[go: up one dir, main page]

CN208857762U - Semicircular caisson and pile foundation combined breakwater - Google Patents

Semicircular caisson and pile foundation combined breakwater Download PDF

Info

Publication number
CN208857762U
CN208857762U CN201821334404.4U CN201821334404U CN208857762U CN 208857762 U CN208857762 U CN 208857762U CN 201821334404 U CN201821334404 U CN 201821334404U CN 208857762 U CN208857762 U CN 208857762U
Authority
CN
China
Prior art keywords
pile foundation
caisson
foundation
arch ring
semi
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821334404.4U
Other languages
Chinese (zh)
Inventor
肖忠
刘莺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201821334404.4U priority Critical patent/CN208857762U/en
Application granted granted Critical
Publication of CN208857762U publication Critical patent/CN208857762U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a kind of semi-circular caissons and pile foundation combined type breakwater, including caisson and pile foundation, the caisson is semi-circular caisson made of being poured based on combined steel formwork, semicircular arch ring including bottom plate and on bottom plate is provided with floor and the vertical plate for supporting semicircular arch ring between semicircular arch ring and bottom plate;It is embedded with the casing for forming pile foundation mounting hole in vertical plate and floor intersection, pile foundation mounting hole squeezes into ground with for pile foundation vertically;Aperture is set on semicircular arch ring.It is short and reusable that the utility model is suitable for soft soil foundation and deep water conditions and having the advantages that rubble-mound foundation of constructing that convenient, no setting is required, Potential Working Time For Operation At Sea.

Description

Semi-circular caisson and pile foundation combined type breakwater
Technical field
The utility model relates to a kind of caissons and pile foundation combined type breakwater.
Background technique
Semicircle breakwater (such as: a kind of semicircle breakwater, publication number CN206736844U) is a kind of adaptation weak soil The Novel breakwater structure of base, is usually made of prefabricated semi-circular member or semi-circular caisson and rubble-mound foundation.With it is traditional straight Vertical breakwater, sloping breakwater are compared, semicircle breakwater have from heavy and light, easy construction, it is reusable, beautiful, The advantages that foundation stress is evenly distributed, suffered wave force is small and antiskid and stability against overturning are good.
When building, semi-circular caisson need to be placed on rubble-mound foundation existing semicircle breakwater.On soft soil foundation When construction, needs first to excavate ground or reinforcing soft foundation, then semi-circular caisson is placed on rubble-mound foundation.Have four among these A main problem, first is that the building stones needed are more since it is desired that building rubble-mound foundation, exploitation of stone can destroy ecological environment;Second is that throwing The setting of ground mass bed not only increases cost, while causing added burden to foundation bearing capacity, is easy that breakwater is made to occur to sink It falls into and destroys;Third is that the stability against sliding of existing semicircle breakwater is by between semi-circular caisson bottom and rubble-mound foundation top Frictional force, when the wave is high for the depth of water, in order to maintain the stability against sliding of breakwater, needs to fill in semi-circular caisson come what is provided More sand material, increase cost and duration, while the increase of dead load, can threaten foundation bearing capacity, factor of safety against sliding Increase but reduce the vertical bearing capacity of this structure, to limit application of this structure in deep water breakwater;Four It is to increase the construction time because there is riprap work.
Utility model content
The purpose of the utility model is to overcome the above-mentioned deficiencies of the prior art, provide a kind of suitable for soft soil foundation and deep water Condition, simple and reasonable, construction is convenient, project cost is low, environmental-friendly and reusable new type of deep-water breakwater.This The breakwater of utility model is a kind of semi-circular caisson and pile foundation novel combined type breakwater, can to avoid using rubble-mound foundation, The setting of pile foundation not only increases this new structural stability against sliding, while increasing its vertical bearing capacity.Technical side Case is as follows:
A kind of semi-circular caisson and pile foundation combined type breakwater, including caisson and pile foundation, which is characterized in that the caisson For semi-circular caisson made of being poured based on combined steel formwork, semicircular arch ring including bottom plate and on bottom plate, in semicircle Floor and the vertical plate for supporting semicircular arch ring are provided between shape arch ring and bottom plate;It is pre- in vertical plate and floor intersection It is embedded with the casing for forming pile foundation mounting hole, pile foundation mounting hole squeezes into ground with for pile foundation vertically;It is set on semicircular arch ring Set aperture.
In the utility model, semi-circular caisson can keep off wave, baffle, earth-retaining, and semicircular in shape can reduce wave force, and make ground Base stress distribution is more uniform;Its base areas is larger, can expand the contact area with ground, reduces foundation stress;Floor and vertical Plate can reinforcement structure globality and rigidity, while its intersection prefabricated can form vertical pile foundation installation by service sleeve Hole;The effect of pile foundation mounting hole is to squeeze into ground vertically for foundation pile;The effect of pile foundation is that the bearing capacity for enhancing ground and structure resist Sliding and stability against overturning.
Detailed description of the invention
(a) and (b) of Fig. 1 is respectively the sectional view and outside drawing of single group semi-circular caisson and pile foundation combined type breakwater
Fig. 2 single group semi-circular caisson and pile foundation combined type breakwater three-view diagram
Specific embodiment
Fig. 1 is single group semi-circular caisson and pile foundation combined type breakwater outside drawing;Fig. 2 is single group semi-circular caisson and pile foundation Combined type breakwater structure figure.In Fig. 2,1 is vertical plate, and 2 be semicircular arch ring, and 3 be floor, and 4 be bottom plate, and 5 be pile foundation, wherein half On round arch ring can appropriate aperture, as the back-up sand hole of semi-circular caisson, at the same semi-circular caisson sink when, aperture can be passed through Water filling sits bottom convenient for semi-circular caisson.
The main working procedure of semi-circular caisson and pile foundation combined type breakwater is as follows: first with combined steel formwork, Precasting yard pours semi-circular caisson by the sequence layering substep of bottom plate 4, vertical plate 1 and floor 3, semicircular arch ring 2, wherein in entirety When prefabricated vertical plate 1 and floor 3,3 intersection service sleeve of vertical plate 1 and floor, to form the mounting hole of pile foundation 5, and prefabricated pile Base 5, pile foundation 5 preferentially select prestress high intensity concrete stake (PHC);That then uses for reference caisson goes out fortune and setting method, will spell The semi-circular caisson installed integrally goes out to transport, transportation by driving to job location;Then past through the tapping of semicircular arch ring in job location Semi-circular caisson is sat bottom in designated position by water filling in caisson;There are the semi-circular caisson of filling ballast requirement, component for design Filling in case should be carried out after installation in time, filling should symmetrically, uniformly should immediately block pack hole after the completion of filling, and It is ensured that blocking tight, secured;Pile foundation 5 is finally placed in pile foundation mounting hole, is squeezed into pile foundation 5 using equipment such as pile driving barges specified Depth;Cement slurry is injected between pile foundation 5 and the gap of pile foundation installation hole wall, pile foundation and semi-circular caisson is made to be linked to be entirety.
Breakwater engineering is gradually to deep-water developments at present;In addition, the seashore of many offshore areas and seabed all there is Soft Soil Layer, several meters to tens meters of thickness are differed, such as the active Bohai Sea Gulf of China's economic development, entrance of Changjiang River, the mouth of the Zhujiang River and Zhejiang, Fujian All widely distributed the soft soil foundation in coastal area.Semi-circular caisson and pile foundation combined type breakwater can be perfectly suitable for badly Wave and Soft Soil build breakwater using the new structure without excavating ground or carrying out ground on soft foundation Reinforce, only ground need to simply be flattened, can be applicable in soft soil foundation and deep water conditions, structure it is simple, it is easy for construction, Project cost is low, is a kind of excellent new type of deep-water structure, is with a wide range of applications in silt coast.

Claims (1)

1.一种半圆形沉箱和桩基组合式防波堤,包括沉箱和桩基,其特征在于,所述的沉箱为基于组合钢模板浇筑而成的半圆形沉箱,包括底板和位于底板上的半圆形拱圈,在半圆形拱圈与底板之间设置有肋板以及用来支撑半圆形拱圈的立板;在立板和肋板相交部分预埋有用来形成桩基安装孔的套管,桩基安装孔用以供桩基竖直打入地基;半圆形拱圈上设置开孔。1. a semicircular caisson and pile foundation combined breakwater, comprise caisson and pile foundation, it is characterized in that, described caisson is the semicircular caisson casted based on composite steel formwork, comprises base plate and the caisson that is positioned on base plate. The semicircular arch ring is provided with a rib plate and a vertical plate used to support the semicircular arch ring between the semicircular arch ring and the bottom plate; the intersection part of the vertical plate and the rib plate is pre-buried to form a pile foundation installation hole The casing of the pile foundation is used for the pile foundation to be driven into the foundation vertically; the semicircular arch ring is provided with openings.
CN201821334404.4U 2018-08-19 2018-08-19 Semicircular caisson and pile foundation combined breakwater Active CN208857762U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821334404.4U CN208857762U (en) 2018-08-19 2018-08-19 Semicircular caisson and pile foundation combined breakwater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821334404.4U CN208857762U (en) 2018-08-19 2018-08-19 Semicircular caisson and pile foundation combined breakwater

Publications (1)

Publication Number Publication Date
CN208857762U true CN208857762U (en) 2019-05-14

Family

ID=66414946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821334404.4U Active CN208857762U (en) 2018-08-19 2018-08-19 Semicircular caisson and pile foundation combined breakwater

Country Status (1)

Country Link
CN (1) CN208857762U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867546A (en) * 2018-08-19 2018-11-23 天津大学 Semi-circular caisson and pile foundation combined type breakwater

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867546A (en) * 2018-08-19 2018-11-23 天津大学 Semi-circular caisson and pile foundation combined type breakwater

Similar Documents

Publication Publication Date Title
CN108560542B (en) A kind of bidirectional reinforcement of waste tire covering building slag and construction method thereof
CN103015367B (en) High-efficiency economical construction method for revetment
CN107419630A (en) A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction
CN201245846Y (en) Clamshell excavator stirring concrete enclosure wall
CN106884433A (en) Control vibrations pile pulling causes the structure of underground structure depression and control depression method
CN104452829A (en) Piled raft foundation anti-floating structure and construction method
CN103233444B (en) Underwater dumped rockfill bedding and side slope Anti-scouring structure and construction method thereof
CN104153371A (en) Grouting-to-stop-water construction method of underwater rubble bed
CN106948340A (en) A kind of construction method of the Manual excavated pile structure of high polymer grouting protection
CN108867547A (en) The construction method of semi-circular caisson and pile foundation combined type breakwater
KR20120012504A (en) Cast in place concrete pile With precast type Caisson
CN108999142A (en) The construction method of dome rectangular light-duty caisson and pile foundation combined type deep water breakwater
CN109706952A (en) Large-scale well-sinking construction method
CN1773022A (en) Fast soft foundation dyke building method and technology
CN104005370B (en) The reinforced earth lightweight revetment barricade of the ecological mask of building-block and construction method thereof
CN102733407A (en) Two-ring grouted single pile foundation
CN208857762U (en) Semicircular caisson and pile foundation combined breakwater
CN208965494U (en) Dome square light caisson and pile foundation combined breakwater
CN102605801A (en) Suspension semi-reverse-construction method for underground circular water tank
CN110820772A (en) A kind of combined reinforcement method and construction technology of anti-sliding piles and structural cementation for side slopes of granular accumulation
CN108867546A (en) Semi-circular caisson and pile foundation combined type breakwater
CN206971246U (en) Suitable for more pier stud bridge pile foundations on shaped corroded cave model stratum
KR100704460B1 (en) Harbor Restoration and Auxiliary Construction Equipment
CN106703024B (en) Construction process of slurry-solidified gravel composite pile
CN109487750A (en) Pile formula semicircular wave breaker structure and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant