[go: up one dir, main page]

CN208983454U - A kind of Regional Energy system - Google Patents

A kind of Regional Energy system Download PDF

Info

Publication number
CN208983454U
CN208983454U CN201821688646.3U CN201821688646U CN208983454U CN 208983454 U CN208983454 U CN 208983454U CN 201821688646 U CN201821688646 U CN 201821688646U CN 208983454 U CN208983454 U CN 208983454U
Authority
CN
China
Prior art keywords
unit
flue gas
lithium bromide
regional energy
type lithium
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821688646.3U
Other languages
Chinese (zh)
Inventor
韩凯
张子竹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Xinmao Smart Energy Co Ltd
Original Assignee
Hunan Xinmao Smart Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Xinmao Smart Energy Co Ltd filed Critical Hunan Xinmao Smart Energy Co Ltd
Priority to CN201821688646.3U priority Critical patent/CN208983454U/en
Application granted granted Critical
Publication of CN208983454U publication Critical patent/CN208983454U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/62Absorption based systems
    • Y02B30/625Absorption based systems combined with heat or power generation [CHP], e.g. trigeneration

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The utility model discloses a kind of Regional Energy system, including power plant unit, Regional Energy station unit, End user unit, Gas Turbine Generating Units are equipped in the power plant unit;Flue gas type lithium bromide chiller, fume hot-water boiler are equipped in the unit of Regional Energy station;The flue gas exit pipe of Gas Turbine Generating Units is connect with flue gas type lithium bromide chiller, and the smoke discharge tube of flue gas type lithium bromide chiller is connect with fume hot-water boiler;The heat extraction water pipe of fume hot-water boiler is connected with corresponding End user unit, and the outlet pipe of flue gas type lithium bromide chiller is connected with corresponding End user unit.The utility model greatly reduces power surplus risk, reduces the initial cost of the equipment such as steam turbine and waste heat steam boiler, and land occupation is few.Reduce the heat waste generated in flue gas and water heat transfer process, flue gas type lithium bromide chiller exhaust heat is recycled, forms non-renewable energy cascade utilization, energy utilization is optimized.

Description

A kind of Regional Energy system
Technical field
The utility model belongs to new energy technology, is related to a kind of Regional Energy system.
Background technique
Regional Energy is the use energy mode in order to replace the not energy-efficient and environmental protections such as traditional coal fired power generation, split-type air conditioner, new to occur New energy comprehensive energy service mode.New energy technology form includes but is not limited to natural gas cold, heat and electricity triple supply, solar energy Photovoltaic and photothermal, Di Yuan (including soil source, all kinds of water sources) heat pump, wind energy, charging pile, industrial exhaust heat utilize.
It include as shown in Figure 1 natural gas cold, heat and electricity triple supply (combustion and steam joint for a kind of typical Regional Energy system The circulatory system+steam type lithium bromide chiller), peak regulation electrical chillers and gas fired-boiler.Workflow are as follows: natural gas enters combustion gas Turbine power generation, the flue gas (500 degrees centigrade) for the generation that generates electricity enter waste heat steam boiler nearby.Waste heat steam boiler is produced On the one hand the steam come can enter steam turbine and generate electricity again, the online sale of institute's electricity;On the other hand it can also pass through steaming Steam pipe net is transported to city cold and heat load center (in 10 kilometers) at a distance, produces sky into steam type double-effect lithium bromide unit Adjust hot and cold water to all kinds of building central cooling heat supplies.It can be freezed and be fired by electricity during combustion gas combined supply system overhauls or shuts down The energy supply of gas boiler peak regulation.Although utilization rate is higher for this mode, but still has following defects that
1. although flue gas utilization will pass through existing natural gas cold, heat and power triple supply system comprehensive energy efficiency is higher The later realization energy cascade utilization of waste heat equipment heat exchange, energy inevitably has loss after repeatedly exchanging heat.
2. the mode that conventional gas-steam combined cycle system generates electricity occurs the risk of power surplus, once with Family end cooling and heating load reduces, and will cause power generation waste.
3. present surrounding city land used is nervous, land used is at high cost, traditional energy resource system equipment is more, takes up a large area, and throws It provides at high cost.
Utility model content
In view of the above-mentioned problems, the utility model is intended to provide the region energy that a kind of system composition is simple, capacity usage ratio is high Source system.
The technical solution that the utility model solves the problems, such as is: a kind of Regional Energy system, including power plant unit, region energy Source station unit, End user unit, the power plant unit is interior to be equipped with Gas Turbine Generating Units;
Flue gas type lithium bromide chiller, fume hot-water boiler are equipped in the unit of the Regional Energy station;
The flue gas exit pipe of Gas Turbine Generating Units is connect with flue gas type lithium bromide chiller, flue gas type lithium bromide chiller Smoke discharge tube is connect with fume hot-water boiler;
The heat extraction water pipe of fume hot-water boiler is connected with corresponding End user unit, the water outlet of flue gas type lithium bromide chiller Pipe is connected with corresponding End user unit.
End user unit referred herein can be a terminal user, be also possible to multiple use in neighboring area The terminal user group of family composition.
Further, gas fired-boiler and electrical chillers, gas fired-boiler and electricity are additionally provided in the unit of the Regional Energy station Refrigeration unit is connected with corresponding End user unit.
Preferably, the Regional Energy station unit parallel connection is equipped with multiple, and is equipped in the unit of each Regional Energy station identical Equipment, flue gas type lithium bromide chiller in the unit of each Regional Energy station with power plant unit internal-combustion gas turbine engine generating set Flue gas exit pipe connection;
Each Regional Energy station unit is correspondingly connected with an End user unit.
The remarkable result of the utility model is:
1, traditional gas-steam combined cycle system is changed to gas turbine single loop system, greatly reduces electric power Superfluous risk reduces the initial cost of the equipment such as steam turbine and waste heat steam boiler.Due to eliminating some equipment, Ke Yijie The contradiction that present surrounding city land used is nervous, land used is at high cost is alleviated in about land use and cost.
2, reduce the process that flue gas enters waste heat steam boiler production steam, directly replace steam to enter pipe network flue gas Conveying reduces the heat waste generated in flue gas and water heat transfer process, improves energy utilization rate.
3, flue gas type lithium bromide chiller exhaust heat is recycled, non-renewable energy cascade utilization is formed, by energy It is the new paragon of utilization of new energy resources using optimization.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawing.
Fig. 1 is prior art Regional Energy system principle schematic diagram.
Fig. 2 is the utility model Regional Energy system principle schematic diagram.
In figure: 1- power plant unit, 2- Regional Energy station unit, 3- End user unit, 4- flue gas exit pipe, 5- flue gas Discharge pipe, 6- heat extraction water pipe, 7- outlet pipe, 11- Gas Turbine Generating Units, 21- flue gas type lithium bromide chiller, 22- flue gas heat Homogeneous solution-type reactor, 23- gas fired-boiler, 24- electrical chillers.
Specific embodiment
As shown in Fig. 2, a kind of Regional Energy system, including power plant unit 1, Regional Energy station unit 2, terminal user's list Member 3.
Gas Turbine Generating Units 11 are equipped in the power plant unit 1.
Flue gas type lithium bromide chiller 21, fume hot-water boiler 22, gas fired-boiler 23 are equipped in Regional Energy station unit 2 With electrical chillers 24.
The flue gas exit pipe 4 of Gas Turbine Generating Units 11 is connect with flue gas type lithium bromide chiller 21.Flue gas type lithium bromide The smoke discharge tube 5 of unit 21 is connect with fume hot-water boiler 22.
The heat extraction water pipe 6 of fume hot-water boiler 22 is connected with corresponding End user unit 3.Flue gas type lithium bromide chiller 21 Outlet pipe 7 connected with corresponding End user unit 3.Gas fired-boiler 23 and electrical chillers 14 with corresponding terminal user Unit 3 connects.
Regional Energy station unit 2 is in parallel to be equipped with multiple, and identical equipment is equipped in each Regional Energy station unit 2. Flue gas type lithium bromide chiller 21 in each Regional Energy station unit 2 with 1 internal-combustion gas turbine engine generating set 11 of power plant unit Flue gas exit pipe 4 connect.Each Regional Energy station unit 2 is correspondingly connected with an End user unit 3.
Workflow are as follows: natural gas enters the power generation of Gas Turbine Generating Units 11, and (500 take the photograph the high-temperature flue gas for the generation that generates electricity Family name's degree or so) city cold and heat load center is transported to (in 10 kilometers) at a distance by flue gas exit pipe net, into flue gas type bromine Change lithium unit 21 and produces air conditioner cold and hot water to all kinds of building central cooling heat supplies, 21 smoke discharge tube of flue gas type lithium bromide chiller There are also 170 degrees centigrades for the flue gas of 5 discharges, can also pass into 22 production and living hot water of fume hot-water boiler, for terminal user Unit 3 uses, and is recycled to the exhaust heat of flue gas type lithium bromide chiller, and non-renewable energy cascade utilization is formed, more excellent That changes is utilized the energy.
It can be energized by electrical chillers 24 and 23 peak regulation of gas fired-boiler during combustion gas combined supply system overhauls or shuts down.

Claims (3)

1. a kind of Regional Energy system, it is characterised in that: including power plant unit, Regional Energy station unit, End user unit, Gas Turbine Generating Units are equipped in the power plant unit;
Flue gas type lithium bromide chiller, fume hot-water boiler are equipped in the unit of the Regional Energy station;
The flue gas exit pipe of Gas Turbine Generating Units is connect with flue gas type lithium bromide chiller, the flue gas of flue gas type lithium bromide chiller Discharge pipe is connect with fume hot-water boiler;
The heat extraction water pipe of fume hot-water boiler is connected with corresponding End user unit, the outlet pipe of flue gas type lithium bromide chiller with Corresponding End user unit connection.
2. Regional Energy system according to claim 1, it is characterised in that: be additionally provided with combustion in the unit of the Regional Energy station Gas boiler and electrical chillers, gas fired-boiler and electrical chillers are connected with corresponding End user unit.
3. Regional Energy system according to claim 1 or 2, it is characterised in that: the Regional Energy station unit parallel connection is set Have multiple, and is equipped with identical equipment, the flue gas type lithium bromide in the unit of each Regional Energy station in the unit of each Regional Energy station Unit is connect with the flue gas exit pipe of power plant unit internal-combustion gas turbine engine generating set;
Each Regional Energy station unit is correspondingly connected with an End user unit.
CN201821688646.3U 2018-10-18 2018-10-18 A kind of Regional Energy system Active CN208983454U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821688646.3U CN208983454U (en) 2018-10-18 2018-10-18 A kind of Regional Energy system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821688646.3U CN208983454U (en) 2018-10-18 2018-10-18 A kind of Regional Energy system

Publications (1)

Publication Number Publication Date
CN208983454U true CN208983454U (en) 2019-06-14

Family

ID=66788010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821688646.3U Active CN208983454U (en) 2018-10-18 2018-10-18 A kind of Regional Energy system

Country Status (1)

Country Link
CN (1) CN208983454U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111219906A (en) * 2020-03-02 2020-06-02 重庆大学 A combined energy supply system of a regional distributed energy system and a lake water source heat pump
CN112594761A (en) * 2020-11-11 2021-04-02 华电电力科学研究院有限公司 Centralized regional energy supply method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111219906A (en) * 2020-03-02 2020-06-02 重庆大学 A combined energy supply system of a regional distributed energy system and a lake water source heat pump
CN112594761A (en) * 2020-11-11 2021-04-02 华电电力科学研究院有限公司 Centralized regional energy supply method

Similar Documents

Publication Publication Date Title
CN113175699B (en) Distributed heating system based on comprehensive utilization of multiple clean energy sources
CN109184916A (en) The method of comprehensive energy router device and energy conversion
CN108625988A (en) A kind of CCHP microgrids structure and its operation method containing compressed-air energy storage
CN206055742U (en) A kind of flat peak heating system based on heating system with multi-eat sources
CN108167076B (en) Comprehensive distributed energy system for steam optimal utilization
CN202267113U (en) Combined gas-steam cycle cooling, heating and power system with zero energy loss rate for heat and power plant
CN110397979B (en) Cold, heat and electricity triple supply new energy storage energy supply and peak shaving system
CN210568762U (en) Combined heat and power generation centralized heating system for coupling electric heat accumulation peak shaving of heat supply network side
CN206129338U (en) Gas - steam combined cycle distributing type energy supply system
CN110361969A (en) A kind of cool and thermal power integrated energy system optimizing operation method
CN103629724B (en) Significantly reduce the system of cogeneration of heat and power central heating temperature
CN108798898B (en) System and method for supplying steam and hot water by combining proton exchange membrane fuel cell and gas turbine
CN208983454U (en) A kind of Regional Energy system
CN207196936U (en) A kind of cold, heat and electricity triple supply peak regulation system
CN209688799U (en) A kind of system that electric heat storage boiler cooperation Direct Air-cooled Unit participates in depth peak regulation
CN104675459B (en) Distributed energy station
CN206001744U (en) A kind of Distribution of Natural formula cold, heat and power triple supply system based on hotspot stress serious forgiveness
CN205156426U (en) Thermoelectric cold many cogeneration system of integrated thermochemical process
CN106593651A (en) Natural gas pipeline differential pressure fuel-cell power generation system
CN217903155U (en) Combined cycle combined cooling heating and power system integrating fuel cell and solar energy
CN207905934U (en) A kind of synthesis distributed energy resource system of steam Optimum utilization
CN218376593U (en) An integrated energy system based on positive and negative cycle multi-energy interaction generalized electric energy storage
CN206280936U (en) A kind of combustion gas simple cycle distributing-supplying-energy system
CN204729187U (en) A kind of distributed energy resource system based on Stirling engine
CN205753443U (en) A kind of distributed busbar protection being applied to LNG liquefaction plant

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant