CN208648957U - A kind of spraying sewage-treatment plant - Google Patents
A kind of spraying sewage-treatment plant Download PDFInfo
- Publication number
- CN208648957U CN208648957U CN201820917492.4U CN201820917492U CN208648957U CN 208648957 U CN208648957 U CN 208648957U CN 201820917492 U CN201820917492 U CN 201820917492U CN 208648957 U CN208648957 U CN 208648957U
- Authority
- CN
- China
- Prior art keywords
- sedimentation basin
- tank
- treatment plant
- fixedly connected
- sedimentation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005507 spraying Methods 0.000 title claims abstract description 23
- 239000010865 sewage Substances 0.000 title claims abstract description 19
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 100
- 238000004062 sedimentation Methods 0.000 claims abstract description 80
- 230000003750 conditioning effect Effects 0.000 claims abstract description 65
- 238000005188 flotation Methods 0.000 claims abstract description 42
- 238000001179 sorption measurement Methods 0.000 claims abstract description 17
- 239000002244 precipitate Substances 0.000 claims abstract description 3
- 238000001914 filtration Methods 0.000 claims description 5
- 230000001681 protective effect Effects 0.000 claims description 5
- 239000003575 carbonaceous material Substances 0.000 claims description 2
- 238000010521 absorption reaction Methods 0.000 claims 1
- 239000003344 environmental pollutant Substances 0.000 abstract description 24
- 231100000719 pollutant Toxicity 0.000 abstract description 24
- 230000000694 effects Effects 0.000 abstract description 12
- 239000002699 waste material Substances 0.000 abstract description 2
- 239000007921 spray Substances 0.000 description 9
- 238000003756 stirring Methods 0.000 description 9
- 230000005540 biological transmission Effects 0.000 description 6
- 238000000034 method Methods 0.000 description 5
- 230000001376 precipitating effect Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 238000002156 mixing Methods 0.000 description 4
- 230000037452 priming Effects 0.000 description 4
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 3
- 235000008733 Citrus aurantifolia Nutrition 0.000 description 3
- 235000011941 Tilia x europaea Nutrition 0.000 description 3
- 239000003513 alkali Substances 0.000 description 3
- 229910052799 carbon Inorganic materials 0.000 description 3
- 210000002421 cell wall Anatomy 0.000 description 3
- 239000011248 coating agent Substances 0.000 description 3
- 238000000576 coating method Methods 0.000 description 3
- 238000000151 deposition Methods 0.000 description 3
- 238000000605 extraction Methods 0.000 description 3
- 239000004571 lime Substances 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 239000010802 sludge Substances 0.000 description 3
- 239000000701 coagulant Substances 0.000 description 2
- 239000000284 extract Substances 0.000 description 2
- 229920000642 polymer Polymers 0.000 description 2
- 238000001556 precipitation Methods 0.000 description 2
- 238000005086 pumping Methods 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 230000003245 working effect Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000003651 drinking water Substances 0.000 description 1
- 235000020188 drinking water Nutrition 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000007790 scraping Methods 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 230000009182 swimming Effects 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- 239000002351 wastewater Substances 0.000 description 1
Landscapes
- Physical Water Treatments (AREA)
Abstract
The utility model discloses a kind of spraying sewage-treatment plants, belong to electric vehicle spraying waste disposal technical field, in the presence of in the water body used contain more pollutant, if this part water body is directly discharged to nature, pollutant in water body can pollute technical problem to nature, its key points of the technical solution are that the sewage-treatment plant includes reservoir, reservoir has been sequentially communicated conditioning tank group, flotation tank, sedimentation basin, reconciliation pond and water purifying tank;Wherein, the position of the connection of the flotation tank and sedimentation basin is located at sedimentation basin by positon of near bottom, precipitates and is fixedly connected with adsorption and sedimentation part in bottom of pond portion, and sedimentation basin top end is fixedly connected with drainage component, achievees the effect that the quantity for reducing the pollutant contained in water body.
Description
Technical field
The utility model relates to a kind of electric vehicles to spray waste disposal field, in particular to a kind of spraying sewage treatment dress
It sets.
Background technique
Skeleton of the vehicle frame as entire electric vehicle, farthest determines the usage experience of user, so, vehicle frame is set
Count and be manufactured as the production and processing link that electric vehicle production firm focuses on the most.
Vehicle frame is after the completion of overall structure is cast, in order to improve the erosion-resisting ability of vehicle frame, it will usually enterprising in vehicle frame
The spraying of row corrosion resistant coating in the factory of electric vehicle, is provided with the rectangular spray booth for spraying, and the two of spray booth
A end one end is feed end, and the other end is discharge end, runs through the transhipment track being connected with for transporting vehicle frame in spray booth, turns
It transports track and is equipped with several transhipment hooks;Spray coating mechanical hand, the inner wall top end of spray coating mechanical hand direction are equipped in spray booth
Equipped with spray head, spray head forms cascade towards water spray on inner wall, extra coating is washed away, while pollution is dissolved in water body
In, and then achieve the effect that reduce the coating being infected on spray booth wall.
But contain more pollutant in the water body after the completion of use, if this part water body is directly discharged to nature,
Pollutant in water body can pollute nature.
Utility model content
In view of the deficienciess of the prior art, being reached the purpose of the utility model is to provide a kind of spraying sewage-treatment plant
To the effect for the quantity for reducing the pollutant contained in water body.
The above-mentioned technical purpose of the utility model has the technical scheme that
A kind of spraying sewage-treatment plant, the sewage-treatment plant include reservoir, and reservoir has been sequentially communicated adjusting
Pond group, flotation tank, sedimentation basin, reconciliation pond and water purifying tank;Wherein, the position of the connection of the flotation tank and sedimentation basin is located at precipitating
Positon of near bottom is leaned in pond, precipitates and is fixedly connected with adsorption and sedimentation part in bottom of pond portion, sedimentation basin top end is fixedly connected with drainage component.
Through the above technical solutions, worker by the water after the use in spraying process by collecting, after simple process, it is unified
It is injected into reservoir and is kept in, the water in reservoir is first poured into conditioning tank group, the pollutant dissolved in water body
Gradually to be precipitated in floccule in water body, remain in conditioning tank group after precipitation, the water flowing in conditioning tank group to air bearing
Chi Zhong, flotation tank are injected with bubble bottom-up, and bubble drives the magazine being precipitated in water jointly upward during ascension
Ascension, then, a large amount of pollutant are swum on the top surface of flotation tank, and after water body enters in sedimentation basin, sedimentation basin can be incited somebody to action
Pollutant in water body is further stopped by the filtration members in sedimentation basin, to make in the water body of sedimentation basin top end
Pollutant reduce, then using the filter effect of sedimentation basin top end drainage component, further reduce in water body
The quantity of pollutant, be then flowed into again reconcile pond in carry out water body pH value adjusting, finally from reconcile pond in extract to
Water purifying tank is medium to be used, and the pollutant in water body all gradually remains in each pond after water body flows through each pond, thus
The clean-up effect for completing whole water body has achieved the effect that the quantity for reducing the pollutant contained in water body.
Preferably, the adsorption and sedimentation part is adsorption and sedimentation part made of active carbon material, it is heavy to be paved on adsorption and sedimentation part
Shallow lake bottom of pond portion.
Through the above technical solutions, on the one hand active carbon has stronger adsorption and sedimentation ability, so as to improve to water
The treatment effect of body, another aspect active carbon has relatively broad scope of selecting material, to reduce the manufacture of adsorption and sedimentation part
Cost improves the cost performance of adsorption and sedimentation part.
Preferably, the drainage component includes the Diversion Plate being fixedly connected on sedimentation basin inner wall, Diversion Plate is around precipitating
Pond inner wall one week, Diversion Plate was fixedly connected with several drainage sawtooth, drainage serrated vertical on the side far from sedimentation basin inner wall
In Diversion Plate, sedimentation basin offers water hole above Diversion Plate, and sedimentation basin is connected to by water hole with reconciliation pond.
Through the above technical solutions, the water in sedimentation basin is after the filtering of adsorption and sedimentation part, the water of sedimentation basin top end
Pollutant load is less in body, and the water body of top layer can only be flowed on Diversion Plate by the gap between drainage sawtooth, then again by
Water hole enters in reconciliation pond, to further reduce the content of the cotton-shaped pollutant in water body, further reaches
Reduce the effect of the quantity of the pollutant contained in water body.
It is fixedly connected on sedimentation basin inner wall preferably, the Diversion Plate is V-shaped.
Make through the above technical solutions, the water that the Diversion Plate of V-type can leak through in the gap to drainage sawtooth provides guidance
With improving the working efficiency of Diversion Plate to accelerate the flow velocity of water;The Diversion Plate of V-type has biggish water empty simultaneously
Between, to improve the quantity of the disposable water body by water hole, further improve the working efficiency of Diversion Plate.
Preferably, shape of the water hole at Diversion Plate mutually suits with Diversion Plate.
Through the above technical solutions, the shape of water hole and the shape of Diversion Plate mutually suit, can will be guided on Diversion Plate
The water flow to come over is quickly emitted into reconciliation pond, to improve the practicability of water hole.
Preferably, the water hole, which is located on the side of sedimentation basin, is covered with filtration gauze.
Through the above technical solutions, the filtration gauze of setting being capable of water body progress further mistake of the convection current through water hole
Filter has further reached the pollution for reducing and containing in water body to further reduce the quantity of the pollutant in water body
The effect of the quantity of object.
Preferably, the conditioning tank group top end is fixedly connected with observation platform, observation platform one end, which is fixedly connected with, to be tilted towards
Under staircase, the other end extend to sedimentation basin close to reconcile pond top.
Through the above technical solutions, the observation platform of setting can be observed for working condition of the worker to conditioning tank group,
When stirring pool group is handled in time when something goes wrong, the working effect of stirring pool group further ensure that.
Preferably, being fixedly connected with protective fence on the observation platform.
Through the above technical solutions, the protective fence of setting can provide safety guarantee to worker of the station on observation platform, subtract
The case where few worker inadvertently falls off, improves the safety that observation platform uses.
In conclusion the utility model has the following beneficial effects:
1, conditioning tank group, flotation tank, being used cooperatively for sedimentation basin reach the quantity for reducing the pollutant contained in water body
Effect;
2, observation platform and being used cooperatively for protective fence improve convenience.
Detailed description of the invention
Fig. 1 is the overall structure diagram for spraying sewage-treatment plant;
Fig. 2 is the schematic diagram in order to show the structure of conditioning tank group;
Fig. 3 is the schematic diagram in order to show the structure of flotation tank;
Fig. 4 is the schematic diagram in order to show the structure of sedimentation basin.
In figure, 1, reservoir;11, water pump;12, intake pipe;2, conditioning tank group;21, level-one conditioning tank;22, second level tune
Save pond;23, three-level conditioning tank;24, level Four conditioning tank;25, supply assembly;251, feeding box;252, mateiral pump;253, material is taken out
Pipe;26, mixing component;261, support frame;262, driving motor;263, stirring rod;3, flotation tank;31, air dissolved pump;32, it ventilates
Pipe;321, crafters;322, gas-distributing pipe;33, scraper plate;331, Power Component;3311, transmission chain;3312, sprocket wheel;3313, it drives
Part;3314, fixed plate;332, water curved arc;333, lock bits felt;34, bits slot is deposited;341, bits hole is put;342, choked flow block;4,
Sedimentation basin;41, adsorption and sedimentation part;42, drainage component;421, Diversion Plate;422, drainage sawtooth;423, water hole;4231, it filters
Gauze;5, reconciliation pond;6, water purifying tank;7, sludge-tank;71, self priming pump;72, extraction tube;73, filter press;8, observation platform;81, it helps
Ladder;82, protective fence.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.The wherein identical attached drawing of identical components
Label indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "up" and "down" refer to
It is the direction in attached drawing, word " bottom surface " and " top surface ", "inner" and "outside" are referred respectively to towards or away from particular elements geometry
The direction at center.
A kind of spraying sewage-treatment plant, as shown in Figure 1, including all is rectangular standing pond, rectangular reservoir
1, square conditioning tank group 2, rectangular flotation tank 3, rectangular sedimentation basin 4, rectangular reconciliation pond 5, rectangular
Water purifying tank 6 and rectangular sludge-tank 7.
The circular intake pipe 12 with water pump 11 is connected on one end of reservoir 1,12 one end of intake pipe is stretched
Enter into reservoir 1, the other end is first connected to water pump 11, then in extending into standing pond.
Reservoir 1 is abutted far from the end for standing pond with conditioning tank group 2, sludge-tank 7, and conditioning tank group 2 and sludge-tank 7 are arranged side by side
Setting, conditioning tank group 2 include that dispensing has the level-one conditioning tank 21 of lime, dispensing to have the second level conditioning tank 22 of piece alkali, dispensing to have wadding
The three-level conditioning tank 23 of solidifying agent and dispensing have the level Four conditioning tank 24 of high polymer coagulant.
In conjunction with Fig. 2, level-one conditioning tank 21 is equipped with mixing component 26, and mixing component 26 includes being fixedly connected on level-one adjusting
The support frame 261 on 21 top of pond, support frame 261 are made of two rectangular plates, are bolted to connection on support frame 261
There is driving motor 262, stirring rod 263 is connected on driving motor 262, stirring rod 263 extends to level-one after running through support frame 261
In conditioning tank 21, driving motor 262 drives stirring rod 263 to rotate, stir in level-one conditioning tank 21.Second level conditioning tank 22, three
Grade conditioning tank 23 and 24 top end of level Four conditioning tank are again provided with identical mixing component 26.
Level-one conditioning tank 21 is equipped with supply assembly 25, and supply assembly 25 includes the feeding box for being placed on 2 outside of conditioning tank group
251, the material-pumping tube 253 with charging pump is fixedly connected on feeding box 251, and 253 one end of material-pumping tube extends to feeding box 251
In, the other end is first connected to the mateiral pump 252 being fixedly connected on feeding box 251, then in extending to level-one conditioning tank 21.Two
It is again provided with corresponding supply assembly 25 in grade conditioning tank 22, three-level conditioning tank 23 and level Four conditioning tank 24, supply assembly 25 is
Level-one conditioning tank 21, second level conditioning tank 22, three-level conditioning tank 23 and level Four conditioning tank 24 supplement respectively required material.
Level-one conditioning tank 21, second level conditioning tank 22, three-level conditioning tank 23 and the square array of level Four conditioning tank 24 and
It is mutually abutted against between adjacent conditioning tank, level-one conditioning tank 21 is first connected to reservoir 1, is then connected again with second level conditioning tank 22
Logical, second level conditioning tank 22 is connected to three-level conditioning tank 23 again, and three-level conditioning tank 23 is connected to level Four conditioning tank 24 again, and level Four is adjusted
Pond 24 is connected to after being connected to three-level conditioning tank 23 with flotation tank 3, and the water flowed out from reservoir 1 is first flowed into level-one conditioning tank 21
In, second level conditioning tank 22, three-level conditioning tank 23 and level Four conditioning tank 24 are then flowed through one by one again, finally from level Four conditioning tank 24
It is flowed into flotation tank 3.
Fig. 1 is reviewed, an end of flotation tank 3 is abutted with conditioning tank group 2, another end and the end of sedimentation basin 4 are supported
It connects.The side of flotation tank 3 is abutted with the side of sludge-tank 7 and the length of sludge-tank 7 is equal to the length of flotation tank 3 plus adjusting
The sum of the length of pond group 2.
In conjunction with Fig. 3, air dissolved pump 31 is placed on 3 bottom surface of flotation tank, air dissolved pump 31 is connected with circular snorkel 32, ventilation
It is communicated with also round gas-distributing pipe 322 on pipe 32, several circular crafters 321 are offered on gas-distributing pipe 322, divide gas
Pipe 322 is paved with the bottom surface of flotation tank 3.
The top end of flotation tank 3 is equipped with scraper plate 33, and scraper plate 33 and the side wall of flotation tank 3 are equipped with Power Component 331, power
For scraper plate 33, from flotation tank 3, close to the end of conditioning tank group 2, trip is starting point to component 331, and flotation tank 3 is close to the end of sedimentation basin 4
Terminal whips the water surface of 3 top end of flotation tank.Power Component 331 includes the transmission chain 3311 with sprocket wheel 3312, sprocket wheel 3312
It is first rotatably connected on the inner wall of flotation tank 3, then engages connection with transmission chain 3311 again, be fixedly connected on transmission chain 3311
Rectangular fixed plate 3314, scraper plate 33 are fixedly connected on the side of fixed plate 3314, and scraper plate 33 is equipped with water curved arc
332, for scraper plate 33 when scraping the water surface of flotation tank 3, the bending direction of water curved arc 332 is the side of close flotation tank 3,
In, it is connected with actuator 3313 close to the sprocket wheel 3312 of sedimentation basin 4, actuator 3313 is motor, between motor and sprocket wheel 3312
It is arranged with belt, is rotated by belt band movable sprocket 3312, sprocket wheel 3312 and the cooperation of transmission chain 3311 drive scraper plate 33 to move.
It is equipped with rectangular deposit between flotation tank 3 and sedimentation basin 4 and considers slot 34 to be worth doing, deposits the side wall of the close sedimentation basin 4 of bits slot 34
Height be higher than the tip height of flotation tank 3, deposit bits slot 34 and be arc-shaped close to the inner wall of flotation tank 3 and connect top end is fixed
Being connected to several sections is semicircular choked flow block 342, and the circular arc portion of choked flow block 342 deposits bits slot 34 towards flotation tank 3
Close sludge-tank 7 end on offer it is rectangular put bits hole 341, put bits hole 341 and be communicated to sludge-tank 7.
The communicating position of flotation tank 3 and sedimentation basin 4 is located at the bottom of sedimentation basin 4, fixed on the bottom surface of sedimentation basin 4
Rectangular adsorption and sedimentation part 41 is connected, adsorption and sedimentation part 41 is active carbon, and adsorption and sedimentation part 41 covers the entire bottom of sedimentation basin 4
Face.
In conjunction with Fig. 4, sedimentation basin 4 is equipped with drainage component 42 by proximal portion, and drainage component 42 includes being fixedly connected on precipitating
Diversion Plate 421 on the inner wall in pond 4, one end of Diversion Plate 421 are fixedly connected on the inner wall of sedimentation basin 4 and around sedimentation basins 4
Horizontal one week of inner wall, the end of inner wall of the Diversion Plate 421 far from sedimentation basin 4 is fixedly connected with jagged drainage sawtooth
422, drainage sawtooth 422 is perpendicular to Diversion Plate 421, and Diversion Plate 421 between 4 inner wall of drainage sawtooth 422 and sedimentation basin is to precipitating
The bottom in pond 4 is bent to form V shape, and water hole 423 is offered on the inner wall of sedimentation basin 4, and 423 upper end of water hole is rectangular lower end
Shape and the shape of drainage plate mutually agree with, water hole 423 by sedimentation basin 4 with reconcile pond 5 and be connected to, concoct side and the precipitating in pond
Pond 4 abuts, and the end in reconciliation pond 5 is abutted with the end of sludge-tank 7, and reconciliation pond 5 is connected with the water pipe with water pump, water pipe one end
It extends in reconciliation pond 5, the other end is first connected to water pump, is then then connected in water purifying tank 6.
Flotation tank 3 is equipped with rectangular observation platform 8 close to the place of the side wall of feeding box 251, and 8 one end of observation platform is fixedly connected
There is staircase 81, staircase 81 tilts down, and the other end of observation platform 8 extends to flotation tank 3 and sludge behind the outside of sedimentation basin 4
The top of wall between pond 7, actuator 3313 are fixedly connected on observation platform 8.It is connected with extraction tube 72 in sludge-tank 7, extracts
Pipe 72 is equipped with self priming pump 71, and self priming pump 71 is fixedly connected on observation platform 8, the other end across after sedimentation basin 4 below observation platform 8
It is connected with filter press 73.
Wherein, using rear waste water, same be placed into standing pond carries out natural sedimentation after collecting in spraying process,
Pollutant in water body is precipitated to bottom end, then, water body the matching by suction pump and drinking-water pipe for standing pond upper layer will be located at
It closes to extract and be kept in into reservoir 1, the water head in reservoir 1 in level-one conditioning tank 21 by throwing in level-one conditioning tank 21
It is placed with lime, pollutant adherency, the sedimentation of some suspension classes in water body are tentatively reduced the pollutant in water body, so by lime
Afterwards, then from level-one conditioning tank 21 it flows in second level conditioning tank 22, launching in second level conditioning tank 22 has piece alkali, and piece alkali is further
Water body is handled, then, water flow successively flows in three-level conditioning tank 23 and level Four conditioning tank 24 again, three-level conditioning tank
The high polymer coagulant in flocculant and level Four conditioning tank 24 in 23 analyses the paint dissolved in water body in the form of floccule
It out and swims in water body, stirring motor drives stirring rod 263, and constantly rotation is stirred, and supply assembly 25 guarantees each tune
It saves the material in pond and keeps sufficient.
Then, water body enters in flotation tank 3, and the air dissolved pump 31 of 3 bottom of flotation tank keeps snorkel 32 and gas-distributing pipe 322 logical
It crosses crafters 321 and blows bubble into flotation tank 3, the upward ascension of floccule in bubbles entrain water and the surface for swimming in water body
On, the scraper plate 33 of the top end of flotation tank 3 scrapes the top surface for whipping water body and the pollution by precipitation under the drive of Power Component 331
Position where object towards sedimentation basin 4 moves, and the pollutant at water curved arc 332 in the remittance of guaranteed discharge water body will not be from scraper plate 33
Two sides leak out, and when scraper plate 33 is located at flotation tank 3 close to the end of sedimentation basin 4, scraper plate 33 is abutted with the cell wall for depositing bits slot 34, so
Afterwards, pollutant is pushed to and is deposited in bits slot 34, then flowed in sludge-tank 7 by depositing the bits hole 341 of putting opened up on bits slot 34,
Scraper plate 33 can get rid of the aqueous of part when being detached from the cell wall for depositing bits slot 34, and the water after having got rid of deposits that bits slot 34 is close to sink striking
Fall back to again on the cell wall in shallow lake pond 4 and deposits in bits slot 34;Bits felt 333 is locked simultaneously quickly by the pollution on choked flow block 342
Object, which is pushed to, to be deposited in bits slot 34, and scraper plate 33 comes back to end of the flotation tank 3 far from sedimentation basin 4 under the drive of transmission chain 3311
Head, preparation is scraped next time strokes work.
After flowing in sludge-tank 7, there are self priming pump 71 and the cooperating of extraction tube 72 to transport sludge only to filter press
In 73, sludge is squeezed by the work of filter press 73, then mud after extruding is transported in special processing place and carries out
Processing.
Remaining water body flow in flotation tank 3 is to sedimentation basin 4, in the work effect of the adsorption and sedimentation part 41 of sedimentation basin 4
Fruit is by the processing of peculiar smell and some remnants in water body, and after the completion of processing, the aqueous positioned at 4 top surface of sedimentation basin passes through drainage sawtooth
422 flow on Diversion Plate 421, then under the guidance of Diversion Plate 421 by water hole 423 flow to reconcile pond 5 in into
The debugging of row pH value is extracted into water purifying tank 6 eventually by the working effect of water pipe and water pump and is stored, and waits utilize next time.It is comprehensive
On, through the above steps, achieve the effect that the quantity for reducing the pollutant contained in water body.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but
As long as all by the protection of Patent Law in the scope of the claims of the utility model.
Claims (8)
1. a kind of spraying sewage-treatment plant, it is characterised in that: the sewage-treatment plant includes reservoir (1), reservoir (1)
It has been sequentially communicated conditioning tank group (2), flotation tank (3), sedimentation basin (4), reconciliation pond (5) and water purifying tank (6);The flotation tank (3)
It is located at sedimentation basin (4) with the position of the connection of sedimentation basin (4) and leans on positon of near bottom, is fixedly connected with absorption on sedimentation basin (4) bottom
It settles part (41), sedimentation basin (4) top end is fixedly connected with drainage component (42).
2. a kind of spraying sewage-treatment plant according to claim 1, it is characterised in that: the adsorption and sedimentation part (41) is
Adsorption and sedimentation part (41) made of active carbon material are paved with sedimentation basin (4) bottom on adsorption and sedimentation part (41).
3. a kind of spraying sewage-treatment plant according to claim 1, it is characterised in that: the drainage component (42) includes
The Diversion Plate (421) being fixedly connected on sedimentation basin (4) inner wall, Diversion Plate (421) surround sedimentation basin (4) inner wall one week, diversion
Plate (421) hangs down far from several drainage sawtooth (422), drainage sawtooth (422) is fixedly connected on the side of sedimentation basin (4) inner wall
Directly in Diversion Plate (421), sedimentation basin (4) offers water hole (423) above Diversion Plate (421), and water hole (423) will precipitate
Pond (4) is connected to reconciliation pond (5).
4. a kind of spraying sewage-treatment plant according to claim 3, it is characterised in that: the Diversion Plate (421) is V-shaped
It is fixedly connected on sedimentation basin (4) inner wall.
5. a kind of spraying sewage-treatment plant according to claim 4, it is characterised in that: the water hole (423) is close
Shape at Diversion Plate (421) mutually suits with Diversion Plate (421).
6. a kind of spraying sewage-treatment plant according to claim 3, it is characterised in that: the water hole (423) is located at
Filtration gauze (4231) are covered on the side of sedimentation basin (4).
7. a kind of spraying sewage-treatment plant according to claim 1, it is characterised in that: flotation tank (3) top end
It is fixedly connected with observation platform (8), observation platform (8) is fixedly connected with staircase (81) diagonally downward.
8. a kind of spraying sewage-treatment plant according to claim 7, it is characterised in that: fixed on the observation platform (8)
It is connected with protective fence (82).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820917492.4U CN208648957U (en) | 2018-06-13 | 2018-06-13 | A kind of spraying sewage-treatment plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820917492.4U CN208648957U (en) | 2018-06-13 | 2018-06-13 | A kind of spraying sewage-treatment plant |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208648957U true CN208648957U (en) | 2019-03-26 |
Family
ID=65780090
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820917492.4U Expired - Fee Related CN208648957U (en) | 2018-06-13 | 2018-06-13 | A kind of spraying sewage-treatment plant |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208648957U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113526718A (en) * | 2021-05-28 | 2021-10-22 | 重庆智伦电镀有限公司 | Zero-discharge sewage treatment process for industrial park |
CN114053786A (en) * | 2021-11-19 | 2022-02-18 | 中亿丰建设集团股份有限公司 | Tunnel engineering sewage pumping and draining device and using method thereof |
-
2018
- 2018-06-13 CN CN201820917492.4U patent/CN208648957U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113526718A (en) * | 2021-05-28 | 2021-10-22 | 重庆智伦电镀有限公司 | Zero-discharge sewage treatment process for industrial park |
CN114053786A (en) * | 2021-11-19 | 2022-02-18 | 中亿丰建设集团股份有限公司 | Tunnel engineering sewage pumping and draining device and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208340190U (en) | A kind of inclined-plate clarifying basin sewage disposal apparatus | |
CN209361920U (en) | A kind of town and country sewage treatment sedimentation basin | |
CN214880707U (en) | Filtering sedimentation tank of ecological wetland | |
CN208327752U (en) | A kind of sewage purification processing system | |
CN114873805A (en) | Heavy metal-containing water body waste recycling treatment process and treatment system | |
CN208648957U (en) | A kind of spraying sewage-treatment plant | |
CN217128346U (en) | Dredging ship | |
CN207632577U (en) | A kind of high-efficient vertical flow settling pond | |
CN208949011U (en) | A kind of spraying sewage disposal system | |
CN208648920U (en) | A kind of spraying sewage disposal device | |
CN208839102U (en) | Rectangular sedimentation tank mud scum cleaning plant | |
CN207016661U (en) | A kind of portable mud thickener | |
CN211987434U (en) | Filter equipment who has anti-clogging structure for waste water treatment | |
CN111807569B (en) | Pre-oxidation and coagulating sedimentation device in wastewater treatment process | |
CN210261382U (en) | Sewage treatment device for water pollution prevention and control | |
CN217398654U (en) | Paint spraying circulating water by-pass flow treatment system | |
CN221344033U (en) | Collecting mechanism for cleaning sewage treatment tank | |
CN206872621U (en) | Slaughterhouse wastewater treatment device | |
CN111804016A (en) | Garbage wastewater treatment device with self-cleaning function | |
CN118217720B (en) | Sewage treatment system and sewage treatment construction method for building construction | |
CN212198835U (en) | Underground water purification device for preventing and treating industrial pollution | |
CN114133066B (en) | Integrated water purifier | |
CN209098272U (en) | A kind of electric flocculation sewage-treatment plant | |
CN104973648B (en) | Double-chain waste-water slag remover | |
CN221601473U (en) | Waste water treatment device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190326 |
|
CF01 | Termination of patent right due to non-payment of annual fee |