[go: up one dir, main page]

CN208955120U - fuel cell assembly test integrated platform and system - Google Patents

fuel cell assembly test integrated platform and system Download PDF

Info

Publication number
CN208955120U
CN208955120U CN201822006313.4U CN201822006313U CN208955120U CN 208955120 U CN208955120 U CN 208955120U CN 201822006313 U CN201822006313 U CN 201822006313U CN 208955120 U CN208955120 U CN 208955120U
Authority
CN
China
Prior art keywords
pressure
fuel cell
assembly
platform
stack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822006313.4U
Other languages
Chinese (zh)
Inventor
李东明
徐丽双
田冬伟
邢丹敏
刘雪婷
张宝
胡景春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sunrise Power Co Ltd
Original Assignee
Sunrise Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sunrise Power Co Ltd filed Critical Sunrise Power Co Ltd
Priority to CN201822006313.4U priority Critical patent/CN208955120U/en
Application granted granted Critical
Publication of CN208955120U publication Critical patent/CN208955120U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/30Hydrogen technology
    • Y02E60/50Fuel cells

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Fuel Cell (AREA)

Abstract

本实用新型公开一种燃料电池组装测试集成平台及系统,涉及燃料电池技术领域,以解决现有技术中燃料电池组装效率低的技术问题。本实用新型所述的燃料电池组装测试集成平台中,电堆组装装置用于燃料电池的组装;液压控制装置与电堆组装装置连通,并作为动力源;压力分布测试装置匹配在电堆组装装置内,用于判断压力的均一性;性能检测装置与电堆组装装置连通,并进行性能检测。电堆组装装置能够调节电堆间的压缩的均一性以消除人为误差、模拟车载任意角度下的安装,液压控制装置能够保证电堆间的压力均一性、并调节平台角度,压力分布测试装置能够检测压力的均一性,性能检测装置能够检测电堆在车载角度下以及任意组装参数下的电堆性能。

The utility model discloses a fuel cell assembly test integrated platform and system, which relates to the field of fuel cell technology, in order to solve the technical problem of low fuel cell assembly efficiency in the prior art. In the fuel cell assembly test integrated platform described in the utility model, the stack assembly device is used for the assembly of fuel cells; the hydraulic control device is connected to the stack assembly device and serves as a power source; the pressure distribution test device is matched in the stack assembly device, and is used to judge the uniformity of pressure; the performance detection device is connected to the stack assembly device, and performs performance detection. The stack assembly device can adjust the uniformity of compression between stacks to eliminate human errors and simulate installation at any vehicle-mounted angle. The hydraulic control device can ensure the uniformity of pressure between stacks and adjust the platform angle. The pressure distribution test device can detect the uniformity of pressure. The performance detection device can detect the stack performance at the vehicle-mounted angle and any assembly parameters.

Description

Fuel cell assembles test set into platform and system
Technical field
The utility model relates to field of fuel cell technology, in particular to a kind of fuel cell assembling test set at platform and System.
Background technique
Currently, due to Proton Exchange Membrane Fuel Cells have can at room temperature quick start, pollution-free, the service life is long, compares function The outstanding features such as rate and specific energy height are adapted as the dynamical system of the delivery vehicles such as vehicle, ship, while can also be at it Its field plays key player, such as is used as backup power source or emergency generator, wherein Proton Exchange Membrane Fuel Cells is focused on Point is in vehicle application, and the core of fuel cell is pile, mainly by groups such as bipolar plates, membrane electrode, end plate and packaging parts It fills, pressure detecting, performance detection etc. are carried out in the assembling process of pile can be improved packaging efficiency and optimize assembling condition.
However, the application utility model people has found, and in the prior art, since pile is separated in Integration Assembly And Checkout, and And test and package system are not associated with actual condition, so that inefficiency and cost are high.
Therefore, a kind of fuel cell assembling test set how is provided into platform and system, be can be improved packaging efficiency, is had become The technical issues of for those skilled in the art's urgent need to resolve.
Utility model content
The purpose of this utility model is to provide a kind of fuel cell assembling test sets into platform and system, existing to solve Fuel cell assembles the technical issues of low efficiency in technology.
The utility model provides a kind of fuel cell assembling test set into platform, comprising: pile assembling device, the pile Assembling device is used for the assembling of fuel cell;Hydraulic control device, the hydraulic control device and the pile assembling device connect It is logical, and as power source;Pressure distribution tester, the pressure distribution tester matching is in the pile assembling device It is interior, for judging the homogeneity of pressure;Device for detecting performance, the device for detecting performance are connected to the pile assembling device, And carry out performance detection.
When practical application, the pile assembling device includes: pedestal, and the pedestal is equipped with rotating platform, angular adjustment Mechanism, the rotating platform are equipped with bottom insulation locating piece, hydraulic fixed plate, power hydraulic cylinder, hydraulic cylinder fixing seat, pressure Laminated body that plate, hold-down support, pliable pressure regulating mechanism, the first insulation board, the first collector plate, more piece monocell stack, the Two collector plates, the second insulation board and port end plate.
Wherein, the pliable pressure regulating mechanism includes: wavy metal part, and the wavy metal part passes through flange and sealing Part and locating rod are connected between cecum end plate and floating end plate;The cecum end plate is imported and exported equipped with hydraulic oil, and is led to The real-time monitoring for crossing the pressure distribution tester, adjusts the homogeneity of pressure, to the accumulated size error generated when stacking It is modified.
Specifically, there are two symmetrical swallows for installation between the hold-down support, the port end plate and the cecum end plate The side insulation positioning plate of stern construction;Dovetail groove on the cecum end plate and the port end plate is relative to lateral insulation positioning Plate can slide.
Further, bottom insulation locating piece and hydraulic fixed plate, the bottom insulation are housed on the rotating platform The hydraulic fixed plate of locating piece is equipped with power hydraulic cylinder, side of the power hydraulic cylinder far from the pliable pressure regulating mechanism Hydraulic cylinder fixing seat is equipped with equipped with hydraulic fixed plate, is equipped with pressing plate close to the side of the pliable pressure regulating mechanism.
Further, the angle adjusting mechanism includes rotation driving hydraulic cylinder, rotary shaft, rotary support, the rotation Turn driving hydraulic cylinder and the rotating platform connected by the rotary support, the rotating platform by the rotary shaft with it is described Pedestal connection, and the rotating platform closes on and is equipped with angular transducer at the rotary shaft;Rotation driving hydraulic cylinder passes through rotation Support is connect with the rotating platform, to realize angular adjustment.
When practical application, the hydraulic control device includes: fuel tank, and the fuel tank is filled by pipeline and pile assembling The power hydraulic cylinder set is connected to the rotation driving hydraulic cylinder, and oil pump, pressure reducing valve, pressure are provided on the pipeline Sensor, hydralic pressure gauge, electrical ball valve and check valve.
Wherein, the pressure distribution tester includes: the more piece monocell for being placed on the pile assembling device The edge section and the pressure test blanket at middle node position at the laminated body both ends of stacking, and successively connect with the pressure test blanket The pressure acquisition devices and host computer connect.
Specifically, the device for detecting performance includes: performance test bed, and performance test bed be equipped with tests pipeline, The free end of the test pipeline is equipped with test splice, and the testing tube road, which is closed on, is equipped with pressure sensing at the test splice Device and temperature sensor.
Compared with the existing technology, fuel cell assembling test set described in the utility model has the advantage that at platform
Fuel cell assembling test set provided by the utility model is in platform, comprising: pile assembling device, hydraulic control Device, pressure distribution tester and device for detecting performance;Wherein, pile assembling device is used for the assembling of fuel cell;It is hydraulic Control device is connected to pile assembling device, and as power source;Pressure distribution tester matches in pile assembling device, For judging the homogeneity of pressure;Device for detecting performance is connected to pile assembling device, and carries out performance detection.Thus analysis can Know, fuel cell provided by the utility model assembling test set is in platform, since pile assembling device can be adjusted between pile Compression homogeneity to eliminate the installation under human error, the vehicle-mounted any angle of simulation, hydraulic control device can guarantee group It fills the pressure uniformity between the adjustability of pressure, pile and adjusts platform angle, pressure distribution tester is able to detect pressure Homogeneity, device for detecting performance is able to detect Performance data of the pile under vehicle-mounted angle and under Optional assembling parameter, because This fuel cell assemble test set at platform can be improved the assembling of fuel cell, test it is integrated, and effectively improve assembling Efficiency.Also, it is directed to the fuel cell pack of arbitrary structures form, devises assembly platform, it is contemplated that pressure is distributed, is fixed between battery Performance under accuracy and the multi-angle installation of position, the final assembly parameter for determining reasonably optimizing are simultaneously packaged, realize Pile assembling, detect it is integrated.
The utility model also provides a kind of fuel cell assembling test set into system, comprising: as described in any one of the above embodiments Fuel cell assembles test set into platform.
The fuel cell assembling test set assembles test set into platform relative to existing at system and above-mentioned fuel cell Advantage possessed by technology is identical, and details are not described herein.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art Under the premise of labour, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is that fuel cell provided by the embodiment of the utility model assembles test set into the structural schematic diagram of platform;
Fig. 2 is that fuel cell provided by the embodiment of the utility model assembles test set into the knot of pile assembling device in platform Structure schematic diagram;
Fig. 3 is that fuel cell provided by the embodiment of the utility model assembles test set at the of pile assembling device in platform One viewing angle constructions schematic diagram;
Fig. 4 is that fuel cell provided by the embodiment of the utility model assembles test set into the pipe of hydraulic control device in platform Road schematic diagram;
Fig. 5 is that fuel cell provided by the embodiment of the utility model assembles test set into pressure distribution tester in platform Structural schematic diagram;
Fig. 6 is that fuel cell provided by the embodiment of the utility model assembles test set into the knot of platform neutral energy detection device Structure schematic diagram;.
In figure: 1- pile assembling device;The hydraulic fixed plate of 1.1-;1.2- power hydraulic cylinder;1.3- pressing plate;1.4- Pliable pressure regulating mechanism;1.4.1- cecum end plate;1.4.2- wavy metal part;1.4.3- locating rod;1.4.4- floating End plate;The first insulation board of 1.5-;The first collector plate of 1.6-;The laminated body that 1.7- more piece monocell stacks;1.8- second collects Flowing plate;The second insulation board of 1.9-;1.10- port end plate;1.11- hold-down support;1.12- rotary shaft;1.13- pedestal; 1.14- rotary support;1.15- rotating driving hydraulic cylinder;1.16- outer enclosure;1.17- side insulation positioning plate; 1.18- rotating platform;1.19- bottom insulation locating piece;1.21- angular transducer;1.22- hydraulic cylinder fixing seat;
2- hydraulic control device;2.1- fuel tank;2.2- oil pump;2.3- pressure reducing valve;2.4- pressure sensor;2.5- Hydralic pressure gauge;2.6- electrical ball valve;2.7- check valve;2.5.1- the first hydralic pressure gauge;2.5.2- the second hydralic pressure gauge;2.5.3- Third hydralic pressure gauge;2.6.1- the first electrical ball valve;2.6.2- the second electrical ball valve;2.6.3- third electrical ball valve; 2.6.4- the 4th electrical ball valve;2.6.5- the 5th electrical ball valve;2.6.6- the 6th electrical ball valve;
3- pressure distribution tester;3.1- pressure test blanket;3.2- pressure acquisition devices;3.3- host computer;
4- device for detecting performance;4.1- test splice;4.2- testing tube;4.3- testboard;4.4- pressure sensing Device;4.5- temperature sensor.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally Field those of ordinary skill every other embodiment obtained without making creative work belongs to practical Novel protected range.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the system of indication or suggestion meaning or element must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, term " the One ", " second ", " third " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, the indirect phase of intermediary can also be passed through Even, it can be the connection inside two elements.For the ordinary skill in the art, can be understood with concrete condition above-mentioned The concrete meaning of term in the present invention.
It should be added that, in pile assembling process, the pressure uniformity and performance detection of pile are all herein It is that fuel cell assembles the key factor improved efficiency.However, in the prior art, the production testing equipment of fuel cell is not The pressure distributional analysis for carrying out pile in assembling process of system, also without the performance test of pile under the vehicle-mounted angle of progress, and Process portion is only completed, cost can be improved in this way, reduces assembly efficiency, and cannot get the performance of pile and major parameter Most accurately assessment.
Fig. 1 is that fuel cell provided by the embodiment of the utility model assembles test set into the structural schematic diagram of platform.
As shown in Figure 1, the utility model embodiment provides a kind of fuel cell assembling test set into platform, comprising: pile Assembling device 1, pile assembling device 1 are used for the assembling of fuel cell;Hydraulic control device 2, hydraulic control device 2 and pile group Assembling device 1 is connected to, and as power source;Pressure distribution tester 3, the matching of pressure distribution tester 3 is assembled in pile to be filled It sets in 1, for judging the homogeneity of pressure;Device for detecting performance 4, device for detecting performance 4 are connected to pile assembling device 1, and Carry out performance detection.
Compared with the existing technology, the assembling test set of fuel cell described in the utility model embodiment has following at platform Advantage:
Fuel cell provided by the embodiment of the utility model assembling test set is in platform, as shown in Figure 1, comprising: pile Assembling device 1, hydraulic control device 2, pressure distribution tester 3 and device for detecting performance 4;Wherein, pile assembling device 1 is used In the assembling of fuel cell;Hydraulic control device 2 is connected to pile assembling device 1, and as power source;Pressure distribution tests dress 3 matchings are set in pile assembling device 1, for judging the homogeneity of pressure;Device for detecting performance 4 and pile assembling device 1 connect It is logical, and carry out performance detection.From this analysis, fuel cell assembling test set provided by the embodiment of the utility model is at platform In, since pile assembling device 1 can adjust the homogeneity of the compression between pile to eliminate human error, the vehicle-mounted random angle of simulation Installation under degree, hydraulic control device 2 can guarantee the pressure uniformity between the adjustability of stacking pressure, pile and adjust flat Corner of table degree, pressure distribution tester 3 are able to detect the homogeneity of pressure, and device for detecting performance 4 is able to detect pile vehicle-mounted Performance data under angle and under Optional assembling parameter, therefore fuel cell assembling test set can be improved fuel electricity at platform The assembling in pond, test it is integrated, and effectively improve packaging efficiency.Also, it is directed to the fuel cell pack of arbitrary structures form, if Count assembly platform, it is contemplated that the performance between battery under pressure distribution, the accuracy of positioning and multi-angle installation, it is final to determine The assembly parameter of reasonably optimizing is simultaneously packaged, realize pile assembling, detect it is integrated.
Fig. 2 is that fuel cell provided by the embodiment of the utility model assembles test set into the knot of pile assembling device in platform Structure schematic diagram;Fig. 3 is that fuel cell provided by the embodiment of the utility model assembles test set into pile assembling device in platform First viewing angle constructions schematic diagram.
When practical application, as shown in Figures 2 and 3, above-mentioned pile assembling device 1 may include: pedestal 1.13, pedestal 1.13 On can be equipped with angle adjusting mechanism, rotating platform 1.18, can be equipped on rotating platform 1.18 bottom insulation locating piece 1.19, Hydraulic fixed plate 1.1, power hydraulic cylinder 1.2, hydraulic cylinder fixing seat 1.22, pressing plate 1.3, pliable pressure regulating mechanism 1.4, first Insulation board 1.5, the first collector plate 1.6, the laminated body 1.7 of more piece monocell stacking, the second collector plate 1.8, the second insulation board 1.9 With port end plate 1.10 and outer enclosure 1.16.
Wherein, as shown in Figures 2 and 3, above-mentioned pliable pressure regulating mechanism 1.4 may include: wavy metal part 1.4.2, Wavy metal part 1.4.2 can be connected to cecum end plate 1.4.1 and floating end by flange and sealing element and locating rod 1.4.3 Between plate 1.4.4;It can be equipped with hydraulic oil on cecum end plate 1.4.1 to import and export, and pass through the real-time of pressure distribution tester 3 Monitoring, adjusts the homogeneity of pressure, is modified to the accumulated size error generated when stacking.
Specifically, as shown in Figures 2 and 3, hold-down support 1.11, hold-down support can be housed on above-mentioned rotating platform 1.18 1.11, the side insulation of symmetrical dovetail configuration is fixed there are two can installing between port end plate 1.10 and cecum end plate 1.4.1 Position plate 1.17;Dovetail groove on cecum end plate 1.4.1 and port end plate 1.10 can be slided relative to lateral insulation positioning board 1.17 It is dynamic, to guarantee the accuracy and insulating properties of location and installation well.
Further, as shown in Figures 2 and 3, on above-mentioned rotating platform 1.18 equipped with bottom insulation locating piece 1.19 and Hydraulic fixed plate 1.1, hydraulic fixed plate 1.1 are equipped with power hydraulic cylinder 1.2, and power hydraulic cylinder 1.2 is adjusted far from pliable pressure Mechanism 1.4 is equipped with hydraulic cylinder fixing seat 1.22, is equipped with pressing plate 1.3 close to the side of pliable pressure regulating mechanism 1.4.
Further, as shown in Figures 2 and 3, above-mentioned angle adjusting mechanism includes rotation driving hydraulic cylinder 1.15, rotation Driving hydraulic cylinder 1.15 connects rotating platform 1.18 by rotary support 1.14, and rotating platform 1.18 can pass through rotary shaft 1.12 It is connect with pedestal 1.13, and rotating platform 1.18 closes on that angular transducer 1.21 can be equipped at rotary shaft 1.12;Rotation driving Hydraulic cylinder 1.15 can be connect by rotary support 1.14 with rotating platform 1.18, to realize angular adjustment, for simulating pile Performance under vehicle-mounted any angle, to improve adaptability of the pile under vehicle-mounted operating condition.
In the case where angle guarantees, pile assembling is carried out, successively by bottom insulation locating piece 1.19, hydraulic fixed plate 1.1, hydraulic cylinder fixing seat 1.22 and hold-down support 1.11 are fixed on rotating platform 1.18, then consolidate power hydraulic cylinder 1.2 It is scheduled between hydraulic fixed plate 1.1 and hydraulic cylinder fixing seat 1.22,1.17 one end of side insulation positioning plate is fixed on fixed branch On seat 1.11, floating end plate 1.4.4, locating rod 1.4.3, wavy metal part 1.4.2 assembly are formed on cecum end plate 1.4.1 Then pliable pressure regulating mechanism 1.4 will pass through the dovetail groove connection type on side insulation positioning plate 1.17 and end plate for gas Mouth end plate 1.10 and cecum end plate 1.4.1 installation, then successively by the first insulation board 1.5, the first collector plate 1.6, more piece monocell The laminated body 1.7 of stacking, the second collector plate 1.8, the second insulation board 1.9 are placed on port end plate 1.10 and floating end by positioning Between plate 1.4.4, insulation positioning board is placed primarily to short circuit occurs when guaranteeing accurate positioning and preventing test performance.
Fig. 4 is that fuel cell provided by the embodiment of the utility model assembles test set into the pipe of hydraulic control device in platform Road schematic diagram.
When practical application, as shown in figure 4, above-mentioned hydraulic control device 2 may include: fuel tank 2.1, fuel tank 2.1 can lead to It crosses pipeline to be connected to the power hydraulic cylinder 1.2 of pile assembling device 1 and rotation driving hydraulic cylinder 1.15, and can be set on pipeline There are oil pump 2.2, pressure reducing valve 2.3, pressure sensor 2.4, hydralic pressure gauge 2.5, electrical ball valve 2.6 and check valve 2.7.
For the fuel cell pack placed angle under various automobile scenarios, the oil pump 2.2 in hydraulic control device 2 can be passed through Pressure is provided and pushes rotating platform 1.18 to rotate around rotary shaft 1.12 to rotation driving hydraulic cylinder 1.15, and the moment observes the first liquid Table 2.5.1 numerical value is pressed, when rotating the angle pile angle that reach vehicle-mounted lower, angular transducer 1.21 feeds back to controller, controls Device processed controls the first electrical ball valve 2.6.1 and the second electrical ball valve 2.6.2 and closes to guarantee that angle is constant.
Fig. 5 is that fuel cell provided by the embodiment of the utility model assembles test set into pressure distribution tester in platform Structural schematic diagram.
Wherein, as shown in figure 5, above-mentioned pressure distribution tester 3 may include: be placed on pile assembling device 1 more The edge section and the pressure test blanket 3.1 at middle node position for saving 1.7 both ends of laminated body that monocell stacks, and surveyed with pressure The sequentially connected pressure acquisition devices 3.2 of blanket 3.1 and host computer 3.3 are tried, thus real by pressure acquisition devices 3.2 and host computer 3.3 When acquisition pressure distribution and analyzing and processing data, the homogeneity of contact pressure between intuitive judgment pile.
In pile placement process, pressure test blanket 3.1 is individually positioned in the laminated body 1.7 of more piece monocell stacking Both ends and middle part, then the pressure reducing valve 2.3 in hydraulic control device 2 adjusts line pressure, by observing the second hydralic pressure gauge 2.5.2 numerical value determines pressure, is opened by the third electrical ball valve 2.6.3 on control piper, closes the 4th electrical ball valve 2.6.4 with the 5th electrical ball valve 2.6.5, it is filled with hydraulic oil to pliable pressure regulating mechanism 1.4, oil liquid is full of entire wavy metal Part 1.4.2 simultaneously compresses pile, tests the numerical value on blanket 3.1 by the real-time observed pressure of host computer 3.3 at this time, whether is reduced pressure It keeps uniform, if uniform, can stop compressing, conversely, then continuing to pressurize, end plate 1.4.4 to be floated is moved to wavy metal part When maximal dilation amount 1.4.2, at this time floating end plate 1.4.4 can automatic leveling, keep equal to the pressure value on host computer 3.3 One, control third electrical ball valve 2.6.3 closes pressure maintaining, and each component can be all conditioned smooth at this time, eliminate human error.
Fig. 6 is that fuel cell provided by the embodiment of the utility model assembles test set into the knot of platform neutral energy detection device Structure schematic diagram.
Specifically, performance test bed as shown in fig. 6, above-mentioned device for detecting performance 4 may include: performance test bed 4.3 Test pipeline 4.2 can be equipped on 4.3, the free end for testing pipeline 4.2 can be equipped with test splice 4.1, test on pipeline 4.2 Pressure sensor 4.4 and temperature sensor 4.5 can be equipped with by closing at test splice 4.1.
After each component is accurately positioned, pressure test blanket 3.1 in heap is removed, pressure test blanket 3.1 is placed respectively Between pressing plate 1.3 and cecum end plate 1.4.1 and between hold-down support 1.11 and port end plate 1.10, thus in not influence property Pressure uniformity can be detected in the case where detection, test splice 4.1 is installed on hold-down support 1.11, by testing tube 4.2, pressure Sensor 4.4 and temperature sensor 4.5 are connected with test splice 4.1, open the 4th electrical ball valve 2.6.4 and the 5th electric ball Valve 2.6.5 loads power hydraulic cylinder 1.2, has positioning pin and the matching of cecum end plate 1.4.1 pin hole on pressing plate 1.3, is adding While load, the outside oil extraction of the hydraulic oil of pliable pressure regulating mechanism 1.4 starts to compress entire pile until emptying, During compression, can real-time detection pressure test blanket 3.1 pressure distribution, it is settable in the case that assembly parameter is unknown Several groups of assembly parameters can stop compressing when parameter reaches the value of setting, and it is electronic to close the 5th electrical ball valve 2.6.5 and the 6th Ball valve 2.6.6 carries out pressure maintaining, and the numerical value by observing third hydralic pressure gauge 2.5.3 determines whether to leak, and keeps pile pressure-bearing constant, Under this pressure condition, testboard 4.3 is started to work, and observes the performance in each section list pond, if keeps homogeneity, if uniform, then Whether optimal performance is observed, conversely, replacing problematic single pond if inhomogenous, continuing to test, until homogeneity meets;Meet After homogeneity, it is only necessary to control test parameter and change observation performance until performance is stablized.Under multiple groups assembly parameter, need It controls pressure reducing valve 2.3 and adjusts loine pressure progress multiple groups test, compare the performance curve under different assembly parameters, judge at what Reach best performance under the assembly parameter of sample, test parameter at this time be it is optimal, finally carry out outer enclosure 1.16 envelope Dress.
The utility model embodiment also provides a kind of fuel cell assembling test set into system, comprising: such as any of the above-described The fuel cell assembling test set is at platform.
Fuel cell assembling test set provided by the embodiment of the utility model is at platform and system, for arbitrary structures form Fuel cell pack, devise soft readjustment device and adjust installation error, pressure distribution detection device detection pressure uniformity, new Type positioning method ensures that the multi-angle installation of vehicle-mounted lower pile is simulated in accurate positioning and insulating properties, angle adjustment device and performance is surveyed Examination, to reach the space with very little, to realize most functions integrated;Fuel cell assembling provided by the embodiment of the utility model Test integrated platform and system, not only can determine that reasonable assembly parameter and test parameter, and improve work efficiency and Improve the adaptability of pile under vehicle-mounted operating condition.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (8)

1.一种燃料电池组装测试集成平台,其特征在于,包括:1. A fuel cell assembly test integration platform is characterized in that, comprising: 电堆组装装置,所述电堆组装装置用于燃料电池的组装;a stack assembling device, the stack assembling device is used for assembling a fuel cell; 液压控制装置,所述液压控制装置与所述电堆组装装置连通,并作为动力源;a hydraulic control device, the hydraulic control device communicates with the stack assembly device and serves as a power source; 压力分布测试装置,所述压力分布测试装置匹配在所述电堆组装装置内,用于判断压力的均一性;a pressure distribution test device, the pressure distribution test device is matched in the stack assembly device for judging the uniformity of the pressure; 性能检测装置,所述性能检测装置与所述电堆组装装置连通,并进行性能检测。A performance testing device is communicated with the stack assembly device and performs performance testing. 2.根据权利要求1所述的燃料电池组装测试集成平台,其特征在于,所述电堆组装装置包括:底座,所述底座上设有旋转平台、角度调节机构,所述旋转平台上设有底部绝缘定位块、液压固定板、动力液压缸、液压缸固定座、压板、固定支座、柔性压力调节机构、第一绝缘板、第一集流板、多节单电池堆叠的层叠体、第二集流板、第二绝缘板和气口端板。2 . The integrated platform for assembly and testing of fuel cells according to claim 1 , wherein the stack assembly device comprises: a base, a rotating platform and an angle adjustment mechanism are arranged on the base, and a rotating platform is provided with Bottom insulation positioning block, hydraulic fixing plate, power hydraulic cylinder, hydraulic cylinder fixing seat, pressure plate, fixing support, flexible pressure regulating mechanism, first insulating plate, first current collecting plate, multi-cell stack stacked body, first Two collector plates, a second insulating plate and an air port end plate. 3.根据权利要求2所述的燃料电池组装测试集成平台,其特征在于,所述柔性压力调节机构包括:金属波纹件,所述金属波纹件通过法兰和密封件以及定位杆连接在盲端端板和浮动端板之间;3 . The integrated platform for fuel cell assembly and testing according to claim 2 , wherein the flexible pressure regulating mechanism comprises: a metal bellows, and the metal bellows is connected to the blind end through a flange, a seal and a positioning rod. 4 . between the end plate and the floating end plate; 所述盲端端板上设有液压油进出口,并通过所述压力分布测试装置的实时监测,调节压力的均一性,对堆叠时产生的累积尺寸误差进行修正。The blind end plate is provided with a hydraulic oil inlet and outlet, and through the real-time monitoring of the pressure distribution testing device, the uniformity of the pressure is adjusted, and the accumulated dimensional error generated during stacking is corrected. 4.根据权利要求3所述的燃料电池组装测试集成平台,其特征在于,所述固定支座、所述气口端板和所述盲端端板之间安装有两个对称的燕尾结构的侧面绝缘定位板;4 . The integrated platform for fuel cell assembly and testing according to claim 3 , wherein two symmetrical dovetail structure sides are installed between the fixed support, the gas port end plate and the blind end end plate. 5 . Insulation positioning plate; 所述盲端端板和所述气口端板上的燕尾槽相对于侧向绝缘定位板能够滑动。The dovetail grooves on the blind end plate and the gas port end plate are slidable relative to the lateral insulating positioning plate. 5.根据权利要求2所述的燃料电池组装测试集成平台,其特征在于,所述角度调节机构包括旋转驱动液压缸、旋转轴、旋转支座,所述旋转驱动液压缸通过所述旋转支座连接所述旋转平台,所述旋转平台通过所述旋转轴与所述底座连接,且所述旋转平台临近所述旋转轴处设有角度传感器。5 . The integrated platform for fuel cell assembly and testing according to claim 2 , wherein the angle adjustment mechanism comprises a rotary driving hydraulic cylinder, a rotary shaft, and a rotary support, and the rotary driving hydraulic cylinder passes through the rotary support. 6 . The rotating platform is connected, the rotating platform is connected with the base through the rotating shaft, and an angle sensor is provided on the rotating platform adjacent to the rotating shaft. 6.根据权利要求5所述的燃料电池组装测试集成平台,其特征在于,所述液压控制装置包括:油箱,所述油箱通过管路与所述电堆组装装置的所述动力液压缸和所述旋转驱动液压缸连通,且所述管路上设置有油泵、减压阀、压力传感器、液压表、电动球阀和单向阀。6 . The integrated platform for fuel cell assembly and testing according to claim 5 , wherein the hydraulic control device comprises: an oil tank, the oil tank is connected to the power hydraulic cylinder and all the power hydraulic cylinders of the stack assembly device through pipelines. 7 . The rotary driving hydraulic cylinder is connected, and the pipeline is provided with an oil pump, a pressure reducing valve, a pressure sensor, a hydraulic gauge, an electric ball valve and a one-way valve. 7.根据权利要求2所述的燃料电池组装测试集成平台,其特征在于,所述压力分布测试装置包括:放置在所述电堆组装装置的所述多节单电池堆叠的层叠体两端的边缘节和中间节位置处的压力测试毯,以及与所述压力测试毯依次连接的压力采集器和上位机。7 . The integrated platform for fuel cell assembly and testing according to claim 2 , wherein the pressure distribution test device comprises: edges placed at both ends of the stack of the multi-cell single cell stack of the stack assembly device. 8 . The pressure test blankets at the positions of the nodes and the intermediate nodes, as well as the pressure collectors and the upper computer sequentially connected to the pressure test blankets. 8.一种燃料电池组装测试集成系统,其特征在于,包括:如上述权利要求1-7中任一项所述的燃料电池组装测试集成平台。8 . An integrated system for assembly and testing of fuel cells, comprising: the integrated platform for assembly and testing of fuel cells according to any one of the preceding claims 1 to 7 .
CN201822006313.4U 2018-11-30 2018-11-30 fuel cell assembly test integrated platform and system Active CN208955120U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822006313.4U CN208955120U (en) 2018-11-30 2018-11-30 fuel cell assembly test integrated platform and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822006313.4U CN208955120U (en) 2018-11-30 2018-11-30 fuel cell assembly test integrated platform and system

Publications (1)

Publication Number Publication Date
CN208955120U true CN208955120U (en) 2019-06-07

Family

ID=66745447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822006313.4U Active CN208955120U (en) 2018-11-30 2018-11-30 fuel cell assembly test integrated platform and system

Country Status (1)

Country Link
CN (1) CN208955120U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110828875A (en) * 2019-10-29 2020-02-21 武汉格罗夫氢能汽车有限公司 Hydrogen fuel cell stack assembly device
CN112201829A (en) * 2020-09-01 2021-01-08 湖北德普电气股份有限公司 Hydrogen fuel cell stack production and test device with uniformly stacked cell units

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110828875A (en) * 2019-10-29 2020-02-21 武汉格罗夫氢能汽车有限公司 Hydrogen fuel cell stack assembly device
CN110828875B (en) * 2019-10-29 2021-07-20 中极氢能汽车(长治)有限公司 Hydrogen fuel cell stack assembly device
CN112201829A (en) * 2020-09-01 2021-01-08 湖北德普电气股份有限公司 Hydrogen fuel cell stack production and test device with uniformly stacked cell units

Similar Documents

Publication Publication Date Title
CN109390619A (en) fuel cell assembly test integrated platform and system
CN208955120U (en) fuel cell assembly test integrated platform and system
CN102608543B (en) Flow battery test platform
CN105244521A (en) Water content control method and system of fuel cell
CN109763972A (en) An electric passenger car air compressor testing system and method
CN209654212U (en) A kind of electric motor coach air compressor test macro
CN114824373B (en) Simulation test combined fuel cell performance optimization method, device and equipment
CN113161579A (en) Multifunctional proton exchange membrane fuel cell component in-loop test bench
CN106410243A (en) Experiment table feedback adjusting system for fuel cell and working method of experiment table feedback adjusting system
CN114707369A (en) Air compressor-based modeling simulation method for fuel cell air circuit subsystem
CN115683516A (en) Comprehensive testing device and method for vibration test of vehicle fuel cell stack
CN108168798A (en) A kind of air-tightness detection device for fuel cell pile
CN113776953B (en) Device and method for detecting compressive strength of fuel cell stack
CN114420980B (en) Cross-scale multifunctional integrated proton exchange membrane fuel cell test system
CN214378516U (en) Hydrogen circulation testing device of fuel cell
CN207703414U (en) A kind of air-tightness detection device for fuel cell pile
CN215575358U (en) Device for testing ionic conductivity of diaphragm
JP4300315B2 (en) Gas leak evaluation device
CN206573694U (en) A kind of fuel cell measurement apparatus
KR20240099880A (en) Constant Speed Thermal Shock Test Device For Gasket Of Fuel Cell
CN114689656A (en) A kind of test method of electrochemical hydrogen compressor electrochemical impedance spectroscopy
CN208254710U (en) A kind of petroleum vapor recovery detector calibrating installation
CN109461953B (en) A method and device for testing the distribution of electrolyte in a vanadium battery stack
CN207908124U (en) A kind of device of detection fuel cell parts leakage
CN217403723U (en) Membrane detection device with visible inner leakage point position

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Fuel cell assembly and testing integration platform and system

Effective date of registration: 20231026

Granted publication date: 20190607

Pledgee: Industrial Bank Limited by Share Ltd. Dalian branch

Pledgor: Sunrise Power Co.,Ltd.

Registration number: Y2023980062978