CN208792797U - A kind of building steel girder erection auxiliary locator - Google Patents
A kind of building steel girder erection auxiliary locator Download PDFInfo
- Publication number
- CN208792797U CN208792797U CN201821511320.3U CN201821511320U CN208792797U CN 208792797 U CN208792797 U CN 208792797U CN 201821511320 U CN201821511320 U CN 201821511320U CN 208792797 U CN208792797 U CN 208792797U
- Authority
- CN
- China
- Prior art keywords
- mounting plate
- link block
- clamping block
- compressed spring
- fastening bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of building steel girder erection auxiliary locators, including intermediate connecting column and the second compressed spring, the external surrounding of the intermediate connecting column and upper and lower two sides are provided with link block, and the middle position of link block is provided with mounting head, and the second fastening bolt is provided through on the outside of link block, the top of the mounting head is connected by mounting blocks with clamping block, and the inner tip of clamping block is connected by the first compressed spring with mounting plate, and it is connected between mounting plate and mounting plate by the second compressed spring, the inside of the mounting plate is connected by the first fastening bolt with girder steel main body.The building steel girder erection during being carried out use, is facilitated with auxiliary locator and carries out installment work to girder steel according to the size of girder steel, and facilitated and dismantled, and whole installation process stability might as well.
Description
Technical field
The utility model relates to build girder steel correlative technology field, specially a kind of building steel girder erection is filled with auxiliary positioning
It sets.
Background technique
Building steel girder erection with auxiliary locator be one kind during being installed to girder steel, to building girder steel into
A kind of building auxiliary device of row location and installation, with this come achieve the effect that facilitate staff carry out installment work, existing city
It on during being positioned to girder steel, is installed by way of welding or engaging, but being welded to connect cannot be very
Good carry out dismantlement work, engaging, which is placed, will appear the bad phenomenon of stability again, therefore, just need a kind of auxiliary locator
To facilitate staff to carry out installation and removal well, while stability is good.
Utility model content
The purpose of this utility model is to provide a kind of building steel girder erection auxiliary locators, to solve above-mentioned background
The building girder steel positioning device currently on the market that technology proposes cannot have stability good simultaneously during carrying out use
With problem easy to disassemble.
To achieve the above object, the utility model provides the following technical solutions: a kind of building steel girder erection auxiliary positioning
Device, including intermediate connecting column and the second compressed spring, external surrounding and the upper and lower two sides of the intermediate connecting column are provided with
Link block, and the middle position of link block is provided with mounting head, and the second fastening bolt is provided through on the outside of link block,
The top of the mounting head is connected by mounting blocks with clamping block, and the inner tip of clamping block by the first compressed spring with
Mounting plate is connected, and is connected between mounting plate and mounting plate by the second compressed spring, and the inside of the mounting plate is logical
The first fastening bolt is crossed to be connected with girder steel main body.
Preferably, it is structure as a whole between the outside and link block of the intermediate connecting column, and the cross section of link block is in
"u"-shaped.
Preferably, pass through the second compression bullet between the mounting plate and mounting plate and between mounting plate and clamping block respectively
Spring and the first compressed spring constitute stretching structure.
Preferably, it is connected between the girder steel main body and mounting plate by the first fastening bolt, and the first fastening bolt
There is setting in the surrounding of girder steel main body.
Preferably, the cross section of the clamping block also " U "-shaped structure, and be mutually clamped between clamping block and link block,
It and is to be threadedly coupled between the mounting blocks outside clamping block and the mounting head inside link block.
Compared with prior art, the utility model has the beneficial effects that the building steel girder erection auxiliary locator exists
During carrying out use, facilitates and installment work is carried out to girder steel according to the size of girder steel, and facilitate and dismantled, and
And whole installation process stability might as well;
1, concave mounting blocks are provided in the outside of entire intermediate connecting column, installation conveniently is carried out to clamping block and is torn open
Work is unloaded, and then the shape installed as needed can be reached well, work is adjusted, it is convenient by engaging
The disassembly of block achievees the effect that installing and dismounting is carried out between girder steel and girder steel, so that the flexibility of entire positioning device is more preferable;
2, it is provided with the first compressed spring and the second compressed spring, can be very good the length so that between each mounting plate
Work is adjusted, so that distance can be very good that work is adjusted according to the size of girder steel between mounting plate, so that entirely
The use scope of positioning device is wider, and the effect of the second fastening bolt of cooperation it can be fixed very well work, guarantees whole
The stability of a device.
Detailed description of the invention
Fig. 1 is the utility model overlooking structure diagram;
Fig. 2 is the utility model main view attachment structure schematic diagram;
Fig. 3 is enlarged structure schematic diagram at A in the utility model Fig. 2.
In figure: 1, intermediate connecting column;2, mounting plate;3, girder steel main body;4, the first compressed spring;5, the first fastening bolt;
6, the second fastening bolt;7, mounting head;8, link block;9, clamping block;10, mounting blocks;11, the second compressed spring.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1-3, the utility model provides a kind of technical solution: a kind of building steel girder erection is filled with auxiliary positioning
It sets, including intermediate connecting column 1, mounting plate 2, girder steel main body 3, the first compressed spring 4, the first fastening bolt 5, the second fastening bolt
6, mounting head 7, link block 8, clamping block 9, mounting blocks 10 and the second compressed spring 11, the external surrounding of intermediate connecting column 1 with it is upper
Lower two sides are provided with link block 8, and the middle position of link block 8 is provided with mounting head 7, and the outside of link block 8 is run through
It is provided with the second fastening bolt 6, the top of mounting head 7 is connected by mounting blocks 10 with clamping block 9, and the inside of clamping block 9
Top is connected by the first compressed spring 4 with mounting plate 2, and passes through the second compressed spring between mounting plate 2 and mounting plate 2
11 are connected, and the inside of mounting plate 2 is connected by the first fastening bolt 5 with girder steel main body 3.
It is structure as a whole between the outside and link block 8 of intermediate connecting column 1, and the " U "-shaped knot in cross section of link block 8
Structure, it is convenient by carrying out installment work between link block 8 and clamping block 9, reach to facilitate and clamping block 9 is pacified according to the direction of installation
The effect that the quantity of dress is adjusted.
Between mounting plate 2 and mounting plate 2 and between mounting plate 2 and clamping block 9 respectively by the second compressed spring 11 and
First compressed spring 4 constitutes stretching structure, convenient so that the distance between mounting plate 2 can be very good in the second compressed spring 11
Work is adjusted under the action of the first compressed spring 4, so that the use scope of whole device is wider.
It is connected between girder steel main body 3 and mounting plate 2 by the first fastening bolt 5, and the first fastening bolt 5 is in girder steel master
The surrounding of body 3 has setting, convenient that further fastening work is carried out under the action of the first fastening bolt 5.
The cross section of clamping block 9 also " U "-shaped structure, and be mutually clamped between clamping block 9 and link block 8, and engage
Mounting blocks 10 outside block 9 and between the mounting head 7 inside link block 8 to be threadedly coupled, facilitate clamping block 9 and link block 8
Installation.
Working principle: when using the building steel girder erection auxiliary locator, firstly, it is necessary to according to steel girder erection
It connects quantity clamping block 9 is installed, during installing clamping block 9, firstly, staff needs clamping block
It is threadedly coupled between the mounting blocks 10 of 9 outer tip ends and the mounting head 7 inside link block 8, after the completion of connection, passes through second
Fastening bolt 6 will carry out further fastening work between link block 8 and clamping block 9, later, so that it may well according to girder steel
The size of main body 3 is to progress installment work between girder steel main body 3, during being installed, it is only necessary to which staff will
The top engaging of girder steel main body 3 is inserted into the inside of mounting plate 2, and then the second compressed spring between mounting plate 2 and mounting plate 2
11 can carry out extruding and flexible work according to the size of girder steel main body 3 well, during squeeze can stretch, due to
The presence of first compressed spring 4, but can the certain limitation work of the mobile carry out to mounting plate 2 well, as a result, can
The size between mounting plate 2 and mounting plate 2 is adjusted according to the size of girder steel main body 3, finally, staff is again
It will be installed between girder steel main body 3 and mounting plate 2 under the action of the first fastening bolt 5, just complete entire peace well
It sets position to work, the content being not described in detail in this specification belongs to existing skill well known to professional and technical personnel in the field
Art.
Although the utility model is described in detail with reference to the foregoing embodiments, come for those skilled in the art
Say, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic into
Row equivalent replacement, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all
It is included within the scope of protection of this utility model.
Claims (5)
1. a kind of building steel girder erection auxiliary locator, including intermediate connecting column (1) and the second compressed spring (11), special
Sign is: the external surrounding of the intermediate connecting column (1) and upper and lower two sides are provided with link block (8), and in link block (8)
Meta position, which installs, to be equipped with mounting head (7), and the second fastening bolt (6), the mounting head are provided through on the outside of link block (8)
(7) top is connected by mounting blocks (10) with clamping block (9), and the inner tip of clamping block (9) passes through the first compression bullet
Spring (4) is connected with mounting plate (2), and is connected between mounting plate (2) and mounting plate (2) by the second compressed spring (11)
It connects, the inside of the mounting plate (2) is connected by the first fastening bolt (5) with girder steel main body (3).
2. a kind of building steel girder erection auxiliary locator according to claim 1, it is characterised in that: the centre connects
It connects and is structure as a whole between the outside of column (1) and link block (8), and the " U "-shaped structure in cross section of link block (8).
3. a kind of building steel girder erection auxiliary locator according to claim 1, it is characterised in that: the mounting plate
(2) pass through the second compressed spring (11) and first between mounting plate (2) and between mounting plate (2) and clamping block (9) respectively
Compressed spring (4) constitutes stretching structure.
4. a kind of building steel girder erection auxiliary locator according to claim 1, it is characterised in that: the girder steel master
It is connected between body (3) and mounting plate (2) by the first fastening bolt (5), and the first fastening bolt (5) is in girder steel main body (3)
Surrounding have setting.
5. a kind of building steel girder erection auxiliary locator according to claim 1, it is characterised in that: the clamping block
(9) cross section also " U "-shaped structure, and be mutually clamped between clamping block (9) and link block (8), and clamping block (9) is external
Mounting blocks (10) and the internal mounting head (7) of link block (8) between to be threadedly coupled.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821511320.3U CN208792797U (en) | 2018-09-17 | 2018-09-17 | A kind of building steel girder erection auxiliary locator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821511320.3U CN208792797U (en) | 2018-09-17 | 2018-09-17 | A kind of building steel girder erection auxiliary locator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208792797U true CN208792797U (en) | 2019-04-26 |
Family
ID=66209714
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821511320.3U Expired - Fee Related CN208792797U (en) | 2018-09-17 | 2018-09-17 | A kind of building steel girder erection auxiliary locator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208792797U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110965789A (en) * | 2019-11-28 | 2020-04-07 | 中建钢构有限公司 | Positioning and mounting device for mounting steel beam |
-
2018
- 2018-09-17 CN CN201821511320.3U patent/CN208792797U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110965789A (en) * | 2019-11-28 | 2020-04-07 | 中建钢构有限公司 | Positioning and mounting device for mounting steel beam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204546759U (en) | Prestressed concrete mortar leakage prevention device | |
CN205206309U (en) | Template for expansion joint | |
CN205370601U (en) | Two lining construction waterstop positioner in tunnel | |
CN208792797U (en) | A kind of building steel girder erection auxiliary locator | |
CN207362717U (en) | A kind of device replaced for main rope of suspension bridge cord clip | |
CN209243957U (en) | The pre-buried weldment of curtain wall slot type | |
CN209114606U (en) | A kind of the side bar node and assembled connector of quadrate steel pipe column and H profile steel | |
CN106239020A (en) | A kind of novel pipe fitting welder | |
CN202944998U (en) | Attached installation and maintenance platform of calibrated tower crane | |
CN208792745U (en) | Aluminum alloy mould plate assembles big mold device | |
CN206607504U (en) | A kind of support platform for building | |
CN108316644A (en) | A kind of big mold device of aluminum alloy mould plate assembling | |
CN107697241A (en) | A kind of body section scaffold and its building method | |
CN209508884U (en) | A kind of thread-protected tube and line protection device being laid in Expressway Central Strip | |
CN222576214U (en) | A design guardrail for steel construction engineering | |
CN204001992U (en) | A kind of screen frame holder | |
CN209503988U (en) | It is a kind of for installing the auxiliary hydraulic device of clip sealing ring | |
CN206233547U (en) | Adhere to the tool bracing truss of climbing frame | |
CN205655092U (en) | High strength steel board | |
CN206392644U (en) | A kind of hydraulic pipe bender for project installation | |
CN221030663U (en) | Firmly-connected assembled steel structure | |
CN211564819U (en) | High-efficient steel mesh connection butt-joint machine | |
CN209011136U (en) | Bracing members and steel purlin connection structure in the building enclosure of subway station | |
CN220870254U (en) | Pipeline installation structure | |
CN213508959U (en) | Improved steel structure fastening device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190426 Termination date: 20190917 |