CN207714540U - A kind of modified assembled wall - Google Patents
A kind of modified assembled wall Download PDFInfo
- Publication number
- CN207714540U CN207714540U CN201820009394.0U CN201820009394U CN207714540U CN 207714540 U CN207714540 U CN 207714540U CN 201820009394 U CN201820009394 U CN 201820009394U CN 207714540 U CN207714540 U CN 207714540U
- Authority
- CN
- China
- Prior art keywords
- load
- bearing wall
- layer
- proof
- screw holes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009413 insulation Methods 0.000 claims abstract description 83
- 238000004321 preservation Methods 0.000 claims abstract description 32
- 238000005034 decoration Methods 0.000 claims abstract description 16
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 3
- 229920001084 poly(chloroprene) Polymers 0.000 claims description 9
- 230000002787 reinforcement Effects 0.000 claims description 9
- 239000004568 cement Substances 0.000 claims description 6
- 239000004570 mortar (masonry) Substances 0.000 claims description 5
- 239000000853 adhesive Substances 0.000 claims description 4
- 230000001070 adhesive effect Effects 0.000 claims description 4
- 239000000463 material Substances 0.000 claims description 4
- -1 polyethylene styrene Polymers 0.000 claims description 3
- 230000009970 fire resistant effect Effects 0.000 claims 1
- 239000010410 layer Substances 0.000 abstract description 75
- 238000010276 construction Methods 0.000 abstract description 14
- 239000002346 layers by function Substances 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 6
- 238000005457 optimization Methods 0.000 description 5
- 239000004566 building material Substances 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 239000002002 slurry Substances 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 238000001816 cooling Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000010792 warming Methods 0.000 description 2
- 239000011449 brick Substances 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Building Environments (AREA)
Abstract
一种改进型装配式墙体,内防燃保温板螺孔、内承重墙螺孔、外承重墙螺孔和外防燃保温板螺孔均成直线式贯通分布,内防燃保温板螺孔、内承重墙螺孔、外承重墙螺孔和外防燃保温板螺孔内部贯穿有加固螺栓,内防燃保温层,内承重墙,外承重墙和外防燃保温层经由加固螺栓紧固连接成一整体。内装饰层和外装饰层分别粘贴于内防燃保温层和外防燃保温层的外侧。本实用新型提供的改进型装配式墙体,其装配方便快捷,大大减小了施工难度,缩短了施工周期,而且在满足强度要求的前提下,大大增强了墙体的保温、隔热、隔音、防潮性能;墙体有若干功能层复合而成,这些由若干层墙板组合成的墙体的综合性能更加优越,用户体验更加舒适。
An improved prefabricated wall, the screw holes of the inner fire-proof and heat-preservation board, the screw holes of the inner load-bearing wall, the screw holes of the outer load-bearing wall and the screw holes of the outer fire-proof heat-preservation The screw holes of the load-bearing wall, the screw holes of the outer load-bearing wall and the screw holes of the outer fire-proof and thermal insulation board are penetrated with reinforcing bolts, the inner flame-proof and thermal insulation layer, the inner load-bearing wall, the outer load-bearing wall and the outer flame-proof and thermal insulation layer are fastened and connected into one overall. The inner decoration layer and the outer decoration layer are pasted on the outer sides of the inner flame-proof and heat-preservation layer and the outer flame-proof heat-preservation layer respectively. The improved prefabricated wall provided by the utility model is convenient and quick to assemble, greatly reduces the difficulty of construction, shortens the construction period, and greatly enhances the thermal insulation, heat insulation and sound insulation of the wall under the premise of meeting the strength requirements. , Moisture-proof performance; the wall is composed of several functional layers, the comprehensive performance of these walls composed of several layers of wall panels is more superior, and the user experience is more comfortable.
Description
技术领域technical field
本实用新型涉及建筑建材领域,尤其涉及一种改进型装配式墙体。The utility model relates to the field of building materials, in particular to an improved assembled wall body.
背景技术Background technique
现今,建筑行业墙体主要有采用实心砖或者空心砌块堆砌的前提、现场浇筑的墙体和板块性墙体,砌筑墙体施工劳动强度大,占用人力资源多,工序繁琐,施工周期长,该种建筑方法较为传统,已经不能满足现如今高速发展的房地产行业,现场浇注成型是现今应用最广的建筑方法,但是该方法需要特殊设备现场浇灌浆料,根据国家法律规定,城区内不允许调制水泥浆料,避免扬尘污染城市空气,所以水泥浆料一般在市外调制,然后用罐车运至施工现场,浇筑时需要现场浇筑,而且第一次浇筑完成后需要依次进行第二次、第三次浇筑,工序繁琐,施工周期长,能耗大;板块性墙体虽然提高了施工效率,但是墙体的强度较低,存在严重的安全隐患,而且这些材料保温、隔热、隔音、防潮等性能越来越不能满足人们的对居住条件日益增高的要求,因此迫切需要一种新式的改进型装配式墙体。Nowadays, the walls in the construction industry mainly have the premise of using solid bricks or hollow blocks, cast-in-place walls and plate walls. The construction of masonry walls is labor-intensive, takes up a lot of human resources, and the process is cumbersome and the construction period is long. , this kind of construction method is relatively traditional, which can no longer meet the rapid development of the real estate industry today. Site casting is the most widely used construction method today, but this method requires special equipment to pour the slurry on site. According to national laws and regulations, no It is allowed to prepare cement slurry to avoid dust pollution in urban air. Therefore, cement slurry is generally prepared outside the city, and then transported to the construction site by tank truck. It needs to be poured on site during pouring, and after the first pouring is completed, it needs to be poured for the second time. The third pouring process is cumbersome, the construction period is long, and the energy consumption is high; although the slab wall improves the construction efficiency, the strength of the wall is low, and there are serious safety hazards, and these materials are thermal insulation, heat insulation, sound insulation, Performances such as moisture resistance can no longer meet people's increasing requirements for living conditions, so there is an urgent need for a new and improved assembled wall.
实用新型内容Utility model content
为了解决上述现有技术中存在的问题,本实用新型提供一种改进型装配式墙体。In order to solve the above-mentioned problems in the prior art, the utility model provides an improved assembled wall.
本实用新型解决其技术问题所采用的技术方案是:一种改进型装配式墙体,由内至外依次包括有相互装配结合的内装饰层,内防燃保温层,内承重墙,外承重墙,外防燃保温层和外装饰层。内防燃保温层包括有内防燃保温板层,内防燃保温板层上均匀间隔设置有呈凸起状的内防燃保温板横梁,内防燃保温板层上还均匀间隔设有内防燃保温板螺孔。内承重墙包括有内承重墙体,内承重墙体的内侧均匀间隔设置有呈凹陷状的内承重墙横槽,内承重墙横槽和内防燃保温板横梁相互配合;内承重墙体的外侧均匀间隔设置有呈凸起状的内承重墙竖梁;内承重墙体上还均匀间隔设有内承重墙螺孔。外承重墙包括有外承重墙体,外承重墙体的内侧均匀间隔设置有呈凸起状的外承重墙竖槽,外承重墙竖槽和内承重墙竖梁相互配合;外承重墙体的外侧均匀间隔设置有呈凸起状的外承重墙横梁。外承重墙体上还均匀间隔设有外承重墙螺孔。外防燃保温层包括有外防燃保温板层,外防燃保温板层上均匀间隔设置有呈凹陷状的外防燃保温板横槽,外防燃保温板横槽和外承重墙横梁相互配合;外防燃保温板层上还均匀间隔设有外防燃保温板螺孔。内防燃保温板螺孔、内承重墙螺孔、外承重墙螺孔和外防燃保温板螺孔均成直线式贯通分布,内防燃保温板螺孔、内承重墙螺孔、外承重墙螺孔和外防燃保温板螺孔内部贯穿有加固螺栓,内防燃保温层,内承重墙,外承重墙和外防燃保温层经由加固螺栓紧固连接成一整体。内装饰层和外装饰层分别粘贴于内防燃保温层和外防燃保温层的外侧。The technical solution adopted by the utility model to solve the technical problem is: an improved assembled wall, which includes an inner decoration layer assembled and combined with each other, an inner fire-proof insulation layer, an inner load-bearing wall, and an outer load-bearing wall from the inside to the outside. Walls, outer fire-proof insulation layer and outer decorative layer. The internal flame-proof thermal insulation layer includes internal flame-resistant thermal insulation board layers, on which the internal flame-proof thermal insulation board layers are evenly spaced with protruding internal flame-resistant thermal Flame-proof insulation board screw holes. The inner load-bearing wall includes an inner load-bearing wall, and the inner side of the inner load-bearing wall is evenly spaced with concave-shaped inner load-bearing wall transverse grooves, and the inner load-bearing wall transverse grooves cooperate with the inner fire-proof insulation board beams; the inner load-bearing wall Protruding inner load-bearing vertical beams are evenly spaced on the outer side; inner load-bearing wall screw holes are evenly spaced on the inner load-bearing wall. The outer load-bearing wall includes an outer load-bearing wall, and the inside of the outer load-bearing wall is evenly spaced with raised vertical grooves of the outer load-bearing wall, and the vertical grooves of the outer load-bearing wall and the vertical beams of the inner load-bearing wall cooperate with each other; Protruding external load-bearing wall beams are evenly spaced on the outside. The outer load-bearing wall body is also provided with outer load-bearing wall screw holes at even intervals. The outer fire-proof and heat-insulation layer includes an outer fire-proof heat-insulation board layer, and the outer fire-proof heat-preservation board layer is evenly spaced with concave-shaped outer fire-proof heat preservation board transverse grooves, and the outer fire-proof heat preservation board transverse grooves and the outer load-bearing wall beams are connected to each other. Cooperate; the outer fireproof heat preservation board layer is also provided with the screw holes of the outer fireproof heat preservation board at even intervals. The screw holes of the inner flameproof insulation board, the screw holes of the inner load-bearing wall, the screw holes of the outer load-bearing wall and the screw holes of the outer flameproof insulation board are all distributed in a straight line. Reinforcement bolts run through the hole and the screw hole of the outer flameproof insulation board, the inner flameproof insulation layer, the inner load-bearing wall, the outer load-bearing wall and the outer flameproof insulation layer are fastened and connected into a whole through the reinforcement bolts. The inner decoration layer and the outer decoration layer are pasted on the outer sides of the inner flame-proof and heat-preservation layer and the outer flame-proof heat-preservation layer respectively.
本实用新型还具有以下附加技术特征:The utility model also has the following additional technical features:
作为本实用新型具体优化的,内装饰层和外装饰层结构相同,内侧设有包裹加固螺栓的突出部分的凹槽。As a specific optimization of the utility model, the inner decorative layer and the outer decorative layer have the same structure, and the inner side is provided with grooves wrapping the protruding parts of the reinforcement bolts.
作为本实用新型具体优化的,内防燃保温层和外防燃保温层的材料为聚乙烯苯板。As a specific optimization of the utility model, the material of the inner fireproof and heat preservation layer and the outer fireproof heat preservation layer is polyethylene styrene board.
作为本实用新型具体优化的,内承重墙和外承重墙之间涂抹有粘结砂浆。As a specific optimization of the utility model, adhesive mortar is applied between the inner load-bearing wall and the outer load-bearing wall.
作为本实用新型具体优化的,内防燃保温层和内承重墙之间涂抹有氯丁橡胶;外承重墙和外防燃保温层之间涂抹有氯丁橡胶。As a specific optimization of the utility model, neoprene is applied between the inner fire-proof and heat-insulating layer and the inner load-bearing wall; and neoprene is applied between the outer load-bearing wall and the outer fire-proof and heat-preserve layer.
作为本实用新型具体优化的,内承重墙和外承重墙均通过水泥浇筑预制而成。As a specific optimization of the utility model, both the inner load-bearing wall and the outer load-bearing wall are prefabricated by pouring cement.
本实用新型和现有技术相比,其优点在于:本实用新型提供的改进型装配式墙体,其装配方便快捷,大大减小了施工难度,缩短了施工周期,而且在满足强度要求的前提下,大大增强了墙体的保温、隔热、隔音、防潮性能;墙体有若干功能层复合而成,这些由若干层墙板组合成的墙体的综合性能更加优越,用户体验更加舒适。内承重墙和外承重墙可以改变建筑物的着力结构,节省建筑用材,强度非常高,承重性能卓越。墙体设有内防燃保温层和外防燃保温层能有效隔绝室内外的热量交换,使建筑内的温度维持在相对稳定的范围,即达到了冬暖夏凉的效果,大大增加了建筑的舒适性和安全性。Compared with the prior art, the utility model has the advantages that: the improved prefabricated wall body provided by the utility model is convenient and quick to assemble, greatly reduces the difficulty of construction, shortens the construction period, and meets the strength requirements Under the circumstances, the thermal insulation, heat insulation, sound insulation and moisture-proof performance of the wall are greatly enhanced; the wall is composed of several functional layers, and the comprehensive performance of these walls composed of several layers of wall panels is more superior, and the user experience is more comfortable. The inner load-bearing wall and the outer load-bearing wall can change the structure of the building, save building materials, have very high strength, and have excellent load-bearing performance. The wall is equipped with an inner fire-proof insulation layer and an outer fire-proof insulation layer, which can effectively isolate the heat exchange between indoors and outdoors, so that the temperature in the building can be maintained in a relatively stable range, which achieves the effect of warming in winter and cooling in summer, greatly increasing the building capacity. comfort and safety.
本实用新型的附加方面和优点将在下面的描述中部分给出,部分将从下面的描述中变得明显,或通过本实用新型的实践了解到。Additional aspects and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are only some embodiments of the utility model, and those skilled in the art can also obtain other drawings based on these drawings without creative work.
图1为本实用新型改进型装配式墙体安装后剖视结构示意图;Fig. 1 is the schematic diagram of the sectional structure after installation of the improved assembled wall of the utility model;
图2为本实用新型局部爆炸结构示意图;Fig. 2 is the schematic diagram of partial explosion structure of the utility model;
图3为本实用新型内防燃保温层结构示意图;Fig. 3 is a structural schematic diagram of the internal flame-proof insulation layer of the utility model;
图4为本实用新型内承重墙结构示意图;Fig. 4 is a structural schematic diagram of the load-bearing wall in the utility model;
图5为本实用新型外承重墙结构示意图;Fig. 5 is a schematic diagram of the structure of the outer load-bearing wall of the utility model;
图6为本实用新型外防燃保温层结构示意图。Fig. 6 is a schematic diagram of the structure of the outer flame-proof and thermal insulation layer of the present invention.
附图标记说明:内装饰层1;内防燃保温层2;内承重墙3;外承重墙4;外防燃保温层5;外装饰层6;加固螺栓7;内装饰板层201;内装饰板横梁202;内装饰板螺孔203;内承重墙体301;内承重墙竖梁302;内承重墙螺孔303;内承重墙横槽304;外承重墙体401;外承重墙横梁402;外承重墙螺孔403;外承重墙竖槽404;外防燃保温板层501;外防燃保温板螺孔502;外防燃保温板横槽503。Explanation of reference numerals: inner decoration layer 1; inner fire-proof and heat-insulation layer 2; Decorative plate beam 202; inner decorative plate screw hole 203; inner bearing wall 301; inner bearing wall vertical beam 302; inner bearing wall screw hole 303; inner bearing wall transverse groove 304; outer bearing wall 401; outer bearing wall beam 402 Outer load-bearing wall screw hole 403; Outer load-bearing wall vertical groove 404; Outer fire-proof and heat-preservation board layer 501; Outer fire-proof heat-preservation board screw hole 502;
具体实施方式Detailed ways
下面将参照附图更详细地描述本公开的示例性实施例。虽然附图中显示了本公开的示例性实施例,然而应当理解,可以以各种形式实现本公开而不应被这里阐述的实施例所限制。相反,提供这些实施例是为了能够更透彻地理解本公开,并且能够将本公开的范围完整的传达给本领域的技术人员。Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited by the embodiments set forth herein. Rather, these embodiments are provided for more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.
在本实用新型的描述中,需要理解的是,术语“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In describing the present invention, it should be understood that the terms "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", "vertical" , "horizontal", "top", "bottom", "inner", "outer" and other indicated orientations or positional relationships are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the utility model, rather than Any indication or implication that a referenced device or element must have a particular orientation, be constructed, and operate in a particular orientation should not be construed as limiting the invention.
一种改进型装配式墙体,如图1和图2所示,由内至外依次包括有相互装配结合的内装饰层1,内防燃保温层2,内承重墙3,外承重墙4,外防燃保温层5和外装饰层6。An improved prefabricated wall, as shown in Figure 1 and Figure 2, includes an internal decoration layer 1 assembled and combined with each other, an internal flame-proof insulation layer 2, an internal load-bearing wall 3, and an external load-bearing wall 4 from the inside to the outside. , Outer flame-proof insulation layer 5 and outer decorative layer 6.
如图3所示,内防燃保温层2包括有内防燃保温板层201,内防燃保温板层201上均匀间隔设置有呈凸起状的内防燃保温板横梁202,内防燃保温板层201上还均匀间隔设有内防燃保温板螺孔203。As shown in Figure 3, the internal flame-proof and thermal insulation layer 2 includes an internal flame-resistant thermal insulation board layer 201, on which the internal flame-resistant thermal insulation board layer 201 is evenly spaced with raised internal flame-resistant thermal insulation board beams 202, and the internal flame-resistant thermal insulation board layer 201 is evenly spaced. The heat-insulating board layer 201 is also provided with internal flame-proof heat-insulating plate screw holes 203 at regular intervals.
如图4所示,内承重墙3包括有内承重墙体301,内承重墙体301的内侧均匀间隔设置有呈凹陷状的内承重墙横槽304,内承重墙横槽304和内防燃保温板横梁202相互配合;内承重墙体301的外侧均匀间隔设置有呈凸起状的内承重墙竖梁302;内承重墙体301上还均匀间隔设有内承重墙螺孔303。As shown in Figure 4, the inner load-bearing wall 3 includes an inner load-bearing wall 301, and the inner side of the inner load-bearing wall 301 is evenly spaced with concave-shaped inner load-bearing wall transverse grooves 304, the inner load-bearing wall transverse grooves 304 and the inner fire-proof The insulation board beams 202 cooperate with each other; the outer side of the inner load-bearing wall 301 is provided with protruding inner load-bearing wall vertical beams 302; the inner load-bearing wall 301 is also provided with inner load-bearing wall screw holes 303 at even intervals.
内防燃保温层2和内承重墙3之间涂抹有氯丁橡胶,通过氯丁橡胶使内防燃保温层2和内承重墙3结合成一体。Neoprene is smeared between the inner flame-proof insulation layer 2 and the inner load-bearing wall 3, and the inner flame-proof insulation layer 2 and the inner load-bearing wall 3 are combined into one body through the neoprene rubber.
如图5所示,外承重墙4包括有外承重墙体401,外承重墙体401的内侧均匀间隔设置有呈凸起状的外承重墙竖槽404,外承重墙竖槽404和内承重墙竖梁302相互配合;外承重墙体401的外侧均匀间隔设置有呈凸起状的外承重墙横梁402。外承重墙体401上还均匀间隔设有外承重墙螺孔403。As shown in Figure 5, the outer load-bearing wall 4 includes an outer load-bearing wall 401, the inside of the outer load-bearing wall 401 is evenly spaced with protruding outer load-bearing wall vertical grooves 404, the outer load-bearing wall vertical grooves 404 and the inner load-bearing The wall vertical beams 302 cooperate with each other; the outer load-bearing wall 401 is evenly spaced with protruding outer load-bearing wall beams 402 . The outer load-bearing wall 401 is also provided with outer load-bearing wall screw holes 403 at even intervals.
内承重墙3和外承重墙4均通过水泥浇筑预制而成。内承重墙3和外承重墙4之间涂抹有粘结砂浆,通过粘结砂浆使内承重墙3和外承重墙4结合成一体。Both the inner bearing wall 3 and the outer bearing wall 4 are prefabricated by pouring cement. Adhesive mortar is applied between the inner load-bearing wall 3 and the outer load-bearing wall 4, and the inner load-bearing wall 3 and the outer load-bearing wall 4 are combined into one body through the adhesive mortar.
如图6所示,外防燃保温层5包括有外防燃保温板层501,外防燃保温板层501上均匀间隔设置有呈凹陷状的外防燃保温板横槽503,外防燃保温板横槽503和外承重墙横梁402相互配合;外防燃保温板层501上还均匀间隔设有外防燃保温板螺孔502。As shown in Figure 6, the outer flameproof and thermal insulation layer 5 includes an outer flameproof thermal insulation board layer 501, and the outer flameproof thermal insulation board layer 501 is evenly spaced with concave outer flameproof thermal insulation board transverse grooves 503, and the outer flameproof thermal insulation board layer 501 is evenly spaced. The transverse grooves 503 of the thermal insulation board cooperate with the beams 402 of the outer load-bearing wall; the screw holes 502 of the outer flameproof thermal insulation boards are evenly spaced on the outer flameproof thermal insulation board layer 501 .
外承重墙4和外防燃保温层5之间涂抹有氯丁橡胶,通过使外承重墙4和外防燃保温层5结合成一体。Neoprene is smeared between the outer load-bearing wall 4 and the outer fire-proof heat-insulation layer 5, and the outer load-bearing wall 4 and the outer fire-proof heat-insulation layer 5 are combined into one.
如图1和图2所示,内防燃保温板螺孔203、内承重墙螺孔303、外承重墙螺孔403和外防燃保温板螺孔502均成直线式贯通分布,内防燃保温板螺孔203、内承重墙螺孔303、外承重墙螺孔403和外防燃保温板螺孔502内部贯穿有加固螺栓7。内防燃保温层2,内承重墙3,外承重墙4和外防燃保温层5经由加固螺栓7紧固连接成一整体。As shown in Fig. 1 and Fig. 2, the screw holes 203 of the inner fire-proof and thermal insulation board, the screw holes 303 of the inner load-bearing wall, the screw holes 403 of the outer load-bearing wall and the screw holes 502 of the outer flame-proof and thermal insulation board are distributed in a straight line. Reinforcing bolts 7 run through the screw holes 203 of the insulation board, the screw holes 303 of the inner load-bearing wall, the screw holes 403 of the outer load-bearing wall and the screw holes 502 of the outer fireproof insulation board. The inner flame-proof and thermal insulation layer 2, the inner load-bearing wall 3, the outer load-bearing wall 4 and the outer flame-resistant thermal insulation layer 5 are fastened and connected into a whole through reinforcement bolts 7.
内防燃保温层2和外防燃保温层5的材料为聚乙烯苯板。内装饰层1和外装饰层6结构相同,内侧设有包裹加固螺栓7的突出部分的凹槽。内装饰层1和外装饰层6分别粘贴于内防燃保温层2和外防燃保温层5的外侧。The material of the inner flame-proof insulation layer 2 and the outer flame-proof insulation layer 5 is polyethylene styrene board. The inner decoration layer 1 and the outer decoration layer 6 have the same structure, and the inner side is provided with grooves wrapping the protruding parts of the reinforcement bolts 7 . The inner decoration layer 1 and the outer decoration layer 6 are pasted on the outsides of the inner fireproof and heat preservation layer 2 and the outer fireproof heat preservation layer 5 respectively.
改进型装配式墙体的安装方法,首先通过水泥浇筑预制而成内承重墙3和外承重墙4,在内承重墙3或外承重墙4的结合侧涂抹有粘结砂浆,将内承重墙3和外承重墙4紧密贴合;在内承重墙3的另一侧涂抹有氯丁橡胶,将内承重墙3和内防燃保温层2紧密贴合;在外承重墙4的另一侧涂抹有氯丁橡胶,将外承重墙4和外防燃保温层5紧密贴合;在安装内防燃保温层2,内承重墙3,外承重墙4和外防燃保温层5的过程中要保证内防燃保温板螺孔203、内承重墙螺孔303、外承重墙螺孔403和外防燃保温板螺孔502均成直线式贯通分布,将加固螺栓7贯穿于内防燃保温板螺孔203、内承重墙螺孔303、外承重墙螺孔403和外防燃保温板螺孔502中,经由加固螺栓7紧固连接成一整体。最后将内装饰层1粘贴于内防燃保温层2的外侧,将外装饰层6贴于外防燃保温层5的外侧。The installation method of the improved prefabricated wall is first to prefabricate the inner load-bearing wall 3 and the outer load-bearing wall 4 through cement pouring, and the joint side of the inner load-bearing wall 3 or the outer load-bearing wall 4 is coated with bonding mortar, and the inner load-bearing wall 3 and the outer load-bearing wall 4 are closely attached; the other side of the inner load-bearing wall 3 is coated with neoprene, and the inner load-bearing wall 3 and the inner fire-proof insulation layer 2 are closely attached; the other side of the outer load-bearing wall 4 is coated There is neoprene, and the outer load-bearing wall 4 and the outer flame-proof insulation layer 5 are closely bonded; Ensure that the screw holes 203 of the inner fireproof insulation board, the screw holes 303 of the inner load-bearing wall, the screw holes 403 of the outer load-bearing wall and the screw holes 502 of the outer fireproof insulation board are all distributed in a straight line, and the reinforcement bolts 7 are penetrated through the inner fireproof insulation board The screw holes 203 , the inner load-bearing wall screw holes 303 , the outer load-bearing wall screw holes 403 and the outer flame-proof and thermal insulation board screw holes 502 are fastened and connected into a whole through the reinforcement bolts 7 . Finally, the interior decoration layer 1 is pasted on the outside of the interior fireproof and heat-preserving layer 2, and the exterior decoration layer 6 is pasted on the outside of the outside fireproof and heat-preserving layer 5.
本实用新型提供的改进型装配式墙体,其装配方便快捷,大大减小了施工难度,缩短了施工周期,而且在满足强度要求的前提下,大大增强了墙体的保温、隔热、隔音、防潮性能;墙体有若干功能层复合而成,这些由若干层墙板组合成的墙体的综合性能更加优越,用户体验更加舒适。内承重墙3和外承重墙4可以改变建筑物的着力结构,节省建筑用材,强度非常高,承重性能卓越。墙体设有内防燃保温层2和外防燃保温层5能有效隔绝室内外的热量交换,使建筑内的温度维持在相对稳定的范围,即达到了冬暖夏凉的效果,大大增加了建筑的舒适性和安全性。The improved prefabricated wall provided by the utility model is convenient and quick to assemble, greatly reduces the difficulty of construction, shortens the construction period, and greatly enhances the thermal insulation, heat insulation and sound insulation of the wall under the premise of meeting the strength requirements. , Moisture-proof performance; the wall is composed of several functional layers, the comprehensive performance of these walls composed of several layers of wall panels is more superior, and the user experience is more comfortable. The inner load-bearing wall 3 and the outer load-bearing wall 4 can change the stress structure of the building, save building materials, have very high strength and excellent load-bearing performance. The wall is provided with an inner flameproof insulation layer 2 and an outer flameproof insulation layer 5, which can effectively isolate the heat exchange between indoor and outdoor, so that the temperature in the building can be maintained in a relatively stable range, which achieves the effect of warming in winter and cooling in summer, greatly increasing building comfort and safety.
尽管已经对上述各实施例进行了描述,但本领域内的技术人员一旦得知了基本创造性概念,则可对这些实施例做出另外的变更和修改,所以以上仅为本实用新型的实施例,并非因此限制本实用新型的专利保护范围,凡是利用本实用新型说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其他相关的技术领域,均同理包括在本实用新型的专利保护范围之内。Although the above-mentioned embodiments have been described, those skilled in the art can make additional changes and modifications to these embodiments once they know the basic creative concepts, so the above are only embodiments of the present utility model , not to limit the scope of patent protection of the utility model, any equivalent structure or equivalent process transformation made by using the specification and drawings of the utility model, or directly or indirectly used in other related technical fields, are all included in the same reasoning Within the scope of patent protection of the utility model.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820009394.0U CN207714540U (en) | 2018-01-04 | 2018-01-04 | A kind of modified assembled wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820009394.0U CN207714540U (en) | 2018-01-04 | 2018-01-04 | A kind of modified assembled wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207714540U true CN207714540U (en) | 2018-08-10 |
Family
ID=63054651
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820009394.0U Expired - Fee Related CN207714540U (en) | 2018-01-04 | 2018-01-04 | A kind of modified assembled wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207714540U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115262784A (en) * | 2022-07-25 | 2022-11-01 | 叶圣英 | Building heat-insulating material and preparation method thereof |
-
2018
- 2018-01-04 CN CN201820009394.0U patent/CN207714540U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115262784A (en) * | 2022-07-25 | 2022-11-01 | 叶圣英 | Building heat-insulating material and preparation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2007134517A1 (en) | Composite concrete shear wall for heat insulation | |
CN205475901U (en) | An inorganic lightweight composite thermal insulation integrated exterior wall hanging board system | |
CN207714540U (en) | A kind of modified assembled wall | |
CN201125487Y (en) | A hollow block with improved anti-seismic and thermal insulation and energy-saving effects | |
CN205348562U (en) | Prefabricated assembled concrete honeycomb thermal insulation wall | |
CN209293242U (en) | A kind of compound internal partition wall of precast light | |
CN217811906U (en) | A bolt-connected prefabricated concrete composite sandwich insulation wall panel | |
CN216973931U (en) | Prefabricated coincide thermal insulation wall body and shear force wall | |
CN2851396Y (en) | Polystyrene board sandwiched steel wire mesh building thermal-insulating energy-saving board and energy-saving board assembly | |
CN201809891U (en) | Z-shaped self-locking type energy conservation impermeable building block | |
CN107119815B (en) | Assembled in-line thermal insulation wall with lead pipe-coarse sand energy dissipation and shock absorption key and its method | |
CN215802643U (en) | Green integral type assembly type building wallboard | |
CN201433484Y (en) | Light steel truss cast-in-place lightweight solid composite wall | |
CN206477479U (en) | A kind of compound heat preservation die plate wall body structure | |
CN211622049U (en) | Heat preservation board and heat preservation wall | |
CN108612256A (en) | A kind of novel light assembled compound external wall panel | |
CN210597844U (en) | Passive insulation construction integration cavity module system | |
CN1322208C (en) | Construction thermal insulation energy-saving plate with polystyrene panel sandwiched steel wire mesh core | |
CN202090446U (en) | Prestressed reinforced concrete ribbed sandwich insulation board | |
CN207376948U (en) | The high fireproof thermal insulation wall board of rigidity or varied rigid link | |
CN207260427U (en) | Light steel composite thermo-insulating wall board | |
CN107119817B (en) | Assembled Z-shaped thermal insulation wall with lead pipe-coarse sand energy dissipation and shock absorption key and its method | |
CN206428851U (en) | A kind of light steel skeleton solid wall | |
CN104790584A (en) | Prefabricated box type large-size externally-suspended wall plate and manufacturing method thereof | |
CN221523858U (en) | Ultralow-energy-consumption composite insulation board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180810 Termination date: 20190104 |
|
CF01 | Termination of patent right due to non-payment of annual fee |