CN208748469U CN201820771713.1U CN201820771713U CN208748469U CN 208748469 U CN208748469 U CN 208748469U CN 201820771713 U CN201820771713 U CN 201820771713U CN 208748469 U CN208748469 U CN 208748469U
Authority
CN
China
Prior art keywords
heating
control unit
temperature sensor
snow
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820771713.1U
Other languages
Chinese (zh)
Inventor
梅朝
李新星
刘林松
赵辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central and Southern China Municipal Engineering Design and Research Institute Co Ltd filed Critical Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Priority to CN201820771713.1U priority Critical patent/CN208748469U/en
Application granted granted Critical
Publication of CN208748469U publication Critical patent/CN208748469U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provide it is a kind of applied to town road from deicing snow-melting system, including the heating system being arranged in below bituminous pavement upper layer and the control system being arranged in the electric power pipe trench of bituminous pavement two sides, the heating system is made of multiple spaced sets and vertical with road surface running vehicle direction heating units, the control system is made of multiple control units, one end of described control unit is connect with heating unit, the other end of described control unit is connect with municipal electric power pipe network, and each control unit controls multiple heating units simultaneously.The system not only can heat with fast melt road snow but also before snowfall road surface prevention road snow, and for control system using municipal electric power pipe network, electricity consumption is convenient, and electric energy is renewable energy, and no pollution to the environment meets the construction theory of " blue montains and green waters ".

Description

It is a kind of applied to town road from deicing snow-melting system
Technical field
The utility model relates to Municipal Road Engineering technical field, and in particular to it is a kind of applied to town road from deicing Snow-melting system.
Background technique
The northern area of China Winter Snow is more, affects the normal use of urban road.According to statistics, the friendship in winter 30% Influence of interpreter's event from ice and snow on road surfaces.Ice and snow on road surfaces is mainly manifested in the change of road conditions, road surface to the harm of highway driving Accumulated snow is after vehicle is compacted, and the frictional force between tire and road surface reduces, the easy left and right sliding of automobile, meanwhile, the braking distance of automobile Also it is difficult to control, once speed is too fast, turning is too anxious, easily generation traffic accident.Currently, northern China urban road deicing is swept Snow mainly has artificial and mechanical removal or spreads snow-melting agent (ice-melt salt etc.) two ways, and both modes all exist it is certain Insufficient: the method higher cost and efficiency of cleaning snow of hand fit's mechanical equipment snow removing are lower, it is also possible to destroy bituminous pavement and The traffic of long period is closed;Though the method effect for dispensing snow removing salt is preferable, the chloride ion in the salt that removes the snow can accelerate bridge knot The aging of the corrosion of reinforcing bar and road deck pitch in structure not only influences the service performance of road, bridge, and salt content is high The individually recycling of the larger needs of snow-broth pollution, should not flow directly into Urban Underground water system, practical operation is more troublesome.Therefore, if It is very necessary for counting the completely new town road ice and snow removing method of one kind.
Utility model content
In view of this, the utility model proposes a kind of applied to town road from deicing snow-melting system, it can be preferably Prevention, snow removing guarantee roadway travel safety and promote environmental protection.
For this purpose, the technical solution adopted in the utility model is:
It is a kind of applied to town road from deicing snow-melting system, including the heating below bituminous pavement upper layer is arranged in System and the control system being arranged in the electric power pipe trench of bituminous pavement two sides, the heating system by multiple spaced sets, And the heating unit composition vertical with road surface running vehicle direction, the control system are made of multiple control units, the control One end of unit is connect with heating unit, and the other end of described control unit is connect with municipal electric power pipe network, each control Unit controls multiple heating units simultaneously.
Preferably, the heating unit from top to bottom successively include heat transfer layer, heating layer and thermal insulation layer, the heating layer by Heater strip and steel pipe composition, heater strip is the core component of heating layer, and the inside of steel pipe, the both ends of the heater strip are arranged in It is connected respectively with the electric wire of control unit.
Preferably, the heater strip is carbon fiber heating silk or metal alloy heater strip, is preferred in an engineering Same heater strip;The steel pipe is the round carbon steel tubing or alloy pipe of diameter 20mm, and plucking is done in the outer surface of steel pipe Processing, it is in the both ends heat insulation waterproof material of steel pipe that steel pipe is closed.
Preferably, the heat transfer layer is heat transfer steel wire class uniformly transfer heat material, and the thermal insulation layer is polyester glass fibre dry goods Heat-barrier material.
Preferably, each control unit further includes that the first temperature being equidistantly arranged symmetrically being arranged on heat transfer layer passes Sensor and second temperature sensor, any one temperature sensor is higher than in first temperature sensor and second temperature sensor Then circuit disconnects when design temperature, and the temperature sensor of first temperature sensor and second temperature sensor is lower than design simultaneously Temperature circuit can just be opened.
Preferably, the setting spacing between the multiple heating unit is 20~30cm, each control unit control 10~ About 50~100 heater strips in parallel in the length range of the road surface 20m.
Preferably, surface layer in bituminous pavement, bituminous pavement cutting optimal, base can be also successively arranged below the heating system Layer and soil layer, above layers time are optional level, can specifically be set according to actual road conditions in construction.
Compared with existing deicing snow-smelting method, a kind of melting from deicing applied to town road provided by the utility model Snow system is that a kind of heating system is arranged below town road bituminous pavement, not only can be with fast melt road snow but also can Prevent road snow to heat road surface before snowfall, the cold cracking on road surface can also be prevented, while taking measures to effectively increase energy savings and reduce material consumption, It is high to solve the problems, such as that system consumes energy while guaranteeing system snow melt effect, control system uses municipal electric power pipe network, electricity consumption It is convenient, and electric energy is renewable energy, no pollution to the environment meets the construction theory of " blue montains and green waters ", has with the following Beneficial effect:
1, by heater strip be arranged in steel pipe, such heater strip has the protection of steel pipe, avoid bituminous pavement damage by pressure plus Heated filament;
2, heat transfer layer is set on heating layer top, thermal insulation layer is arranged in lower part, and by the both ends heat insulation waterproof material of steel pipe It is closed, road surface heating rate can be accelerated in this way;
3, hair pulling treatment is done in the outer surface of steel pipe, and heat transfer layer and thermal insulation layer are all Web materials, strengthen pitch in this way Road surface in (under) interlaminar bonding of surface layer;
4, heater strip parallel connection accesses circuit, and by water pipe precaution, reduces failure rate, can be direct if heater strip failure It takes out, for ease of maintenaince maintains;
5, the design temperature of temperature sensor is set, it is ensured that road surface is evenly heated, and can avoid road surface because of temperature mistake It is high and generate disease;
6, the control system for controlling heating system directly uses municipal electric power pipe network system, not only facilitates management in this way but also is easy to Maintenance.
To sum up, compared with snow removal with machine or chemical agent remove the snow, the utility model have pre- Anti-ice-and-snow, it is convenient to use, Economic and environment-friendly, the advantages that road pavement is not damaged;Compared with other underground snow melt cables, the present invention, which has, reinforces bituminous pavement interlayer Bonding, easy to operate, easy-maintaining maintenance, the advantages that failure is small.
Detailed description of the invention
Fig. 1 is the vertical planning drawing from deicing snow-melting system in pavement structure of the utility model.
Fig. 2 is the road plane layout drawing from deicing snow-melting system of the utility model.
It is as shown in the figure: 10- bituminous pavement upper layer, 20- heating unit, 21- heat transfer layer, 22- heating layer, 22.1- heating Silk, 22.2- steel pipe, 23- thermal insulation layer, 30- control unit, 31- electric wire, the first temperature sensor of 32-, 33- second temperature sensing Device, surface layer in 40- bituminous pavement, 50- bituminous pavement cutting optimal, 60- base, 70- soil layer, 80- electric power pipe trench.
Specific embodiment
The present invention will be further described in the following with reference to the drawings and specific embodiments.
Referring to Fig.1 shown in -2, the present embodiment provides a kind of applied to town road from deicing snow-melting system, including heats System and control system, heating system are arranged below bituminous pavement upper layer 10, and set-up of control system is in bituminous pavement two In the electric power pipe trench 80 of side, in which:
The heating system is by multiple spaced sets and 20 groups of heating unit vertical with road surface running vehicle direction At the heating unit 20 from top to bottom successively includes heat transfer layer 21, heating layer 22 and thermal insulation layer 23, and the heat transfer layer 21 is to pass Hot steel wire class uniformly transfer heat material, the thermal insulation layer 23 are polyester glass fibre dry goods heat-barrier material, and the heating layer 22 is by core Component heater strip 22.1 and steel pipe 22.2 form, and the inside of steel pipe 22.2 is arranged in the heater strip 22.1, heater strip 22.1 Both ends are connected with the electric wire 31 in control system, and 22.2 top of steel pipe is laid with heat transfer layer 21, and lower part is laid with thermal insulation layer 23, the both ends of the steel pipe 22.2 are carried out closed with heat insulation waterproof material.
Specifically, the heater strip 22.1 is carbon fiber heating silk or metal alloy heater strip, in same item engineering Same heater strip 22.1 is preferred;The steel pipe 22.2 is the round carbon steel tubing or alloy pipe of diameter 20mm, steel Do hair pulling treatment in the outer surface of pipe 22.2.
Specifically, the setting spacing between the multiple heating unit 20 is 20~30cm.
The control system is made of multiple control units 30, and each control unit 30 can control the road surface 10~20m About 50~100 heater strips 22.1 in parallel in length range, each control unit 30 further includes being arranged on heat transfer layer 21 The first temperature sensor 32 and second temperature sensor 33 being equidistantly arranged symmetrically, first temperature sensor 32 and the second temperature It spends circuit when any one temperature sensor is higher than design temperature in sensor 33 to disconnect, first temperature sensor 32 and second Circuit is opened when the temperature sensor of temperature sensor 33 is lower than design temperature simultaneously.
Specifically, it is 20 DEG C that first temperature sensor 32 and second temperature sensor 33, which are typically designed temperature, this is set Meter temperature is adjusted according to factors such as environment, bituminous pavement properties in practical applications, is needed quickly if ice and snow on road surfaces is thicker When deicing snow melt, design temperature can be set to 50 DEG C, but this time is unsuitable too long.
Specifically, multiple control units 30 can concentrated setting in a master control area, it is single that multiple controls are set in master control area The master switch of member 30, due to being equipped with the first temperature sensor 32 and second temperature sensor 33 in each control unit 30, and The unlatching of design temperature control heater strip 22.1 is set, is equivalent to the effect of switch, therefore each control unit 30 is no longer individually Respective switch is set.
Specifically, the control range of described control unit 30 can take the circumstances into consideration to adjust according to the deployment scenarios of municipal electric power pipe network system Whole, it is this reality that municipal electric power pipe network system, which refers to the facility in the embedding municipal cable such as the electric power pipe trench 80 of both sides of the road setting, The heating system for applying example provides electric energy.
Specifically, being also successively arranged surface layer 40, asphalt road in bituminous pavement below heating system described in the present embodiment Face cutting optimal 50, base 60 and soil layer 70, in practice of construction, above layers time can carry out selection setting according to situation.
To sum up, the present embodiment it is a kind of applied to town road from deicing snow-melting system, from top to bottom successively include Bituminous pavement upper layer 10, heat transfer layer 21, heating layer 22, thermal insulation layer 23, surface layer 40, bituminous pavement cutting optimal in bituminous pavement 50, base 60 and soil layer 70, construction procedure is main are as follows: 1. by Asphalt Pavement Base 60, cutting optimal 50 and middle surface layer 40 according to Method for normalizing construction;2. thermal insulation layer 23 is laid in surface layer 40 in bituminous pavement;3. being spaced 10~20cm cloth on thermal insulation layer 23 Heater strip 22.1 and steel pipe 22.2 are set, crosses in the access two sides electric system of road surface, connects control unit 30,22.2 both ends of steel pipe It is closed with heat insulation waterproof material;4. being laid with heat transfer layer 21 above steel pipe 22.2;5. being equidistantly arranged symmetrically on heat transfer layer 21 One temperature sensor grade second temperature sensor;6. heater strip 22.1 within the scope of the 10~20m of length of road surface and the first temperature are passed Sensor, second temperature sensor connect, and form control unit 30, and each control unit 30 accesses in master control area;7. making Bituminous pavement upper layer, and be compacted conserve.
The application method of the present embodiment are as follows: 1. system is overhauled before ice and snow season arrives, it is main to check heating Silk 22.1 and the first temperature sensor 32, second temperature sensor 33;2. being opened when needing pre- Anti-ice-and-snow or direct deicing Control unit 30, each control unit 30 are started to work;3. in each control unit 30, the first temperature sensor 32 and the second temperature The temperature sensor for having a sensor in degree sensor 33 is more than design temperature, then can automatically disconnect the circuit, heater strip 22.1 stops It only works, when the first temperature sensor 32 and the temperature sensor of second temperature sensor 33 are all lower than design temperature simultaneously, It will start circuit, heater strip 22.1 is reworked;4. will not influence each control unit 30 if 22.1 failure of part heater strip and control Other heater strips 22.1 work, if two temperature sensors in the same control unit 30 break down, from dynamic circuit breaker Open circuit, heater strip 22.1 stops working in entire control unit 30, but does not influence the normal work of other control units 30.
Above-described embodiment is a kind of one kind from deicing snow-melting system applied to town road provided by the utility model Better embodiment, can also being applied on bridge floor from deicing snow-melting system by the utility model, when being applied on bridge floor, this The control system of utility model can access in the public lighting circuit of bridge two sides, provide electric power for heating system.
The part not illustrated in specification is the prior art or common knowledge.It is practical new that the present embodiment is merely to illustrate this Type, rather than limitation the scope of the utility model, the equivalent replacement etc. that those skilled in the art do the utility model Modification is deemed to fall in the utility model claims book institute protection scope.

Claims (5)

1. it is a kind of applied to town road from deicing snow-melting system, it is characterised in that: including being arranged in bituminous pavement upper layer (10) below heating system and the control system being arranged in bituminous pavement two sides electric power pipe trench (80), the heating system by Multiple spaced sets and vertical with road surface running vehicle direction heating unit (20) compositions, the control system is by multiple Control unit (30) composition, one end of described control unit (30) are connect with heating unit (20), described control unit (30) The other end is connect with municipal electric power pipe network, and each control unit (30) controls multiple heating units (20) simultaneously.
2. it is according to claim 1 it is a kind of applied to town road from deicing snow-melting system, it is characterised in that: it is described plus Hot cell (20) from top to bottom successively includes heat transfer layer (21), heating layer (22) and thermal insulation layer (23), the heating layer (22) by Heater strip (22.1) and steel pipe (22.2) composition, the heater strip (22.1) are arranged in the inside of steel pipe (22.2), the heating The both ends of silk (22.1) are connected with the electric wire (31) of control unit (30) respectively.
3. it is according to claim 2 it is a kind of applied to town road from deicing snow-melting system, it is characterised in that: it is described plus Heated filament (22.1) is carbon fiber heating silk or metal alloy heater strip, and the steel pipe (22.2) is the round carbon of diameter 20mm Steel pipe or alloy pipe, and hair pulling treatment is done on surface.
4. it is according to claim 2 it is a kind of applied to town road from deicing snow-melting system, it is characterised in that: it is described every A control unit (30) further includes that the first temperature sensor (32) being equidistantly arranged symmetrically on heat transfer layer (21) and the is arranged Two temperature sensors (33), any one temperature sensor in first temperature sensor (32) and second temperature sensor (33) Circuit disconnects when higher than design temperature, and the temperature sensor of first temperature sensor (32) and second temperature sensor (33) is same When be lower than design temperature when circuit open.
5. it is according to claim 1 it is a kind of applied to town road from deicing snow-melting system, it is characterised in that: it is described more Setting spacing between a heating unit (20) is 20~30cm.
CN201820771713.1U 2018-05-22 2018-05-22 It is a kind of applied to town road from deicing snow-melting system Active CN208748469U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820771713.1U CN208748469U (en) 2018-05-22 2018-05-22 It is a kind of applied to town road from deicing snow-melting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820771713.1U CN208748469U (en) 2018-05-22 2018-05-22 It is a kind of applied to town road from deicing snow-melting system

Publications (1)

Publication Number Publication Date
CN208748469U true CN208748469U (en) 2019-04-16

Family

ID=66053022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820771713.1U Active CN208748469U (en) 2018-05-22 2018-05-22 It is a kind of applied to town road from deicing snow-melting system

Country Status (1)

Country Link
CN (1) CN208748469U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113005848A (en) * 2021-03-23 2021-06-22 北京工业大学 Road zebra crossing line surface anti-icing device utilizing solar energy
CN115103466A (en) * 2022-07-01 2022-09-23 中国建筑第八工程局有限公司 Constant temperature pipe for temperature rise of anchored lawn
CN115103465A (en) * 2022-07-01 2022-09-23 中国建筑第八工程局有限公司 Warming device for anchoring lawn in cold zone and construction method thereof
US12100297B1 (en) 2024-02-01 2024-09-24 King Faisal University Designing a smart system to evaporate rainwater in low-lying areas of streets that do not have a rain drainage system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113005848A (en) * 2021-03-23 2021-06-22 北京工业大学 Road zebra crossing line surface anti-icing device utilizing solar energy
CN115103466A (en) * 2022-07-01 2022-09-23 中国建筑第八工程局有限公司 Constant temperature pipe for temperature rise of anchored lawn
CN115103465A (en) * 2022-07-01 2022-09-23 中国建筑第八工程局有限公司 Warming device for anchoring lawn in cold zone and construction method thereof
US12100297B1 (en) 2024-02-01 2024-09-24 King Faisal University Designing a smart system to evaporate rainwater in low-lying areas of streets that do not have a rain drainage system

Similar Documents

Publication Publication Date Title
CN208748469U (en) It is a kind of applied to town road from deicing snow-melting system
KR102197761B1 (en) Upward heat concentrating snow melting system and its installation method using electric heat line on paved roads
CN204825636U (en) Anti -freeze system of intelligence accuse temperature
CN101413240A (en) Method for melting snow and ice based on carbon fiber-glass fiber composite braiding net
KR20150009795A (en) Snow melting apparatus on paved road and installing mehod thereof
CN205917555U (en) Can splice road surface ceramic tile that forms road surface
CN109898388B (en) Road pavement structure and intelligent snow-melting and ice-melting processing system suitable for cold areas
CN104005318A (en) Electrical-snow melting asphalt concrete pavement used for municipal roads
CN106835896A (en) A kind of asphalt concrete pavement snow-melting system
CN102174793A (en) Intelligent temperature-control anti-freezing bridge deck
CN205501771U (en) Road with snow melt ice function
CN101979770A (en) Solar photoelectric complementary road de-icing and snow melting control system
CN104631276A (en) Carbon fiber composite geogrid with electric heating function
CN111926651A (en) A kind of road electric heating ice-proof and snow-melting system and its laying method
CN110055856A (en) Seif-citing rate road surface and heating cable mixing road surface ice melting system and its construction method
CN202131554U (en) Active heat-insulation antiskid facility for road surfaces
CN102182132B (en) Intelligently controlled electric heating pavement ice and snow removing process
CN104631277B (en) A kind of pavement construction method
CN206157521U (en) Carbon fiber road surface snow -melting system that generates heat
CN213476524U (en) Snow and ice melting device arranged in pervious concrete ground
CN203904798U (en) Electric snow-melting asphalt concrete pavement applicable to municipal road
CN105386406B (en) A scanning cycle power supply electric heating system for melting ice and snow bridge deck
CN207435844U (en) A kind of asphalt concrete pavement snow-melting system
CN108894072A (en) A kind of solar energy highway
CN105463954A (en) Ice and snow melting device and method through heating steel pipes on PC track beams

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant