis, cage can only be run on the guide rail bracket above basis, the self weight of building hoist complete machine and load
Loading amount is all directly taken on by basis.Building hoist some special fields such as deep-well construction in, building hoist
Basis is rest on the ground, and as the depth that hoistway is constructed is continuously increased, building hoist guide rail bracket requires constantly to extend to underground;
At this point, traditional building hoist has been unable to meet construction requirement.The suspension building hoist that guide rail bracket is inversely installed is a kind of
The special construction elevator that can satisfy deep-well construction, is provided with the base that can drive and fix guide rail bracket in ground base
It stands, by base station drive system, guide rail bracket can be driven integrally to move down and reach the depth of requirement, which exists
In normal use process, guide rail bracket is integrally attached on base station by guide rail bracket by the braking system of base station driving mechanism, guide rail
Frame is located at base station or less and is partially typically in suspension status (the only constraint of horizontal direction), the self weight of building hoist complete machine and load
Loading amount etc. is undertaken by base station;If the brake system non-functional of base station driving mechanism, there are complete machines to fall for building hoist
Significant security risk.It is solved for this reason, it may be necessary to design the new technical solution of one kind and give.
Summary of the invention
The utility model is exactly in view of the deficienciess of the prior art, provide a kind of suspension that guide rail bracket is inversely installed construction
Elevator guide rails frame hanging device, the suspension arrangement are arranged on base station, and when operating normally, construction rises construction elevator cage
Drop machine main screw lift is shared by suspension arrangement and base station driving mechanism braking system, if base station driving mechanism braking system is lost
Effect, complete machine all wt can all be undertaken by suspension arrangement, so that the safety that the type building hoist uses greatly improved
Property, meet actual operation requirements.
To solve the above problems, technical solution adopted in the utility model is as follows:
A kind of building hoist guide rail frame hanging device, it is characterised in that: include: that suspension lifter, suspension lifter are led
Rail gantry, the suspension lifter include suspension lifter base station, and the suspension lifter base station is equipped with suspension arrangement and lifting
Machine cage;
The suspension arrangement is by load cross-arm, guide wheel device, compressed spring, moving track, load cross-arm mechanical lock
And crossbearer composition, load cross-arm two sides are respectively equipped with one group of guide wheel device, are respectively equipped with one in the guide wheel device
Compressed spring, wherein the moving track and load cross-arm mechanical lock are fixedly connected by bolt with the crossbearer, the suspension
Device is on the crossbearer being assemblied at the top of base station;The suspension lifter is equipped with the guide rail bracket being used cooperatively.
As an improvement of the above technical solution, the load cross-arm is equipped with standard knot bolt and sissy bar fixation hole,
The top of the guide rail bracket is fixedly connected by standard knot bolt and sissy bar with the load cross-arm.
As an improvement of the above technical solution, the crossbearer be equipped with the load cross-arm that is used cooperatively limit in place, load
Cross-arm cross spacing, load cross-arm anticreep frame and guide rail bracket limit in place.
Compared with prior art, the implementation result of the utility model is as follows:
(1) what the utility model solved that suspension lifter main screw lift whole base station driving mechanism braking system undertakes asks
Topic, improves the safety of building hoist.
(2) the utility model structure is simple, can be easily in moving rail by the guide wheel device of load cross-arm two sides
It is slided on road, it is convenient to assemble and disassemble laborsaving, it is high-efficient.
(3) the utility model design has more set electric limitings and mechanical locking arrangement, can effectively prevent maloperation, safety
Reliably.
Detailed description of the invention
Fig. 1 is the utility model structure diagram of suspension device;
Fig. 2 is the utility model suspension lifter work structuring figure;
Fig. 3 is the utility model suspension arrangement elevator craning cage operation schematic diagram during normal operation;
Fig. 4 is A-A view in Fig. 3;
Fig. 5 is operation schematic diagram during the utility model suspension arrangement elevator guide bracket peace is torn open;
Fig. 6 is B-B view in Fig. 5.
Specific embodiment
Illustrate the content of the utility model below in conjunction with specific embodiments.
It as shown in Figures 1 to 6, is building hoist guide rail bracket suspension device structure diagram described in the utility model.
Fig. 1 is structure diagram of suspension device: it compressed spring 3, moving track 4, is held by load cross-arm 1, guide wheel device 2
The composition such as power cross-arm mechanical lock 5 and crossbearer 7, load cross-arm 1 share two groups, are arranged symmetrically, and every group of 1 two sides of load cross-arm are installed
There is one group of guide wheel device 2, a compressed spring 3 is disposed in guide wheel device 2.
Fig. 2 is suspension lifter work structuring figure;Fig. 3 is suspension arrangement elevator craning cage work structuring during normal operation
Figure;Fig. 4 is A-A view in Fig. 3: where on the basis of base station 6 is fixed on, suspension arrangement is assemblied in the crossbearer 7 at 6 top of base station
On, moving track 4 and load cross-arm mechanical lock 5 are fixed by bolt and crossbearer 7;It is in place that load cross-arm is disposed on crossbearer 7
Limit 9, load cross-arm cross spacing 10, load cross-arm anticreep frame 11 and guide rail bracket limit 12 in place.
Elevator craning cage during normal operation when, load cross-arm 1 is tightly attached on the crossbearer 7 of base station 6, and guide rail bracket 8 is most
Upper end is fixed by standard knot bolt 13 and sissy bar 14 and load cross-arm 1, and elevator main screw lift is mainly by load cross-arm 1
It undertakes;At this point, load cross-arm limits 9 in running order in place, compressed spring 3 is in complete compressive state.
Fig. 5 is work structuring figure during suspension arrangement elevator guide bracket peace is torn open;Fig. 6 is B-B view in Fig. 5;In guide rail
During the peace of frame 8 is torn open, the standard knot bolt 13 and sissy bar 14 between guide rail bracket 8 and load cross-arm 1 are unclamped;At this point, elevator is whole
Machine weight is temporarily undertaken by the driving mechanism braking system of base station 6, and load cross-arm 1 lifts under the action of compressed spring 3, crossbearer
Be provided with load cross-arm anticreep frame 11 on 7 and guarantee that load cross-arm 1 is not fallen off when lifting, load cross-arm limit in place 9 be returned to it is non-
Then working condition moves load cross-arm 1 along the moving track 4 on crossbearer 7 outward, until load cross-arm cross spacing 10
Movement, is lockked load cross-arm 1 using load cross-arm mechanical lock 5;At this point, the peace that can carry out guide rail bracket 8 tears work open.
After guide rail bracket 8 peace tear work open after the completion of, by guide rail bracket 8 run down until guide rail bracket limit 12 movements in place, pine
Load cross-arm mechanical lock 5 is opened, is moved above load cross-arm 1 to guide rail bracket 8 along moving track 4, standard knot bolt 13 and peace are passed through
Full pull rod 14 is fixed by guide rail bracket 8 and load cross-arm 1, then runs down 8 entirety of guide rail bracket until load cross-arm limits in place
Position 9 acts, and unclamps again the driving mechanism brake of base station 6, so that guide rail bracket 8 is freely fallen to load cross-arm 1 and be tightly attached to crossbearer 7
On, electromotor brake is finally tightened, elevator overall weight is just undertaken by load cross-arm 1 to be shared with 6 electromotor brake of base station.
This programme is by being arranged suspension arrangement on base station, and construction elevator cage is when operating normally, construction lifting
Machine main screw lift is shared by suspension arrangement and base station driving mechanism braking system, if base station driving mechanism brake system non-functional,
Complete machine all wt can all be undertaken by suspension arrangement, so that the safety that the type building hoist uses greatly improved,
Meet actual operation requirements.
The above content is in conjunction with specific embodiments to detailed description made by the utility model, and it cannot be said that this is practical new
Type specific implementation is only limitted to these explanations.For those skilled in the art of the present invention, this is not being departed from
Under the premise of utility model is conceived, a number of simple deductions or replacements can also be made, all shall be regarded as belonging to the utility model guarantor
The range of shield.
Claims (3)
1. a kind of building hoist guide rail frame hanging device, it is characterised in that: include: suspension lifter, suspension lifter guide rail
Frame, the suspension lifter include suspension lifter base station (6), and the suspension lifter base station is equipped with suspension arrangement and lifting
Machine cage;
The suspension arrangement is by load cross-arm (1), and guide wheel device (2), compressed spring (3), moving track (4), load are horizontal
Mechanical lock (5) and crossbearer (7) composition are carried on a shoulder pole, load cross-arm (1) two sides are respectively equipped with one group of guide wheel device (2), described to lead
A compressed spring (3) are respectively installed into wheel apparatus (2), wherein the moving track (4) and load cross-arm mechanical lock (5) are logical
It crosses bolt to be fixedly connected with the crossbearer (7), the suspension arrangement is on the crossbearer (7) being assemblied at the top of base station (6);
The suspension lifter is equipped with the guide rail bracket (8) being used cooperatively.
2. a kind of building hoist guide rail frame hanging device according to claim 1, it is characterised in that: the load cross-arm
(1) it is equipped with standard knot bolt (13) and sissy bar (14), the top of the guide rail bracket (8) passes through standard knot bolt (13)
It is fixedly connected with sissy bar (14) with the load cross-arm (1).
3. a kind of building hoist guide rail frame hanging device according to claim 1, it is characterised in that: on the crossbearer (7)
(9), load cross-arm cross spacing (10), load cross-arm anticreep frame (11) are limited in place equipped with the load cross-arm being used cooperatively and are led
Rail gantry limits (12) in place.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821659144.8U CN209009920U (en) | 2018-10-13 | 2018-10-13 | A kind of building hoist guide rail frame hanging device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821659144.8U CN209009920U (en) | 2018-10-13 | 2018-10-13 | A kind of building hoist guide rail frame hanging device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209009920U true CN209009920U (en) | 2019-06-21 |
Family
ID=66838364
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821659144.8U Active CN209009920U (en) | 2018-10-13 | 2018-10-13 | A kind of building hoist guide rail frame hanging device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209009920U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112723110A (en) * | 2020-12-03 | 2021-04-30 | 安徽中旭机械科技有限公司 | Construction elevator cage bracket device that stability is high |
-
2018
- 2018-10-13 CN CN201821659144.8U patent/CN209009920U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112723110A (en) * | 2020-12-03 | 2021-04-30 | 安徽中旭机械科技有限公司 | Construction elevator cage bracket device that stability is high |
CN112723110B (en) * | 2020-12-03 | 2022-05-06 | 安徽中旭机械科技有限公司 | Construction elevator cage bracket device that stability is high |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101920882B (en) | Compensating device for elevator | |
CN103086225B (en) | Anti-slip protection device for elevator | |
CN205873573U (en) | Low top layer does not have pit elevator | |
CN206126573U (en) | Machine -room -less goods elevator | |
CN201737555U (en) | Compensation device of elevator | |
CN209009920U (en) | A kind of building hoist guide rail frame hanging device | |
CN201334790Y (en) | Multi-layer lifting transverse-moving parking equipment | |
CN2587991Y (en) | Drawing-lifting apparatus for vertical lifting/lowering type parking equipment | |
CN204251150U (en) | A kind of crosshead sheave assembly for elevator | |
CN206705441U (en) | A kind of building hoist tape jam detection and the cable pulley system of automatic protection | |
CN210710632U (en) | Guide rail type protection device for lifting operation platform | |
CN207932827U (en) | A kind of protective device at elevator preventing colliding with top and crouching bottom | |
CN203903727U (en) | Tightening device for compensation rope of high-speed elevator | |
CN217102578U (en) | An elevator car safety gear and speed limiter linkage test display device | |
CN201793300U (en) | Elevator | |
CN204847659U (en) | Hoisting overwinder about shaft winding machine | |
CN203545378U (en) | Buffering and braking device of elevator cab not meeting retention working condition | |
CN103738809A (en) | Elevator car buffer braking method and device not meeting retention working condition | |
CN201808984U (en) | Magnetic induction type stroke limiting device of rack type lifting machine | |
CN209065224U (en) | Elevator end station protects structure | |
CN200978549Y (en) | Stereo garage speed-limiting falling-proof device | |
CN207046628U (en) | A kind of bottom type rope broken protector | |
CN221459624U (en) | Forced lifting technical improvement device for failure grab bucket of crown block | |
CN204643429U (en) | A kind of elevator safety gear pulling apparatus | |
CN103395677A (en) | Counterweight housing for elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |