CN208668270U - A kind of interim expanded joint structure of bridge - Google Patents
A kind of interim expanded joint structure of bridge Download PDFInfo
- Publication number
- CN208668270U CN208668270U CN201821417026.6U CN201821417026U CN208668270U CN 208668270 U CN208668270 U CN 208668270U CN 201821417026 U CN201821417026 U CN 201821417026U CN 208668270 U CN208668270 U CN 208668270U
- Authority
- CN
- China
- Prior art keywords
- bridge
- building body
- layer
- elastic cord
- interim
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
A kind of interim expanded joint structure of bridge, it is related to technical field of bridge construction, including pouring building body, elastic cord breaker and filled layer, the filled layer is located in the gap of two bridges engagement, the building body of pouring is separately positioned on the step of bridge, described pour is equipped with one layer of insulation blanket between building body and the step contact surface of bridge, the elastic cord breaker is located on the upper surface of the filled layer, and transition pad is posted in the two sides of the elastic cord breaker, the another side of the transition pad pours between building body and height is concordant described in being attached to two respectively, the building body of pouring is equipped with several grooves, the embedded bar of bridge step is respectively positioned in the groove, it is stamped cover board in the upper surface for pouring building body and the transition pad, the cover board is removably attachable to described pour in building body by fastening screw.It is convenient that the utility model ensures to remove, while expansion joint can smoothly buffer when can guarantee bridge deformation, and the integrality of surface layer, improves service life in guarantee.
Description
Technical field
The utility model relates to technical field of bridge construction, and in particular to a kind of interim expanded joint structure of bridge.
Background technique
Bridge expanssion joint is when having the influence such as external factor such as contraction of running car, temperature change, pontic to meet
The flexible requirement of bridge floor, usually at the expansion joint of two beam-ends joints or beam-ends and abutment joint setting one fixed width.
Expansion joint needs are vertical, are parallel in the both direction of bridge axes equal can generate is displaced free extension, and when vehicle crosses
Want steady when expansion joint, without convex jump and noise.The sequence of construction of bridge expanssion joint are as follows: pave and complete bituminous concrete upper layer
Afterwards, the bituminous concrete of expansion joint position is rejected, the fashioned iron at expansion joint and the embedded bar of bridge end is welded, finally existed
Casting concrete at the reserved location of expansion joint, can open to traffic after the completion of concrete curing.
Highway reconstruction, enlarging during, need frequently to carry out traffic lead change, the stage guarantor lead to, in order to guarantee most
The smooth traffic changed greatly, some sections need to just open section in pavement spread completion and pass through, construct to other sections after surface layer
After whole, then blocks section of not completing and construct;Therefore, section of not completing can not carry out expansion joint construction, but
It is the temporary traffic in order to ensure section of not completing, needs to be arranged before middle surface layer paves interim expansion joint, guarantees that road is handed over
Clear and coherent smooth, vehicle safety passes through.
Currently, existing interim expansion joint is that direct casting concrete and bridge deck pavement are flat in the step of bridge end
Together, surface layer in then paving on bridge deck pavement, then top plate is set in gap upper cover, the interim expansion joint of such structure exists such as
Lower disadvantage: bridge step is equipped with embedded bar with flexible seam welding, embedded bar is wrapped in when concreting in,
It is subsequent to cut concrete construct again lay permanent expansion joint when, embedded bar, which is laid in, to be caused to cut difficulty in concrete,
It is uneven directly to contact parting surface when causing to cut with bridge step for concrete simultaneously, in addition, cover board is only used at the both ends at expansion joint
Connection, so that the deformation buffer between bridge is unstable, the middle surface layer structure at frangible cover plate edge, service life is short.
Summary of the invention
In order to solve above-mentioned problem of the prior art, the utility model provides a kind of interim expanded joint structure of bridge, it is ensured that
Expansion joint can smoothly buffer when removing conveniently, while can guarantee bridge deformation, the integrality of surface layer in guarantee, improve and use the longevity
Life.
The purpose of this utility model can be realized by the following technical scheme: a kind of interim expanded joint structure of bridge, including
Building body, elastic cord breaker and filled layer are poured, the filled layer is located in the gap of two bridges engagement, and the building body of pouring is set respectively
It sets on the step of bridge, described pour is equipped with one layer of insulation blanket between building body and the step contact surface of bridge, the elasticity is slow
It rushes layer to be located on the upper surface of the filled layer, and transition pad, the transition pad are posted in the two sides of the elastic cord breaker
Another side be attached to two respectively described in pour between building body and height is concordant, the building body of pouring equipped with several grooves,
The embedded bar of bridge step is respectively positioned in the groove, and cover board is stamped in the upper surface for pouring building body and the transition pad, institute
It states cover board and described pour in building body is removably attachable to by fastening screw.
Preferably, the upper surface of the cover board is concordant with the upper surface of the bridge step, the upper surface paving of bridge step
If surface layer in one layer, the middle surface layer is equipped with the clip slot for the upper end opening that one section is rectangle, the clip slot and bridge
Axis is vertical while the clip slot is located at the position directly above of the elastic cord breaker.Work as bridge deformation, elastic cord breaker by
When extruding, deformation occurs raises upward for elastic cord breaker, to make middle surface layer jack up upwards, when vehicle grinds out-of-date, downward stone roller
Pressure easily leads to middle surface layer and easily occurs blistering, cracking, and clip slot can guarantee when being extruded after middle surface layer protrusion, and two side of clip slot is to clip slot
Interior folding, the high spot for giving middle surface layer have space buffer, it is ensured that middle surface layer it is smooth.
Preferably, the upper surface of the filled layer is concordant with the bottom surface of bridge step.
Preferably, the elastic cord breaker is made of asphalt adhesive, and the width of the elastic cord breaker and the filling
Layer is of same size.
Preferably, the filled layer is made with the transition pad of cystosepiment.
Preferably, the insulation blanket is made of malthoid.
The use principle of the utility model: installing filled layer between the gap of bridge, lays on bridge step and pours building body
Template, then carry out concreting, pour it is body formed after remove template, poured at two building body opposite side attach transition pad,
Then cover board is covered to be fastened and fixed with screw;Elastic cord breaker is poured between two transition pads, until elastic cord breaker and lid
Plate is concordant;Surface layer in being finally laid with, is cut into clip slot in middle surface layer, after middle surface layer acceptance(check), can temporarily pass through.
Resultant effect brought by the utility model includes:
1, the utility model simple structure is reasonable, easy to use, pours building body and is equipped with the contact surface of bridge step and is isolated
Felt avoids the concrete for pouring building body directly with step face contact, conveniently pours cutting for building body, while ensuring the complete of step surface
Property;Simultaneously the embedded bar in step be located in the groove for pouring building body not with pour building body and contact, it is ensured that pour internal clear,
Enable pour building body when smashing quickly, conveniently;Cover board is removably attachable to pour on building body upper surface;Transition pad is slow by elasticity
It rushes layer and is separated with building body is poured;To sum up, the above structure ensures that interim expansion joint can quickly remove, and accelerates the speed of construction in later period.
2, transition is lined with foam pad and is made, and has certain elasticity, expands in elastic cord breaker stress to two sides and upper end
When deformation, transition pad is compressed thinning, and certain deformation space is provided to elastic cord breaker, so that the change that elastic cord breaker is upward
Shape amount reduces, so that it is guaranteed that middle surface layer is smooth.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the interim expanded joint structure of the utility model embodiment bridge.
Fig. 2 is the A-A structural schematic diagram of the interim expanded joint structure of the utility model embodiment bridge.
Wherein, the identical appended drawing reference of identical component in the accompanying drawings;The attached drawing is not drawn according to the actual ratio.
Specific embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples.
Embodiment
A kind of interim expanded joint structure of bridge 4, including building body 1, elastic cord breaker 2 and filled layer 3 are poured, the filled layer 3
In the gap of two bridges 4 engagement, the upper surface of the filled layer 3 is concordant with the bottom surface of 4 step of bridge, described to pour building body
1 is separately positioned on the step of bridge 4, and described pour is equipped with one layer of insulation blanket 5 between building body 1 and the step contact surface of bridge 4,
The insulation blanket 5 is made of malthoid;The elastic cord breaker 2 is located on the upper surface of the filled layer 3, and the elasticity is slow
Transition pad 6 is posted in the two sides for rushing layer 2, the another side of the transition pad 6 be attached to two respectively described in pour between building body 1 and
Height is concordant, and for the building body 1 of pouring equipped with several grooves 11, the embedded bar 7 of 4 step of bridge is respectively positioned on the groove 11
Interior, cover board 8 is stamped in the upper surface for pouring building body 1 and the transition pad 6, and the cover board 8 is dismountable by fastening screw 12
It is connected to described pour in building body 1.The elastic cord breaker 2 is made of asphalt adhesive, and the width of the elastic cord breaker 2 and institute
It is of same size to state filled layer 3.The filled layer 3 is made with the transition pad 6 of cystosepiment.
The upper surface of the cover board 8 is concordant with the upper surface of 4 step of bridge, and the upper surface of 4 step of bridge is laid with one
Surface layer 9 in layer, the middle surface layer 9 are equipped with the clip slot 10 for the upper end opening that one of section is rectangle, the clip slot 10 and bridge 4
Axis is vertical while the clip slot 10 is located at the position directly above of the elastic cord breaker 2.When the deformation of bridge 4, elastic buffer
Layer 2 is when being squeezed, and deformation occurs raises upward for elastic cord breaker 2, so that middle surface layer 9 be made to jack up upwards, when vehicle grinds out-of-date,
Downward grinding pressure easily leads to middle surface layer 9 and easily occurs blistering, cracking, and clip slot 10 can guarantee when being extruded after middle 9 protrusion of surface layer, folder
For 10 liang of sides of slot to 10 interior folding of clip slot, the high spot for giving middle surface layer 9 has space buffer, it is ensured that middle surface layer 9 it is smooth.
The use principle of the utility model: filled layer 3 is installed between the gap of bridge 4, lays and pours on 4 step of bridge
Then the template of body 1 carries out concreting, pour after building body 1 forms and remove template, attached in the opposite side that two are poured building body 1
Pad 6 is crossed, cover board 8 is then covered and is fastened and fixed with screw;Elastic cord breaker 2 is poured between two transition pads 6, until elasticity is slow
It is concordant with cover board 8 to rush layer 2;Surface layer 9 in being finally laid with, is cut into clip slot 10 in middle surface layer 9, after middle 9 acceptance(check) of surface layer,
It can temporarily pass through.
Resultant effect brought by the utility model embodiment includes:
1, the utility model embodiment simple structure is reasonable, easy to use, and the contact surface for pouring building body 1 and 4 step of bridge is spread
Equipped with insulation blanket 5, avoids the concrete for pouring building body 1 directly with step face contact, conveniently pour cutting for building body 1, while ensuring platform
The integrality of terrace;Simultaneously the embedded bar 7 in step be located in the groove 11 for pouring building body 1 not with pour building body 1 and contact, it is ensured that pour
Clear in building body 1, enable pour building body 1 when smashing quickly, conveniently;Cover board 8 is removably attachable to pour 1 upper end of building body
On face;Transition pad 6 separates elastic cord breaker 2 with building body 1 is poured;To sum up, the above structure ensures that interim expansion joint can quickly be torn open
It removes, accelerates the speed of construction in later period.
2, transition pad 6 has foam pad to be made, and has certain elasticity, swollen to two sides and upper end in 2 stress of elastic cord breaker
When bulging deformation, transition pad 6 is compressed thinning, and certain deformation space is provided to elastic cord breaker 2 so that elastic cord breaker 2 to
On deflection reduce, so that it is guaranteed that middle surface layer 9 is smooth.
This specification structure depicted in this specification institute accompanying drawings, ratio, size etc., only to cooperate specification revealed interior
Hold, so that those skilled in the art understands and reads, is not intended to limit the utility model enforceable qualifications, therefore not
Has technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size are practical new not influencing this
Under the effect of type can be generated and the purpose that can reach, it should all still fall in the revealed technology contents of the utility model and obtain and can contain
In the range of lid.Meanwhile cited such as "upper" in this specification, "lower", "left", "right", " centre " and " one " term,
It is merely convenient to being illustrated for narration, rather than to limit the enforceable range of the utility model, the change of relativeness or tune
It is whole, under the content of no substantial changes in technology, when being also considered as the enforceable scope of the utility model.
The utility model is described above with reference to preferred embodiment, but the protection scope of the utility model is not
Limited to this, any all technical solutions fallen within the scope of the appended claims are within the protection scope of the present utility model.?
In the case where not departing from the scope of the utility model, various improvement can be carried out to it and can be replaced with equivalent therein
Component.Especially, as long as structural conflict is not present, items technical characteristic mentioned in the various embodiments can be in any way
It combines.
Claims (6)
1. a kind of interim expanded joint structure of bridge, which is characterized in that described to fill out including pouring building body, elastic cord breaker and filled layer
It fills layer to be located in the gap of two bridges engagement, the building body of pouring is separately positioned on the step of bridge, described to pour building body and bridge
One layer of insulation blanket is equipped between the step contact surface of beam, the elastic cord breaker is located on the upper surface of the filled layer, and
And transition pad is posted in the two sides of the elastic cord breaker, the another side of the transition pad be attached to two respectively described in pour building body
Between and height it is concordant, for the building body of pouring equipped with several grooves, the embedded bar of bridge step is respectively positioned on the groove
Interior, cover board is stamped in the upper surface for pouring building body and the transition pad, and the cover board is removably attachable to by fastening screw
It is described to pour in building body.
2. the interim expanded joint structure of bridge according to claim 1, which is characterized in that the upper surface of the cover board with it is described
The upper surface of bridge step is concordant, and the upper surface of bridge step is laid with surface layer in one layer, and the middle surface layer is equipped with one of section
For the clip slot of the upper end opening of rectangle, the clip slot clip slot described simultaneously vertical with the axis of bridge is located at the elastic cord breaker
Position directly above.
3. the interim expanded joint structure of bridge according to claim 2, which is characterized in that the upper surface of the filled layer and bridge
The bottom surface of beam step is concordant.
4. the interim expanded joint structure of bridge according to claim 3, which is characterized in that the elastic cord breaker is by asphalt adhesive
It is made, and the width of the elastic cord breaker and the filled layer are of same size.
5. the interim expanded joint structure of bridge according to claim 4, which is characterized in that the filled layer and the transition pad
It is made of cystosepiment.
6. the interim expanded joint structure of bridge according to claim 5, which is characterized in that the insulation blanket is made of malthoid.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821417026.6U CN208668270U (en) | 2018-08-30 | 2018-08-30 | A kind of interim expanded joint structure of bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821417026.6U CN208668270U (en) | 2018-08-30 | 2018-08-30 | A kind of interim expanded joint structure of bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208668270U true CN208668270U (en) | 2019-03-29 |
Family
ID=65840158
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821417026.6U Expired - Fee Related CN208668270U (en) | 2018-08-30 | 2018-08-30 | A kind of interim expanded joint structure of bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208668270U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114753244A (en) * | 2022-03-25 | 2022-07-15 | 江苏平山交通设施有限公司 | Interim permanent components of a whole that can function independently festival section assembled modulus telescoping device that changes |
CN115075126A (en) * | 2022-06-23 | 2022-09-20 | 宁波路宝科技实业集团有限公司 | A bridge expansion device and its installation method |
-
2018
- 2018-08-30 CN CN201821417026.6U patent/CN208668270U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114753244A (en) * | 2022-03-25 | 2022-07-15 | 江苏平山交通设施有限公司 | Interim permanent components of a whole that can function independently festival section assembled modulus telescoping device that changes |
CN114753244B (en) * | 2022-03-25 | 2024-01-26 | 江苏平山交通设施有限公司 | Temporary-to-permanent split segment assembly type modulus telescoping device |
CN115075126A (en) * | 2022-06-23 | 2022-09-20 | 宁波路宝科技实业集团有限公司 | A bridge expansion device and its installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104018425B (en) | A kind of quick-replaceable bridge expansion joint installation and installation method thereof | |
CN208668270U (en) | A kind of interim expanded joint structure of bridge | |
CN109826093B (en) | Asphalt concrete seamless expansion device and construction method thereof | |
CN205711596U (en) | Assembled oblique bond-retarded prestressed concrete pavement structure | |
CN105544390A (en) | Assembled-type reinforced-concrete crash-proof wall and construction method thereof | |
US2949828A (en) | Road joints | |
CN108221655A (en) | A kind of comb-tooth bridge expansion device and its construction method | |
CN106480821A (en) | A kind of end is using seamless bridge neotectonics and its construction method of arc attachment strap | |
CN105178171B (en) | Chain type butt strap structure based on seamless bridge | |
JP5728048B2 (en) | Bridge buried joint structure and construction method thereof | |
CN110725194B (en) | Unequal-spacing suction transformation device and construction method thereof | |
CN208917619U (en) | A kind of reconstruction and extension project new-old concrete bond Pavement mosaic structure | |
CN110965427A (en) | Continuous reinforced concrete composite asphalt pavement expansion joint structure and construction method thereof | |
CN209227316U (en) | A kind of reconstruction and extension project new-old pavement splicing construction | |
CN104532759B (en) | A kind of double curvature arched bridge bridge floor widen reinforcement process method | |
CN215482025U (en) | Widening and splicing roadbed structure of new and old roadbed | |
CN208899319U (en) | A kind of comb-tooth bridge expansion device | |
GB504570A (en) | Improvements in or relating to joints for pavements, roads, dams and the like, and methods of making the same | |
CN210262567U (en) | Post-pouring belt for cement concrete pavement | |
CN108342940A (en) | A kind of bus stop station pavement structure | |
CN208088114U (en) | Bridge expansion joint installation | |
CN208088035U (en) | A kind of transition segment structure of hard and soft drop-over | |
CN206706543U (en) | A kind of deck transverse slope adjusts structure | |
CN205711723U (en) | A kind of Fast Installation bridge expansion joint installation | |
CN211596339U (en) | Bridge pipeline structure capable of reducing self load of bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190329 |
|
CF01 | Termination of patent right due to non-payment of annual fee |