CN208040372U - It is a kind of to simulate the experimental provision that oil gas water enchroachment (invasion) influences cementing quality in well cementation - Google Patents

It is a kind of to simulate the experimental provision that oil gas water enchroachment (invasion) influences cementing quality in well cementation Download PDF

Info

Publication number
CN208040372U
CN208040372U CN201820557791.1U CN201820557791U CN208040372U CN 208040372 U CN208040372 U CN 208040372U CN 201820557791 U CN201820557791 U CN 201820557791U CN 208040372 U CN208040372 U CN 208040372U
Authority
CN
China
Prior art keywords
ball valve
water pump
water
fluid flowmeter
flowmeter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820557791.1U
Other languages
Chinese (zh)
Inventor
陈光凌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820557791.1U priority Critical patent/CN208040372U/en
Application granted granted Critical
Publication of CN208040372U publication Critical patent/CN208040372U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The experimental provision that oil gas water enchroachment (invasion) influences cementing quality in cementing the well the utility model is related to a kind of simulation of casing and cementing technical field, it is mainly by electromagnetic air pump, gas flowmeter, gas feed, liquid mixture import, ball valve A, fluid flowmeter A, water pump A, crude oil stock tank, water storing tank, water pump B, fluid flowmeter B, ball valve B, drill bit, high-speed camera, computer monitoring system, outer tube, inner tube, mixture outlet, pressure sensor, inside and outside pipe fitting, cement slurry inlet, ball valve C, fluid flowmeter C, water pump C, cement mortar basin and waste liquor storage tank composition.After crude oil stock tank is connected with water pump A, fluid flowmeter A, ball valve A, the lines in parallel that is linked to be with water storing tank, water pump B, fluid flowmeter B, ball valve B;Electromagnetic air pump is connected with gas flowmeter, ball valve, gas feed.The utility model can accurately simulate critical condition when oil gas water enchroachment (invasion) under actual condition.

Description

It is a kind of to simulate the experimental provision that oil gas water enchroachment (invasion) influences cementing quality in well cementation
Technical field
Oil gas water enchroachment (invasion) influences cementing quality in cementing the well the utility model is related to a kind of simulation of casing and cementing technical field Experimental provision.
Background technology
Well cementing operation refers to injecting cement mortar from casing to the annular space of the borehole wall and casing and allowing on it to return to certain altitude, water Mud becomes Behavior of Hardened Cement Paste by the borehole wall and casing cement with the passing of time.Cement slurry sets process is waited for carrying out well cementation In, cement mortar will produce weightlessness, and weightlessness is to influence one of the principal element of oil gas well cementing operation quality.Well cementation waits for cement slurry sets During, cement mortar hydration rate is accelerated, and static gel strength increases, while constantly releasing Free water, and then makes in pit shaft Head of liquid reduce;If head of liquid is lower than strata pressure, it will produce oil gas water immersion annular space and formed and alter slot, when serious It also will produce well control accident;If head of liquid is higher than strata pressure, the case where cementing fluid is missed will produce.Therefore actual Pressure balance control in well cementing process between head of liquid and strata pressure is the key point entirely cemented the well, for fluid column pressure It is necessary to be studied for relationship between power and strata pressure.If oil gas water enchroachment (invasion) can be invented in a kind of simulation well cementation to cementing quality The experimental provision of influence carries out experimental study to the relationship in well cementing process between head of liquid and strata pressure, this will be to improving Cementing quality solves well cementation problem and is of great significance.
Invention content
The utility model aim is:Provide the experiment dress that oil gas water enchroachment (invasion) influences cementing quality in a kind of simulation well cementation It sets.
Technical solution used by the utility model is:
The experimental provision that oil gas water enchroachment (invasion) influences cementing quality in a kind of simulation well cementation of the utility model, mainly by electromagnetic type Air pump, gas flowmeter, gas feed, liquid mixture import, ball valve A, fluid flowmeter A, water pump A, crude oil stock tank, storage Water pot, water pump B, fluid flowmeter B, ball valve B, drill bit, high-speed camera, computer monitoring system, outer tube, inner tube, mixture Outlet, pressure sensor, inside and outside pipe fitting, cement slurry inlet, ball valve C, fluid flowmeter C, water pump C, cement mortar basin and useless Liquid storage tank forms.After crude oil stock tank is connected with water pump A, fluid flowmeter A, ball valve A, with water storing tank, water pump B, fluid flowmeter B, the lines in parallel that ball valve B is linked to be;Electromagnetic air pump is connected with gas flowmeter, ball valve, gas feed;Cement mortar basin with Water pump C, fluid flowmeter C, ball valve C are connected with cement slurry inlet, and mixture outlet is connected with ball valve, waste liquor storage tank.Outer tube is adopted It being made with transparent PC material, pressure-bearing 2MPa is respectively equipped with a pressure sensor in the upper left of outer tube and lower left quarter, with Computer monitoring system is connected;Inner tube is made using blue PC materials, pressure-bearing 2MPa.Inside and outside pipe fitting using can open type set Meter can be tested by opening inner and outer pipes joint replacing difference outer tube, diameter of inner pipe, a diameter of cement mortar of mixture outlet into 1.2 times of mouth, gas feed diameter is 0.5 times of liquid mixture import;Cement mortar inlet diameter and liquid mixture import Diameter is identical.Fluid flowmeter A, fluid flowmeter B and fluid flowmeter C are the fluid flowmeter of same size, water pump A, water The water pump that B and water pump C is same size is pumped, the ball valve used in the process of entire experimental simulation is all the ball valve of same size.Water The cement mortar of well cementation under cement mortar simulation actual condition in mud basin, reservoir under the Fluid Dynamics actual condition in water storing tank Interior water, the crude oil under the crude oil simulation actual condition in crude oil stock tank in reservoir, the gas simulation that electromagnetic air pump generates Gas under actual condition in reservoir, drill bit simulate the drill bit under actual condition, and outer tube simulates the casing under actual condition, inner tube Simulate the drilling rod under actual condition.
The advantages of the utility model:It is good to simulate effect, can really simulate in well cementing process oil gas water enchroachment (invasion) to cementing quality Affecting laws.
Description of the drawings
Fig. 1 is that the structure for the experimental provision that oil gas water enchroachment (invasion) influences cementing quality in a kind of simulation well cementation of the utility model is shown It is intended to.
Fig. 2 be Fig. 1 carry out simulation oil air water invade there is critical condition when flow schematic diagram of the fluid in pit shaft.
In figure:1. electromagnetic air pump, 2. gas flowmeters, 3. gas feeds, 4. liquid mixture imports, 5. ball valve A, 6. fluid flowmeter A, 7. water pump A, 8. crude oil stock tanks, 9. water storing tanks, 10. water pump B, 11. fluid flowmeter B, 12. ball valve B, 13. drill bit, 14. high-speed cameras, 15. computer monitoring systems, 16. outer tubes, 17. inner tubes, 18. mixture outlets, 19. pressure Sensor, pipe fitting inside and outside 20., 21. cement slurry inlets, 22. ball valve C, 23. fluid flowmeter C, 24. water pump C, 25. cement mortars Basin, 26. waste liquor storage tanks.
Specific implementation mode
The utility model is described further below in conjunction with the accompanying drawings.
As shown in Figure 1, the experimental provision that oil gas water enchroachment (invasion) influences cementing quality in a kind of simulation well cementation of the utility model, main Will by electromagnetic air pump 1, gas flowmeter 2, gas feed 3, liquid mixture import 4, ball valve A5, fluid flowmeter A6, Water pump A7, crude oil stock tank 8, water storing tank 9, water pump B10, fluid flowmeter B11, ball valve B12, drill bit 13, high-speed camera 14, meter Calculation machine monitor system 15, outer tube 16, inner tube 17, mixture outlet 18, pressure sensor 19, inside and outside pipe fitting 20, cement mortar into Mouth 21, ball valve C22, fluid flowmeter C23, water pump C24, cement mortar basin 25 and waste liquor storage tank 26 form.Crude oil stock tank 8 and water After pumping A7, fluid flowmeter A6, ball valve A5 series connection, it is linked to be with water storing tank 9, water pump B10, fluid flowmeter B11, ball valve B12 Lines in parallel;Electromagnetic air pump 1 is connected with gas flowmeter 2, ball valve, gas feed 3;Cement mortar basin 25 and water pump C24, Fluid flowmeter C23, ball valve C22 are connected with cement slurry inlet 21, and mixture outlet 18 is connected with ball valve, waste liquor storage tank 26.
As shown in Figure 1 and Figure 2, physical simulation process is:It is first turned on water pump C24, ball valve C22, is made in cement mortar basin 25 Cement mortar by water pump C24, enter inside inner tube 17 from cement slurry inlet 21 after fluid flowmeter C23 meterings, cement mortar exists It flows inside inner tube 17, is finally flowed out from drill bit 13 from top to bottom, in annular space of the cement mortar between outer tube 16, inner tube 17 under Up flow.When mixture outlet 18 has cement mortar outflow, water pump B10, ball valve B12, water pump A7, ball valve are opened successively at once A5, electromagnetic air pump 1, the ball valve being connected with gas feed 3, and successively control ball valve B12, ball valve A5, with 3 phase of gas feed The aperture of ball valve even, it is 0.1m to make the flow shown in fluid flowmeter B113The flow shown in/h, fluid flowmeter A6 For 0.9m3/ h, the interior flow shown of gas flowmeter 2 is 0.05m3/ h, it is 9 to make oil-water ratio:1.Then the row of water pump C24 is adjusted Amount makes oil gas water that can just enter 16 inside of outer tube but can not continue the oil gas water enchroachment (invasion) critical condition up flowed, passes through meter Calculation machine monitors the pressure of the record of system 15 at this time.Then make the gas flow shown in gas flowmeter 2 constant, regulation ball valve B12 and ball valve A5, it is 0.2m to make the flow shown in fluid flowmeter B113The flow of display is in/h, fluid flowmeter A6 0.8m3/ h, oil-water ratio 8:2 carry out repeating above-mentioned experiment, find oil gas water enchroachment (invasion) critical condition, and record pressure and reality at this time Test phenomenon.Then successively according to oil-water ratio be 7:3,6:4,5:5 carry out repeating above-mentioned experiment, find oil gas water enchroachment (invasion) critical condition and Corresponding experimental phenomena, is handled data after experiment, draw out different oil-water ratios and oil gas water enchroachment (invasion) critical pressure it Between relation curve.The experimental phenomena in experimentation, oil gas are had recorded by high-speed camera 14 in whole experiment process Relation curve between water enchroachment (invasion) difference oil-water ratio and oil gas water enchroachment (invasion) critical pressure will carry out well cementing operation for scene and provide specifically Directive significance, i.e., entire simulation process terminate.

Claims (4)

1. the experimental provision that oil gas water enchroachment (invasion) influences cementing quality in a kind of simulation well cementation, mainly by electromagnetic air pump (1), gas Flowmeter body (2), gas feed (3), liquid mixture import (4), ball valve A (5), fluid flowmeter A (6), water pump A (7), original Oil measure tank (8), water storing tank (9), water pump B (10), fluid flowmeter B (11), ball valve B (12), drill bit (13), high-speed camera (14), computer monitoring system (15), outer tube (16), inner tube (17), mixture outlet (18), pressure sensor (19), inside and outside Pipe fitting (20), cement slurry inlet (21), ball valve C (22), fluid flowmeter C (23), water pump C (24), cement mortar basin (25) It is formed with waste liquor storage tank (26), it is characterised in that:Crude oil stock tank (8) is gone here and there with water pump A (7), fluid flowmeter A (6), ball valve A (5) After connection, the lines in parallel that is linked to be with water storing tank (9), water pump B (10), fluid flowmeter B (11), ball valve B (12);Electromagnetic type air Pump (1) is connected with gas flowmeter (2), ball valve, gas feed (3);Cement mortar basin (25) and water pump C (24), fluid flow Meter C (23), ball valve C (22) are connected with cement slurry inlet (21), and mixture outlet (18) is connected with ball valve, waste liquor storage tank (26).
2. the experimental provision that oil gas water enchroachment (invasion) influences cementing quality in a kind of simulation well cementation according to claim 1, special Sign is:Outer tube (16) is made using transparent PC material, pressure-bearing 2MPa, is set respectively in the upper left of outer tube (16) and lower left quarter There are one pressure sensors (19), are connected with computer monitoring system (15);Inner tube (17) using blue PC materials making and At pressure-bearing 2MPa.
3. the experimental provision that oil gas water enchroachment (invasion) influences cementing quality in a kind of simulation well cementation according to claim 1, special Sign is:Inside and outside pipe fitting (20) using can open type design, the 1.2 of a diameter of cement slurry inlet (21) of mixture outlet (18) Times, gas feed (3) diameter is 0.5 times of liquid mixture import (4);Cement slurry inlet (21) diameter and liquid mixture into Mouth (4) diameter is identical.
4. the experimental provision that oil gas water enchroachment (invasion) influences cementing quality in a kind of simulation well cementation according to claim 1, special Sign is:Fluid flowmeter A (6), fluid flowmeter B (11) and fluid flowmeter C (23) are the fluid flowmeter of same size, Water pump A (7), water pump B (10) and water pump C (24) are the water pump of same size, and the ball valve used in the process of entire experimental simulation is all For the ball valve of same size.
CN201820557791.1U 2018-04-19 2018-04-19 It is a kind of to simulate the experimental provision that oil gas water enchroachment (invasion) influences cementing quality in well cementation Expired - Fee Related CN208040372U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820557791.1U CN208040372U (en) 2018-04-19 2018-04-19 It is a kind of to simulate the experimental provision that oil gas water enchroachment (invasion) influences cementing quality in well cementation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820557791.1U CN208040372U (en) 2018-04-19 2018-04-19 It is a kind of to simulate the experimental provision that oil gas water enchroachment (invasion) influences cementing quality in well cementation

Publications (1)

Publication Number Publication Date
CN208040372U true CN208040372U (en) 2018-11-02

Family

ID=63927724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820557791.1U Expired - Fee Related CN208040372U (en) 2018-04-19 2018-04-19 It is a kind of to simulate the experimental provision that oil gas water enchroachment (invasion) influences cementing quality in well cementation

Country Status (1)

Country Link
CN (1) CN208040372U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022199701A1 (en) * 2021-03-26 2022-09-29 中联煤层气国家工程研究中心有限责任公司 Experimental apparatus for simulating substance exchange between wellbore and formation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022199701A1 (en) * 2021-03-26 2022-09-29 中联煤层气国家工程研究中心有限责任公司 Experimental apparatus for simulating substance exchange between wellbore and formation

Similar Documents

Publication Publication Date Title
CN105178926B (en) Fractured-cavernous carbonate reservoir physical model, displacement simulation experimental provision and system
CN106640061A (en) Simulation experiment device and method of mineshaft-stratum fracture coupled flowing
CN105041280A (en) Method and device for realizing carbon dioxide miscible-phase displacement laboratory experiment
CN203614095U (en) Cement sheath cementing strength evaluation device
CN103256047A (en) Method for researching variable mass multiphase flowing regular in horizontal well fracturing completion method
CN206329308U (en) One kind simulation gas hydrates drilling straight-hole well cementation experimental provision
CN106198928A (en) Full-hole core acidizing wormhole growth simulation device and experimental technique
CN208040372U (en) It is a kind of to simulate the experimental provision that oil gas water enchroachment (invasion) influences cementing quality in well cementation
CN114965231B (en) An experimental device suitable for corrosion of metal pipe materials
CN108798628B (en) Gas-liquid separation metering device based on capillary force
CN208520832U (en) A kind of experimental provision for simulating gas hydrates counterflush drilling flow field change
CN205089298U (en) Fracture type carbonate oil reservoir physical model , displacement simulation experiment device and system
CN108008075A (en) A kind of experimental provision for being used to simulate loose sand oil accumulation sand block filter medium clogging
CN111721691B (en) Pipeline corrosion test system
CN202710439U (en) Borehole pressure water-injection in-situ permeability tester
CN206848130U (en) It is a kind of to simulate water influx during the water enchroachment (invasion) of carbonate rock gas field to mutually oozing the experimental provision of influence
CN203685151U (en) Heating constant temperature device
CN110805429A (en) A dynamic fracture self-supporting fracturing technology research device and its conductivity measurement method
CN110485975A (en) A kind of horizontal well acidizing large scale acidizing wormhole simulator and experimental method
CN208024343U (en) A kind of simulation cementing replaces the experimental provision of drilling fluid flow field flow variation
CN110806365B (en) Dynamic fracture self-supporting fracturing process research device and friction resistance measurement method thereof
CN114034565A (en) Online evaluation device and method for sand consolidation effect of chemical sand consolidation agent
CN205532579U (en) Experimental device for it forms to be used for monitoring artificial gas cap
CN210489031U (en) Device for simulating horizontal well section rock debris removing effect
CN208024342U (en) A kind of experimental provision simulated drill string rotating and buckling and slim-hole annular pressure is influenced

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181102

Termination date: 20200419