[go: up one dir, main page]

CN207728012U - A kind of safety protection device for elevator hoistway - Google Patents

A kind of safety protection device for elevator hoistway Download PDF

Info

Publication number
CN207728012U
CN207728012U CN201721770737.7U CN201721770737U CN207728012U CN 207728012 U CN207728012 U CN 207728012U CN 201721770737 U CN201721770737 U CN 201721770737U CN 207728012 U CN207728012 U CN 207728012U
Authority
CN
China
Prior art keywords
fixed frame
frame
protection device
expansion bracket
safety protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721770737.7U
Other languages
Chinese (zh)
Inventor
覃淼平
卢海英
刘永忠
陈小勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Group Holding Co ltd
Original Assignee
GUANGXI CONSTRUCTION ENGINEERING GROUP UNITED CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGXI CONSTRUCTION ENGINEERING GROUP UNITED CONSTRUCTION Co Ltd filed Critical GUANGXI CONSTRUCTION ENGINEERING GROUP UNITED CONSTRUCTION Co Ltd
Priority to CN201721770737.7U priority Critical patent/CN207728012U/en
Application granted granted Critical
Publication of CN207728012U publication Critical patent/CN207728012U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Elevator Door Apparatuses (AREA)

Abstract

一种电梯井道安全防护装置,包括固定架和所述固定架前端的卡口,卡口用于卡住电梯门下部的楼板,固定架的宽度大于电梯门的宽度,还包括沿固定架左右两侧伸出的第一伸缩架,沿固定架后端伸出的第二伸缩架,第一伸缩架和第二伸缩架的伸出的长度可调,固定架的长度和第二伸缩架的伸出长度之和大于电梯井道的前后的剪力墙间距,固定架以后端高于前端的方式斜置于电梯井道的前后的剪力墙之间。采用伸缩结构实现防护装置尺寸可变,提高了该装置的适用性,降低了施工成本,可重复利用、经济适用;防护装置收缩后体积减小,从电梯门安装更加容易,同时也便于运输保存。

A safety protection device for an elevator shaft, comprising a fixed frame and a bayonet at the front end of the fixed frame, the bayonet is used to block the floor at the lower part of the elevator door, the width of the fixed frame is larger than that of the elevator door, and two The first telescopic frame that protrudes from the side, the second telescopic frame that protrudes along the rear end of the fixed frame, the extended lengths of the first telescopic frame and the second telescopic frame are adjustable, the length of the fixed frame and the extension of the second telescopic frame The sum of the lengths is greater than the distance between the front and rear shear walls of the elevator shaft, and the rear end of the fixing frame is obliquely placed between the front and rear shear walls of the elevator shaft in a manner that the rear end is higher than the front end. The telescopic structure is used to realize the variable size of the protective device, which improves the applicability of the device, reduces the construction cost, is reusable, and is economical and applicable; the volume of the protective device is reduced after shrinking, and it is easier to install from the elevator door, and it is also convenient for transportation and storage .

Description

一种电梯井道安全防护装置A safety protection device for an elevator shaft

技术领域technical field

本实用新型涉及建筑施工技术领域,具体是一种电梯井道安全防护装置。The utility model relates to the technical field of building construction, in particular to an elevator shaft safety protection device.

背景技术Background technique

随着城市化进程发展,越来越多高层建筑或超高层建筑掘地而起,在电梯井口施工时如何保证安全、快速完成施工也显得尤为重要,现有技术采取电梯井防护装置,解决上述问题,如中国专利CN 204126290U,公开了一种电梯井水平防护装置,包括水平固定安装在楼板上的两根第一支撑杆、横向压杆和防护网,两根第一支撑杆一端伸入电梯井内侧、且两根第一支撑杆分别位于电梯井门洞两侧,所述防护网位于电梯井内侧、且其位于电梯井门洞一侧搭接在两个第一支撑杆上,所述防护网倾斜设置,其所在的平面与两根第一支撑杆的轴线所在的水平面之间呈15-30度夹角,所述横向压杆两端与两根第一支撑杆位于电梯井外侧的端部连接,其优点在于:通过使用两根与楼板固定的第一支撑杆和横向压杆作为支撑结构,将倾斜设置的防护网搭设在两根第一支撑杆位于电梯井内侧一端,只需两个第一支撑杆与墙面配合即可支撑防护网及坠落到防护网上的坠落物,确保施工安全。又如中国专利CN105544999A,公开了一种电梯井水平安全防护装置,包括2根斜撑;斜撑为长条形,其长度大于电梯井道的前后剪力墙间距且以后端高于前端的方式斜置于电梯井道的前后剪力墙之间,斜撑前端和后端各固接有一用于扩大两端接触面积的边撑,斜撑的前端还固接用于卡住电梯门楼板的卡口,该方案利用自身重力牢固地顶紧在电梯井道中且不会滑落,结构简单,安装便捷、安全可靠、便于运输保存,可重复利用、经济适用。但上述技术方案仍存在如下问题:1、防护装置的尺寸是一定的,只适合一个尺寸的电梯井道的防护,通用性不强;2、安装和拆除困难,With the development of the urbanization process, more and more high-rise buildings or super high-rise buildings are dug out of the ground. How to ensure safety and quickly complete the construction at the elevator shaft head is also particularly important. The existing technology adopts elevator shaft protection devices to solve the above problems. Problem, such as the Chinese patent CN 204126290U, discloses a horizontal protection device for an elevator shaft, including two first support rods fixed horizontally on the floor, a horizontal pressure rod and a protective net, and one end of the two first support rods extends into the elevator The inside of the well, and the two first support rods are located on both sides of the elevator shaft door opening, the protective net is located inside the elevator shaft, and it is located on the side of the elevator shaft door opening and overlapped on the two first support rods, the protective net It is arranged obliquely, and the angle between the plane where it is located and the horizontal plane where the axes of the two first support rods are located is 15-30 degrees, and the two ends of the horizontal pressure rod are located at the ends outside the elevator shaft The advantages of connection are: by using two first support rods fixed to the floor and horizontal pressure rods as the support structure, the oblique protective net is erected at the inner end of the two first support rods at the inner side of the elevator shaft, and only two The first supporting rod cooperates with the wall surface to support the protective net and the falling objects falling on the protective net, so as to ensure construction safety. Another example is the Chinese patent CN105544999A, which discloses a horizontal safety protection device for an elevator shaft, including two diagonal braces; Placed between the front and rear shear walls of the elevator shaft, the front and rear ends of the diagonal brace are each fixed with a temple for expanding the contact area at both ends, and the front end of the diagonal brace is also fixed with a bayonet for locking the elevator door floor , The scheme utilizes its own gravity to firmly hold the elevator well without slipping, has a simple structure, is convenient to install, is safe and reliable, is convenient for transportation and storage, can be reused, and is economical and applicable. But still there are following problems in above-mentioned technical scheme: 1, the size of protective device is certain, is only suitable for the protection of the elevator shaft of a size, and versatility is not strong; 2, installation and removal difficulty,

实用新型内容Utility model content

本实用新型公开了一种电梯井道安全防护装置,提高电梯井道安全防护装置的通用性,便于拆装。The utility model discloses an elevator shaft safety protection device, which improves the universality of the elevator shaft safety protection device and facilitates disassembly and assembly.

本实用新型的技术方案如下:一种电梯井道安全防护装置,包括固定架1和所述固定架1前端的卡口10,所述卡口10用于卡住电梯门9下部的楼板,所述固定架1的宽度大于电梯门9的宽度,还包括沿所述固定架1 左右两侧伸出的第一伸缩架3,沿所述固定架1后端伸出的第二伸缩架2,所述第一伸缩架3和第二伸缩架2的伸出的长度可调,所述固定架1的长度和第二伸缩架2的伸出长度之和大于电梯井道的前后的剪力墙8间距,所述固定架1以后端高于前端的方式斜置于电梯井道的前后的剪力墙8之间。通过伸缩架3和伸缩架2的伸缩实现电梯井道安全防护装置尺寸可调,可适应不同尺寸的电梯井道安装,提高防护装置的通用性;通过伸缩架3 和伸缩架2实现电梯井道安全防护装置的拆装更加便捷。The technical scheme of the utility model is as follows: a safety protection device for an elevator shaft, comprising a fixed frame 1 and a bayonet 10 at the front end of the fixed frame 1, the bayonet 10 is used to block the floor at the lower part of the elevator door 9, the The width of fixed mount 1 is greater than the width of elevator door 9, also comprises the first telescopic frame 3 that stretches out along described fixed mount 1 left and right sides, the second telescopic frame 2 that stretches out along described fixed mount 1 rear end, so The protruding length of the first telescopic frame 3 and the second telescopic frame 2 is adjustable, and the sum of the length of the fixed frame 1 and the protruding length of the second telescopic frame 2 is greater than the distance between the shear walls 8 before and after the elevator shaft , the fixed frame 1 is obliquely placed between the front and rear shear walls 8 of the elevator shaft in such a way that the rear end is higher than the front end. Through the expansion and contraction of the telescopic frame 3 and the telescopic frame 2, the size of the elevator shaft safety protection device can be adjusted, which can be adapted to the installation of elevator shafts of different sizes, and the versatility of the protection device is improved; the elevator shaft safety protection device is realized through the telescopic frame 3 and the telescopic frame 2 The disassembly and assembly are more convenient.

优选的,所述固定架1上安装有导轨7,所述第一伸缩架3和第二伸缩架2安装在所述导轨7内,便于伸缩架的调节,拉伸平稳。Preferably, a guide rail 7 is installed on the fixed frame 1, and the first telescopic frame 3 and the second telescopic frame 2 are installed in the guide rail 7, which is convenient for the adjustment of the telescopic frame and stable stretching.

优选的,所述卡口10为所述第二伸缩架2的两根中间导轨701沿固定架1前端延伸而成,利用现有的导轨延伸成卡口,结构简单,节省成本。Preferably, the bayonet 10 is formed by extending the two middle guide rails 701 of the second telescopic frame 2 along the front end of the fixed frame 1, and the existing guide rails are used to extend to form a bayonet, which has a simple structure and saves costs.

优选的,所述所述第一伸缩架3和第二伸缩架2后上设置有锁紧螺栓 4,所述锁紧螺栓4穿过所述固定架1上的锁紧槽5,实现伸缩架3的位置调节以后的锁紧固定,保证安装的牢固性。Preferably, the first telescopic frame 3 and the second telescopic frame 2 are provided with locking bolts 4 behind them, and the locking bolts 4 pass through the locking grooves 5 on the fixed frame 1 to realize the expansion of the telescopic frame. 3. After the position is adjusted, it is locked and fixed to ensure the firmness of the installation.

优选的,所述第一伸缩架3和第二伸缩架2上设置有刻度线6,便于对伸缩架1进行精确调节。Preferably, the first telescopic frame 3 and the second telescopic frame 2 are provided with scale lines 6 to facilitate precise adjustment of the telescopic frame 1 .

优选的,所述导轨7采用方钢焊接到固定架1上制成,制作加工简单,节省成本。Preferably, the guide rail 7 is made of square steel welded to the fixing frame 1, which is simple to manufacture and process, and saves cost.

本实用新型的有益效果:The beneficial effects of the utility model:

1.采用伸缩结构实现防护装置尺寸可变,提高了该装置的适用性,降低了施工成本,可重复利用、经济适用;1. The size of the protective device is variable by adopting a telescopic structure, which improves the applicability of the device, reduces construction costs, and is reusable and economical;

2.防护装置收缩后体积减小,从电梯门安装更加容易,同时也便于运输保存。2. The volume of the protective device is reduced after shrinking, and it is easier to install from the elevator door, and it is also convenient for transportation and storage.

附图说明Description of drawings

图1是本实用新型所述的一种电梯井道安全防护装置的安装结构示意图。Fig. 1 is a schematic diagram of the installation structure of an elevator shaft safety protection device described in the present invention.

图2是本实用新型所述的一种电梯井道安全防护装置的安装结构示意图的俯视图。Fig. 2 is a top view of a schematic diagram of the installation structure of an elevator shaft safety protection device described in the present invention.

图3是本实用新型所述的一种电梯井道安全防护装置的实施例2的安装结构示意图。Fig. 3 is a schematic diagram of the installation structure of Embodiment 2 of an elevator shaft safety protection device described in the present invention.

图4是本实用新型所述的一种电梯井道安全防护装置的实施例2的伸缩架的安装结构示意图。Fig. 4 is a schematic diagram of the installation structure of the telescopic frame of Embodiment 2 of an elevator shaft safety protection device described in the present invention.

图5是图1中A处的放大图。Fig. 5 is an enlarged view of A in Fig. 1 .

图6是本实用新型所述的一种电梯井道安全防护装置的实施例3的结构示意图。Fig. 6 is a schematic structural view of Embodiment 3 of an elevator shaft safety protection device described in the present invention.

图中:1、固定架;2、第二伸缩架;3、第一伸缩架;4、锁紧螺栓;5、锁紧槽;6、刻度线;7、导轨;701、中间导轨;8、剪力墙;9、电梯门; 10、卡口。In the figure: 1, fixed frame; 2, second telescopic frame; 3, first telescopic frame; 4, locking bolt; 5, locking groove; 6, scale line; 7, guide rail; 701, intermediate guide rail; 8, Shear wall; 9. Elevator door; 10. Bayonet.

具体实施方式Detailed ways

下面结合说明书附图说明本实用新型的具体实施方式:The specific embodiment of the utility model is illustrated below in conjunction with the accompanying drawings of the description:

实施例1:Example 1:

如图1和图2所示,一种电梯井道安全防护装置,包括固定架1和所述固定架1前端的卡口10,所述卡口10用于卡住电梯门9下部的楼板, 所述固定架1的宽度大于电梯门9的宽度,还包括沿所述固定架1左右两侧伸出的第一伸缩架3,沿所述固定架1后端伸出的第二伸缩架2,所述第一伸缩架3和第二伸缩架2的伸出的长度可调,所述固定架1的长度和第二伸缩架2的伸出长度之和大于电梯井道的前后的剪力墙8间距,所述固定架1以后端高于前端的方式斜置于电梯井道的前后的剪力墙8之间。导轨7采用方钢焊接到固定架1上制成。As shown in Figures 1 and 2, an elevator shaft safety protection device includes a fixed frame 1 and a bayonet 10 at the front end of the fixed frame 1, and the bayonet 10 is used to block the floor below the elevator door 9, so The width of the fixed mount 1 is greater than the width of the elevator door 9, and also includes a first telescopic frame 3 stretched out along the left and right sides of the fixed mount 1, a second telescopic frame 2 stretched out along the rear end of the fixed mount 1, The protruding length of the first telescopic frame 3 and the second telescopic frame 2 is adjustable, and the sum of the length of the fixed frame 1 and the protruding length of the second telescopic frame 2 is greater than the front and rear shear walls 8 of the elevator shaft The distance between the fixed frame 1 and the front and rear shear walls 8 of the elevator shaft is obliquely placed in such a way that the rear end is higher than the front end. Guide rail 7 adopts square steel to be welded on the fixed frame 1 and makes.

实施例2:Example 2:

如图1、图3和图4和图5所示,一种电梯井道安全防护装置,包括固定架1和所述固定架1前端的卡口10,所述卡口10用于卡住电梯门9 下部的楼板,所述固定架1的宽度大于电梯门9的宽度,还包括沿所述固定架1左右两侧伸出的第一伸缩架3,沿所述固定架1后端伸出的第二伸缩架2,所述第一伸缩架3和第二伸缩架2的伸出的长度可调,所述固定架1的长度和第二伸缩架2的伸出长度之和大于电梯井道的前后的剪力墙 8间距,所述固定架1以后端高于前端的方式斜置于电梯井道的前后的剪力墙8之间。As shown in Fig. 1, Fig. 3 and Fig. 4 and Fig. 5, an elevator shaft safety protection device includes a fixed frame 1 and a bayonet 10 at the front end of the fixed frame 1, and the bayonet 10 is used to block the elevator door 9 The lower floor, the width of the fixed frame 1 is greater than the width of the elevator door 9, and also includes the first telescopic frame 3 protruding along the left and right sides of the fixed frame 1, and the first telescopic frame 3 protruding along the rear end of the fixed frame 1 The second telescopic frame 2, the extended length of the first telescopic frame 3 and the second telescopic frame 2 is adjustable, the length of the fixed mount 1 and the sum of the extended length of the second telescopic frame 2 is greater than that of the elevator shaft The front and rear shear walls 8 are spaced apart, and the fixed frame 1 is obliquely placed between the front and rear shear walls 8 of the elevator shaft in such a manner that the rear end is higher than the front end.

所述所述伸缩架3上设置有锁紧螺栓4,所述锁紧螺栓4穿过所述固定架1上的锁紧槽5;所述第一伸缩架3和第二伸缩架2上设置有刻度线 6。导轨7采用方钢焊接到固定架1上制成。The telescopic frame 3 is provided with a locking bolt 4, and the locking bolt 4 passes through the locking groove 5 on the fixed frame 1; the first telescopic frame 3 and the second telescopic frame 2 are provided with There are tick marks 6. Guide rail 7 adopts square steel to be welded on the fixed frame 1 and makes.

实施例3:Example 3:

如图1和图6所示,一种电梯井道安全防护装置,包括固定架1和所述固定架1前端的卡口10,所述卡口10用于卡住电梯门9下部的楼板, 所述固定架1的宽度大于电梯门9的宽度,还包括沿所述固定架1左右两侧伸出的第一伸缩架3,沿所述固定架1后端伸出的第二伸缩架2,所述第一伸缩架3和第二伸缩架2的伸出的长度可调,所述固定架1的长度和第二伸缩架2的伸出长度之和大于电梯井道的前后的剪力墙8间距,所述固定架1以后端高于前端的方式斜置于电梯井道的前后的剪力墙8之间。As shown in Figures 1 and 6, an elevator shaft safety protection device includes a fixed frame 1 and a bayonet 10 at the front end of the fixed frame 1, and the bayonet 10 is used to block the floor below the elevator door 9, so The width of the fixed mount 1 is greater than the width of the elevator door 9, and also includes a first telescopic frame 3 stretched out along the left and right sides of the fixed mount 1, a second telescopic frame 2 stretched out along the rear end of the fixed mount 1, The protruding length of the first telescopic frame 3 and the second telescopic frame 2 is adjustable, and the sum of the length of the fixed frame 1 and the protruding length of the second telescopic frame 2 is greater than the front and rear shear walls 8 of the elevator shaft The distance between the fixed frame 1 and the front and rear shear walls 8 of the elevator shaft is obliquely placed in such a way that the rear end is higher than the front end.

如图4和图5所示,所述所述伸缩架3上设置有锁紧螺栓4,所述锁紧螺栓4穿过所述固定架1上的锁紧槽5;所述第一伸缩架3和第二伸缩架2上设置有刻度线6。导轨7采用方钢焊接到固定架1上制成。As shown in Figures 4 and 5, the telescopic frame 3 is provided with a locking bolt 4, and the locking bolt 4 passes through the locking groove 5 on the fixed frame 1; the first telescopic frame 3 and the second telescopic frame 2 are provided with scale marks 6. Guide rail 7 adopts square steel to be welded on the fixed frame 1 and makes.

如图6所示,所述卡口10为所述第二伸缩架2的两根中间导轨701 沿固定架1前端延伸而成。As shown in FIG. 6 , the bayonet 10 is formed by extending the two middle guide rails 701 of the second telescopic frame 2 along the front end of the fixed frame 1 .

本实用新型的工作原理如下:根据电梯井长度调节第二伸缩架2的伸出距离,所述固定架1的长度和第二伸缩架2的伸出长度之和大于电梯井道的前后的剪力墙8间距;将卡口10放置在电梯门9下部的楼板上,将电梯井道安全防护装置另一端放入电梯井中;第二伸缩架2后端依靠在剪力墙8上,固定架1得到固定,将卡口10末端通过膨胀钉固定在楼板上;调整所述第一伸缩架3的伸出距离,使伸缩架3外端贴近左右两侧的剪力墙8并锁紧;在电梯井道安全防护装置上方铺设网板或木板;施工完成后,清理电梯井道安全防护装置的上表面,收缩所述第一缩伸缩架3,调整电梯井道安全防护装置宽度为最小宽度并锁紧,从电梯门9中取出电梯井道安全防护装置,完成拆除。The working principle of the present utility model is as follows: adjust the extension distance of the second telescopic frame 2 according to the length of the elevator shaft, the sum of the length of the fixed frame 1 and the extension length of the second telescopic frame 2 is greater than the shear force before and after the elevator shaft Wall 8 spacing; bayonet 10 is placed on the floor of elevator door 9 lower parts, and the other end of elevator shaft safety protection device is put into elevator shaft; the rear end of second telescopic frame 2 leans on shear wall 8, and fixing frame 1 obtains Fix, fix the end of the bayonet 10 on the floor through expansion nails; adjust the extension distance of the first telescopic frame 3, so that the outer ends of the telescopic frame 3 are close to the shear walls 8 on the left and right sides and locked; Lay mesh panels or planks above the safety protection device; after the construction is completed, clean the upper surface of the elevator shaft safety protection device, shrink the first shrinkable telescopic frame 3, adjust the width of the elevator shaft safety protection device to the minimum width and lock it, from the elevator Take out the elevator shaft safety protection device in the door 9, and complete the dismantling.

Claims (6)

1. a kind of safety protection device for elevator hoistway includes the bayonet (10) of fixed frame (1) and the fixed frame (1) front end, institute Floor of the bayonet (10) for blocking elevator door (9) lower part is stated, the width of the fixed frame (1) is more than the width of elevator door (9), It is characterized in that:Further include the first expansion bracket (3) stretched out at left and right sides of the fixed frame (1), after the fixed frame (1) The second expansion bracket (2) stretched out is held, the length of the stretching of first expansion bracket (3) and the second expansion bracket (2) is adjustable, described solid Determine front and back shear wall (8) spacing that the sum of the length of frame (1) and the extension elongation of the second expansion bracket (2) are more than elevator shaft, The fixed frame (1) is by between rear end in a manner of front end higher than the front and back shear wall (8) of elevator shaft is inclined in.
2. a kind of safety protection device for elevator hoistway as described in claim 1, it is characterised in that:Pacify on the fixed frame (1) Equipped with guide rail (7), first expansion bracket (3) and second expansion bracket (2) are mounted in the guide rail (7).
3. a kind of safety protection device for elevator hoistway as described in any one of claims 1 or 2, it is characterised in that:The card Mouth (10) is that two intermediate rails (701) of second expansion bracket (2) extend along fixed frame (1) front end.
4. a kind of safety protection device for elevator hoistway as described in any one of claims 1 or 2, it is characterised in that:Described Clamping screw (4) is provided on one expansion bracket (3) and second expansion bracket (2), the clamping screw (4) passes through the fixation Locking slot (5) on frame (1).
5. a kind of safety protection device for elevator hoistway as described in any one of claims 1 or 2, it is characterised in that:Described It is provided with graduation mark (6) on one expansion bracket (3) and second expansion bracket (2).
6. a kind of safety protection device for elevator hoistway as claimed in claim 2, it is characterised in that:Guide rail (7) the use side Steel is welded on fixed frame (1) and is made.
CN201721770737.7U 2017-12-18 2017-12-18 A kind of safety protection device for elevator hoistway Expired - Fee Related CN207728012U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721770737.7U CN207728012U (en) 2017-12-18 2017-12-18 A kind of safety protection device for elevator hoistway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721770737.7U CN207728012U (en) 2017-12-18 2017-12-18 A kind of safety protection device for elevator hoistway

Publications (1)

Publication Number Publication Date
CN207728012U true CN207728012U (en) 2018-08-14

Family

ID=63097560

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721770737.7U Expired - Fee Related CN207728012U (en) 2017-12-18 2017-12-18 A kind of safety protection device for elevator hoistway

Country Status (1)

Country Link
CN (1) CN207728012U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829567A (en) * 2017-12-18 2018-03-23 广西建工集团联合建设有限公司 A kind of safety protection device for elevator hoistway and its application method
CN113530278A (en) * 2021-07-07 2021-10-22 中安华力建设集团有限公司 Telescopic safety shield structure for elevator well
CN116201385A (en) * 2023-02-06 2023-06-02 中国建筑第八工程局有限公司 Elevator shaft protection device and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829567A (en) * 2017-12-18 2018-03-23 广西建工集团联合建设有限公司 A kind of safety protection device for elevator hoistway and its application method
CN113530278A (en) * 2021-07-07 2021-10-22 中安华力建设集团有限公司 Telescopic safety shield structure for elevator well
CN116201385A (en) * 2023-02-06 2023-06-02 中国建筑第八工程局有限公司 Elevator shaft protection device and its construction method

Similar Documents

Publication Publication Date Title
CN207728012U (en) A kind of safety protection device for elevator hoistway
CN105064670B (en) Exterior wall cantilevered plate formwork for placing sets up support
CN103291066B (en) A kind of construction elevator wall-attached frame servicing unit reinforcement means
CN106854937A (en) A kind of Height Adjustable protection guardrail of assembly type
CN201817814U (en) Adjustable fixed support of vertical surface sheet steel form
CN107829567A (en) A kind of safety protection device for elevator hoistway and its application method
CN204754159U (en) Outer wall body is encorbelmented board and is built template and set up support
CN201649652U (en) Adjustable Beam Support Frame
CN107190968A (en) A kind of new corner aluminium alloy protection network
CN208294235U (en) It is height-adjustable to face side enclosure device
CN209413271U (en) Casing wall-through pull rod formula connects wall fixed Combination device
CN204040556U (en) A telescopic graduation two electronic box protection canopy
CN209397897U (en) An indoor multifunctional scaffolding
CN207245243U (en) Prefabricated superimposed sheet vertical supporting device
CN207959899U (en) A kind of novel aluminium alloy net protective device
CN104818859B (en) The installation method of orbit traffic overhead station operation platform
CN113356553A (en) Assembly type external hanging rack and construction method thereof
CN106854938A (en) A kind of Height Adjustable protection guardrail of assembly type
CN216921307U (en) A construction support that is used for building construction to have anti-drop structure
CN205742944U (en) A kind of construction operation scaffold
CN206855743U (en) A kind of protector for prestress wire tensioning
CN208215308U (en) Suspension type station
CN220377808U (en) External triangular support frame fixing device of assembled building
CN216739315U (en) Arch bridge construction frame
CN214360119U (en) Expansion bracket for constructional engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 530000 Jiangong building, No.19 Pingle Avenue, Liangqing District, Nanning City, Guangxi Zhuang Autonomous Region

Patentee after: Guangxi Construction Engineering Group Holding Co.,Ltd.

Address before: 530001 the Guangxi Zhuang Autonomous Region XiXiangTang Nanning fraternity Road No. 45

Patentee before: GUANGXI CONSTRUCTION ENGINEERING GROUP UNITED CONSTRUCTION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180814