[go: up one dir, main page]

CN207935619U - Air heave type Combined joint based on ship - Google Patents

Air heave type Combined joint based on ship Download PDF

Info

Publication number
CN207935619U
CN207935619U CN201820207784.9U CN201820207784U CN207935619U CN 207935619 U CN207935619 U CN 207935619U CN 201820207784 U CN201820207784 U CN 201820207784U CN 207935619 U CN207935619 U CN 207935619U
Authority
CN
China
Prior art keywords
plug
threaded shaft
pipeline
positioning panel
ship
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820207784.9U
Other languages
Chinese (zh)
Inventor
焦自权
孙勇敢
冯志强
王侨
焦子硕
夏义江
韩鑫
付桂霞
杨润党
石南辉
黄新欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinzhou University
Original Assignee
Qinzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinzhou University filed Critical Qinzhou University
Priority to CN201820207784.9U priority Critical patent/CN207935619U/en
Application granted granted Critical
Publication of CN207935619U publication Critical patent/CN207935619U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipe Accessories (AREA)

Abstract

本实用新型公开了一种基于船舶的气胀式管道堵漏器,通过主要由充气管15、充气球阀16、n个气囊4‑2、n+1个圆形夹板4‑1构成的堵头4,在封堵管道14时,通过推动中空套管6对堵头4进行挤压并通过旋转件固定堵头4,气囊4‑2充气后立刻充盈且在圆形夹板4‑1的挤压作用下无缝贴合与各圆形夹板4‑1之间的间隙以及圆形夹板4‑1与管道14侧壁之间的间隙,封堵效果好,具有结构简单、操作方便、实用性强的特点;通过主要由定位面板2和2个以上均匀分布在定位面板2侧部的连接杆9构成的管道连接机构,能够实现船舶泄漏管道的二次封堵与固定,堵头4被管道14内的液体压力冲开的概率大大降低,封堵的可靠性和安全性大大提高,有益于推广。

The utility model discloses an inflatable pipeline leak stopper based on a ship, through a plug mainly composed of an inflatable tube 15, an inflatable ball valve 16, n airbags 4‑2, and n+1 circular splints 4‑1 4. When blocking the pipeline 14, the plug 4 is squeezed by pushing the hollow sleeve 6 and the plug 4 is fixed by the rotating part. After the air bag 4-2 is inflated, it is filled immediately and squeezed by the circular splint 4-1. The gap between the seamless fit and each circular splint 4-1 and the gap between the circular splint 4-1 and the side wall of the pipe 14 under the action has good sealing effect, simple structure, convenient operation and strong practicability The characteristics; through the pipeline connection mechanism mainly composed of the positioning panel 2 and more than two connecting rods 9 evenly distributed on the side of the positioning panel 2, the secondary sealing and fixing of the leaking pipeline of the ship can be realized, and the plug 4 is covered by the pipeline 14 The probability of the pressure of the liquid inside being flushed away is greatly reduced, and the reliability and safety of the plugging are greatly improved, which is beneficial to popularization.

Description

基于船舶的气胀式管道堵漏器Ship-Based Inflatable Pipeline Leak Stopper

技术领域technical field

本实用新型涉及一种管路封堵装置,具体涉及一种基于船舶的气胀式管道堵漏器。The utility model relates to a pipeline sealing device, in particular to an inflatable pipeline leakage stopper based on a ship.

背景技术Background technique

我国是航运大国,航运业发展迅速。首先船舶的生命周期比较长一般在25年~30年。船舶作为一个独立体,能够在江河与海洋上自由航行少不了船舶内较为齐全的供应配套。大型的航运船舶上一般配备有淡水供应系统、航行燃油系统及气体供应系统,这些系统都是通过输送管路安装分布在整个船体上。这些管路系统在使用中,受船舶的故障、撞击和管路自身的老化或被输送介质的腐蚀等原因,经常发生因船舶管路断裂、破损导致船舶上输送的燃料、水等泄漏的故障。因此,针对管道泄漏或断裂故障,一般是通过堵块将断裂或泄漏的管路进行密封堵漏后实时更换破损管道。my country is a big shipping country, and the shipping industry is developing rapidly. First of all, the life cycle of a ship is relatively long, generally 25 to 30 years. As an independent body, a ship can navigate freely on rivers and oceans without a relatively complete set of supplies in the ship. Large-scale shipping ships are generally equipped with fresh water supply systems, voyage fuel systems and gas supply systems, and these systems are installed and distributed on the entire hull through pipelines. During the use of these pipeline systems, due to the failure of the ship, impact, aging of the pipeline itself or corrosion of the medium to be transported, failures such as leakage of fuel and water delivered on the ship often occur due to breakage and damage of the ship's pipeline. . Therefore, for pipeline leakage or fracture faults, the broken or leaking pipeline is generally sealed and plugged by a block and then the damaged pipeline is replaced in real time.

目前,船舶行业采用的堵漏方式主要采用软木塞和破抹布对破损管口进行封堵。传统堵漏方法操作复杂、封堵时间长、需要大量的人力,且受管道内流动的液体压力作用,封堵的工具(如软木塞、破抹布等)极易被管道内液体压力冲开,封堵效果差。现有技术中,用于管路的封堵装置各种各样。例如授权公告号为204692896U的中国实用新型专利公开了一种船舶管路泄漏应急堵漏密封装置,包括堵漏体、紧固螺柱及导气阀,其中堵漏体包括球冠状端头及圆柱形主体,主体内部设定位螺孔,紧固螺柱通过定位螺孔与堵漏体连接,主体上另环绕定位螺孔设至少一条导气孔,导气孔在主体端面处与导气阀连接,主体侧表面上设密封气囊及定位块,密封气囊嵌于两定位块层之间,定位块与堵漏体主体垂直且滑动连接,且其末端嵌于堵漏体上的定位螺孔内部,并与紧固螺柱相抵,密封气囊嵌于堵漏体主体上,并与导气孔连通。该结构的管路封堵装置通过将球冠状端头11插入管路内、接着通过气囊15紧密堵住破损口并由定位块16对其固定。其承载能力和封堵的稳定性能与传统堵漏装置有了很大的提高,但堵漏端头无法对管路的内径进行无缝密封,且整个堵漏体是通过定位块16固定在管路上,当管路内的液体压力较大时,仍然出现堵漏装置被冲开的情况,封堵的效果仍需改进。At present, the plugging method adopted by the shipbuilding industry mainly uses cork and broken rags to block the damaged nozzle. The traditional plugging method is complicated to operate, takes a long time to plug, requires a lot of manpower, and is affected by the liquid pressure flowing in the pipeline. The plugging tools (such as cork, broken rags, etc.) are easily washed away by the liquid pressure in the pipeline. The blocking effect is poor. In the prior art, there are various blocking devices for pipelines. For example, the Chinese utility model patent with the authorized announcement number 204692896U discloses an emergency plugging and sealing device for ship pipeline leakage, including a plugging body, fastening studs and an air guide valve, wherein the plugging body includes a spherical crown end and a cylindrical The main body has a positioning screw hole inside the main body, the fastening stud is connected with the plugging body through the positioning screw hole, and at least one air guide hole is arranged around the positioning screw hole on the main body, and the air guide hole is connected with the air guide valve at the end surface of the main body. A sealing airbag and a positioning block are arranged on the side surface of the main body. The sealing airbag is embedded between the two positioning block layers. The positioning block is vertically and slidably connected to the main body of the plugging body, and its end is embedded in the positioning screw hole on the plugging body. Against the fastening stud, the sealing air bag is embedded on the main body of the leak plugging body and communicates with the air guide hole. In the pipeline blocking device of this structure, the spherical crown end 11 is inserted into the pipeline, and then the damaged opening is tightly blocked by the air bag 15 and fixed by the positioning block 16 . Its bearing capacity and plugging stability have been greatly improved compared with traditional leak plugging devices, but the plugging end cannot seamlessly seal the inner diameter of the pipeline, and the entire leak plugging body is fixed on the pipe by the positioning block 16. On the road, when the liquid pressure in the pipeline is high, the leakage plugging device is still flushed open, and the plugging effect still needs to be improved.

实用新型内容Utility model content

针对上述的不足,本实用新型所要解决的技术问题是提供一种结构简单、封堵操作快捷、封堵效果和封堵可靠性显著提高的基于船舶的基于船舶的气胀式管道堵漏器。In view of the above-mentioned deficiencies, the technical problem to be solved by the utility model is to provide a ship-based inflatable pipeline leak stopper with simple structure, quick plugging operation, significantly improved plugging effect and plugging reliability.

为达到上述目的,本实用新型通过以下技术方案实现:In order to achieve the above object, the utility model is realized through the following technical solutions:

基于船舶的气胀式管道堵漏器,包括沿径向设有螺纹的螺纹轴和依次安装在螺纹轴上的堵头、中空套管和管道连接机构,所述管道连接机构的一端可自由卡接在管道上、其另一端螺纹连接在螺纹轴上,所述中空套管穿入螺纹轴内且中空套管的一端固定在堵头上、其另一端设有用于固定堵头的旋紧件,所述旋紧件螺纹连接在螺纹轴上;The ship-based inflatable pipeline leak stopper includes a threaded shaft provided with threads in the radial direction, a plug installed on the threaded shaft in sequence, a hollow sleeve and a pipeline connection mechanism, and one end of the pipeline connection mechanism can be freely clamped Connected to the pipeline, the other end of which is threaded on the threaded shaft, the hollow sleeve penetrates into the threaded shaft and one end of the hollow sleeve is fixed on the plug, and the other end is provided with a screw for fixing the plug , the tightening member is threaded on the threaded shaft;

所述堵头包括充气管、n个气囊、n+1个圆形夹板,所述圆形夹板依次同轴安装在螺纹轴上且在每两个相邻的圆形夹板之间安装有一个所述气囊,所述充气管的一端安装有充气球阀、其另一端分别穿过各圆形夹板的壳体后与各气囊相连通,其中n为≥1的整数。The plug includes an inflatable tube, n airbags, and n+1 circular splints, and the circular splints are coaxially mounted on the threaded shaft in turn, and one of the circular splints is installed between every two adjacent circular splints. In the airbag, one end of the inflation tube is equipped with an inflatable ball valve, and the other end of the inflation tube passes through the housing of each circular splint and communicates with each airbag, wherein n is an integer ≥ 1.

上述方案中,用于实现将整个管道堵漏器与待封堵管道进行连接的所述管道连接机构,包括定位面板和2个以上均匀分布在定位面板侧部的连接杆,所述定位面板通过紧固件可滑动连接在螺纹轴上且定位面板的横截面积大于堵头的横截面积,所述连接杆的一端通过铰链铰接在定位面板的侧壁、其另一端设有用以连接管道的卡钩。In the above solution, the pipeline connection mechanism for connecting the entire pipeline leak stopper with the pipeline to be blocked includes a positioning panel and more than two connecting rods evenly distributed on the sides of the positioning panel, and the positioning panel passes through The fastener can be slidably connected on the threaded shaft and the cross-sectional area of the positioning panel is greater than that of the plug. One end of the connecting rod is hinged on the side wall of the positioning panel through a hinge, and the other end is provided with a hole for connecting the pipeline. hook.

上述方案中,用于将定位面板定位在螺纹轴上的所述紧固件,包括第二连接套管,第二连接套管穿入螺纹轴内且在第二连接套管上垂直安装有所述定位面板,在第二连接套管的两端各固定有一拧紧螺母,所述拧紧螺母螺纹连接在螺纹轴上。In the above solution, the fastener for positioning the positioning panel on the threaded shaft includes a second connecting sleeve, the second connecting sleeve penetrates into the threaded shaft and is installed vertically on the second connecting sleeve. For the positioning panel, a tightening nut is respectively fixed at both ends of the second connecting sleeve, and the tightening nut is threadedly connected to the threaded shaft.

上述方案中,为了进一步增强定位面板与管道连接的可靠性,可在定位面板与第二连接套管之间至少连接有3个支撑板,各支撑板的一端固定在定位面板上、其另一端固定在第二连接套管上。In the above scheme, in order to further enhance the reliability of the connection between the positioning panel and the pipeline, at least three support plates can be connected between the positioning panel and the second connecting sleeve, one end of each support plate is fixed on the positioning panel, and the other end fixed on the second connecting sleeve.

上述方案中,所述旋紧件可包括第一连接套管和两个旋转把手,第一连接套管穿入螺纹轴内且在第一连接套管的两端各安装有一拧紧螺母,所述拧紧螺母与螺纹轴螺纹连接,两个旋转把手分别对称设在螺纹轴的两侧并固定在第一连接套管的侧壁上。In the above scheme, the tightening member may include a first connecting sleeve and two rotating handles, the first connecting sleeve penetrates into the threaded shaft and a tightening nut is respectively installed at both ends of the first connecting sleeve, the The tightening nut is threadedly connected with the threaded shaft, and two rotating handles are arranged symmetrically on both sides of the threaded shaft and fixed on the side wall of the first connecting sleeve.

本实用新型的有益效果为:The beneficial effects of the utility model are:

1)本实用新型通过主要由充气管、充气球阀、n个气囊、n+1个圆形夹板构成的堵头,在封堵管道时,通过推动中空套管对堵头进行挤压并通过旋转件固定堵头,所述气囊充气后立刻充盈且在圆形夹板的挤压作用下无缝贴合与各圆形夹板之间的间隙以及圆形夹板与管道侧壁之间的间隙,封堵效果好,具有结构简单、操作方便、实用性强的特点;1) The utility model uses a plug mainly composed of an inflatable tube, an inflatable ball valve, n airbags, and n+1 circular splints. When blocking the pipeline, the plug is squeezed by pushing the hollow sleeve and rotated The airbag is filled immediately after being inflated and seamlessly fits the gap between each circular splint and the gap between the circular splint and the side wall of the pipe under the extrusion of the circular splint to seal The effect is good, and it has the characteristics of simple structure, convenient operation and strong practicability;

2)通过主要由可滑动连接在螺纹轴上的定位面板和2个以上均匀分布在定位面板侧部的连接杆构成的管道连接机构,在使用时,将堵头固定在管道内后,再将连接杆上的卡钩固定在管道上的法兰盘上,最后通过紧固件将定位面板固定在螺纹轴上,这样通过法兰盘对连接杆的拉紧实现二次封堵与固定,堵头被管道内的液体压力冲开的概率大大降低,封堵的可靠性和安全性大大提高,有益于推广。2) Through the pipeline connection mechanism mainly composed of a positioning panel slidably connected to the threaded shaft and more than two connecting rods evenly distributed on the side of the positioning panel, when in use, after the plug is fixed in the pipeline, the The hook on the connecting rod is fixed on the flange on the pipeline, and finally the positioning panel is fixed on the threaded shaft through the fastener, so that the second sealing and fixing can be realized by the tightening of the connecting rod by the flange. The probability that the head is flushed by the liquid pressure in the pipeline is greatly reduced, and the reliability and safety of the plugging are greatly improved, which is beneficial to popularization.

附图说明Description of drawings

图1为基于船舶的气胀式管道堵漏器的结构示意图。Fig. 1 is a structural schematic diagram of an inflatable pipeline leak stopper based on a ship.

图2为图1中圆形面板的A-A侧视结构示意图。Fig. 2 is a schematic structural diagram of the A-A side view of the circular panel in Fig. 1 .

图3为管道连接机构的结构示意图。Fig. 3 is a structural schematic diagram of the pipeline connection mechanism.

图4为堵头的结构示意图。Figure 4 is a schematic structural view of the plug.

图中标号为:1、螺纹轴,2、定位面板,3、铰链,4、堵头,4-1、圆形夹板,4-2、气囊,5、旋转把手,6、中空套管,7、第一连接套管,8、第二连接套管,9、连接杆,10、固定螺母,11、拧紧螺母,12、支撑板,13、法兰盘,14、管道,15、充气管,16、充气球阀。The labels in the figure are: 1, threaded shaft, 2, positioning panel, 3, hinge, 4, plug, 4-1, circular splint, 4-2, air bag, 5, rotating handle, 6, hollow sleeve, 7 , the first connecting sleeve, 8, the second connecting sleeve, 9, connecting rod, 10, fixing nut, 11, tightening nut, 12, support plate, 13, flange plate, 14, pipe, 15, inflatable tube, 16. Inflatable ball valve.

具体实施方式Detailed ways

如图1所示,基于船舶的气胀式管道堵漏器,包括沿径向设有螺纹的螺纹轴1和依次安装在螺纹轴1上的堵头4、中空套管6和管道连接机构。所述管道连接机构的一端可自由卡接在管道14上、其另一端螺纹连接在螺纹轴1上。所述中空套管6穿入螺纹轴1内且中空套管6的一端固定在堵头4上、其另一端设有用于固定堵头4的旋紧件。所述旋紧件螺纹连接在螺纹轴1上。具体地,所述旋紧件包括第一连接套管7和两个旋转把手5,第一连接套管7穿入螺纹轴1内且在第一连接套管7的两端各安装有一拧紧螺母11,所述拧紧螺母11与螺纹轴1螺纹连接。两个旋转把手5分别对称设在螺纹轴1的两侧并固定在第一连接套管7的侧壁上。所设置的两个旋转把手5起到省力、便于操作、提高两个拧紧螺母11的拧紧效率的作用,在使用时也在不安装旋转把手5的情况,仅通过第一连接套管7和两个拧紧螺母11也可完成。As shown in FIG. 1 , the ship-based inflatable pipeline leak stopper includes a threaded shaft 1 provided with threads in the radial direction, a plug 4 , a hollow sleeve 6 and a pipeline connection mechanism sequentially installed on the threaded shaft 1 . One end of the pipeline connection mechanism can be freely clamped on the pipeline 14 , and the other end is screwed on the threaded shaft 1 . The hollow sleeve 6 penetrates into the threaded shaft 1 and one end of the hollow sleeve 6 is fixed on the plug 4 , and the other end is provided with a screw for fixing the plug 4 . The tightening member is screwed on the threaded shaft 1 . Specifically, the tightening member includes a first connecting sleeve 7 and two rotating handles 5, the first connecting sleeve 7 penetrates into the threaded shaft 1 and a tightening nut is respectively installed at both ends of the first connecting sleeve 7 11. The tightening nut 11 is threadedly connected with the threaded shaft 1 . The two rotary handles 5 are respectively arranged symmetrically on both sides of the threaded shaft 1 and fixed on the side wall of the first connecting sleeve 7 . The two rotary handles 5 provided are labor-saving, easy to operate, and improve the tightening efficiency of the two tightening nuts 11. When in use, the rotary handles 5 are not installed, only through the first connecting sleeve 7 and the two. A tightening nut 11 can also be completed.

如图4所示,所述堵头4包括充气管15、n个气囊4-2、n+1个圆形夹板4-1,其中n为≥1的整数。本实施例中,所示n=2。所述圆形夹板4-1依次同轴安装在螺纹轴1上,在每两个相邻的圆形夹板4-1之间安装有一个所述气囊4-2。所述充气管15的一端安装有充气球阀16、其另一端分别穿过各圆形夹板4-1的壳体后与各气囊4-2相连通。各圆形夹板4-1和气囊4-2的中心均设有供螺纹轴1穿过的通孔,并通过固定螺母10安装在螺纹上。设有固定螺母10一侧的堵头4作为封堵端面,所示固定螺母10与中空套管6相对。各圆形夹板4-1的大小相一致,且比待封堵的管道14内径小0.1-0.5mm。为了加强堵头4的气密性,可在相邻的气囊4-2与圆形夹板4-1之间安装一圆形密封垫圈。As shown in FIG. 4 , the plug 4 includes an inflatable tube 15 , n airbags 4 - 2 , and n+1 circular splints 4 - 1 , wherein n is an integer ≥ 1. In this embodiment, n=2 as shown. The circular splints 4-1 are sequentially coaxially installed on the threaded shaft 1, and one air bag 4-2 is installed between every two adjacent circular splints 4-1. One end of the inflation tube 15 is equipped with an inflatable ball valve 16, and the other end thereof passes through the housings of the circular splints 4-1 respectively and communicates with the air bags 4-2. The center of each circular splint 4-1 and the air bag 4-2 is provided with a through hole for the threaded shaft 1 to pass through, and is mounted on the thread by a fixing nut 10 . The plug 4 on one side of the fixing nut 10 is provided as the plugging end face, and the fixing nut 10 shown is opposite to the hollow sleeve 6 . The size of each circular splint 4-1 is consistent, and is 0.1-0.5mm smaller than the inner diameter of the pipeline 14 to be blocked. In order to strengthen the airtightness of the plug 4, a circular sealing gasket can be installed between the adjacent air bag 4-2 and the circular splint 4-1.

如图2、图3所示,所述管道连接机构包括定位面板2和2个以上均匀分布在定位面板2侧部的连接杆9,本实施例中,所述连接杆9的数量为4。其中所述定位面板2通过紧固件可滑动连接在螺纹轴1上且定位面板2的横截面积大于堵头4的横截面积。进一步地,定位面板2具体可为圆形钢板、方形钢板等其他形状的面板。所述连接杆9的一端通过铰链3铰接在定位面板2的侧壁、其另一端设有用以连接管道14的卡钩。在定位面板2与第二连接套管8之间至少连接有3个支撑板12,本实施例中,所述支撑板12的数量为4,并以螺纹轴1为中心、呈十字形结构安装。各支撑板12的一端固定在定位面板2上、其另一端固定在第二连接套管8上。As shown in Fig. 2 and Fig. 3, the pipeline connection mechanism includes a positioning panel 2 and more than two connecting rods 9 evenly distributed on the sides of the positioning panel 2, and in this embodiment, the number of the connecting rods 9 is four. Wherein the positioning panel 2 is slidably connected to the threaded shaft 1 through fasteners, and the cross-sectional area of the positioning panel 2 is larger than that of the plug 4 . Further, the positioning panel 2 may specifically be a panel of other shapes such as a circular steel plate, a square steel plate, or the like. One end of the connecting rod 9 is hinged to the side wall of the positioning panel 2 through the hinge 3 , and the other end is provided with a hook for connecting the pipe 14 . At least three support plates 12 are connected between the positioning panel 2 and the second connection sleeve 8. In this embodiment, the number of support plates 12 is four, and they are installed in a cross-shaped structure with the threaded shaft 1 as the center. . One end of each support plate 12 is fixed on the positioning panel 2 , and the other end is fixed on the second connecting sleeve 8 .

所述紧固件包括第二连接套管8。第二连接套管8穿入螺纹轴1内且在第二连接套管8上垂直安装有所述定位面板2,在第二连接套管8的两端各固定有一拧紧螺母11,所述拧紧螺母11螺纹连接在螺纹轴1上。The fastener comprises a second connecting sleeve 8 . The second connection sleeve 8 penetrates into the threaded shaft 1 and the positioning panel 2 is vertically installed on the second connection sleeve 8, and a tightening nut 11 is respectively fixed at both ends of the second connection sleeve 8, and the tightening The nut 11 is screwed on the threaded shaft 1 .

如图1所示,本实用新型在工作时:As shown in Figure 1, the utility model when working:

1)将堵头4伸入管道14内,;1) Extend the plug 4 into the pipeline 14;

2)然后推动中空套管6使堵头4移动至合适位置后,转动旋转把手5,带动与旋转把手5相连接的拧紧螺母11,拧紧螺母11在螺纹轴1上螺纹旋转,推动中空套管6向前挤压堵头4上的圆形夹板4-1,同时通过充气球阀16向气囊4-2内充气,设在圆形夹板4-1之间的气囊4-2受到圆形夹板4-1的挤压后向有空隙的空间延伸、膨胀,填充圆形夹板4-1之间的间隙和管道14之间的缝隙,形成一道道气密性良好的封堵墙顶住管道14内的液体,最后通过拧紧螺母11固定堵头4;2) Then push the hollow sleeve 6 to move the plug 4 to a proper position, turn the rotary handle 5 to drive the tightening nut 11 connected to the rotary handle 5, and the tightening nut 11 is screwed on the threaded shaft 1 to push the hollow sleeve 6 Squeeze the circular splint 4-1 on the plug 4 forward, and at the same time inflate the air bag 4-2 through the inflatable ball valve 16, and the air bag 4-2 between the circular splints 4-1 is received by the circular splint 4 -1 stretches and expands to the space with gaps after being squeezed, filling the gap between the circular splints 4-1 and the gap between the pipes 14, forming a series of sealing walls with good airtightness against the inside of the pipe 14 liquid, and finally fix the plug 4 by tightening the nut 11;

3)将连接杆9上的卡钩勾在管道14上固定有的法兰盘13上,拧紧第二连接套管8上的拧紧件即可固定定位面板2,即可完成封堵操作。3) Hook the hook on the connecting rod 9 on the fixed flange 13 on the pipe 14, and tighten the screw on the second connecting sleeve 8 to fix the positioning panel 2 and complete the plugging operation.

本实用新型通过带气囊4-2结构的堵头4以及中空套管6、旋转件实现管道14的一次封堵,通过定位面板2、连接杆9和紧固件实现管道14的二次封堵;同时管道14内的液体压力作用在堵头4上形成管内压力,有将堵头4有推出管道14的趋势,而将连接杆9上的卡钩与法兰盘13盘勾紧,使其与管内压力形成反向的作用力,组成一对平衡力,大大提高了封堵的可靠性和封堵安全性。The utility model realizes the primary sealing of the pipeline 14 through the plug 4 with the structure of the air bag 4-2, the hollow sleeve 6 and the rotating part, and realizes the secondary sealing of the pipeline 14 through the positioning panel 2, the connecting rod 9 and the fastener ; Simultaneously, the liquid pressure in the pipeline 14 acts on the plug 4 to form the pressure in the pipe, and the plug 4 has a tendency to be pushed out of the pipeline 14, and the hook on the connecting rod 9 is tightly hooked with the flange 13 to make it It forms a reverse force with the pressure in the pipe, forming a pair of balanced forces, which greatly improves the reliability and safety of sealing.

以上仅为说明本实用新型的实施方式,并不用于限制本实用新型,对于本领域的技术人员来说,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above is only to illustrate the implementation of the utility model, and is not intended to limit the utility model. For those skilled in the art, any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the utility model , should be included within the protection scope of the present utility model.

Claims (4)

1.基于船舶的气胀式管道堵漏器,其特征在于:包括沿径向设有螺纹的螺纹轴(1)和依次安装在螺纹轴(1)上的堵头(4)、中空套管(6)和管道连接机构,所述中空套管(6)穿入螺纹轴(1)内且中空套管(6)的一端固定在堵头(4)上、其另一端设有用于固定堵头(4)的旋紧件,所述旋紧件螺纹连接在螺纹轴(1)上;1. The ship-based inflatable pipeline leakage stopper is characterized in that: it includes a threaded shaft (1) provided with threads in the radial direction, a plug (4) and a hollow casing sequentially installed on the threaded shaft (1) (6) and the pipeline connection mechanism, the hollow sleeve (6) penetrates into the threaded shaft (1) and one end of the hollow sleeve (6) is fixed on the plug (4), and the other end is provided with a plug for fixing the plug. A tightening part of the head (4), which is threaded on the threaded shaft (1); 所述堵头(4)包括充气管(15)、n个气囊(4-2)、n+1个圆形夹板(4-1),所述圆形夹板(4-1)依次同轴安装在螺纹轴(1)上且在每两个相邻的圆形夹板(4-1)之间安装有一个所述气囊(4-2),所述充气管(15)的一端安装有充气球阀(16)、其另一端分别穿过各圆形夹板(4-1)的壳体后与各气囊(4-2)相连通,其中n为≥1的整数;The plug (4) includes an inflation tube (15), n air bags (4-2), n+1 circular splints (4-1), and the circular splints (4-1) are installed coaxially in sequence On the threaded shaft (1) and between every two adjacent circular splints (4-1), an air bag (4-2) is installed, and an inflatable ball valve is installed at one end of the inflation tube (15) (16), the other end of which passes through the shells of each circular splint (4-1) and communicates with each air bag (4-2), wherein n is an integer ≥ 1; 所述管道连接机构包括定位面板(2)和2个以上均匀分布在定位面板(2)侧部的连接杆(9),所述定位面板(2)通过紧固件可滑动连接在螺纹轴(1)上且定位面板(2)的横截面积大于堵头(4)的横截面积,所述连接杆(9)的一端通过铰链(3)铰接在定位面板(2)的侧壁、其另一端设有用以连接管道(14)的卡钩。The pipeline connection mechanism includes a positioning panel (2) and more than two connecting rods (9) evenly distributed on the side of the positioning panel (2), and the positioning panel (2) is slidably connected to the threaded shaft ( 1) and the cross-sectional area of the positioning panel (2) is greater than the cross-sectional area of the plug (4), and one end of the connecting rod (9) is hinged on the side wall of the positioning panel (2) through a hinge (3), its The other end is provided with a hook for connecting the pipe (14). 2.根据权利要求1所述的基于船舶的气胀式管道堵漏器,其特征在于:所述紧固件包括第二连接套管(8),第二连接套管(8)穿入螺纹轴(1)内且在第二连接套管(8)上垂直安装有所述定位面板(2),在第二连接套管(8)的两端各固定有一拧紧螺母(11),所述拧紧螺母(11)螺纹连接在螺纹轴(1)上。2. The ship-based inflatable pipeline leak stopper according to claim 1, characterized in that: the fastener comprises a second connecting sleeve (8), and the second connecting sleeve (8) penetrates into the screw thread The positioning panel (2) is vertically installed in the shaft (1) and on the second connection sleeve (8), and a tightening nut (11) is respectively fixed at both ends of the second connection sleeve (8). The tightening nut (11) is threadedly connected on the threaded shaft (1). 3.根据权利要求1所述的基于船舶的气胀式管道堵漏器,其特征在于:在定位面板(2)与第二连接套管(8)之间至少连接有3个支撑板(12),各支撑板(12)的一端固定在定位面板(2)上、其另一端固定在第二连接套管(8)上。3. The ship-based inflatable pipeline leak stopper according to claim 1, characterized in that: at least three support plates (12) are connected between the positioning panel (2) and the second connecting sleeve (8) ), one end of each support plate (12) is fixed on the positioning panel (2), and the other end is fixed on the second connecting sleeve (8). 4.根据权利要求1所述的基于船舶的气胀式管道堵漏器,其特征在于:所述旋紧件包括第一连接套管(7)和两个旋转把手(5),第一连接套管(7)穿入螺纹轴(1)内且在第一连接套管(7)的两端各安装有一拧紧螺母(11),所述拧紧螺母(11)与螺纹轴(1)螺纹连接,两个旋转把手(5)分别对称设在螺纹轴(1)的两侧并固定在第一连接套管(7)的侧壁上。4. The ship-based inflatable pipeline leak stopper according to claim 1, characterized in that: the tightening member comprises a first connecting sleeve (7) and two rotating handles (5), the first connecting The sleeve (7) penetrates into the threaded shaft (1) and a tightening nut (11) is respectively installed at both ends of the first connecting sleeve (7), and the tightening nut (11) is threadedly connected with the threaded shaft (1) The two rotating handles (5) are symmetrically arranged on both sides of the threaded shaft (1) and fixed on the side wall of the first connecting sleeve (7).
CN201820207784.9U 2018-02-06 2018-02-06 Air heave type Combined joint based on ship Active CN207935619U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820207784.9U CN207935619U (en) 2018-02-06 2018-02-06 Air heave type Combined joint based on ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820207784.9U CN207935619U (en) 2018-02-06 2018-02-06 Air heave type Combined joint based on ship

Publications (1)

Publication Number Publication Date
CN207935619U true CN207935619U (en) 2018-10-02

Family

ID=63651586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820207784.9U Active CN207935619U (en) 2018-02-06 2018-02-06 Air heave type Combined joint based on ship

Country Status (1)

Country Link
CN (1) CN207935619U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108105523A (en) * 2018-02-06 2018-06-01 钦州学院 Air heave type Combined joint based on ship
CN114084304A (en) * 2022-01-10 2022-02-25 启东市新创船舶配件有限公司 Leakage blocking device for bulkhead of small and medium-sized ship

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108105523A (en) * 2018-02-06 2018-06-01 钦州学院 Air heave type Combined joint based on ship
CN108105523B (en) * 2018-02-06 2023-12-29 钦州学院 Inflatable pipeline plugging device based on ship
CN114084304A (en) * 2022-01-10 2022-02-25 启东市新创船舶配件有限公司 Leakage blocking device for bulkhead of small and medium-sized ship
CN114084304B (en) * 2022-01-10 2022-03-29 启东市新创船舶配件有限公司 Leakage blocking device for bulkhead of small and medium-sized ship

Similar Documents

Publication Publication Date Title
CN108105523B (en) Inflatable pipeline plugging device based on ship
CN102109080B (en) Inner plugging air bag for leakage of risk source pipeline and quick plugging method thereof
CN202001772U (en) Air bag for inner plugging for leakage of pipeline
CN207935619U (en) Air heave type Combined joint based on ship
CN207935618U (en) Ship submarine pipeline air heave type device for plugging
CN215951133U (en) Natural gas line leakage detection device
CN203519430U (en) Sealing device for water pressure test of gas cylinder in water jacket method
CN108087652A (en) Ship submarine pipeline air heave type device for plugging
CN104006263A (en) Leakage hole plugging tool and method
CN108105524A (en) Air heave type plugging pipelines instrument with pressure relief
CN207935617U (en) Combined joint based on ship
CN108105521B (en) Pipeline plugging device based on ship
CN207935622U (en) Air heave type plugging pipelines tool with pressure relief
CN102060151B (en) Risk source leakage self-adaption universal ferromagnetic plugging device and fast plugging method thereof
CN207935627U (en) Ship submarine pipeline device for plugging
CN108116632A (en) Air heave type device for plugging based on shipbreaking
CN104309820B (en) A kind of space station drinking water Long-term Storage Water case
CN207455049U (en) A kind of portable repairs repairing leakage of pipeline device
CN108061216B (en) Pipeline plugging tool with pressure relief structure
CN207935607U (en) Plugging pipelines tool with pressure relief
US20240125073A1 (en) Inflatable active packer
CN201281645Y (en) Airtight inspection device of sealed cabin under water
CN214579229U (en) Low-temperature liquid valve with leakage-proof function
CN108105526A (en) Ship submarine pipeline device for plugging
CN220948450U (en) Leakage blocking device for ship

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant