CN207782411U - Power supply system - Google Patents
Power supply system Download PDFInfo
- Publication number
- CN207782411U CN207782411U CN201820199286.4U CN201820199286U CN207782411U CN 207782411 U CN207782411 U CN 207782411U CN 201820199286 U CN201820199286 U CN 201820199286U CN 207782411 U CN207782411 U CN 207782411U
- Authority
- CN
- China
- Prior art keywords
- control
- power supply
- power
- supply system
- timesharing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012544 monitoring process Methods 0.000 claims description 13
- 238000004891 communication Methods 0.000 claims description 7
- 238000000034 method Methods 0.000 description 14
- 230000006870 function Effects 0.000 description 11
- 230000005540 biological transmission Effects 0.000 description 10
- 238000010586 diagram Methods 0.000 description 9
- 230000008569 process Effects 0.000 description 9
- 238000005070 sampling Methods 0.000 description 6
- 230000005611 electricity Effects 0.000 description 5
- 230000000694 effects Effects 0.000 description 3
- 230000004044 response Effects 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 230000005764 inhibitory process Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
- 238000013507 mapping Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 230000001960 triggered effect Effects 0.000 description 1
- 230000001755 vocal effect Effects 0.000 description 1
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The utility model discloses a kind of power supply systems, belong to power supply and distribution field.The power supply system includes:Uninterruptible power supply UPS, timesharing power supervisor and at least two load equipments;The input terminal of the UPS and mains-supplied network connection, the timesharing power supervisor are connect with the UPS and at least two load equipment respectively;The timesharing power supervisor is used for when the mains-supplied network has electric signal output, being electrically connected for the mains-supplied network and at least two load equipment is connected, when the mains-supplied network is without electric signal output, controls the UPS and the timesharing of at least two load equipment into horizontal electrical signal is exported.The utility model controls UPS at least two load equipments time sharing power supply by timesharing power supervisor, without for all load equipments continued power simultaneously.Improve the power supply flexibility of power supply system.
Description
Technical field
The utility model is related to power supply and distribution field, more particularly to a kind of power supply system.
Background technology
Security technique guarding system is can provide the crime prevention system of security service, such as the particular place for particular place
For self-help bank site, which is commonly equipped with uninterruptible power supply (English:Uninterruptible Power Supply;
Referred to as:UPS), which is used in the case where alternating current powers off, and is security technique guarding system continued power.
Currently, UPS can be separately connected with load equipment all in security technique guarding system, after alternating current power-off,
It is all load supplyings simultaneously.
But due to each power demands difference being supported on after alternating current powers off, and being continuously all load supplyings may
The load equipment for causing some power consumption larger causes the power supply heavier loads of UPS, therefore the power supply spirit of current power supply system
Activity is relatively low.
Utility model content
The utility model embodiment provides a kind of power supply system, can solve the power supply spirit of power supply system in the related technology
The relatively low problem of activity.The technical solution is as follows:
It is according to the present utility model in a first aspect, providing a kind of power supply system, the power supply system includes:
Uninterruptible power supply UPS, timesharing power supervisor and at least two load equipments;
The input terminal of the UPS and mains-supplied network connection, the timesharing power supervisor respectively with the UPS and institute
State the connection of at least two load equipments;
The timesharing power supervisor is used for when the mains-supplied network has electric signal output, and the alternating current is connected and supplies
Electric network is electrically connected at least two load equipment, when the mains-supplied network is without electric signal output, controls institute
UPS is stated to export the timesharing of at least two load equipment into horizontal electrical signal.
Optionally, the timesharing power supervisor includes:Controller and power control module,
The output end of the power control module and the controller and the UPS is separately connected, the power control
Module is also separately connected at least two load equipment, and the power control module is used for the control in the controller
Under, it controls whether to be powered each load equipment respectively.
Optionally, the power supply system further includes:
Bypass module, the bypass module are in parallel with the power control module.
Optionally, at least two load equipment is in parallel, is gone here and there between each load equipment and the power control module
It is associated with channel breaker.
Optionally, the timesharing power supervisor further includes:
Switch module, the UPS is by the switch module and the mains-supplied network connection, and the switch module is also
It is connect with the controller, the controller is used to control the break-make of the switch module.
Optionally, the switch module is contactor.
Optionally, the timesharing power supervisor further includes:
Input/output module, the input/output module are connect with the controller.
Optionally, the input/output module includes at least one of control panel, keyboard and control button.
Optionally, the power supply system further includes:Main breaker,
The input terminal of the main breaker and the mains-supplied network connection, the output end of the main breaker with it is described
The input terminal of UPS connects.
Optionally, the timesharing power supervisor includes:
It is switched with the concatenated control of the input terminal of the UPS, the control switch is for controlling the mains-supplied network
The break-make of circuit between the input terminal of the UPS;
And/or the timesharing power supervisor includes:It connects one to one at least at least two load equipment
Two control switches, at least two control switch are also connect with the power control module respectively, and each control is opened
Close the break-make for controlling circuit between corresponding load equipment and the power control module.
Optionally, the control switch is dry contact.
Optionally, the power supply system further includes:
Host is controlled, the control host is electrically connected with the timesharing power supervisor, and the control host is for controlling
The break-make of circuit between the timesharing power supervisor and the UPS, and/or, for controlling the UPS and the mains-supplied
The break-make of circuit between network, and/or, for controlling between the timesharing power supervisor and at least two load equipment
The break-make of circuit.
Optionally, at least a pair of of dry contact circuit is set between the control host and the timesharing power supervisor, often
Include incoming line and outlet line, at least a pair of dry contact circuit and the timesharing power supervisor to dry contact circuit
At least one of dry contact correspond, each pair of dry contact circuit is used to control the break-make of corresponding dry contact.
Optionally, the power supply system further includes:
Central platform, the timesharing power supervisor have network interface, the central platform and the timesharing power supervisor
There are communication connection, the central platform to be used to carry out remote control to the timesharing power supervisor by network interface foundation.
Optionally, it is provided with manual cut-off button on the central platform.
Optionally, the power supply system is security protection power supply system, and at least two load equipment includes:
Video monitoring equipment, warning device and access control equipment.
The advantageous effect brought of technical solution that the utility model embodiment provides is:
A kind of power supply system that the utility model embodiment provides, by setting timesharing power supervisor and UPS and extremely
Few two load equipments connection so that when mains-supplied network has electric signal output, conducting mains-supplied network and at least two
The electrical connection of a load equipment, when mains-supplied network is without electric signal output, which can control UPS pairs
At least two load equipment into horizontal electrical signal timesharing export, without for all load equipments simultaneously continued power.It improves
The power supply flexibility of power supply system.
Description of the drawings
It is required in being described below to embodiment in order to illustrate more clearly of the technical scheme in the embodiment of the utility model
Attached drawing to be used is briefly described, it should be apparent that, the accompanying drawings in the following description is only some realities of the utility model
Example is applied, it for those of ordinary skill in the art, without creative efforts, can also be according to these attached drawings
Obtain other attached drawings.
Fig. 1 is a kind of structural schematic diagram for power supply system that the utility model embodiment provides;
Fig. 2A is the structural schematic diagram for another power supply system that the utility model embodiment provides;
Fig. 2 B are the structural schematic diagrams for another power supply system that the utility model embodiment provides;
Fig. 2 C are the structural schematic diagrams for another power supply system that the utility model embodiment provides;
Fig. 2 D are the structural schematic diagrams for another power supply system that the utility model embodiment provides;
Fig. 2 E are the structural schematic diagrams for another power supply system that the utility model embodiment provides;
Fig. 2 F are the structural schematic diagrams for another power supply system that the utility model embodiment provides.
Through the above attached drawings, it has been shown that the specific embodiment of the utility model will be hereinafter described in more detail.These
Attached drawing and verbal description are not intended to limit the range of the utility model design in any manner, but by reference to specific
Embodiment is the concept that those skilled in the art illustrate the utility model.
Specific implementation mode
In order to keep the purpose of this utility model, technical solution and advantage clearer, below in conjunction with attached drawing to this practicality
It is novel to be described in further detail.
As shown in Figure 1, the utility model embodiment provides a kind of power supply system 10, which can be that city is handed over
Logical power supply system, domestic power system or security protection power supply system etc., which includes:
UPS11, timesharing power supervisor (also referred to as tdm controller) 12 and at least two load equipments 13.
The input terminal of UPS11 and mains-supplied network connection, timesharing power supervisor 12 respectively with UPS11 and at least two
Load equipment 13 connects.The electric signal of the mains-supplied network usually 220 volts of (V) voltage of output.
UPS generally includes voltage-stablizer and filter, can be off-line UPS, on line type UPS or Line interaction
UPS etc., current UPS are mainly divided into two kinds according to the connection relation with accumulator, and one is the UPS of internal battery, separately
One is the UPS of outer even accumulator, Fig. 1 is illustrated so that UPS11 is the UPS of internal battery as an example, and the utility model is implemented
Example is not defined the type of UPS11;The load equipment is that can consume component or equipment of power etc., this practicality
New embodiment is not limited herein.
As shown in Figure 1, when mains-supplied network has electric signal output, which passes through UPS11 and timesharing power supply pipe
Reason device 12 is exported at least two load equipments 13, and UPS11 can ensure mains-supplied while charging to accumulator
The stabilization for the electric signal that network is inputted to load equipment 13;When mains-supplied network is without electric signal output, which can lead to
Battery discharging is crossed, under the control of timesharing power supervisor 12, electric signal is exported at least two load equipment 13, ensures
The normal operation of at least two load equipment 13.
Wherein, which can be the equipment with time-sharing function, for monitoring mains-supplied
Network, when mains-supplied network has electric signal output, conducting mains-supplied network is electrically connected at least two load equipments 13
It connects, when mains-supplied network is without electric signal output, timesharing of UPS11 pairs of at least two load equipments 13 of control into horizontal electrical signal
Output.
It should be noted that timesharing power supervisor 12 usually by monitor mains-supplied network signal output terminal with
Determine whether the mains-supplied network has electric signal output, in actual implementation, due to input terminal and the mains-supplied network of UPS11
Signal output terminal connection, timesharing power supervisor 12 can also monitor the input terminal of UPS11, to determine the mains-supplied net
Whether network has electric signal output, the utility model embodiment not to limit this.
In conclusion the power supply system that the utility model embodiment provides, by be arranged timesharing power supervisor and UPS with
And at least two load equipment connection so that when mains-supplied network has electric signal output, conducting mains-supplied network with extremely
The electrical connection of few two load equipments, when mains-supplied network is without electric signal output, which can control
UPS at least two load equipment into horizontal electrical signal timesharing export, without for all load equipments simultaneously continued power.
Improve the power supply flexibility of power supply system.
In existing security protection power supply system, when mains-supplied network is without electric signal output, which can be each load
Equipment continued power, and the power supply needs to meet the power demands of all load equipments after a loss of power, that is to say, needs for gate inhibition
Also it is video monitoring equipment and the equal continued power of warning device 48 hours while equipment continued power 48 hours.It needs in this way
It is equipped with a fairly large number of accumulator for UPS, leads to the power supply heavier loads of UPS.
And the security protection power supply system that the utility model embodiment is provided sets each load using timesharing power supervisor
Electric signal is exported when back-up.Such as when mains-supplied network is without electric signal output, under the control of timesharing manager, UPS can
To be that each load equipment is powered simultaneously first, after for video monitoring equipment continued power 2 hours, timesharing power supervisor control
UPS processed stops powering to the video monitoring equipment;After for warning device continued power 8 hours, the control of timesharing power supervisor
UPS stops powering to the warning device;After for access control equipment continued power 48 hours, timesharing power supervisor control UPS stops
Only power to the access control equipment.The security protection power supply system that the utility model embodiment is provided is powered compared to existing security protection
System, reduce the quantity of required accumulator, reduce UPS for electric loading, improve the power supply flexibility of security protection power supply system.
Optionally, as shown in Figure 2 A, the utility model embodiment shows the structural schematic diagram of another power supply system 10,
Wherein, timesharing power supervisor 12 includes:Controller 121 and power control module 122,
Power control module 122 and the output end of controller 121 and UPS11 are separately connected, and power control module 122 is also
It is separately connected at least two load equipments 13, power control module 122 is used under the control of controller 121, is controlled respectively
Whether each load equipment 13 is powered.
When mains-supplied network has electric signal output, mains-supplied network can be transmitted by UPS11 to controller 121
Electric signal, for 121 normal operation of controller;When mains-supplied network is without electric signal output, UPS11 can be to controller
Electric signal in 121 transmission accumulators, for 121 normal operation of controller.In actual implementation, timesharing power supervisor 12 also wraps
It includes:Power supply module (is not shown) in Fig. 2A, which connect with the output end of UPS11 and controller 121 respectively, is used for
The electric signal of UPS11 outputs is handled, to provide the electric signal for adapting to the controller 121 to controller 121.The power supply
Module can be rectification circuit.
In the utility model embodiment, controller 121 can control the input terminal of UPS11, can also be right
The output end of UPS11 is controlled, Tu2AZhong, and controller 121 carries out the output end of UPS11 by power control module 122
Control.As shown in Figure 2 A, power control module 122 can be separately connected at least two load equipments 13, power control module
122 have at least two control terminals to connect one to one at least two load equipments 13, as shown in Figure 2 A, control terminal y1,
Y2 to yn corresponds a1, a2 to an at least two load equipments 13, and wherein n can be the number of load equipment 13, and n is
Integer more than 1, power control module 122 are used under the control of controller 121, are controlled whether respectively to each load equipment
13 are powered, i.e., controller 121 controls whether to be powered load equipment a1 by controlling control terminal y1, passes through control
Control terminal y2, which controls whether to be powered load equipment a2, ... is controlled whether by controlling control terminal yn to load equipment
An is powered.Optionally, the load control parameter of at least two load equipment 13 can be provided in the controller 121,
All control terminals of power control module 122 are controlled based on the load control parameter.It is defeated without electric signal in mains-supplied network
When going out, UPS first passes through power control module simultaneously to all load equipment transmission telecommunications numbers, and electricity is being transmitted to each load equipment
After the duration of signal reaches energization duration threshold value corresponding with the load equipment, controller disconnects power control module
In, the connection between load equipment and the control terminal of the load equipment, until in controller disconnection power control module, owning
Connection between load equipment and its one-to-one control terminal.In practical applications, the power control module normal operation institute
The current value needed can be 30 amperes (A), and the utility model embodiment is not limited herein.
Optionally, power control module 122 may include being passed at least two load equipments one-to-one at least two
The output end of defeated circuit, each transmission line one end and UPS connect, and the other end is connected with corresponding load equipment, this at least two
It is above-mentioned control terminal y1, y2 with load equipment connecting pin in a transmission line to yn, a control is provided on each transmission line
System switch, controller 121 can control each control and switch on-off, control whether to supply load equipment to realize
Electricity.
In the utility model embodiment, which may include a timer, which can beat for electromagnetism
Point timer or spark timer can configure each load in a timer in advance according to load control parameter
The energization duration threshold value of equipment;Alternatively, the controller may include at least two timers, at least two timer with
At least two load equipments correspond, and can be pre-configured in each timer according to load control parameter corresponding negative
The energization duration threshold value of equipment is carried, in actual implementation, above-mentioned timer can directly store energization duration threshold value,
The memory for specially storing the energization duration threshold value can be connected, the utility model embodiment does not limit this.To
Up to a load equipment energization duration threshold value when, timer to power control module 122 export control signal (such as to
Control switch output instruction on corresponding transmission line carries out the control signal of switch disconnection, which can be that level is believed
Number or dry contact signal etc.), stop being powered the load equipment by the power control module 122 control.
Further, as shown in Figure 2 B, power supply system 10 shown in Fig. 2 B in fig. 2 shown in power supply system 10
On the basis of be added to other structures, please refer to Fig.2 B, Fig. 2 B provide a kind of controller 121 can to the input terminal of UPS11 into
The mode of row control, timesharing power supervisor 12 can also include switch module 123 at this time, which passes through switch module 123
With mains-supplied network connection, switch module 123 is also connect with controller 121, and controller 121 can be used for controlling switch module
123 break-make, and then whether the electric signal for controlling mains-supplied network inputs UPS11.
Optionally, switch module is the module with switching function, for example, the switch module can be contactor, contact
Device is a kind of electromagnetic switch electric appliance, exemplary, and contactor may include coil and contact, its working principle is that:Utilize coil
The current induced magnetic field flowed through, makes contact closure, and the size of the electric current is no more than the load current value of the contactor, exemplary,
The load current value can be 40A.Then when mains-supplied network provides electric current, the contactor is due to magnetic field caused by electric current
It is closed, the conducting for keeping circuit between mains-supplied network and UPS can be continued.Certainly, which can also pass through control
The break-make of contactor controls whether the electric signal of mains-supplied network inputs UPS11.
In addition, since controller is not with mains-supplied direct network connection, and controller needs to have based on mains-supplied network
No electric signal output controls UPS, and therefore, controller needs to monitor whether mains-supplied network has electric signal output.
In the utility model embodiment, the mode of controller monitoring mains-supplied network can there are many, for example, can be in mains-supplied
Monitoring module is set between network and the input terminal of UPS, the monitoring module is for monitoring whether mains-supplied network has electric signal
Output, and to controller output monitoring as a result, the controller can control the output end of UPS based on monitored results, again
For example, when switch module is contactor, controller can detect whether mains-supplied network has electric signal by contactor
Output.Optionally, the knot that controller can be sampled into horizontal electrical signal to the output end of contactor, and be sampled according to the electric signal
Fruit determines that mains-supplied network whether there is electric signal.It is exemplary, when controller collects electric signal in the output end of contactor
When, it may be determined that there are electric signals for mains-supplied network at this time;When controller does not acquire electric signal in the output end of contactor
When, it may be determined that electric signal is not present in mains-supplied network at this time.
Further, it whether there is electric signal to ensure to more accurately determine mains-supplied network, controller can be with
Periodic electric signal sampling is carried out to the output end of contactor;When not sampling electric signal in the continuous t sampling period, really
Determine mains-supplied network and electric signal is not present, t is the integer more than 1.Exemplary, the sampling period is 20 milliseconds, t=3.When in office
When one sampling period sampled electric signal, determine that there are electric signals for mains-supplied network.
Further, as shown in Figure 2 B, at least two load equipments a1, the a2 to an is in parallel, and respectively with power control
Control terminal y1, y2 of module 122 is in series with channel breaker to yn connections between each load equipment and power control module
(channel breaker t1, channel breaker t2 shown in Fig. 2 B to channel breaker tn, wherein n correspond to the number of load equipment,
N is the integer more than 1).
The channel breaker can be that recloser may be manual switchgroup.It is exemplary, when channel open circuit
When device is recloser, which can be the switching device with specified function, for example, the specified function can
Think and overcurrent protection is carried out to load equipment connected to it.In the electric current transmitted to the load equipment being connect with channel breaker
Size be more than the channel breaker load current value (load current value can be the channel breaker default setting electricity
Flow valuve or the current threshold of later stage configuration) when, channel breaker can disconnect circuit where it, connected to it to protect
Load equipment, the usual load current value are less than or equal to the maximum current value that the load equipment can bear.
Using control terminal y1, channel the breaker t1 and load equipment a1 in Fig. 2 B, (such as load equipment a1 is security protection
Video monitoring equipment in power supply system) for, it is assumed that the maximum current value that load equipment a1 can bear is 10A, the channel
The load current value of breaker t1 could be provided as 10A.When the electric current of 12A is transmitted to channel breaker t1 by control terminal y1
When, channel breaker t1 then will disconnect the circuit where t1, and preventing the electric current of the 12A to be transmitted to load equipment a1 causes load to set
Standby a1 is damaged.Channel breaker t1 realizes the overcurrent protection to load equipment a1.Certainly, the load of distinct device type
The maximum current value that equipment can bear is different, exemplary, the smaller load equipment of equipment energy consumption (such as in security protection power supply system
Warning device and access control equipment) maximum current value that can bear is also relatively small, such as the warning device and access control equipment
The maximum current value that can bear is 6A.
Please continue to refer to Fig. 2 B, timesharing power supervisor 12 can also include input/output module 124, input/output module
124 connect with controller 121.Operating personnel can control controller 121 by the input/output module 124, such as pass through
The controller controls whether to be powered each load equipment, and operating personnel can also be matched by the input/output module 124
Set or change the related data in controller 121, for example, configure or change above-mentioned load control parameter, energization duration and/
Or mapping table etc..The input/output module 124 can be various structures, such as its may include control panel, keyboard and
At least one of control button, can also be including click wheel etc., wherein control button can be manual cut-off button.
When mains-supplied network is without electric signal output, i.e., when mains-supplied network stops power supply, which can also export
Alarm signal, to prompt related personnel to handle.
Optionally, above-mentioned power supply system can also include:Bypass module, the bypass module are in parallel with power control module.
The output end of bypass module is connect at least two load equipments.The bypass module can be in power control module non-normal working
When, bypassed so that at least two load equipment can continue working, improve the reliability of power supply system.The bypass mould
Block is usually by-pass switch, and when power control module works normally, by-pass switch disconnects, and circuit disconnects where by-pass switch,
In power control module non-normal working, by-pass switch is closed, line conduction where by-pass switch, and power control module is other
The electric signal on road, UPS outputs is transmitted at least two load equipments by the by-pass switch of closure, can continue working.
Optionally, bypass module can also be in parallel with the other structures in power supply system, for improper in other structures
When work, other structures are bypassed, detailed process refers to the above process.The utility model embodiment is not limited herein.
Optionally, in order to protect the power supply safety of power supply system 10, as shown in Figure 2 C, power supply system 10 can also include total
Breaker 17.
The input terminal of main breaker 17 and mains-supplied network connection, output end and the timesharing power management of main breaker 17
The input terminal of the UPS11 of device 12 connects.Similar with channel breaker shown in Fig. 2 B, which can be to open automatically
It may be manual switchgroup to close device.Exemplary, when main breaker 17 is recloser, which can
Think the switching device with specific function, such as the specified function is that can carry out overcurrent protection to power supply system 10.To
When the size of the electric current for the power supply system transmission being connect with main breaker is more than the load current value of the main breaker, main breaker
Circuit where it can be disconnected, to protect power supply system connected to it.In practical application, the load current value of the main breaker
Can be 25A.It should be noted that when main breaker is arranged between mains-supplied network and UPS, timesharing power supervisor can
To determine whether mains-supplied network has electric signal output by monitoring the state of main breaker, when main breaker disconnects,
Mains-supplied network can be determined without electric signal output, when main breaker is connected, it may be determined that mains-supplied network has telecommunications
Number output.
Optionally, above-mentioned power supply system can also realize two kinds of communication control modes, respectively short distance control mode and
Remote controlled manner is individually below introduced two kinds of communication control modes.
For short distance control mode, as shown in Figure 2 D, power supply system 10 further include control host 15, control host 15 with
Timesharing power supervisor 12 is electrically connected, and control host 15 is used to control the logical of circuit between timesharing power supervisor 12 and UPS11
It is disconnected, and/or, the break-make for controlling circuit between UPS11 and mains-supplied network, and/or, for controlling timesharing power management
The break-make of circuit between device 12 and at least two load equipments 13.Fig. 2 D schematically assume the knot of timesharing power supervisor 12
Structure.As shown in Figure 2 D, i.e., the timesharing power supervisor 12 includes controller 121 and power control module 122.Controlling host 15 can
To control the break-make (break-make of circuit between control UPS11 and mains-supplied network) of the incoming line of UPS, and/or, control
The break-make of the outlet line of UPS (controls the break-make of circuit between timesharing power supervisor 12 and UPS11, alternatively, control timesharing
The break-make of circuit between power supervisor 12 and at least two load equipments 13).The utility model embodiment is with following two feelings
It is illustrated for condition:
The first situation, the break-make for controlling UPS incoming lines.
Optionally, timesharing power supervisor includes being switched with the concatenated control of the input terminal of UPS, and control switch is for controlling
The break-make of circuit between mains-supplied network and the input terminal of UPS.Control host can be switched on-off by controlling control, be come
The break-make of the incoming line of timesharing power supervisor is controlled, and then whether the electric signal for controlling mains-supplied network inputs timesharing electricity
Source manager.
Exemplary, as shown in Figure 2 D, timesharing power supervisor 12 includes being switched with the concatenated controls of the input terminal z1 of UPS11
S1, control switch s1 are arranged between mains-supplied network and the input terminal z1 of UPS11, and control host 15 is by controlling
The break-make of switch s1, come control UPS11 input terminal z1 break-make, and then control mains-supplied network electric signal whether input
UPS11。
The second situation, control UPS outlet line break-make.
Optionally, timesharing power supervisor includes at least two controls to connect one to one at least two load equipments
Switch.Control host can control at least two control and switch on-off, to control the break-make of the outlet line of UPS, in turn
The break-make for the load equipment that control connects one to one at least two control switch.Optionally, which can divide
At least two control switch is not controlled, or controls at least two control switch simultaneously.
Certainly, timesharing power supervisor can also include the control switch being connected between UPS and power control module, control
Host processed can control the control and switch on-off, to control the break-make of the outlet line of UPS.
Exemplary, as shown in Figure 2 D, timesharing power supervisor 12 further includes one-to-one at least two load equipments
Control switch w1, w2 to wn (n corresponds to the number of load equipment 13, and n is the integer more than 1), control switch w1 is arranged in work(
Between the control terminal y1 load equipments corresponding with control terminal y1 of rate control module 122;Control switch w2 is arranged in power control
Between the control terminal y2 load equipments corresponding with control terminal y2 of molding block 122;... control switch wn is arranged in power control mould
Between the control terminal yn load equipments corresponding with control terminal yn of block 122.It controls host 15 and switch w1, w2 is controlled extremely by control
The break-make of wn controls the break-make of corresponding control terminal and the circuit of corresponding load equipment.
Optionally, above-mentioned control switch can be dry contact, and dry contact is a kind of passive electric switch, have disconnect and
Two states are connected.Exemplary, control host can be by sending dry contact signal (also referred to as switching value to timesharing power supervisor
Signal) come realize above-mentioned two situations circuit control.Dry contact signal includes that dry contact Continuity signal and dry contact disconnect letter
Number, for example, 0 represents dry contact Continuity signal, 1 represents dry contact cut-off signal.It controls between host and timesharing power supervisor
At least a pair of of dry contact circuit, at least a pair of of at least one of dry contact circuit and timesharing power supervisor stem grafting can be set
Point corresponds, and each pair of dry contact circuit is used to control the break-make of corresponding dry contact.Each pair of dry contact circuit includes input line
Road and outlet line, the incoming line are used to send dry contact signal, the output line to timesharing power supervisor for control host
Road is used to return to dry contact signal to control host for timesharing power supervisor.
It is exemplary, it is assumed that timesharing power supervisor includes the total n+1 control of control switch s1, control switch w1, w2 to wn
Switch, and this n+1 control switch is dry contact, then in order to effectively realize the control of dry contact, controls host and timesharing electricity
N+1 can be set between source manager to dry contact circuit.To control the worked of corresponding a pair of of the dry contact circuits of switch w1
For journey, if control host needs to control control switch w1 unlatchings, the control host is by corresponding incoming line to timesharing
Power supervisor inputs dry contact Continuity signal 0;For timesharing power supervisor after receiving the dry contact Continuity signal, control should
It controls switch w1 to open, dry contact Continuity signal 0 is then exported to control host by outlet line, to be carried out to control host
Response, to inform that control host completes the unlatching of control switch w1, above-mentioned control control switch w1 is opened and is rung
The action answered can be completed by the controller in timesharing power supervisor.Other control the course of work of switch similarly, this practicality
It is novel that this is repeated no more.
It should be noted that input line of the timesharing power supervisor in addition to UPS can be controlled by above-mentioned two situations
Road, and/or, except the break-make of outlet line, when timesharing power supervisor include above-mentioned switch module, access breaker and/or
When main breaker etc. has the structure of switching function, which can also control this with switching function by controller
The break-make of structure controls the incoming line of UPS, and/or, the break-make of outlet line.Exemplary, which still can be with
Controller is controlled by dry contact signal, to control the corresponding structure with switching function by controller.
In practical application, which can be the control host with specified function, such as the control host can be with
For alarm host machine, which can send dry contact signal by the alarm signal received to timesharing power supervisor.
For remote controlled manner, as shown in Figure 2 E, power supply system 10 can also include central platform 16, timesharing power supply pipe
Managing device 12, there is network interface (being not shown in Fig. 2 E), central platform 16 to have communication link by network interface foundation with timesharing power supervisor 12
It connects, central platform 16 can be used to carry out remote control to timesharing power supervisor 12 with central platform.
In practical application, which can be one or more computer or one or more server, the center
Platform and timesharing power supervisor are established by network interface to be communicated to connect, and can transmit instruction between the two, which may include
Control instruction and inquiry instruction, the control instruction and inquiry instruction can be mutual to be based on transmission control protocol/internet
Join agreement (English:Transmission Control Protocol/Internet Protocol;Abbreviation:TCP/IP number)
It is transmitted according to the form of packet.
For example, the instruction transmitted between central platform and timesharing power supervisor instructs in order to control, then under a preset scenario
(such as the central platform receives alarm signal) central platform can send the number based on TCP/IP to timesharing power supervisor
According to packet, which can carry control instruction, after timesharing power supervisor receives the control instruction, can parse the control
Instruction, and the break-make of UPS incoming lines is controlled based on the control instruction after parsing and/or controls the break-make of UPS outlet lines.It should
Control process can refer to the process that above-mentioned control host controls timesharing power supervisor, that is to say above-mentioned short distance controlling party
The first situation and the second situation of formula.
For another example the instruction transmitted between central platform and timesharing power supervisor is inquiry instruction, then central platform can
To send the data packet based on TCP/IP to timesharing power supervisor, which can carry inquiry instruction, such as the inquiry
Instruction can be used for inquiring the break-make situation for each load equipment being connect with the timesharing power supervisor, can be used for inquiring
Whether the input terminal of timesharing power supervisor has electric signal, and the state that can be also used for reading each load equipment (such as powers on
State or non-power-up state;Alternatively, malfunction or non-faulting state), after timesharing power supervisor receives the inquiry instruction,
Query result is packaged into data packet and returns to central platform.
Further, it is assumed that the structure phase of the structure of timesharing power supervisor and timesharing power supervisor in Fig. 2 D in Fig. 2 E
Together, timesharing power supervisor 12 include with the concatenated control switch s1 of the input terminal z1 of UPS11, and/or, timesharing power supervisor
12 include controlling switch w1, w2 correspondingly at least two load equipments to wn, it is assumed that and above-mentioned control switch is dry contact,
Then timesharing power supervisor parses the control instruction, and based on parsing after the control instruction for receiving central platform transmission
Control instruction afterwards generates corresponding dry contact signal, to control corresponding dry contact.It is controlled accordingly to the dry contact
After system, timesharing power supervisor 12 can also generate control response instruction, and feed back to central platform.
It, should if central platform needs to control control switch s1 disconnections for controlling the corresponding courses of work of switch s1
Central platform sends the control instruction that indicating control switch s1 is disconnected by network to timesharing power supervisor;Timesharing power management
Device controls control switch w1 and disconnects after receiving the control instruction, if control switch w1 is dry contact, timesharing power supply pipe
Control instruction generation dry contact signal 0 can be based on by managing device, and be sent to control switch w1, to control its disconnection;Then timesharing
Power supervisor sends control response instruction by network to central platform, to be responded to central platform, in informing
Heart platform completes the disconnection of control switch w1, and above-mentioned control control switch w1 is disconnected and the action responded can be by dividing
When power supervisor in controller complete.Similarly, the utility model repeats no more this to the course of work of other control switches.
Optionally, manual cut-off button can be provided on central platform.It may be implemented pair by the manual cut-off button
Timesharing power supervisor manually controls, manual cut-off button can have it is multiple, for example, each manual cut-off button is for triggering
A kind of control instruction is generated, timesharing power supervisor is accurately controlled with realizing.In another example each manual cut-off button can be with
Corresponding one controls switch, is switched on-off for controlling corresponding control by control instruction come remote manual, with realization pair
Timesharing power supervisor accurately controls.
Optionally, warning device is also provided on central platform, such as the warning device is audible-visual annunciator etc.,
Central platform learns this when mains-supplied network is without electric signal output by the query result that timesharing power supervisor is sent,
The warning device can be triggered and send out alarm signal to prompt related personnel to handle.
Certainly, the structure of timesharing power supervisor can be not limited to the structure of timesharing power supervisor in above-mentioned Fig. 2 D,
Such as the timesharing power supervisor further includes above-mentioned switch module, access breaker and/or main breaker etc..Therefore, in timesharing
Power supervisor receive control instruction and disconnect UPS incoming line and outlet line method also there are many, detailed process
The method that above-mentioned offer can be referred to, the utility model embodiment are not limited herein.
Optionally, above-described embodiment is illustrated so that power supply system respectively includes control host and central platform as an example, real
When border is realized, power supply system can also include control host and central platform simultaneously, and the two course of work refers to above-described embodiment.
In actual implementation, control host can be established with central platform by network interface communication connection, and control host is used for
After receiving warning message, the corresponding alert levels of warning message are determined, when alert levels are more than preset alarm rank, to
Central platform sends alarm command.Optionally, control host can be connect with the load equipment of power supply system, which is
The warning message that load equipment is sent manually is triggering the triggering alternatively, can be provided with alarm trigger button on control host
After button, control host receives corresponding warning message.Above-mentioned warning message can be fire alarm information, earthquake alarm letter
Breath or robbery warning message etc., above-mentioned preset alarm rank can be by being manually set in control host.
Central platform is used for after receiving alarm command, and power-off control instruction, power-off are sent to timesharing power supervisor
Control instruction instruction disconnects the connection of the input terminal and mains-supplied network of UPS;Timesharing power supervisor is receiving the power-off
After control instruction, you can disconnect the connection of the input terminal and mains-supplied network of UPS, wherein disconnect the input terminal and alternating current of UPS
The process of the connection of supply network can refer to above-mentioned control switch s1 disconnection process, the utility model embodiment to this no longer
It repeats.
Certainly, above-mentioned control host can also directly control timesharing power supply when alert levels are more than preset alarm rank
Manager disconnects the connection of the input terminal and mains-supplied network of UPS, and control process refers to above-mentioned short distance control mode
In the first situation, the utility model embodiment repeats no more this.
The power supply system that the utility model embodiment provides can be controlled when alert levels are higher by central platform
UPS is disconnected with mains-supplied network, after avoiding mains-supplied network from breaking down, influences the normal operation of power supply system,
The reliability of power supply system is provided.
Optionally, Fig. 2 F show the structural schematic diagram for another power supply system 10 that the utility model embodiment provides.
The power supply system 10 includes:UPS11, timesharing power supervisor 12, at least two load equipments 13, main breaker 17, control master
Machine 15 and central platform 16, wherein timesharing power supervisor 12 includes controller 121, power control module 122, contactor
1231 and input/output module 124.Controller 121 can sample the output end of contactor 1231 into horizontal electrical signal, according to
Electric signal sampling as a result, determining that mains-supplied network whether there is electric signal.When mains-supplied network has electric signal output
When, which is exported by UPS11 and timesharing power supervisor 12 at least two load equipments 13;When mains-supplied network
When without electric signal output, controller 121 controls power control module 122 and divides into horizontal electrical signal at least two load equipments 13
When export.In addition, control host 15 can be communicated with timesharing power supervisor 12 by dry contact signal, central platform 16
It can be communicated by network signal with timesharing power supervisor 12, the description of other detailed processes can refer to above-mentioned Fig. 2A to figure
Content described in 2E, this will not be repeated here for the utility model embodiment.
In conclusion the power supply system that the utility model embodiment provides, by be arranged timesharing power supervisor and UPS with
And at least two load equipment connections, and the control host and central platform being separately connected with the timesharing power supervisor are set,
So that the control host and central platform can control outputting and inputting for the electric signal of timesharing power supervisor, supplied in alternating current
When electric network has electric signal output, conducting mains-supplied network is electrically connected at least two load equipments, in mains-supplied net
When network is without electric signal output, which can control UPS at least two load equipment into horizontal electrical signal
Timesharing export, without for all load equipments simultaneously continued power.Enhance the communication function of the power supply system and raising
The power supply flexibility of power supply system.Also, the utility model embodiment provide power supply system can by control host into
The short distance of row timesharing power supervisor controls, and the remote control of timesharing power supervisor is carried out by central platform, into
One step improves the power supply flexibility of power supply system.
Term "and/or" in the utility model, only a kind of incidence relation of description affiliated partner, indicates may exist
Three kinds of relationships, for example, A and/or B, can indicate:Individualism A exists simultaneously A and B, these three situations of individualism B.Separately
Outside, character "/" herein, it is a kind of relationship of "or" to typically represent forward-backward correlation object.
In the present invention, term " first ", " second ", " third " and " the 4th " is used for description purposes only, and cannot
It is interpreted as indicating or implying relative importance.Term " multiple " refers to two or more, unless otherwise restricted clearly.
One of ordinary skill in the art will appreciate that realize that the part steps of above-described embodiment can be completed by hardware,
Relevant hardware can also be instructed to complete by program, the program can be stored in a kind of computer readable storage medium
In, storage medium mentioned above can be read-only memory, disk or CD etc..
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all in this practicality
Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model
Within the scope of shield.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all in this practicality
Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model
Within the scope of shield.
Claims (16)
1. a kind of power supply system, which is characterized in that the power supply system includes:
Uninterruptible power supply UPS, timesharing power supervisor and at least two load equipments;
The input terminal of the UPS and mains-supplied network connection, the timesharing power supervisor respectively with the UPS and it is described extremely
Few two load equipments connection;
The timesharing power supervisor is used for when the mains-supplied network has electric signal output, and the mains-supplied net is connected
Network is electrically connected at least two load equipment, when the mains-supplied network is without electric signal output, controls the UPS
The timesharing of at least two load equipment into horizontal electrical signal is exported.
2. power supply system according to claim 1, which is characterized in that
The timesharing power supervisor includes:Controller and power control module,
The output end of the power control module and the controller and the UPS is separately connected, the power control module
Also it is separately connected at least two load equipment, the power control module is used under the control of the controller, point
It does not control whether to be powered each load equipment.
3. power supply system according to claim 2, which is characterized in that the power supply system further includes:
Bypass module, the bypass module are in parallel with the power control module.
4. power supply system according to claim 3, which is characterized in that
At least two load equipment is in parallel, and channel open circuit is in series between each load equipment and the power control module
Device.
5. power supply system according to claim 2, which is characterized in that the timesharing power supervisor further includes:
Switch module, the UPS by the switch module and the mains-supplied network connection, the switch module also with institute
Controller connection is stated, the controller is used to control the break-make of the switch module.
6. power supply system according to claim 5, which is characterized in that
The switch module is contactor.
7. power supply system according to claim 2, which is characterized in that the timesharing power supervisor further includes:
Input/output module, the input/output module are connect with the controller.
8. power supply system according to claim 7, which is characterized in that
The input/output module includes at least one of control panel, keyboard and control button.
9. power supply system according to claim 1, which is characterized in that the power supply system further includes:Main breaker,
The input terminal of the main breaker and the mains-supplied network connection, the output end of the main breaker and the UPS
Input terminal connection.
10. power supply system according to claim 2, which is characterized in that
The timesharing power supervisor includes:
It is switched with the concatenated control of the input terminal of the UPS, the control switch is for controlling the mains-supplied network and institute
State the break-make of circuit between the input terminal of UPS;
And/or the timesharing power supervisor includes:At least two to connect one to one at least two load equipment
Control switch, at least two control switch are also connect with the power control module respectively, and each control switch is used
In the break-make for controlling circuit between corresponding load equipment and the power control module.
11. power supply system according to claim 10, which is characterized in that
The control switch is dry contact.
12. power supply system according to claim 1, which is characterized in that the power supply system further includes:
Host is controlled, the control host is electrically connected with the timesharing power supervisor, and the control host is described for controlling
The break-make of circuit between timesharing power supervisor and the UPS, and/or, for controlling the UPS and the mains-supplied network
Between circuit break-make, and/or, for controlling circuit between the timesharing power supervisor and at least two load equipment
Break-make.
13. power supply system according to claim 12, which is characterized in that
At least a pair of of dry contact circuit, each pair of dry contact circuit are set between the control host and the timesharing power supervisor
Including incoming line and outlet line, at least a pair of of at least one of the dry contact circuit and the timesharing power supervisor
Dry contact corresponds, and each pair of dry contact circuit is used to control the break-make of corresponding dry contact.
14. power supply system according to claim 1, which is characterized in that the power supply system further includes:
There is network interface, the central platform to pass through with the timesharing power supervisor for central platform, the timesharing power supervisor
The network interface foundation has communication connection, the central platform to be used to carry out remote control to the timesharing power supervisor.
15. power supply system according to claim 14, which is characterized in that
Manual cut-off button is provided on the central platform.
16. power supply system according to claim 1, which is characterized in that
The power supply system is security protection power supply system, and at least two load equipment includes:
Video monitoring equipment, warning device and access control equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820199286.4U CN207782411U (en) | 2018-02-05 | 2018-02-05 | Power supply system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820199286.4U CN207782411U (en) | 2018-02-05 | 2018-02-05 | Power supply system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207782411U true CN207782411U (en) | 2018-08-28 |
Family
ID=63212291
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820199286.4U Active CN207782411U (en) | 2018-02-05 | 2018-02-05 | Power supply system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207782411U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109861377A (en) * | 2019-02-02 | 2019-06-07 | 吕遮玉 | Power Management Devices and Smart Security Systems |
CN111130212A (en) * | 2020-02-21 | 2020-05-08 | 中国铁塔股份有限公司 | Standby power control device |
CN112448461A (en) * | 2020-11-13 | 2021-03-05 | 成都天进仪器有限公司 | Waveform generator equipment for time-sharing power supply of large-signal power supply and small-signal power supply |
-
2018
- 2018-02-05 CN CN201820199286.4U patent/CN207782411U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109861377A (en) * | 2019-02-02 | 2019-06-07 | 吕遮玉 | Power Management Devices and Smart Security Systems |
CN111130212A (en) * | 2020-02-21 | 2020-05-08 | 中国铁塔股份有限公司 | Standby power control device |
CN112448461A (en) * | 2020-11-13 | 2021-03-05 | 成都天进仪器有限公司 | Waveform generator equipment for time-sharing power supply of large-signal power supply and small-signal power supply |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110120700A (en) | Power supply system and its control method | |
CN207782411U (en) | Power supply system | |
JP2626562B2 (en) | Collective charger | |
CN108206570A (en) | DC power transmission system and control method between electric vehicle vehicle | |
JP4974868B2 (en) | DC connection device | |
CN111555279A (en) | Method for maintaining power utilization continuity based on intelligent unloading of three-level load | |
CN110100370A (en) | The switching construction that switches between two input terminals, equipment, system and method | |
CN106787131A (en) | A kind of two rank region spare power automatic switching system and prepared auto restart control method | |
CN106711970B (en) | A kind of THE UPFC switch failure guard method containing series transformer | |
CN107947949A (en) | A kind of the time frequency system and control method of more extension set switching on and shutting down of host computer control | |
CN103887872B (en) | UPS device | |
CN110943535A (en) | Power supply control system | |
CN207218221U (en) | The shunt trip and RCCB of RCCB | |
CN215731498U (en) | Switch controller and system | |
CN105703913B (en) | A kind of Power over Ethernet system | |
CN116470545A (en) | Energy storage system starting method and device, energy storage system and nonvolatile storage medium | |
CN112968432B (en) | Control and protection system of negative pressure coupling type high-voltage direct-current circuit breaker | |
KR100855704B1 (en) | Input delay circuit of uninterruptible power supply | |
CN105870520B (en) | control method, device and system of lithium battery | |
CN110571913B (en) | Emergency power supply management method, device, equipment and storage medium for closed space | |
CN210431003U (en) | Elevator emergency device | |
CN222395483U (en) | Power supply device and cabinet | |
CN110366302A (en) | Circuit control device, method and system capable of switching working modes | |
CN108710291A (en) | A kind of anti-jump control circuit of adaptive breaker | |
CN215911900U (en) | An intelligent IoT circuit breaker system |