CN208857762U - Semicircular caisson and pile foundation combined breakwater - Google Patents
Semicircular caisson and pile foundation combined breakwater Download PDFInfo
- Publication number
- CN208857762U CN208857762U CN201821334404.4U CN201821334404U CN208857762U CN 208857762 U CN208857762 U CN 208857762U CN 201821334404 U CN201821334404 U CN 201821334404U CN 208857762 U CN208857762 U CN 208857762U
- Authority
- CN
- China
- Prior art keywords
- pile foundation
- caisson
- foundation
- arch ring
- semi
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/11—Hard structures, e.g. dams, dykes or breakwaters
Landscapes
- Revetment (AREA)
Abstract
The utility model relates to a kind of semi-circular caissons and pile foundation combined type breakwater, including caisson and pile foundation, the caisson is semi-circular caisson made of being poured based on combined steel formwork, semicircular arch ring including bottom plate and on bottom plate is provided with floor and the vertical plate for supporting semicircular arch ring between semicircular arch ring and bottom plate;It is embedded with the casing for forming pile foundation mounting hole in vertical plate and floor intersection, pile foundation mounting hole squeezes into ground with for pile foundation vertically;Aperture is set on semicircular arch ring.It is short and reusable that the utility model is suitable for soft soil foundation and deep water conditions and having the advantages that rubble-mound foundation of constructing that convenient, no setting is required, Potential Working Time For Operation At Sea.
Description
Technical field
The utility model relates to a kind of caissons and pile foundation combined type breakwater.
Background technique
Semicircle breakwater (such as: a kind of semicircle breakwater, publication number CN206736844U) is a kind of adaptation weak soil
The Novel breakwater structure of base, is usually made of prefabricated semi-circular member or semi-circular caisson and rubble-mound foundation.With it is traditional straight
Vertical breakwater, sloping breakwater are compared, semicircle breakwater have from heavy and light, easy construction, it is reusable, beautiful,
The advantages that foundation stress is evenly distributed, suffered wave force is small and antiskid and stability against overturning are good.
When building, semi-circular caisson need to be placed on rubble-mound foundation existing semicircle breakwater.On soft soil foundation
When construction, needs first to excavate ground or reinforcing soft foundation, then semi-circular caisson is placed on rubble-mound foundation.Have four among these
A main problem, first is that the building stones needed are more since it is desired that building rubble-mound foundation, exploitation of stone can destroy ecological environment;Second is that throwing
The setting of ground mass bed not only increases cost, while causing added burden to foundation bearing capacity, is easy that breakwater is made to occur to sink
It falls into and destroys;Third is that the stability against sliding of existing semicircle breakwater is by between semi-circular caisson bottom and rubble-mound foundation top
Frictional force, when the wave is high for the depth of water, in order to maintain the stability against sliding of breakwater, needs to fill in semi-circular caisson come what is provided
More sand material, increase cost and duration, while the increase of dead load, can threaten foundation bearing capacity, factor of safety against sliding
Increase but reduce the vertical bearing capacity of this structure, to limit application of this structure in deep water breakwater;Four
It is to increase the construction time because there is riprap work.
Utility model content
The purpose of the utility model is to overcome the above-mentioned deficiencies of the prior art, provide a kind of suitable for soft soil foundation and deep water
Condition, simple and reasonable, construction is convenient, project cost is low, environmental-friendly and reusable new type of deep-water breakwater.This
The breakwater of utility model is a kind of semi-circular caisson and pile foundation novel combined type breakwater, can to avoid using rubble-mound foundation,
The setting of pile foundation not only increases this new structural stability against sliding, while increasing its vertical bearing capacity.Technical side
Case is as follows:
A kind of semi-circular caisson and pile foundation combined type breakwater, including caisson and pile foundation, which is characterized in that the caisson
For semi-circular caisson made of being poured based on combined steel formwork, semicircular arch ring including bottom plate and on bottom plate, in semicircle
Floor and the vertical plate for supporting semicircular arch ring are provided between shape arch ring and bottom plate;It is pre- in vertical plate and floor intersection
It is embedded with the casing for forming pile foundation mounting hole, pile foundation mounting hole squeezes into ground with for pile foundation vertically;It is set on semicircular arch ring
Set aperture.
In the utility model, semi-circular caisson can keep off wave, baffle, earth-retaining, and semicircular in shape can reduce wave force, and make ground
Base stress distribution is more uniform;Its base areas is larger, can expand the contact area with ground, reduces foundation stress;Floor and vertical
Plate can reinforcement structure globality and rigidity, while its intersection prefabricated can form vertical pile foundation installation by service sleeve
Hole;The effect of pile foundation mounting hole is to squeeze into ground vertically for foundation pile;The effect of pile foundation is that the bearing capacity for enhancing ground and structure resist
Sliding and stability against overturning.
Detailed description of the invention
(a) and (b) of Fig. 1 is respectively the sectional view and outside drawing of single group semi-circular caisson and pile foundation combined type breakwater
Fig. 2 single group semi-circular caisson and pile foundation combined type breakwater three-view diagram
Specific embodiment
Fig. 1 is single group semi-circular caisson and pile foundation combined type breakwater outside drawing;Fig. 2 is single group semi-circular caisson and pile foundation
Combined type breakwater structure figure.In Fig. 2,1 is vertical plate, and 2 be semicircular arch ring, and 3 be floor, and 4 be bottom plate, and 5 be pile foundation, wherein half
On round arch ring can appropriate aperture, as the back-up sand hole of semi-circular caisson, at the same semi-circular caisson sink when, aperture can be passed through
Water filling sits bottom convenient for semi-circular caisson.
The main working procedure of semi-circular caisson and pile foundation combined type breakwater is as follows: first with combined steel formwork,
Precasting yard pours semi-circular caisson by the sequence layering substep of bottom plate 4, vertical plate 1 and floor 3, semicircular arch ring 2, wherein in entirety
When prefabricated vertical plate 1 and floor 3,3 intersection service sleeve of vertical plate 1 and floor, to form the mounting hole of pile foundation 5, and prefabricated pile
Base 5, pile foundation 5 preferentially select prestress high intensity concrete stake (PHC);That then uses for reference caisson goes out fortune and setting method, will spell
The semi-circular caisson installed integrally goes out to transport, transportation by driving to job location;Then past through the tapping of semicircular arch ring in job location
Semi-circular caisson is sat bottom in designated position by water filling in caisson;There are the semi-circular caisson of filling ballast requirement, component for design
Filling in case should be carried out after installation in time, filling should symmetrically, uniformly should immediately block pack hole after the completion of filling, and
It is ensured that blocking tight, secured;Pile foundation 5 is finally placed in pile foundation mounting hole, is squeezed into pile foundation 5 using equipment such as pile driving barges specified
Depth;Cement slurry is injected between pile foundation 5 and the gap of pile foundation installation hole wall, pile foundation and semi-circular caisson is made to be linked to be entirety.
Breakwater engineering is gradually to deep-water developments at present;In addition, the seashore of many offshore areas and seabed all there is
Soft Soil Layer, several meters to tens meters of thickness are differed, such as the active Bohai Sea Gulf of China's economic development, entrance of Changjiang River, the mouth of the Zhujiang River and Zhejiang, Fujian
All widely distributed the soft soil foundation in coastal area.Semi-circular caisson and pile foundation combined type breakwater can be perfectly suitable for badly
Wave and Soft Soil build breakwater using the new structure without excavating ground or carrying out ground on soft foundation
Reinforce, only ground need to simply be flattened, can be applicable in soft soil foundation and deep water conditions, structure it is simple, it is easy for construction,
Project cost is low, is a kind of excellent new type of deep-water structure, is with a wide range of applications in silt coast.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821334404.4U CN208857762U (en) | 2018-08-19 | 2018-08-19 | Semicircular caisson and pile foundation combined breakwater |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821334404.4U CN208857762U (en) | 2018-08-19 | 2018-08-19 | Semicircular caisson and pile foundation combined breakwater |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208857762U true CN208857762U (en) | 2019-05-14 |
Family
ID=66414946
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821334404.4U Active CN208857762U (en) | 2018-08-19 | 2018-08-19 | Semicircular caisson and pile foundation combined breakwater |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208857762U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867546A (en) * | 2018-08-19 | 2018-11-23 | 天津大学 | Semi-circular caisson and pile foundation combined type breakwater |
-
2018
- 2018-08-19 CN CN201821334404.4U patent/CN208857762U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867546A (en) * | 2018-08-19 | 2018-11-23 | 天津大学 | Semi-circular caisson and pile foundation combined type breakwater |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108560542B (en) | A kind of bidirectional reinforcement of waste tire covering building slag and construction method thereof | |
CN103015367B (en) | High-efficiency economical construction method for revetment | |
CN107419630A (en) | A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction | |
CN201245846Y (en) | Clamshell excavator stirring concrete enclosure wall | |
CN106884433A (en) | Control vibrations pile pulling causes the structure of underground structure depression and control depression method | |
CN104452829A (en) | Piled raft foundation anti-floating structure and construction method | |
CN103233444B (en) | Underwater dumped rockfill bedding and side slope Anti-scouring structure and construction method thereof | |
CN104153371A (en) | Grouting-to-stop-water construction method of underwater rubble bed | |
CN106948340A (en) | A kind of construction method of the Manual excavated pile structure of high polymer grouting protection | |
CN108867547A (en) | The construction method of semi-circular caisson and pile foundation combined type breakwater | |
KR20120012504A (en) | Cast in place concrete pile With precast type Caisson | |
CN108999142A (en) | The construction method of dome rectangular light-duty caisson and pile foundation combined type deep water breakwater | |
CN109706952A (en) | Large-scale well-sinking construction method | |
CN1773022A (en) | Fast soft foundation dyke building method and technology | |
CN104005370B (en) | The reinforced earth lightweight revetment barricade of the ecological mask of building-block and construction method thereof | |
CN102733407A (en) | Two-ring grouted single pile foundation | |
CN208857762U (en) | Semicircular caisson and pile foundation combined breakwater | |
CN208965494U (en) | Dome square light caisson and pile foundation combined breakwater | |
CN102605801A (en) | Suspension semi-reverse-construction method for underground circular water tank | |
CN110820772A (en) | A kind of combined reinforcement method and construction technology of anti-sliding piles and structural cementation for side slopes of granular accumulation | |
CN108867546A (en) | Semi-circular caisson and pile foundation combined type breakwater | |
CN206971246U (en) | Suitable for more pier stud bridge pile foundations on shaped corroded cave model stratum | |
KR100704460B1 (en) | Harbor Restoration and Auxiliary Construction Equipment | |
CN106703024B (en) | Construction process of slurry-solidified gravel composite pile | |
CN109487750A (en) | Pile formula semicircular wave breaker structure and construction method |