CN208225828U - On-load replaces fuse switch auxiliary device - Google Patents

On-load replaces fuse switch auxiliary device Download PDF

Info

Publication number
CN208225828U
CN208225828U CN201820681075.4U CN201820681075U CN208225828U CN 208225828 U CN208225828 U CN 208225828U CN 201820681075 U CN201820681075 U CN 201820681075U CN 208225828 U CN208225828 U CN 208225828U
Authority
CN
China
Prior art keywords
binding clip
functional binding
auxiliary device
drainage thread
insulating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820681075.4U
Other languages
Chinese (zh)
Inventor
张冬
王志辉
盛晓翔
李凤友
刘灵光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaian Jiyuan Electric Power Technology Co Ltd
State Grid Corp of China SGCC
HuaiAn Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Huaian Jiyuan Electric Power Technology Co Ltd
State Grid Corp of China SGCC
HuaiAn Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaian Jiyuan Electric Power Technology Co Ltd, State Grid Corp of China SGCC, HuaiAn Power Supply Co of State Grid Jiangsu Electric Power Co Ltd filed Critical Huaian Jiyuan Electric Power Technology Co Ltd
Priority to CN201820681075.4U priority Critical patent/CN208225828U/en
Application granted granted Critical
Publication of CN208225828U publication Critical patent/CN208225828U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Driving Mechanisms And Operating Circuits Of Arc-Extinguishing High-Tension Switches (AREA)

Abstract

本实用新型公开了一种带负荷更换跌落式熔断器辅助装置,该辅助装置包括电杆固定座(1)、绝缘支撑杆(4)、分段开关(5)、第一多功能钳头引流线(16)和第二多功能钳头引流线(22),绝缘支撑杆(4)的其中一顶端安装电杆固定座(1),绝缘支撑杆(4)的杆体上安装分段开关(5),第一多功能钳头引流线(16)和第二多功能钳头引流线(22)分别连接在分段开关(5)上,整体构成带负荷更换跌落式熔断器的辅助装置。本实用新型借助分断开关实现负荷转移,解决进行负荷转移时预防跌落式熔断器熔丝熔断问题,有效避免负荷转移时及极端条件下燃弧对作业人员、设备造成的伤害,实现完全不停电更换10kV配变跌落式熔断器,进一步拓展了不停电作业技术,减少用户停电,意义重大。

The utility model discloses an auxiliary device for replacing a drop-out fuse with load. The auxiliary device includes a pole fixing seat (1), an insulating support rod (4), a section switch (5), and a first multifunctional clamp head for drainage. Line (16) and the second multifunctional pincer head drain wire (22), one of the tops of the insulating support rod (4) is equipped with a pole holder (1), and the section switch ( 5), the first multifunctional pincer drain wire (16) and the second multifunctional pincer drain wire (22) are respectively connected to the subsection switch (5), and the whole constitutes an auxiliary device for replacing the drop-out fuse with load. The utility model realizes the load transfer by means of the breaking switch, solves the problem of preventing the fuse of the drop-type fuse from blowing during the load transfer, effectively avoids the damage to the operators and equipment caused by the arc burning during the load transfer and under extreme conditions, and realizes complete replacement without power failure The 10kV distribution transformer drop-out fuse further expands the technology of non-stop operation and reduces power outages for users, which is of great significance.

Description

带负荷更换跌落式熔断器辅助装置Auxiliary Device for On-Load Replacement of Dropout Fuse

技术领域technical field

本实用新型属于配网不停电作业应用技术领域,具体涉及一种带负荷更换跌落式熔断器辅助装置,如10kV的配网不停电更换跌落式熔断器,其作业安全、可靠。The utility model belongs to the application technical field of distribution network non-stop operation, in particular to an auxiliary device for replacing a drop-out fuse with load, such as a 10kV distribution network for non-stop replacement of a drop-out fuse, and its operation is safe and reliable.

背景技术Background technique

随着社会经济的飞速发展和人民生活水平的不断提高,社会对电能的需求也越来越大,对电能的质量要求也越来越高,保证不间断供电成为电力企业为客户提供优质服务的重要标准之一。这就要求有—个高质量的运行可靠的供电系统,10kV配电网是电力系统的重要组成部分,是负荷中心,具有用电量大,负荷密集度高,点多面广等特点,对电能质量和供电可靠性要求比较高,而10kV配电网设备绝缘强度又相对较低,供电设备多。跌落式熔断器作为最广泛应用的设备之一,会出现老化等问题,需要做状态性更换,因此检修工作量大,停电次数多。With the rapid development of social economy and the continuous improvement of people's living standards, the society's demand for electric energy is also increasing, and the quality requirements for electric energy are also getting higher and higher. Guaranteeing uninterrupted power supply has become the basis for power companies to provide customers with high-quality services. one of the important criteria. This requires a high-quality and reliable power supply system. The 10kV distribution network is an important part of the power system and a load center. It has the characteristics of large power consumption, high load density, and multiple points. The quality and power supply reliability requirements are relatively high, while the insulation strength of 10kV distribution network equipment is relatively low, and there are many power supply equipment. Drop-out fuses, as one of the most widely used devices, will have problems such as aging and need to be replaced in a state-of-the-art manner. Therefore, the maintenance workload is heavy and the number of power outages is frequent.

为了减少因故障停电对客户用电的影响,近几年在10kV配电网检修中大力开展了带电作业,主要有绝缘杆作业法和绝缘手套作业法。带电作业为提高供电可靠性、保证客户用电起到了很大作用,但是由于目前开展的带电是将作业点后面(负荷侧)的所有客户的用电负荷减掉,使线路处于空载状态下,才能进行作业,影响了作业点后面客户的用电,少供电量,没能达到真正意义上的不停电作业。不能满足公司提出的“建设一流配电网”的要求。因此,研发新的工具,借助该工具带负荷更换跌落式熔断器,解决作业点后面用户用电问题,开展不停电工作,一旦实现,意义重大。In order to reduce the impact of power outages on customers' electricity consumption due to faults, live work has been vigorously carried out in the maintenance of 10kV distribution network in recent years, mainly including insulating rod operation method and insulating glove operation method. Live work has played a great role in improving the reliability of power supply and ensuring the power consumption of customers. However, since the current live work is to reduce the power load of all customers behind the operating point (load side), the line is under no-load status. , the operation can be carried out, which affects the electricity consumption of customers behind the operation point, and the power supply is reduced, which fails to achieve the real non-stop operation. It cannot meet the company's requirement of "building a first-class distribution network". Therefore, it is of great significance to develop a new tool, use the tool to replace the drop-out fuse with load, solve the power consumption problem of users behind the operation point, and carry out uninterrupted power supply work.

若想开展不停电更换跌落式熔断器,其难度主要在于:1)如何控制带电的引流线接线端与带电体、接地体安全距离控制问题;2)如何防范负荷转移瞬间,由于熔丝熔断产生燃弧对作业人员及设备造成的伤害;3)如何解决该变压器负责供电的范围客户完全不停电。If you want to carry out non-stop replacement of drop-out fuses, the difficulty mainly lies in: 1) how to control the safe distance between the live drain wire terminal and the charged body and grounding body; Injuries caused by arcing to operators and equipment; 3) How to solve the problem that the transformer is responsible for power supply without power failure at all.

发明内容Contents of the invention

本实用新型的目的是:提出一种带负荷更换跌落式熔断器辅助装置,借助分断开关实现负荷转移,解决进行负荷转移时预防跌落式熔断器熔丝熔断问题,有效避免负荷转移时及极端条件下燃弧对作业人员、设备造成的伤害,实现完全不停电更换10kV配变跌落式熔断器,进一步拓展不停电作业技术,减少用户停电,意义重大。The purpose of this utility model is: to propose an auxiliary device for replacing drop-out fuses with load, which can realize load transfer by means of breaking switches, solve the problem of preventing the fuses of drop-out fuses from blowing during load transfer, and effectively avoid load transfer and extreme conditions. It is of great significance to realize the replacement of 10kV distribution transformer drop-out fuses without power failure, further expand the technology of power-free operation, and reduce power outages for users.

本实用新型的技术解决方案是:该辅助装置包括电杆固定座、绝缘支撑杆、分段开关、第一多功能钳头引流线和第二多功能钳头引流线,绝缘支撑杆的其中一顶端安装电杆固定座,绝缘支撑杆的杆体上安装分段开关,第一多功能钳头引流线和第二多功能钳头引流线分别连接在分段开关上,整体构成带负荷更换跌落式熔断器的辅助装置。The technical solution of the utility model is: the auxiliary device includes a pole fixing seat, an insulating support rod, a segment switch, a first multi-function clamp head drain wire and a second multi-function clamp head drain wire, one of the insulating support rods The pole fixing seat is installed on the top, and the segment switch is installed on the rod body of the insulating support rod. The first multi-function clamp head drain line and the second multi-function clamp head drain line are respectively connected to the segment switch, and the whole constitutes a load replacement drop type Auxiliary device for fuses.

其中,绝缘支撑杆材料为环氧树脂,采用空心结构,外径10cm,内径5cm,长度150cm。Wherein, the material of the insulating support rod is epoxy resin, adopts a hollow structure, has an outer diameter of 10 cm, an inner diameter of 5 cm, and a length of 150 cm.

其中,所述的电杆固定座包括T型底座、绝缘编织带和快速棘轮锁扣,T型底座直接固定在绝缘支撑杆的顶端,绝缘编织带的一端固定在T型底座上,绝缘编织带的另一端固定在快速棘轮锁扣上,快速棘轮锁扣安装在T型底座上,T型底座通过绝缘编织带配合快速棘轮锁扣固定在电杆上。Wherein, the pole fixing base includes a T-shaped base, an insulating braid and a quick ratchet lock, the T-shaped base is directly fixed on the top of the insulating support rod, one end of the insulating braid is fixed on the T-shaped base, and the insulating braid The other end is fixed on the fast ratchet lock, the quick ratchet lock is installed on the T-shaped base, and the T-shaped base is fixed on the pole through the insulating braid and the quick ratchet lock.

其中,所述的T型底座与电杆接触面设计为圆弧状;绝缘编织带为高强度绝缘编织带,长度为130cm。Wherein, the contact surface between the T-shaped base and the pole is designed to be arc-shaped; the insulating braid is a high-strength insulating braid with a length of 130 cm.

其中,所述的分段开关包括绝缘子、刀闸、第一快速连接桩、第二快速连接桩、固定基座及可移动基座;可移动基座直接套装在绝缘支撑杆上,固定基座通过可移动基座与绝缘支撑杆连接;绝缘子通过第二螺栓直接固定在固定基座上;刀闸通过第一螺栓直接固定在绝缘子上;第一快速连接桩通过第三螺栓直接固定在刀闸上端;第二快速连接桩通过第四螺栓直接固定在刀闸下端。Wherein, the section switch includes an insulator, a knife switch, a first quick connection pile, a second quick connection pile, a fixed base and a movable base; the movable base is directly set on the insulating support rod, and the fixed base The movable base is connected with the insulating support rod; the insulator is directly fixed on the fixed base through the second bolt; the knife switch is directly fixed on the insulator through the first bolt; the first quick connection pile is directly fixed on the knife switch through the third bolt The upper end; the second quick connection pile is directly fixed on the lower end of the knife gate through the fourth bolt.

其中,可移动基座上设有底座,底座上设有两条平行凸起的卡条。Wherein, the movable base is provided with a base, and the base is provided with two parallel protruding clip strips.

其中,可移动基座上设有U形卡槽。Wherein, the movable base is provided with a U-shaped card slot.

其中,所述分段开关的基座为分体式,分别为固定基座和可移动基座;固定基座长160mm,宽65mm;可移动基座设计为嵌入式U形卡槽,卡槽长度60mm,卡槽宽度30mm,卡槽底部开直径孔10mm,与固定基座采用单螺栓连接,卡扣直径95mm;可移动基座与绝缘支撑杆为可调式连接方式,根据作业现场技术要求任意调节与电杆距离;刀闸具有自锁机构,避免通流时刀闸脱落,刀闸分合时能满足负荷转移时的环流要求;第一快速连接桩长20cm,直径4cm,为可拆卸式,与刀闸上端相互包裹紧密连接;第二快速连接桩长20cm,直径4cm,为可拆卸式,与刀闸下端相互包裹紧密连接。Wherein, the base of the segmental switch is a split type, which are respectively a fixed base and a movable base; the fixed base is 160mm long and 65mm wide; the movable base is designed as an embedded U-shaped slot, and the length of the slot is 60mm, the width of the slot is 30mm, the diameter hole at the bottom of the slot is 10mm, and the fixed base is connected with a single bolt, and the diameter of the buckle is 95mm; the movable base and the insulating support rod are adjustable connections, which can be adjusted arbitrarily according to the technical requirements of the job site The distance from the pole; the knife gate has a self-locking mechanism to prevent the knife gate from falling off during the flow, and the knife gate can meet the circulation requirements during load transfer when the knife gate is opened and closed; the first quick connection pile is 20cm long and 4cm in diameter, which is detachable. It is tightly connected with the upper end of the knife gate; the second quick connection pile is 20cm long and 4cm in diameter, which is detachable, and is tightly connected with the lower end of the knife gate.

其中,所述的第一多功能钳头引流线包括第一绝缘操作杆、第二绝缘操作杆、第一引流线本体、第一多功能钳头和第二多功能钳头;第一引流线本体的两端分别安装第一多功能钳头和第二多功能钳头,第一多功能钳头上安装第一绝缘操作杆,第二多功能钳头上安装第二绝缘操作杆;第一多功能钳头引流线一端通过第一多功能钳头与电网侧导线直接连接,第一多功能钳头引流线另一端通过第二多功能钳头与分段开关的第一快速连接桩直接连接。Wherein, the first multifunctional pliers drain wire includes a first insulated operating rod, a second insulated operating rod, a first drain wire body, a first multifunctional pliers head and a second multifunctional pliers head; the first drain wire The two ends of the body are respectively equipped with a first multifunctional pliers head and a second multifunctional pliers head, a first insulating operating rod is installed on the first multifunctional pliers head, and a second insulating operating rod is installed on the second multifunctional pliers head; One end of the drainage wire of the multi-function clamp head is directly connected to the wire on the grid side through the first multi-function clamp head, and the other end of the drainage wire of the first multi-function clamp head is directly connected to the first quick connection pile of the segment switch through the second multi-function clamp head .

其中,所述的第二多功能钳头引流线包括第三绝缘操作杆、第四绝缘操作杆、第二引流线本体、第三多功能钳头和第四多功能钳头;第二引流线本体的两端分别安装第三多功能钳头和第四多功能钳头,第三多功能钳头上安装第三绝缘操作杆,第四多功能钳头上安装第四绝缘操作杆;第二多功能钳头引流线一端通过第三多功能钳头与分段开关的第二快速连接桩直接连接,第二多功能钳头引流线另一端通过第四多功能钳头与变压器高压桩头直接连接。Wherein, the second multifunctional pliers drain wire includes a third insulated operating rod, a fourth insulated operating rod, a second drain wire body, a third multifunctional pliers head, and a fourth multifunctional pliers head; the second drain wire The two ends of the body are respectively equipped with a third multi-functional pliers head and a fourth multi-functional pliers head, a third insulating operating rod is installed on the third multi-functional pliers head, and a fourth insulating operating rod is installed on the fourth multi-functional pliers head; One end of the drainage wire of the multi-function clamp head is directly connected to the second quick connection pile of the segment switch through the third multi-function clamp head, and the other end of the drainage wire of the second multi-function clamp head is directly connected to the high-voltage pile head of the transformer through the fourth multi-function clamp head. connect.

其中,第一多功能钳头引流线、第二多功能钳头引流线的连接头为多功能钳形接头,借助绝缘操作杆完成引流线与带电体连接工作;第一引流线本体、第二引流线本体为软铜线,直径30mm;第一绝缘操作杆、第二绝缘操作杆、第三绝缘操作杆、第四绝缘操作杆的长43cm。Among them, the connectors of the first multi-functional pincer head drain wire and the second multi-function pincer head drain wire are multi-functional pincer joints, and the connection between the drain wire and the charged body is completed by means of an insulating operating rod; the first drain wire body, the second The main body of the drain wire is an annealed copper wire with a diameter of 30mm; the length of the first insulating operating rod, the second insulating operating rod, the third insulating operating rod, and the fourth insulating operating rod is 43 cm.

本实用新型的具体操作步骤如下:Concrete operation steps of the present utility model are as follows:

步骤A:将电杆固定座、绝缘支撑杆、分段开关、第一多功能钳头引流线、第二多功能钳头引流线以及绝缘隔离挡板、扇形挡板按上述连接方式安装到位;绝缘隔离挡板用于跌落式熔断器与跌落式熔断器之间及跌落式熔断器与电杆之间的绝缘隔离,扇形挡板用于跌落式熔断器上下桩头与横担绝缘隔离;Step A: Install the pole fixing seat, insulating support rod, section switch, first multi-function clamp head drain wire, second multi-function clamp head drain wire, insulation isolation baffle, and fan-shaped baffle in place according to the above connection method; The insulation isolation baffle is used for the insulation isolation between the dropout fuse and the dropout fuse and between the dropout fuse and the pole, and the fan-shaped baffle is used for the insulation isolation between the upper and lower pile heads of the dropout fuse and the cross arm;

步骤B:合上刀闸准备负荷转移;Step B: Close the knife switch to prepare for load transfer;

步骤C:拉开待更换跌落式熔断器,实现第一次负荷转移;Step C: pull apart the drop-out fuse to be replaced to realize the first load transfer;

步骤D:拆除待更换跌落式熔断器,并安装上新跌落式熔断器;Step D: Remove the drop-out fuse to be replaced, and install a new drop-out fuse;

步骤E:合上新跌落式熔断器,准备第二次负荷转移;Step E: Close the new drop-out fuse and prepare for the second load transfer;

步骤F:拉开刀闸实现第二次负荷转移;Step F: pull open the switch to realize the second load transfer;

步骤G:拆除电杆固定座、绝缘支撑杆、分段开关、第一多功能钳头引流线、第二多功能钳头引流线以及绝缘隔离挡板、扇形挡板。Step G: Remove the pole fixing seat, insulating support rod, section switch, first multifunctional clamp head drainage wire, second multifunctional clamp head drainage wire, insulation isolation baffle, and fan-shaped baffle.

本实用新型的优点是:结构简单,成本低廉,操作容易,运行平稳,安全性高,借助分断开关实现负荷转移,解决进行负荷转移时预防跌落式熔断器熔丝熔断问题。The utility model has the advantages of simple structure, low cost, easy operation, stable operation, and high safety, realizes load transfer by means of a breaking switch, and solves the problem of preventing the blown fuse of a drop-type fuse during load transfer.

附图说明Description of drawings

图1为本实用新型的安装使用示意图;Fig. 1 is the installation and use schematic diagram of the utility model;

图2为图1的分段开关示意图;Fig. 2 is a schematic diagram of the section switch of Fig. 1;

图3为图1的多功能钳头引流线示意图。FIG. 3 is a schematic diagram of the drainage wire of the multifunctional clamp head in FIG. 1 .

具体实施方式Detailed ways

下面结合附图进一步说明本实用新型的技术解决方案。Further illustrate the technical solution of the utility model below in conjunction with accompanying drawing.

如图1-3所示,该辅助装置包括电杆固定座1、绝缘支撑杆4、分段开关5、第一多功能钳头引流线16和第二多功能钳头引流线22,绝缘支撑杆4的其中一顶端安装电杆固定座1,绝缘支撑杆4的杆体上安装分段开关5,第一多功能钳头引流线16和第二多功能钳头引流线22分别连接在分段开关5上,整体构成带负荷更换跌落式熔断器的辅助装置。As shown in Figures 1-3, the auxiliary device includes a pole holder 1, an insulating support rod 4, a section switch 5, a first multifunctional clamp head drain wire 16 and a second multifunctional clamp head drain wire 22, and the insulation support One of the tops of the rod 4 is equipped with a pole holder 1, and a segment switch 5 is installed on the body of the insulating support rod 4, and the first multifunctional pincer drain wire 16 and the second multifunctional pincer drain wire 22 are respectively connected to the subsection On the switch 5, an auxiliary device for replacing the drop-out fuse with load is formed as a whole.

其中,绝缘支撑杆4材料为环氧树脂,采用空心结构,外径10cm,内径5cm,长度150cm。Wherein, the material of the insulating support rod 4 is epoxy resin, adopts a hollow structure, has an outer diameter of 10 cm, an inner diameter of 5 cm, and a length of 150 cm.

其中,所述的电杆固定座1包括T型底座2、绝缘编织带3和快速棘轮锁扣31,T型底座2直接固定在绝缘支撑杆4的顶端,绝缘编织带3的一端固定在T型底座2上,绝缘编织带3的另一端固定在快速棘轮锁扣31上,快速棘轮锁扣31安装在T型底座2上,T型底座2通过绝缘编织带3配合快速棘轮锁扣31固定在电杆上。Wherein, the pole fixing base 1 includes a T-shaped base 2, an insulating braid 3 and a quick ratchet lock 31, the T-shaped base 2 is directly fixed on the top of the insulating support rod 4, and one end of the insulating braid 3 is fixed on the T On the T-shaped base 2, the other end of the insulating braid 3 is fixed on the quick ratchet lock 31, and the quick ratchet lock 31 is installed on the T-shaped base 2, and the T-shaped base 2 is fixed with the fast ratchet lock 31 through the insulating braid 3 on the pole.

其中,所述的T型底座2与电杆接触面设计为圆弧状;绝缘编织带3为高强度绝缘编织带,长度为130cm。Wherein, the contact surface between the T-shaped base 2 and the pole is designed to be arc-shaped; the insulating braid 3 is a high-strength insulating braid with a length of 130 cm.

其中,所述的分段开关5包括绝缘子6、刀闸7、第一快速连接桩8、第二快速连接桩9、固定基座10及可移动基座11;可移动基座11直接套装在绝缘支撑杆4上,固定基座10通过可移动基座11与绝缘支撑杆4连接;绝缘子6通过第二螺栓13直接固定在固定基座10上;刀闸7通过第一螺栓12直接固定在绝缘子6上;第一快速连接桩8通过第三螺栓14直接固定在刀闸7上端;第二快速连接桩9通过第四螺栓15直接固定在刀闸7下端。Wherein, the section switch 5 includes an insulator 6, a knife switch 7, a first quick connection pile 8, a second quick connection pile 9, a fixed base 10 and a movable base 11; the movable base 11 is directly set on the On the insulating support rod 4, the fixed base 10 is connected with the insulating support rod 4 through the movable base 11; the insulator 6 is directly fixed on the fixed base 10 through the second bolt 13; the knife switch 7 is directly fixed on the fixed base 10 through the first bolt 12 On the insulator 6 ; the first quick connection pile 8 is directly fixed on the upper end of the knife switch 7 through the third bolt 14 ; the second quick connection pile 9 is directly fixed on the lower end of the knife switch 7 through the fourth bolt 15 .

其中,可移动基座11上设有底座28,底座28上设有两条平行凸起的卡条29。Wherein, the movable base 11 is provided with a base 28 , and the base 28 is provided with two parallel protruding clamping strips 29 .

其中,可移动基座11上设有卡槽30。Wherein, the movable base 11 is provided with a card slot 30 .

其中,所述分段开关5的基座为分体式,分别为固定基座10和可移动基座11;固定基座10长160mm,宽65mm;可移动基座11设计为嵌入式U形卡槽,卡槽长度60mm,卡槽宽度30mm,卡槽底部开直径孔10mm,与固定基座10采用单螺栓31连接,卡扣直径95mm;可移动基座11与绝缘支撑杆4为可调式连接方式,根据作业现场技术要求任意调节与电杆距离;刀闸7具有自锁机构,避免通流时刀闸脱落,刀闸7分合时能满足负荷转移时的环流要求;第一快速连接桩8长20cm,直径4cm,为可拆卸式,与刀闸7上端相互包裹紧密连接;第二快速连接桩9长20cm,直径4cm,为可拆卸式,与刀闸7下端相互包裹紧密连接。Wherein, the base of the section switch 5 is a split type, which are respectively a fixed base 10 and a movable base 11; the fixed base 10 is 160mm long and 65mm wide; the movable base 11 is designed as an embedded U-shaped card Slot, the length of the card slot is 60mm, the width of the card slot is 30mm, the bottom of the card slot has a diameter hole of 10mm, and the fixed base 10 is connected with a single bolt 31, and the diameter of the buckle is 95mm; the movable base 11 and the insulating support rod 4 are adjustable connections According to the technical requirements of the job site, the distance from the pole can be adjusted arbitrarily; the knife switch 7 has a self-locking mechanism to prevent the knife switch from falling off during flow, and the switch 7 can meet the circulation requirements when the load is transferred; the first quick connection pile 8 long 20cm, diameter 4cm, is detachable, wraps tightly connected with knife gate 7 upper ends;

其中,所述的第一多功能钳头引流线16包括第一绝缘操作杆17、第二绝缘操作杆18、第一引流线本体19、第一多功能钳头20和第二多功能钳头21;第一引流线本体19的两端分别安装第一多功能钳头20和第二多功能钳头21,第一多功能钳头20上安装第一绝缘操作杆17,第二多功能钳头21上安装第二绝缘操作杆18;第一多功能钳头引流线16一端通过第一多功能钳头20与电网侧导线直接连接,第一多功能钳头引流线16另一端通过第二多功能钳头21与分段开关5的第一快速连接桩8直接连接。Wherein, the first multifunctional pliers drain wire 16 includes a first insulating operating rod 17, a second insulating operating rod 18, a first draining wire body 19, a first multifunctional pliers head 20 and a second multifunctional pliers head 21; the first multifunctional pliers 20 and the second multifunctional pliers 21 are respectively installed at both ends of the first drain wire body 19, and the first insulating operating rod 17 is installed on the first multifunctional pliers 20, and the second multifunctional pliers The second insulated operating rod 18 is installed on the head 21; one end of the first multifunctional pliers drain wire 16 is directly connected with the grid side wire through the first multifunctional pliers 20, and the other end of the first multifunctional pliers drain wire 16 is passed through the second The multifunctional pliers head 21 is directly connected to the first quick connection pile 8 of the section switch 5 .

其中,所述的第二多功能钳头引流线22包括第三绝缘操作杆23、第四绝缘操作杆24、第二引流线本体25、第三多功能钳头26和第四多功能钳头27;第二引流线本体25的两端分别安装第三多功能钳头26和第四多功能钳头27,第三多功能钳头26上安装第三绝缘操作杆23,第四多功能钳头27上安装第四绝缘操作杆24;第二多功能钳头引流线22一端通过第三多功能钳头26与分段开关5的第二快速连接桩9直接连接,第二多功能钳头引流线22另一端通过第四多功能钳头27与变压器高压桩头直接连接。Wherein, the second multifunctional pliers drain wire 22 includes a third insulating operating rod 23, a fourth insulating operating rod 24, a second draining wire body 25, a third multifunctional pliers head 26 and a fourth multifunctional pliers head 27; the two ends of the second drain wire body 25 are respectively equipped with the third multi-functional pliers 26 and the fourth multi-functional pliers 27, the third multi-functional pliers 26 is equipped with the third insulating operating rod 23, the fourth multi-functional pliers The fourth insulated operating rod 24 is installed on the head 27; one end of the second multifunctional pliers drain wire 22 is directly connected with the second quick connection pile 9 of the segment switch 5 through the third multifunctional pliers 26, and the second multifunctional pliers The other end of the drain wire 22 is directly connected to the transformer high-voltage pile head through the fourth multifunctional clamp head 27 .

其中,第一多功能钳头引流线16、第二多功能钳头引流线22的连接头为多功能钳形接头,借助绝缘操作杆完成引流线与带电体连接工作;第一引流线本体19、第二引流线本体25为软铜线,直径30mm;第一绝缘操作杆17、第二绝缘操作杆18、第三绝缘操作杆23、第四绝缘操作杆24的长43cm。Among them, the connectors of the first multi-function pincer head drain wire 16 and the second multi-function pincer head drain wire 22 are multi-functional pincer joints, and the connection between the drain wire and the charged body is completed by means of an insulating operating rod; the first drain wire body 19 , The second drain wire body 25 is an annealed copper wire with a diameter of 30mm; the length of the first insulating operating rod 17, the second insulating operating rod 18, the third insulating operating rod 23, and the fourth insulating operating rod 24 is 43 cm.

本实用新型的具体操作步骤如下:Concrete operation steps of the present utility model are as follows:

步骤A:将电杆固定座1、绝缘支撑杆4、分段开关5、第一多功能钳头引流线16、第二多功能钳头引流线22以及绝缘隔离挡板、扇形挡板按上述连接方式安装到位;绝缘隔离挡板用于跌落式熔断器与跌落式熔断器之间及跌落式熔断器与电杆之间的绝缘隔离,扇形挡板用于跌落式熔断器上下桩头与横担绝缘隔离;Step A: Connect the electric pole fixing seat 1, the insulating support rod 4, the section switch 5, the first multifunctional clamp head drain wire 16, the second multifunctional clamp head drain wire 22, and the insulation isolation baffle and the sector baffle according to the above The connection method is installed in place; the insulation isolation baffle is used for the insulation isolation between the drop-out fuse and the drop-out fuse and between the drop-out fuse and the pole, and the fan-shaped baffle is used for the drop-out fuse. Insulation isolation;

步骤B:合上刀闸7准备负荷转移;Step B: Close the knife switch 7 to prepare for load transfer;

步骤C:拉开待更换跌落式熔断器,实现第一次负荷转移;Step C: pull apart the drop-out fuse to be replaced to realize the first load transfer;

步骤D:拆除待更换跌落式熔断器,并安装上新跌落式熔断器;Step D: Remove the drop-out fuse to be replaced, and install a new drop-out fuse;

步骤E:合上新跌落式熔断器,准备第二次负荷转移;Step E: Close the new drop-out fuse and prepare for the second load transfer;

步骤F:拉开刀闸7实现第二次负荷转移;Step F: pull open the switch 7 to realize the second load transfer;

步骤G:拆除电杆固定座1、绝缘支撑杆4、分段开关5、第一多功能钳头引流线16、第二多功能钳头引流线22以及绝缘隔离挡板、扇形挡板。Step G: Remove the pole fixing seat 1, the insulating support rod 4, the section switch 5, the first multi-functional clamp head drain wire 16, the second multi-function clamp head drain wire 22, the insulation isolation baffle, and the fan-shaped baffle.

Claims (10)

1. on-load replace fuse switch auxiliary device, it is characterized in that: the auxiliary device include electric pole fixing seat (1), Insulating support rod (4), block switch (5), the first multi-functional binding clip drainage thread (16) and the second multi-functional binding clip drainage thread (22), Electric pole fixing seat (1) is installed on a wherein top for insulating support rod (4), installs block switch on the body of rod of insulating support rod (4) (5), the first multi-functional binding clip drainage thread (16) and the second multi-functional binding clip drainage thread (22) are connected to block switch (5) On, the auxiliary device of overall structure on-load replacement fuse switch.
2. the auxiliary device of on-load replacement fuse switch according to claim 1, it is characterized in that: insulating support rod (4) material is epoxy resin, using hollow structure, outer diameter 10cm, internal diameter 5cm, length 150cm.
3. the auxiliary device of on-load replacement fuse switch according to claim 1, it is characterized in that: the electric pole Fixing seat (1) includes that T-type pedestal (2), insulation braid over braid (3) and quick ratchet lock (31), T-type pedestal (2) are directly anchored to The one end on the top of insulating support rod (4), insulation braid over braid (3) is fixed on T-type pedestal (2), the another of braid over braid (3) of insulating End is fixed on quick ratchet lock (31), and quick ratchet lock (31) is mounted on T-type pedestal (2), and T-type pedestal (2) passes through Insulation braid over braid (3) cooperates quick ratchet lock (31) to be fixed on electric pole.
4. the auxiliary device of on-load replacement fuse switch according to claim 3, it is characterized in that: the T-type Pedestal (2) and electric pole contact surface are designed as arc-shaped;Insulation braid over braid (3) is high-strength insulating braid over braid, length 130cm.
5. the auxiliary device of on-load replacement fuse switch according to claim 1, it is characterized in that: the segmentation Switch (5) includes that quickly connection stake (8), second quickly connect stake (9), fixed pedestal (10) for insulator (6), disconnecting link (7), first And movable base (11);Movable base (11) is directly sleeved on insulating support rod (4), and fixed pedestal (10) passes through removable Moving base (11) is connect with insulating support rod (4);Insulator (6) is directly anchored to fixed pedestal (10) by the second bolt (13) On;Disconnecting link (7) is directly anchored on insulator (6) by the first bolt (12);First, which quickly connects stake (8), passes through third bolt (14) it is directly anchored to disconnecting link (7) upper end;Second, which quickly connects stake (9), is directly anchored to disconnecting link (7) by the 4th bolt (15) Lower end.
6. the auxiliary device of on-load replacement fuse switch according to claim 5, it is characterized in that: movable base (11) pedestal (28) are equipped with, pedestal (28) is equipped with the strip (29) of two parallel protrusions;Wherein, on movable base (11) Equipped with card slot (30).
7. the auxiliary device of on-load replacement fuse switch according to claim 5 or 6, it is characterized in that: described point The pedestal of Duan Kaiguan (5) is split type, respectively fixed pedestal (10) and movable base (11);Fixed pedestal (10) is long 160mm, wide 65mm;Movable base (11) is designed as embedded U-shaped card slot, card slot length 60mm, card slot width 30mm, card slot Diametric hole 10mm is opened in bottom, with fixed pedestal (10) using being singly bolted, buckles diameter 95mm;Movable base (11) and absolutely Edge support rod (4) is adjustable connection type, is arbitrarily adjusted according to operation field technical requirements and electric pole distance;Disconnecting link (7) tool There is self-locking mechanism, disconnecting link falls off when avoiding through-flow, and when disconnecting link (7) division is able to satisfy circulation requirement when load transfer;First is fast Speed connection stake (8) long 20cm, diameter 4cm is mutually wrapped up with disconnecting link (7) upper end and closely being connect to be detachable;Second quickly connects Pile extension (9) long 20cm, diameter 4cm is mutually wrapped up with disconnecting link (7) lower end and closely being connect to be detachable.
8. the auxiliary device of on-load replacement fuse switch according to claim 1, it is characterized in that: described first Multi-functional binding clip drainage thread (16) includes the first insulating bar (17), the second insulating bar (18), the first drainage thread ontology (19), the first multi-functional binding clip (20) and the second multi-functional binding clip (21);It installs respectively at the both ends of first drainage thread ontology (19) First multi-functional binding clip (20) and the second multi-functional binding clip (21) install the first insulating bar on the first multi-functional binding clip (20) (17), the second insulating bar (18) are installed on the second multi-functional binding clip (21);First multi-functional binding clip drainage thread (16) one end It is directly connected to by the first multi-functional binding clip (20) with grid side conducting wire, first multi-functional binding clip drainage thread (16) other end passes through Second multi-functional binding clip (21) quickly connect stake (8) with the first of block switch (5) and is directly connected to.
9. the auxiliary device of on-load replacement fuse switch according to claim 1, it is characterized in that: described second Multi-functional binding clip drainage thread (22) includes third insulating bar (23), the 4th insulating bar (24), the second drainage thread ontology (25), the multi-functional binding clip of third (26) and the 4th multi-functional binding clip (27);
The multi-functional binding clip of third (26) and the 4th multi-functional binding clip (27) are installed in the both ends of second drainage thread ontology (25) respectively, the Third insulating bar (23) are installed on three multi-functional binding clips (26), the 4th insulation operation of installation on the 4th multi-functional binding clip (27) Bar (24);Second multi-functional binding clip drainage thread (22) one end passes through the multi-functional binding clip of third (26) and the second of block switch (5) Quickly connection stake (9) be directly connected to, second multi-functional binding clip drainage thread (22) other end by the 4th multi-functional binding clip (27) with Transformer high-voltage pile crown is directly connected to.
10. the auxiliary device of on-load replacement fuse switch according to claim 8 or claim 9, it is characterized in that: more than first Function binding clip drainage thread (16), the second multi-functional binding clip drainage thread (22) connector be multi-functional clamp terminal, by insulation Operating stick completes drainage thread and connect work with electrical body;First drainage thread ontology (19), the second drainage thread ontology (25) are soft copper Line, diameter 30mm;First insulating bar (17), the second insulating bar (18), third insulating bar (23), the 4th insulation Operating stick (24) long 43cm.
CN201820681075.4U 2018-05-09 2018-05-09 On-load replaces fuse switch auxiliary device Active CN208225828U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820681075.4U CN208225828U (en) 2018-05-09 2018-05-09 On-load replaces fuse switch auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820681075.4U CN208225828U (en) 2018-05-09 2018-05-09 On-load replaces fuse switch auxiliary device

Publications (1)

Publication Number Publication Date
CN208225828U true CN208225828U (en) 2018-12-11

Family

ID=64510619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820681075.4U Active CN208225828U (en) 2018-05-09 2018-05-09 On-load replaces fuse switch auxiliary device

Country Status (1)

Country Link
CN (1) CN208225828U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108447750A (en) * 2018-05-09 2018-08-24 国网江苏省电力有限公司淮安供电分公司 Auxiliary Device for On-Load Replacement of Dropout Fuse
CN111917057A (en) * 2020-09-04 2020-11-10 国网山东省电力公司莱芜供电公司 Device for replacing isolating switch with load

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108447750A (en) * 2018-05-09 2018-08-24 国网江苏省电力有限公司淮安供电分公司 Auxiliary Device for On-Load Replacement of Dropout Fuse
CN111917057A (en) * 2020-09-04 2020-11-10 国网山东省电力公司莱芜供电公司 Device for replacing isolating switch with load

Similar Documents

Publication Publication Date Title
WO2009049544A1 (en) Ice-melting device for bundle conductor transmission line and thereof method
CN103337867B (en) A kind of low-voltage load is in Linear Phasing Device and phase modulation method thereof
CN204966369U (en) Outdoor high voltage isolator of GW1
CN108447750A (en) Auxiliary Device for On-Load Replacement of Dropout Fuse
CN101409438B (en) Ice-melting method suitable for transmission line with multiple fission conductor
CN208225828U (en) On-load replaces fuse switch auxiliary device
CN103532047B (en) A kind of operational method and device changing fuse switch on 10kV post
CN204966368U (en) Novel GW9 isolator
CN106601536A (en) Disconnecting switch
CN208078525U (en) Three-phase conducting wire for distribution network live line work upright bar struts insulating frame
CN108092182A (en) Ultra-high-tension power transmission line is segmented de-icing method and system
CN101612894A (en) Electric locomotive pantograph arc blowout device
CN212648114U (en) An isolating switch based on soft connection and electrodynamic action
CN106129912B (en) A kind of drainage plate electric transmission line hot-line defect elimination power tool
CN103578834A (en) Outdoor low-voltage protection isolation switch
CN206819924U (en) Single pillar knife switch
CN202307657U (en) 126 kV outdoor AC high-voltage isolation switch
CN102437542A (en) Alternating current ice melting system of electrified railway traction network
CN202424080U (en) Alternating-current de-icing system for traction network of electrified railway
CN202997335U (en) Ring network cabinet
CN212033629U (en) A kind of insulation shielding appliance for uninterrupted operation of distribution network
CN101795003B (en) Solid combination switch device
CN205159190U (en) a load switch
CN109637887B (en) A contact structure of a commutation-type high-voltage DC contactor
CN208209449U (en) A kind of quick mounting type lead wire insulation support frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant