[go: up one dir, main page]

CN208247085U - Production equipment without glue bamboo chopping block - Google Patents

Production equipment without glue bamboo chopping block Download PDF

Info

Publication number
CN208247085U
CN208247085U CN201820613336.9U CN201820613336U CN208247085U CN 208247085 U CN208247085 U CN 208247085U CN 201820613336 U CN201820613336 U CN 201820613336U CN 208247085 U CN208247085 U CN 208247085U
Authority
CN
China
Prior art keywords
screw rod
connecting rod
bamboo cane
fixed
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820613336.9U
Other languages
Chinese (zh)
Inventor
周帆
周一帆
周松珍
周宜聪
吴忠旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jiuchuan Bamboo & Wood Co Ltd
Original Assignee
Zhejiang Jiuchuan Bamboo & Wood Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jiuchuan Bamboo & Wood Co Ltd filed Critical Zhejiang Jiuchuan Bamboo & Wood Co Ltd
Priority to CN201820613336.9U priority Critical patent/CN208247085U/en
Application granted granted Critical
Publication of CN208247085U publication Critical patent/CN208247085U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This application discloses the production equipments of no glue bamboo chopping block, including control system, mounting hole automatic drilling system, connecting rod automated installation of system and conveying package system, mounting hole automatic drilling system, connecting rod automated installation of system and conveying package system are controlled by control system;Mounting hole automatic drilling system is for drilling to bamboo cane, and connecting rod automated installation of system is used in the bamboo cane after connecting rod insertion drilling, so that bamboo cane is connected bar series winding, conveying package system is for transporting the bamboo cane after being contacted.The utility model plans as a whole control mounting hole automatic drilling system, connecting rod automated installation of system and the running for conveying package system by control system, and the degree of automation is higher, and the production efficiency and final product quality of product are improved while saving manpower.

Description

Production equipment without glue bamboo chopping block
Technical field
The utility model relates to bamboo chopping block production equipment technologies more particularly to a kind of production of no glue bamboo chopping block to set It is standby.
Background technique
The chopping block (i.e. table trencher) cut the dish in kitchen is currently used in addition to traditional plancon formula structure (mostly saw by heavy caliber pine At) chopping board outside, several years ago Zeng Liuhang use " nontoxic " plastics chopping board.Because plastics table trencher is chemical products, used Inevitably there is plastic scrap to enter in dish again in journey, with the continuous promotion of people's health consciousness, many families, which turn to use, to be had Wood, the bamboo chopping board of green product good reputation.
But though pure natural wooden chopping board is good, is unfavorable for the protection in mountain area forest expense source, and it is serious to eco-environmental impact.So And ecological environment is had substantially no effect on bamboo-made chopping board, this is because the power of regeneration of moso bamboo is strong.
At present in two kinds of manufacturing methods of bamboo-made chopping board: one is arranged with bamboo cane by bamboo fibre with vertical (vertical) direction It by suppressing, is arranged with bamboo cane by the horizontal aspect of bamboo fibre with horizontal and vertical staggeredly overlapping and with bonding Made by agent gluing.Wherein the thickness of the bamboo chopping block of the first preparation method must thicker (thickness is between 30mm-50mm) be just able to maintain Intensity required for kitchen knife impact cutting, and the product suppressed is usually severely deformed, product presentation is concavo-convex, will cause with material amount Greatly, manufactured goods are heavy, virtually increase processing cost.Although the bamboo chopping block thickness of second of preparation method is thin, (thickness is in 20mm- Between 30mm), but the binder used manufactures processing, manufactured goods are to human health, if it is exceeded to encounter related Indexs measure, Green product, which can not be become, influences products export.
Occurs a kind of bamboo chopping block of no glue on the market now, but such chopping block generallys use hand-made, production Inefficiency.
Utility model content
The utility model is in view of the above-mentioned problems, proposing a kind of high degree of automation, manufacturing high-efficient no glue The production equipment of bamboo chopping block.
The technical solution that the utility model is taken is as follows: a kind of production equipment of no glue bamboo chopping block, including control system, Mounting hole automatic drilling system, connecting rod automated installation of system and conveying package system, the mounting hole automatic drilling system connect Extension bar automated installation of system and conveying package system are controlled by control system;The mounting hole automatic drilling system is used for bamboo Item drills, and the connecting rod automated installation of system is used to for connecting rod being inserted into the bamboo cane after drilling, so that bamboo cane is connected Extension bar series winding, the conveying package system is for transporting the bamboo cane after being contacted.
Further, the mounting hole automatic drilling system includes the first rack, the first feed mechanism, the first clamp system And borehole drill construction;First feed mechanism, the first clamp system and borehole drill construction are installed in the first rack;Described first Feed mechanism positions bamboo cane, and the fixed bamboo cane of first clamp system, the borehole drill construction drills to bamboo cane.
Further, first feed mechanism includes the first material loading platform and the first positioning retaining strip, first feeding Platform is fixed in the first rack to be placed for bamboo cane, and first positioning retaining strip is fixed on the first material loading platform to be positioned for bamboo cane It uses;First clamp system includes the first cylinder, the first material folding plate, first gear tablet and the first floor push, and described the One cylinder is fixed in the first rack and is set to the side of the first material loading platform, and first material folding plate is fixed on the first cylinder Push rod on;The first gear tablet is fixed on the other side of the first material loading platform, first cylinder, the first material folding plate, One backgauge piece cooperates fixed bamboo cane, and first floor push is connect with control system, for controlling the movement of the first cylinder;Institute Stating borehole drill construction includes support frame, drilling machine and start button, and support frame as described above is movably arranged in the first rack and sets It is placed in the other side of the first material loading platform, the drilling machine is movably arranged on support frame, for drilling to bamboo cane, The start button is connect with control system, for controlling the working condition of drilling machine.
Further, the borehole drill construction further includes the first screw rod, the first spiral shell of the second screw rod, third screw rod and corresponding driving First motor, the second motor and the third motor that bar, the second screw rod, third screw rod rotate, second screw rod, third screw rod are flat It is fixed in the first rack capablely, and vertical with the first material loading platform length direction;Support frame as described above both ends are respectively arranged at On two screw rods and third screw rod, and can be under the rotation of the second screw rod and third screw rod along the second screw rod and third screw rod Length direction is mobile;First screw rod is rotatably arranged on support frame, and parallel with the first material loading platform length direction; The drilling machine is set on the first screw rod, and can be moved under the rotation of the first screw rod along the length direction of the first screw rod It is dynamic;The first motor, the second motor and third motor are controlled by control system.
Further, the connecting rod automated installation of system includes the second rack, the second feed mechanism, the second clamping machine Structure, correcting mechanism, connecting rod installing mechanism and cutting agency;Second feed mechanism, the second clamp system, connecting rod installation Mechanism, correcting mechanism and cutting agency are each attached in the second rack, and second feed mechanism positions bamboo cane, described Second clamp system fixes bamboo cane, and the correcting mechanism is controlled by control system, to the hole location of connecting rod installing mechanism, bamboo cane it Between relative position calibrated;The connecting rod installing mechanism is controlled by control system, by the bamboo after connecting rod insertion drilling In item;The cutting agency is controlled by control system, pushes the bamboo cane for being serially connected with connecting rod mobile.
Further, second feed mechanism includes the second material loading platform and the second positioning retaining strip, second feeding Platform is fixed in the second rack to be placed for bamboo cane, and second positioning retaining strip is fixed on the second material loading platform to be positioned for bamboo cane It uses;Second clamp system includes the second cylinder, the second material folding plate, second gear tablet and the second floor push, and described the Two cylinders are fixed in the second rack and are set to the side of material loading platform, and second material folding plate is fixed on pushing away for the second cylinder On bar;The second gear tablet is fixed on the other side of material loading platform, second cylinder, the second material folding plate, second gear tablet Cooperate fixed bamboo cane, second floor push is connect with control system, for controlling the movement of the second cylinder.
Further, the connecting rod installing mechanism include connecting rod elevating hopper, pusher cylinder, sliding block, the 4th screw rod and 4th motor, the 4th screw rod be rotatably arranged in it is in the second rack and parallel with the length direction of the second material loading platform, The connecting rod elevating hopper and pusher cylinder are fixed on sliding block, and the connecting rod elevating hopper is described to push away for placing connecting rod Material cylinder is controlled by control system, in the bamboo chip for pushing connecting rod insertion to drill;The sliding block is set on the 4th screw rod, and It can be moved under the rotation of the 4th screw rod along the length direction of the 4th screw rod;4th motor is controlled by control system, The 4th screw rod is driven to rotate.
Further, the correcting mechanism includes laser calibrating equipment and control button;The laser calibrating equipment includes Laser emitter, laser pickoff, the first fixed link, the 5th screw rod and the 5th motor, the 5th screw rod can be rotatably set On the slide block, the 5th motor is controlled by control system, driving the 5th screw rod rotation;The laser emitter passes through the One fixed link is set on the 5th screw rod, and the launching centre of laser emitter is located at the central axes of the vertical plane of connecting rod elevating hopper On;Second material folding plate is equipped with observation panel, and the laser pickoff is movably arranged in observation panel and is with control System connection, for receiving the signal of laser emitter and signal being passed to control system;The control button and control system Connection, for adjusting and controlling position and the movement of connecting rod installing mechanism and laser calibrating equipment.
Further, the cutting agency includes linking arm, blanking cylinder and blanking bar, and the linking arm is movably set It is placed in the second rack and the moving direction of linking arm is parallel with the direction of the second material loading platform, the blanking cylinder is fixed on company It connects on arm, the blanking bar is fixed on the push rod of blanking cylinder, for pushing bamboo cane mobile.
Further, the conveying package system includes third rack, conveyer belt, the 6th motor, infrared inductor and opens Stopping button, the conveyer belt is fixed in third rack, and the 6th motor is controlled by control system, and driving conveyer belt rotates, And the 6th motor be controlled by start-stop button simultaneously;The infrared inductor is fixed in third rack, and connect with control system.
The beneficial effects of the utility model are: the control system of the utility model can be planned as a whole to control mounting hole automatic drilling System, connecting rod automated installation of system and the running for conveying package system.
Mounting hole automatic drilling system can drill to rows of bamboo cane, can directly improve the quality of finished product, and Substantially increase production efficiency.
Connecting rod can be inserted under control of the control system and be drilled with mounting hole by connecting rod automated installation of system Bamboo cane in, be concatenated the bamboo cane of entire row to form plate.By connecting rod automated installation of system, connecting rod is automatically inserted into In bamboo cane, one saves manpower, and two come so that the dynamics of connecting rod insertion is under control and uniformly, and every connecting rod is inserted Enter depth to be unified, improve the uniformity of product quality, while also improving production efficiency.
Conveying package system can under control of the control system convey the bamboo cane after being contacted, by operator Last processing is carried out to rows of bamboo cane at conveying package system, to complete the production of the entirely bamboo chopping block without glue. Entire Automation of Manufacturing Process degree is high, high production efficiency, final product quality degree of unification height.
Detailed description of the invention:
Fig. 1 is the mounting hole automatic drilling system, connecting rod automated installation of system and conveying of an embodiment of the present invention The overall structure diagram that package system matches;
Fig. 2 is the control system of an embodiment of the present invention, mounting hole automatic drilling system, connecting rod automated installation of system With the structure chart of conveying package system;
Fig. 3 is the structural schematic diagram of the mounting hole automatic drilling system of an embodiment of the present invention;
Fig. 4 is the partial enlargement structural representation in Fig. 3 at A;
Fig. 5 is first material folding plate of an embodiment of the present invention and the structural schematic diagram of material folding block;
Fig. 6 is the structural schematic diagram of the connecting rod automated installation of system of an embodiment of the present invention;
Fig. 7 is the partial enlargement structural representation in Fig. 6 at B;
Fig. 8 is the partial enlargement structural representation in Fig. 7 at C;
Fig. 9 is the partial enlargement structural representation in Fig. 6 at D;
Figure 10 is the connecting rod elevating hopper of an embodiment of the present invention and the structural schematic diagram of receiver;
Figure 11 is the structural schematic diagram of the conveying package system of an embodiment of the present invention.
Each appended drawing reference in figure are as follows: 1, control system, 2, mounting hole automatic drilling system, the 21, first rack, 22, first Feed mechanism, the 221, first material loading platform, the 222, first positioning retaining strip, the 23, first clamp system, the 231, first cylinder, 232, First material folding plate, 233, first gear tablet, the 234, first floor push, 235, material folding block, 24, borehole drill construction, 241, support frame, 242, drilling machine, 243, start button, the 244, first screw rod, the 245, second screw rod, 246, third screw rod, 247, first motor, 248, the second motor, 249, third motor, 3, connecting rod automated installation of system, the 31, second rack, the 32, second feed mechanism, 321, the second material loading platform, the 322, second positioning retaining strip, the 33, second clamp system, the 331, second cylinder, the 332, second material folding Plate, 3321, observation panel, 333, second gear tablet, the 334, second floor push, 34, correcting mechanism, 341, laser calibrating equipment, 3411 laser emitters, 3412, laser pickoff, the 3413, first fixed link, the 3414, the 5th screw rod, the 3415, the 5th motor, 3416, the second fixed link, 3,417 first adjusting nuts, the 3418, second adjusting nut, 342, control button, 35, connecting rod installation Mechanism, 351, connecting rod elevating hopper, 352, pusher cylinder, 353, sliding block, the 354, the 4th screw rod, the 355, the 4th motor, 356, connect Charging tray, 36, cutting agency, 361, linking arm, 362, blanking cylinder, 363, blanking bar, the 364, the 6th screw rod, the 365, the 7th electricity Machine, 4, conveying package system, 41, third rack, 42, conveyer belt, the 43, the 6th motor, 44, infrared inductor, 441, first is red Outer inductor, the 442, second infrared inductor, 45, start-stop button.
Specific embodiment:
Below with reference to each attached drawing, the utility model is described in detail.
Referring to Fig. 1, the present embodiment is a kind of production equipment of no glue bamboo chopping block, including control system 1, mounting hole be automatic Hole-drilling system 2, connecting rod automated installation of system 3 and conveying package system 4.
Control system 1 may include human-computer interaction module, by human-computer interaction module, can input phase in control system 1 The numerical parameter answered, to regulate and control the movement of each system.
Mounting hole automatic drilling system 2, connecting rod automated installation of system 3 and conveying package system 4 are controlled by control system System 1, mounting hole automatic drilling system 2 drills to bamboo cane, and connecting rod automated installation of system 3 will be after connecting rod insertion drilling In bamboo cane, so that bamboo cane is connected bar series winding, conveying package system 4 transports the bamboo cane after being contacted.
Control system 1 can be planned as a whole to control mounting hole automatic drilling system 2, connecting rod automated installation of system 3 and conveying group The running of dress system 4.
Mounting hole automatic drilling system 2 can drill to rows of bamboo cane, control of the boring action in control system 1 Under can keep almost the same so that the position and aperture of the mounting hole drilled out in bamboo cane obtain it is relatively uniform, can be direct Improve the quality of finished product;Simultaneously in the case where bamboo cane length is consistent, the hole location of mounting hole and the unification in aperture but also For bamboo cane after the later period is chained together, it is irregular that hardly there is a situation where ends, does not need to do secondary operation processing again, While time saving and energy saving, production cost has been saved.
Connecting rod can be inserted under the control of control system 1 and be drilled with installation by connecting rod automated installation of system 3 In the bamboo cane in hole, it is concatenated the bamboo cane of entire row to form plate.It is by connecting rod automated installation of system 3, connecting rod is automatic It is inserted into bamboo cane, one saves manpower, and two come so that the dynamics of connecting rod insertion is under control and uniformly, every connecting rod Insertion depth unified, improve the uniformity of product quality, while also improving production efficiency.
Conveying package system 4 can convey the bamboo cane after being contacted under the control of control system 1, by operator Member carries out last processing to rows of bamboo cane at conveying package system 4, to complete the life of the entirely bamboo chopping block without glue It produces.Entire Automation of Manufacturing Process degree is high, high production efficiency, final product quality degree of unification height.
- Fig. 4 referring to fig. 2, mounting hole automatic drilling system 2 include the first rack 21, the clamping of the first feed mechanism 22, first Mechanism 23 and borehole drill construction 24.First feed mechanism 22, the first clamp system 23 and borehole drill construction 24 are installed in the first rack On 21, the first feed mechanism 22 positions bamboo cane, and the fixed bamboo cane of the first clamp system 23, borehole drill construction 24 carries out bamboo cane Drilling.
Basic body of first rack 21 as mounting hole automatic drilling system 2 clamps for the first feed mechanism 22, first Mechanism 23 and borehole drill construction 24 provide installation position.First feed mechanism 22 is first is that can place position to need the bamboo cane to drill to provide It sets, second is that can be positioned to the bamboo cane placed, so that bamboo cane keeps neat.After positioning, by the first clamp system 23 pairs of bamboo canes are fixed.After fixing, drilled by borehole drill construction 24 to rows of bamboo cane.
First feed mechanism 22 includes the first material loading platform 221 and the first positioning retaining strip 222.First material loading platform 221 is solid It is scheduled in the first rack 21 and is placed for bamboo cane, the first positioning retaining strip 222 is fixed on the first material loading platform 221 to be made for bamboo cane positioning With;First clamp system 23 includes the first cylinder 231, the first material folding plate 232, first gear tablet 233 and the first floor push 234, the first cylinder 231 is fixed in the first rack 21 and is set to the side of the first material loading platform 221, the first material folding plate 232 It is fixed on the push rod of the first cylinder 231;First gear tablet 233 is fixed on the other side of the first material loading platform 221, the first cylinder 231, the first material folding plate 232, first gear tablet 233 cooperate fixed bamboo cane, and the first floor push 234 is connect with control system 1, use In the movement for controlling the first cylinder 231;Borehole drill construction 24 includes support frame 241, drilling machine 242 and start button 243, support frame 241 are movably arranged in the first rack 21 and are set to the other side of the first material loading platform 221, and drilling machine 242 is removable Ground is set on support frame 241, for drilling to bamboo cane.Start button 243 is connect with control system 1, is bored for controlling The working condition of hole machine 242.
First positioning retaining strip 222 is fixed on wherein one end of the first material loading platform 221, and the first positioning retaining strip 222 is set Set that direction is vertical with the length direction of the first material loading platform 221, the first positioning retaining strip 222 with a thickness of 1-2mm.Bamboo cane can place On the first material loading platform 221, the position of bamboo cane is positioned using the first positioning retaining strip 222.It, will when placing bamboo cane One end of bamboo cane withstands on to positioning to all bamboo canes on the first positioning retaining strip 222, so that the end of bamboo cane is neat.It will After bamboo cane positions, the starting of the first floor push 234 is depressed, signal is passed into control system 1, the control of control system 1 is opened Dynamic first cylinder 231 work.
The side of the first material loading platform 221 is arranged in first cylinder 231, and the first material folding plate 232 is fixed on the first cylinder 231 Push rod on.In the present embodiment, the quantity of the first cylinder 231 be three, along the first material loading platform 221 length direction at Row's setting.First material folding plate 232 is in long strip-board shape, the push rod for being fixed on three the first cylinders 231 on one side of the first material folding plate 232 Top.Meanwhile first gear tablet 233 is fixed on when the other side of the first material loading platform 221.Start in the first cylinder 231 and needs When carrying out stepping up fixed to bamboo cane, the push rod of the first cylinder 231 stretches out, by 232 forward impelling of the first material folding plate, so that the first folder The side of flitch 232 and bamboo cane is close to and pushes bamboo cane mobile toward the direction of first gear tablet 233, the first material folding plate 232 and the Bamboo cane is fastened and fixed by the cooperation of one backgauge piece 233.
In other embodiments, with no restrictions to the quantity of the first cylinder 231.To the thickness of the first positioning retaining strip 222 With no restrictions.
Support frame 241 is movably arranged in the first rack 21, and drilling machine 242 is movably arranged at branch simultaneously On support 241, the two cooperation allows drilling machine 242 according to drilling demand adjustment position, drills to bamboo cane.
The quantity of first gear tablet 233 is unlimited, is arranged at a distance between adjacent two first gear tablets 233, from And avoid drilling hole location.First clamp system 23 further includes material folding block 235, and material folding block 235 is fixed on 232 direction of the first material folding plate The one side of bamboo cane, and the setting corresponding with first gear tablet 233 of material folding block 235.The setting of material folding block 235 is so that the first material folding plate Certain safety clearance is kept between 232 and bamboo cane, can prevent borehole drill construction 24 drill after bamboo cane with the first material folding plate 232 It collides and damages drill bit.
Borehole drill construction 24 further includes the first screw rod 244, the first screw rod of the second screw rod 245, third screw rod 246 and corresponding driving 244, first motor 247, the second motor 248 and third motor 249 that the second screw rod 245, third screw rod 246 rotate.Second spiral shell Bar 245, third screw rod 246 are rotatablely arranged in parallel in the first rack 21, and with 221 length side of the first material loading platform To vertical.241 both ends of support frame are respectively arranged on the second screw rod 245 and third screw rod 246, and can be in the second screw rod 245 It is moved under rotation with third screw rod 246 along the length direction of the second screw rod 245 and third screw rod 246.First screw rod 244 can It is rotatably arranged on support frame 241, and parallel with 221 length direction of the first material loading platform.Drilling machine 242 is set to the first spiral shell On bar 244, and it can be moved under the rotation of the first screw rod 244 along the length direction of the first screw rod 244.First motor 247, the second motor 248 and third motor 249 are controlled by control system 1.
241 both ends of support frame are separately fixed on the second screw rod 245 and third screw rod 246, and the second screw rod 245, third Screw rod 246 is rotatably arranged in again in the first rack 21, and the second screw rod 245 is arranged in parallel with third screw rod 246, with first 221 length direction of material loading platform is vertical.Therefore, when the second screw rod 245, third screw rod 246 are in the second motor 248, third motor When rotating under 249 driving, support frame 241 can be moved along the length direction of the second screw rod 245 and third screw rod 246, And the moving direction of support frame 241 is vertical with the length direction of the first material loading platform 221.Drilling machine 242 passes through the first screw rod 244 Be movably arranged on support frame 241, drilling machine 242 can under the drive of support frame 241, along with the first material loading platform 221 length direction vertically moves, to drill to bamboo cane.Meanwhile when first motor 247 drives 244 turns of the first screw rod When dynamic, drilling machine 242 can move again along the length direction of the first screw rod 244, can be along the length of the first material loading platform 221 Direction is mobile, to change bore position, drills to the different places of bamboo cane.
In other embodiments, borehole drill construction 24 can also include first sliding groove, second sliding slot and third sliding slot.Second is sliding Slot and third sliding slot are set in parallel in the first rack 21, and the direction of second sliding slot and third sliding slot and the first material loading platform 221 length direction is vertical.The both ends of support frame 241 are slidably connected with second sliding slot and third sliding slot respectively.First sliding groove is set It sets on support frame 241, and the direction of first sliding groove is parallel with the length direction of the first material loading platform 221.Drilling machine 242 and One sliding slot is slidably connected.
Referring to Fig. 5-Fig. 9, connecting rod automated installation of system 3 includes the second rack 31, the clamping of the second feed mechanism 32, second Mechanism 33, correcting mechanism 34, connecting rod installing mechanism 35 and cutting agency 36.Second feed mechanism 32, the second clamp system 33, Connecting rod installing mechanism 35, correcting mechanism 34 and cutting agency 36 are each attached in the second rack 31, and the second feed mechanism 32 is right Bamboo cane is positioned, the fixed bamboo cane of the second clamp system 33.Correcting mechanism 34 is controlled by control system 1, to connecting rod fitting machine Structure 35, bamboo cane hole location between relative position calibrated.Connecting rod installing mechanism 35 is controlled by control system 1, will connect In bamboo cane after bar insertion drilling.Cutting agency 36 is controlled by control system 1, pushes the bamboo cane for being serially connected with connecting rod mobile.
Second rack 31 is the second feed mechanism 32, the second clamp system 33, correcting mechanism 34, connecting rod installing mechanism 35 Mounting body is provided with cutting agency 36.Bamboo cane feeding and positioning of second feed mechanism 32 auxiliary with mounting hole, the second folder Tight mechanism 33 is clamped fixation to bamboo cane, so that bamboo cane can not move.Correcting mechanism 34 then can be to connecting rod installing mechanism Relative position between 35 and mounting hole is calibrated, and connecting rod installing mechanism 35 is smoothly inerrably inserted connecting rod Enter into the mounting hole of bamboo cane, so that the bamboo cane of entire row is connected bar and is connected in series.Cutting agency 36 pushes bamboo cane to move on to conveying On package system 4.
Second feed mechanism 32 includes the second material loading platform 321 and the second positioning retaining strip 322.Second material loading platform 321 is solid It is scheduled in the second rack 31 and is placed for bamboo cane, the second positioning retaining strip 322 is fixed on the second material loading platform 321 to be made for bamboo cane positioning With.Second clamp system 33 includes the second cylinder 331, the second material folding plate 332, second gear tablet 333 and the second floor push 334, the second cylinder 331 is fixed in the second rack 31 and is set to the side of the second material loading platform 321, the second material folding plate 332 It is fixed on the push rod of the second cylinder 331.Second gear tablet 333 is fixed on the other side of the second material loading platform 321, the second cylinder 331, the second material folding plate 332, second gear tablet 333 cooperate fixed bamboo cane.Second floor push 334 is connect with control system 1, is used In the movement for controlling the second cylinder 331.
Second positioning retaining strip 322 is fixed on wherein one end of the second material loading platform 321, and the second positioning retaining strip 322 is set It is vertical with the length direction of the second material loading platform 321 to set direction.The thickness of second positioning retaining strip 322 is no more than the one of bamboo cane thickness Half.Bamboo cane can be placed on the second material loading platform 321, position using the second positioning retaining strip 322 to the position of bamboo cane.? When placing bamboo cane, one end of bamboo cane is withstood on to positioning to all bamboo canes on the second positioning retaining strip 322, so that bamboo cane End it is neat.After bamboo cane is positioned, the starting of the second floor push 334 is depressed, signal is passed into control system 1, is controlled The control of system 1 starting the second cylinder 331 work processed.
The side of the second material loading platform 321 is arranged in second cylinder 331, and the second material folding plate 332 is fixed on the second cylinder 331 Push rod on.In the present embodiment, the quantity of the second cylinder 331 be three, along the second material loading platform 321 length direction at Row's setting.Second material folding plate 332 is in long strip-board shape, the push rod for being fixed on three the second cylinders 331 on one side of the second material folding plate 332 Top.Meanwhile second gear tablet 333 is fixed on when the other side of the second material loading platform 321.Start in the second cylinder 331 and needs When carrying out stepping up fixed to bamboo cane, the push rod of the second cylinder 331 stretches out, by 332 forward impelling of the second material folding plate, so that the second folder The side of flitch 332 and bamboo cane is close to and pushes bamboo cane mobile toward the direction of second gear tablet 333, the second material folding plate 332 and the Bamboo cane is fastened and fixed by the cooperation of second gear tablet 333.
In other embodiments, with no restrictions to the quantity of the second cylinder 331.
Connecting rod installing mechanism 35 includes connecting rod elevating hopper 351, pusher cylinder 352, sliding block 353,354 and of the 4th screw rod 4th motor 355.4th screw rod 354 is fixed on the rack and parallel with the length direction of the second material loading platform 321.In connecting rod Hopper 351 and pusher cylinder 352 are fixed on sliding block 353, and connecting rod elevating hopper 351 is for placing connecting rod.Pusher cylinder 352 It is controlled by control system 1, in the bamboo chip for pushing connecting rod insertion to drill.Sliding block 353 is set on the 4th screw rod 354, and energy It is enough to be moved under the rotation of the 4th screw rod 354 along the length direction of the 4th screw rod 354.4th motor 355 is controlled by control system System 1, driving the 4th screw rod 354 rotation.
In other embodiments, the 4th sliding slot can also be set in the second rack 31, and the direction of the 4th sliding slot and the The direction of two material loading platforms 321 is parallel.Sliding block 353 is slidably connected with the 4th sliding slot.
Connecting rod elevating hopper 351 is in inverted triangle shape, and top is opened wide, and bottom is equipped with discharge port, and solid below discharge port Surely there is receiver 356.The bore of discharge port is slightly larger than the diameter of connecting rod, so that connecting rod is when falling on receiver 356, every time One can only be fallen.Pusher cylinder 352 is fixed on the rear of connecting rod elevating hopper 351, i.e. connecting rod elevating hopper 351 is located at second Between material loading platform 321 and pusher cylinder 352.The connecting rod on receiver 356 is pushed to be inserted into bamboo when pusher cylinder 352 works In the mounting hole of item.Meanwhile connecting rod elevating hopper 351 and pusher cylinder 352 are each attached on sliding block 353, sliding block 353 further through 4th screw rod 354 can be moved along the length direction of the second material loading platform 321, so that connecting rod elevating hopper 351 and pusher cylinder 352 can move along the length direction of the second material loading platform 321, to be attached to the mounting hole of different location in bamboo cane The installation of bar.
In other embodiments, connecting rod elevating hopper 351 and pusher cylinder 352 can also be moved respectively by two screw rods It is dynamic, also with no restrictions to the shape of connecting rod elevating hopper 351.
Correcting mechanism 34 includes laser calibrating equipment 341 and control button 342.Laser calibrating equipment 341 is sent out including laser Emitter 3411, laser pickoff 3412, the first fixed link 3413, the 5th screw rod 3414 and the 5th motor 3415.5th screw rod 3414 are fixed on sliding block 353, and the 5th motor 3415 is controlled by control system 1, driving the 5th screw rod 3414 rotation.Laser emission Device 3411 is set on the 5th screw rod 3414 by the first fixed link 3413, and the launching centre of laser emitter 3411 is located at company On the central axes of the vertical plane of bar elevating hopper.Second material folding plate 332 is equipped with observation panel 3321, and laser pickoff 3412 is removable Ground is set in observation panel 3321 and connect with control system 1, for receiving the signal of laser emitter 3411 and passing signal Pass control system 1.Control button 342 is connect with control system 1, for adjusting and controlling connecting rod installing mechanism 35 and laser The position of calibrating installation 341 and movement.
Laser emitter 3411 is set on the 5th screw rod 3414 by the first fixed link 3413, and laser emitter 3411 The launching centre vertical plane that is located at connecting rod elevating hopper central axes on, it is by controlling the rotation of the 5th screw rod 3414, i.e., adjustable Whole laser emitter 3411 is moved up and down along the central axes of connecting rod elevating hopper, to be passed through according to the actual size of connecting rod The launching centre of laser emitter 3411 is adjusted to the center phase with the connecting rod being located on receiver 356 by control button 342 It is overlapped.Laser pickoff 3412 is movably arranged in observation panel 3321, can be before starting calibration, by laser pickoff 3412 It is manually adjusted to the center of one of mounting hole of bamboo cane, connecting rod is then adjusted by manipulation and control button 342 The position up and down of installing mechanism 35, so that the signal that the laser emitter 3411 being fixed on sliding block 353 is launched can To pass through mounting hole, received by laser pickoff 3412, so that control system 1 receives the calibrated signal in position, Then it is attached bar installment work.In the present embodiment, observation panel 3321 is positioned close to the one of the second positioning retaining strip 322 The mounting hole near the second positioning retaining strip 322 is calibrated in calibration side.In other embodiments, to observation panel The mounting hole of 3321 position and calibration is with no restrictions.
Referring to Fig. 6, Fig. 8, observation panel 3321 is arranged along the length direction of the second material folding plate 332.Laser calibrating equipment 341 is also Including the second fixed link 3416, the first adjusting nut 3417 and the second adjusting nut 3418.Second fixed link 3416 is L-shaped, Its short side is equipped with adjustment hole, and long side, which is equipped with, adjusts sliding slot, and the direction in the direction and observation panel 3321 that adjust sliding slot is vertically arranged.The The short side of two fixed links 3416 is connected with the second material folding plate 332, and cooperates the first adjusting nut 3417 removable by adjustment hole It is set in the second material folding plate 332 dynamicly, so that the second fixed link 3416 can move in the direction or so along observation panel 3321 It is dynamic.Laser pickoff 3412 is movably arranged at by the second adjusting nut 3418 and is adjusted on sliding slot, so that laser pickoff 3412 can move up and down along the direction for adjusting sliding slot.
Control button 342 includes origin setting button, elevating hopper moves to left button, elevating hopper moves to right button, laser emitter Uplink button, laser emitter descending button and feeding start button.Equipment uses for the first time or the bamboo cane of selected specification belongs to first Secondary plus man-hour requirement is first proofreaded and is adjusted to the origin position of connecting rod installing mechanism 35.Specific adjustment mode is as follows, first First by hole location data input control system 1, laser pickoff 3412 is adjusted to the center of first bamboo cane mounting hole, so Button is arranged in origin afterwards, adjusting position is toggled it to by locking bit, so that elevating hopper is moved to left button, elevating hopper moves to right button, Laser emission Device uplink button, laser emitter descending button and laser emitter 3411, laser pickoff 3412 are active, and are led to It crosses laser emitter uplink button and laser emitter descending button controls the 5th screw rod 3414, adjust laser emitter 3411 Upper and lower position, so that the launch point of laser emitter 3411 is aligned with the center of the connecting rod on receiver 356.Laser emitter 3411 transmitting laser harness move to left button by elevating hopper at this time and elevating hopper move to right button and controls the 4th screw rod 354 adjustment cunning The left-right position of block 353, so that connecting rod installing mechanism 35 and laser harness are directed at first bamboo cane installation in the horizontal direction The center in hole, laser pickoff 3412 receive signal and pass to control system 1, and calibration finishes, and origin setting button is dialled Locking gear is moved, laser emitter 3411 resets at this time, while corresponding regulation button port shutdown, and system, which records and saves, to be worked as Hole location data and origin point data are finally carried out preservation remarks by data of the preceding data as origin, if needing next time to add identical The bamboo cane of specification need to only call corresponding data.Feeding start button is pressed, system starts to install connecting rod.
Connecting rod installing mechanism 35 can be started by opening feeding start button after the completion of the above setting, pass through the 4th spiral shell at this time The rotation band movable slider 353 of bar 354 moves left and right, and after specified installation site is reached according to system data, pusher cylinder 352 will Connecting rod is pushed into the mounting hole of bamboo cane, makes to interconnect between bamboo cane, forms bamboo clappers.
Cutting agency 36 includes linking arm 361, blanking cylinder 362 and blanking bar 363.Linking arm 361 is movably disposed In in the second rack 31 and the moving direction of linking arm 361 is parallel with the direction of the second material loading platform 321, blanking cylinder 362 is solid It is scheduled on linking arm 361, blanking bar 363 is fixed on the push rod of blanking cylinder 362, for pushing bamboo cane mobile.
After the installation is completed, control system 1 controls cutting agency 36 and works connecting rod, and bamboo cane is pushed to conveying package system On 4.Wherein, the initial position of linking arm 361 is located at the second positioning retaining strip 322, after blanking cylinder 362 receives signal, pushes away Dynamic blanking bar 363 is moved down close to the second material loading platform 321, when blanking bar 363 drops to the second positioning retaining strip of distance 322 When at 1mm-2mm, linking arm 361 is moved along the length direction of the second material loading platform 321, so that blanking bar 363 pushes bamboo clappers It is mobile to conveying assembly platform.
Cutting agency 36 further includes the 6th screw rod 364 and the 7th motor 365.6th screw rod 364 is rotatablely arranged at In two racks 31, and the direction of the 6th screw rod 364 is parallel with the direction of the second material loading platform 321.7th motor 365 is controlled by control System 1 processed, for driving the rotation of the 6th screw rod 364.
Referring to Figure 10, conveying package system 4 includes third rack 41, conveyer belt 42, the 6th motor 43, infrared inductor 44 With start-stop button 45.Conveyer belt 42 is fixed in third rack 41, and the 6th motor 43 is controlled by control system 1, drives conveyer belt 42 rotations, and the 6th motor 43 is controlled by start-stop button 45 simultaneously.Infrared inductor 44 is fixed in third rack 41, and with control System 1 processed connects.
Under the control of control system 1, driving conveyer belt 42 rotates 6th motor 43, and conveyer belt 42 is used to convey bamboo clappers, So that bamboo clappers is mobile.Infrared inductor 44 is connect with control system 1, for incuding the position of bamboo clappers and signal being fed back to control System 1.By start-stop button 45, starting or stoping for conveyer belt 42 can be manually controlled.
Infrared inductor 44 includes the first infrared inductor 441 and the second infrared inductor 442, is separately positioned on conveyer belt In the third rack 41 of the side of 42 rear and front end.Bamboo clappers is moved on conveyer belt 42 in the promotion of cutting agency 36, when When bamboo clappers is moved at the first infrared inductor 441, the first infrared inductor 441 senses the position of bamboo clappers, and signal is passed Control system 1 is passed, control system 1 controls the 6th motor 43 driving conveyer belt 42 and rotates, and bamboo clappers is in conveyer belt 42 and blanking machine It is persistently moved under the action of structure 36.When bamboo clappers is moved to the second 442 position of infrared inductor, the sense of the second infrared inductor 442 The position of bamboo clappers should be arrived, and signal is passed into control system 1, control system 1 controls the 6th motor 43 and stops working, conveyer belt 42 stop operating, meanwhile, cutting agency 36 resets.At this point, conveying the operator of mounting platform two sides waiting in connecting rod The first-class fixed screw in both ends, be securely attached to bamboo cane together, after screw is installed, started by start-stop button 45 defeated It send band 42 that bamboo clappers is transported on subsequent heap grillage, waits following process.
The above is only the preferred embodiment of the present invention, not thereby limits the patent protection of the utility model Range, it is all with equivalent structure transformation made by the utility model specification and accompanying drawing content, directly or indirectly it is used in it His relevant technical field similarly includes within the protection scope of the present utility model.

Claims (10)

1. a kind of production equipment of no glue bamboo chopping block, which is characterized in that including control system, mounting hole automatic drilling system, Connecting rod automated installation of system and conveying package system, the mounting hole automatic drilling system, connecting rod automated installation of system and Conveying package system is controlled by control system;The mounting hole automatic drilling system is for drilling to bamboo cane, the company Extension bar automated installation of system is used to for connecting rod being inserted into the bamboo cane after drilling, so that bamboo cane is connected bar series winding, the conveying Package system is for transporting the bamboo cane after being contacted.
2. the production equipment as described in claim 1 without glue bamboo chopping block, which is characterized in that mounting hole automatic drilling system System includes the first rack, the first feed mechanism, the first clamp system and borehole drill construction;First feed mechanism, first clamp Mechanism and borehole drill construction are installed in the first rack;First feed mechanism positions bamboo cane, and described first clamps Bamboo cane is fixed by mechanism, and the borehole drill construction drills to bamboo cane.
3. the production equipment as claimed in claim 2 without glue bamboo chopping block, which is characterized in that first feed mechanism includes First material loading platform and the first positioning retaining strip, first material loading platform is fixed in the first rack to be placed for bamboo cane, and described the One positioning retaining strip is fixed on the first material loading platform to position for bamboo cane and use;First clamp system includes the first cylinder, the One material folding plate, first gear tablet and the first floor push, first cylinder are fixed in the first rack and are set on first Expect the side of platform, first material folding plate is fixed on the push rod of the first cylinder;The first gear tablet is fixed on first Expect the other side of platform, first cylinder, the first material folding plate, first gear tablet cooperate fixed bamboo cane, and described first foot-operated opens Pass is connect with control system, for controlling the movement of the first cylinder;The borehole drill construction include support frame, drilling machine and starting by Button, support frame as described above are movably arranged in the first rack and are set to the other side of the first material loading platform, the drilling machine It is movably arranged on support frame, for drilling to bamboo cane, the start button is connect with control system, for controlling The working condition of drilling machine.
4. the production equipment as claimed in claim 3 without glue bamboo chopping block, which is characterized in that the borehole drill construction further includes One screw rod, the first screw rod of the second screw rod, third screw rod and corresponding driving, the second screw rod, the first motor of third screw rod rotation, the Two motors and third motor, second screw rod, third screw rod are fixed in parallel in the first rack, and with the first material loading platform Length direction is vertical;Support frame as described above both ends are respectively arranged on the second screw rod and third screw rod, and can in the second screw rod and It is moved under the rotation of third screw rod along the length direction of the second screw rod and third screw rod;First screw rod can be rotatably set On the support frame, and it is parallel with the first material loading platform length direction;The drilling machine is set on the first screw rod, and can be It is moved under the rotation of one screw rod along the length direction of the first screw rod;The first motor, the second motor and third motor are controlled In control system.
5. the production equipment as described in claim 1 without glue bamboo chopping block, which is characterized in that the connecting rod is installed automatically is System includes the second rack, the second feed mechanism, the second clamp system, correcting mechanism, connecting rod installing mechanism and cutting agency;Institute It states the second feed mechanism, the second clamp system, connecting rod installing mechanism, correcting mechanism and cutting agency and is each attached to the second rack On, second feed mechanism positions bamboo cane, and the fixed bamboo cane of second clamp system, the correcting mechanism is controlled by Control system calibrates the relative position between the hole location of connecting rod installing mechanism, bamboo cane;The connecting rod installing mechanism It is controlled by control system, it will be in the bamboo cane after connecting rod insertion drilling;The cutting agency is controlled by control system, pushes concatenation There is the bamboo cane of connecting rod mobile.
6. the production equipment as claimed in claim 5 without glue bamboo chopping block, which is characterized in that second feed mechanism includes Second material loading platform and the second positioning retaining strip, second material loading platform is fixed in the second rack to be placed for bamboo cane, and described the Two positioning retaining strips are fixed on the second material loading platform to position for bamboo cane and use;Second clamp system includes the second cylinder, the Two material folding plates, second gear tablet and the second floor push, second cylinder are fixed in the second rack and are set to feeding and put down The side of platform, second material folding plate are fixed on the push rod of the second cylinder;The second gear tablet is fixed on material loading platform The other side, second cylinder, the second material folding plate, second gear tablet cooperate fixed bamboo cane, second floor push and control System connection, for controlling the movement of the second cylinder.
7. the production equipment as claimed in claim 6 without glue bamboo chopping block, which is characterized in that the connecting rod installing mechanism packet Connecting rod elevating hopper, pusher cylinder, sliding block, the 4th screw rod and the 4th motor are included, the 4th screw rod is rotatably arranged in In two racks and parallel with the length direction of the second material loading platform, the connecting rod elevating hopper and pusher cylinder are fixed on sliding block On, the connecting rod elevating hopper is controlled by control system for placing connecting rod, the pusher cylinder, has pushed connecting rod insertion In the bamboo chip of drilling;The sliding block is set on the 4th screw rod, and can be under the rotation of the 4th screw rod along the 4th screw rod Length direction is mobile;4th motor is controlled by control system, driving the 4th screw rod rotation.
8. the production equipment as claimed in claim 7 without glue bamboo chopping block, which is characterized in that the correcting mechanism includes laser Calibrating installation and control button;The laser calibrating equipment includes laser emitter, laser pickoff, the first fixed link, the 5th Screw rod and the 5th motor, the 5th screw rod are rotatably arranged on the sliding block, and the 5th motor is controlled by control system System, driving the 5th screw rod rotation;The laser emitter is set on the 5th screw rod by the first fixed link, and laser emitter The launching centre vertical plane that is located at connecting rod elevating hopper central axes on;Second material folding plate is equipped with observation panel, described to swash Optical receiver is movably arranged in observation panel and connect with control system, for receiving the signal of laser emitter and will believe Number pass to control system;The control button is connect with control system, for adjusting and controlling connecting rod installing mechanism and swash The position of optical alignment device and movement.
9. the production equipment as claimed in claim 5 without glue bamboo chopping block, which is characterized in that the cutting agency includes connection Arm, blanking cylinder and blanking bar, the linking arm is movably arranged in the second rack and the moving direction of linking arm and The direction of two material loading platforms is parallel, and the blanking cylinder is fixed on the connecting arm, and the blanking bar is fixed on pushing away for blanking cylinder On bar, for pushing bamboo cane mobile.
10. the production equipment as described in claim 1 without glue bamboo chopping block, which is characterized in that the conveying package system packet Third rack, conveyer belt, the 6th motor, infrared inductor and start-stop button are included, the conveyer belt is fixed in third rack, institute It states the 6th motor and is controlled by control system, driving conveyer belt rotation, and the 6th motor is controlled by start-stop button simultaneously;It is described infrared Inductor is fixed in third rack, and connect with control system.
CN201820613336.9U 2018-04-26 2018-04-26 Production equipment without glue bamboo chopping block Active CN208247085U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820613336.9U CN208247085U (en) 2018-04-26 2018-04-26 Production equipment without glue bamboo chopping block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820613336.9U CN208247085U (en) 2018-04-26 2018-04-26 Production equipment without glue bamboo chopping block

Publications (1)

Publication Number Publication Date
CN208247085U true CN208247085U (en) 2018-12-18

Family

ID=64637129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820613336.9U Active CN208247085U (en) 2018-04-26 2018-04-26 Production equipment without glue bamboo chopping block

Country Status (1)

Country Link
CN (1) CN208247085U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108453861A (en) * 2018-04-26 2018-08-28 浙江九川竹木股份有限公司 Production equipment without glue bamboo chopping block
CN109849111A (en) * 2019-04-02 2019-06-07 浙江千束家居用品有限公司 A kind of double lead chopping block conveyer system
CN110666943A (en) * 2019-09-19 2020-01-10 中建材创新科技研究院有限公司 Zero point correction device and method for pushing wrapping edges

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108453861A (en) * 2018-04-26 2018-08-28 浙江九川竹木股份有限公司 Production equipment without glue bamboo chopping block
CN109849111A (en) * 2019-04-02 2019-06-07 浙江千束家居用品有限公司 A kind of double lead chopping block conveyer system
CN110666943A (en) * 2019-09-19 2020-01-10 中建材创新科技研究院有限公司 Zero point correction device and method for pushing wrapping edges

Similar Documents

Publication Publication Date Title
CN208247085U (en) Production equipment without glue bamboo chopping block
CN104049198B (en) A kind of PCBA on-line Full unmanned testing system
CN105881604A (en) Automatic edge cutting machine used for solar photovoltaic production line
CN111230501A (en) Machining equipment for mechanical arm
CN106827105A (en) Novel numerical control carpenter's process equipment
CN206544008U (en) With the protector automatic assembling apparatus to static contact installation function
CN106115244B (en) The object conveying device to be glued of full-automatic hot-pressing veneering equipment
CN108453861A (en) Production equipment without glue bamboo chopping block
CN114260705A (en) Scissors assembly line
CN110788255B (en) Automatic production line
CN111805807B (en) Feeding and discharging device combined with sizing material adding mold
CN202423244U (en) Feeding mechanism
CN113681661A (en) Bamboo chip manufacturing table for processing bamboo artware
CN220762939U (en) Wood processing production equipment
CN105235009A (en) Full-automatic card shearing machine
CN111702711A (en) Spraying pump hypervelocity pipe inserting machine
CN107718227A (en) Wooden clothes tree shape molding system of processing
CN208962078U (en) The slitting carton packer structure of detection reagent production line
CN105525453A (en) Feeding mechanism of seamless mounting equipment for zippers
CN112093096B (en) Automatic glue sticking and plating equipment for small workpieces
CN214871200U (en) CNC tenoning machine
CN205835558U (en) A kind of unmanned neat feeder of tune automatically
CN206277467U (en) A kind of automatic material paying-off or receiving device of material folding formula
CN106377025B (en) A kind of robot pastes viscous water drilling machine automatically
CN203774355U (en) Automatic material loading and blanking mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant