CN207485419U - A kind of transient electromagnetic resistivity logging tool graduation apparatus - Google Patents

A kind of transient electromagnetic resistivity logging tool graduation apparatus Download PDF

Info

Publication number
CN207485419U
CN207485419U CN201721395395.5U CN201721395395U CN207485419U CN 207485419 U CN207485419 U CN 207485419U CN 201721395395 U CN201721395395 U CN 201721395395U CN 207485419 U CN207485419 U CN 207485419U
Authority
CN
China
Prior art keywords
resistivity
receiving coil
coil system
transient electromagnetic
logging tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201721395395.5U
Other languages
Chinese (zh)
Inventor
张守伟
臧德福
刘思慧
蒋宏娜
张付明
刘云兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shengli Logging Co Of Sinopec Jingwei Co ltd
Sinopec Oilfield Service Corp
Sinopec Shengli Petroleum Engineering Corp
Sinopec Jingwei Co Ltd
Original Assignee
Logging Co Of Triumph Petroleum Engineering Co Ltd Of China Petrochemical Industry
Sinopec Oilfield Service Corp
Sinopec Shengli Petroleum Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Logging Co Of Triumph Petroleum Engineering Co Ltd Of China Petrochemical Industry, Sinopec Oilfield Service Corp, Sinopec Shengli Petroleum Engineering Corp filed Critical Logging Co Of Triumph Petroleum Engineering Co Ltd Of China Petrochemical Industry
Priority to CN201721395395.5U priority Critical patent/CN207485419U/en
Application granted granted Critical
Publication of CN207485419U publication Critical patent/CN207485419U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Or Analyzing Materials By The Use Of Magnetic Means (AREA)

Abstract

The utility model belongs to oil well logging construction formation resistivity field of measuring technique, more particularly, to a kind of transient electromagnetic resistivity logging tool graduation apparatus, this kind of graduation apparatus is simple and compact for structure, it is easily achieved and its own resistivity standard value is configured, so as to complete that the adjustment of engineering value is exported after measuring transient electromagnetic resistivity logging tool.A kind of transient electromagnetic resistivity logging tool graduation apparatus, including:Well bore casing;The water tank container for being set in wellbore periphery is resistivity adjustment chamber, and resistivity adjustment chamber is internally provided with isolation baffle plate, and resistivity adjustment intracavitary part is divided into the first inner chamber and the second inner chamber of size, shape all same by isolation baffle plate;Receiving coil system is positioned within well bore casing, and the first receiving coil system is provided at the first inner chamber position, the second receiving coil system is provided at the second inner chamber position;First receiving coil system is opposite with the winding direction of the second receiving coil system and Same Name of Ends connection after draw, so as to form comparison expression receiving coil system.

Description

A kind of transient electromagnetic resistivity logging tool graduation apparatus
Technical field
The utility model belongs to oil well logging construction formation resistivity field of measuring technique, more particularly, to a kind of transient electrical Magnetic resistivity logger graduation apparatus.
Background technology
Transient electromagnetic resistivity logging technology is as a kind of novel logging technique, available for surveys such as open hole well, cased wells In well field, the extraction to formation resistivity information is realized.
The existing periodic bipolarity square pulse of transient electromagnetic resistivity logging tool generally use loads on hair Ray circle.In emission process, by loading of short duration direct current on transmitting coil so that electromagnetism is formed on transmitting coil and is turned It changes, so as to generate stable Primary field in well surrounding medium.It is primary in well surrounding medium after transmitting coil power-off Magnetic field increases at any time fades away, this process can generate vortex in the medium, is vortexed meeting and then generates secondary field(Electric field, magnetic ), secondary field voltage signal be finally received coil measurement.Since the size of vortex and the conductive features of medium are related, so The secondary field voltage signal of measurement can be used for asking for for formation resistivity.
In the development process of existing transient electromagnetic resistivity logging tool, technical staff needs the electricity according to surrounding medium Resistance rate situation carries out reasonable disposition to the graduation apparatus of existing transient electromagnetic resistivity logging tool, so as to ensure apparatus measures institute The precision of value.However inventor has found, and after existing transient electromagnetic resistivity logging tool design molding, graduation apparatus Corresponding sizing, it is difficult to be changed again, therefore to adjust its graduation apparatus become ten points it is difficult, graduation apparatus is provided Measuring resistance rate ground environment also be difficult to change, cause inconvenience of the transient electromagnetic resistivity logging tool during scale.
Utility model content
The utility model provides a kind of transient electromagnetic resistivity logging tool graduation apparatus, is adopted exclusively for electromagnetic probe It takes the instrument of comparison expression receiving coil system and builds.This kind of graduation apparatus is simple and compact for structure, it is easy to accomplish to self-resistance rate Standard value is configured, so as to complete the scale to transient electromagnetic resistivity logging tool engineering value.
In order to solve the above technical problems, the utility model employs following technical solution:
A kind of transient electromagnetic resistivity logging tool graduation apparatus, including:
Well bore casing;
The resistivity adjustment chamber of well bore casing periphery is set in, resistivity adjustment chamber is internally provided with isolation baffle plate, every Resistivity adjustment intracavitary part is divided into the first inner chamber and the second inner chamber of size, shape all same from baffle;It receives Coil array is positioned over inside well bore casing, and the first receiving coil system is provided in the first inner chamber, is provided in the second inner chamber Second receiving coil system;First receiving coil system is opposite with the winding direction of the second receiving coil system and Same Name of Ends draws afterwards in succession Go out, so as to form comparison expression receiving coil system.
Further, it further includes:Be arranged on resistivity adjustment chamber the first inner chamber side wall on first open window and Second be arranged on resistivity adjustment chamber the second inner chamber side wall opens window.
More preferred, resistivity adjustment chamber is made of in hollow cylinder shape glass steel material;Resistivity adjustment chamber 0.4-0.5 meters a diameter of, the length of resistivity adjustment chamber is not less than 2 meters.
More preferred, well bore casing is made of glass steel material or steel material;A diameter of 5 inches of well bore casing or 7 Inch, the length of well bore casing are longer than the length of resistivity adjustment chamber.
It is selectable, it further includes:The stent of well bore casing and resistivity adjustment chamber is used to support, the material of stent has Non-magnetic, non-conductive feature.
It is selectable, distance of the first receiving coil system away from isolation baffle plate and the second receiving coil system away from isolation baffle plate away from From identical.
The utility model provides a kind of transient electromagnetic resistivity logging tool graduation apparatus, this kind of transient electromagnetic resistance The structures such as rate logger graduation apparatus setting well bore casing, the resistivity adjustment chamber for being set in well bore casing periphery, stent Unit, wherein resistivity adjustment chamber are internally provided with isolation baffle plate, and resistivity adjustment intracavitary part is divided into greatly by isolation baffle plate Small, shape all same the first inner chamber and the second inner chamber;It is provided with the first receiving coil system in first inner chamber, second The second receiving coil system is provided in inner chamber;First receiving coil system is opposite with the winding direction of the second receiving coil system and same Name termination is drawn after connecting, so as to form comparison expression receiving coil system.Transient electromagnetic resistivity logging with above structure unit Instrument graduation apparatus can be relatively easy to complete the adjustment to its measurement accuracy, be surveyed so as to fulfill to transient electromagnetic resistivity The amendment of well instrument measurements ultimately helps the scale work of logger.
Description of the drawings
Fig. 1 is the structure diagram of transient electromagnetic resistivity logging tool graduation apparatus provided by the utility model;
Fig. 2 is to carry out zero degree value scale with graduation apparatus to the transient electromagnetic resistivity logging tool of structure shown in Fig. 1 to survey Output waveform diagram caused by amount process.
Specific embodiment
The utility model provides a kind of transient electromagnetic resistivity logging tool graduation apparatus, this kind of graduation apparatus structure Simple and compact, it is easy to accomplish self-resistance rate standard value is configured, so as to complete to transient electromagnetic resistivity logging tool The adjustment of measured value.
As shown in Figure 1, the utility model provides a kind of transient electromagnetic resistivity logging tool graduation apparatus, the transition Electromagnetic resistance rate logger graduation apparatus includes well bore casing 1(Specifically, well bore casing is by steel sleeve or fiberglass Pipe form, inside can also be needed to be provided with the component parts such as water tank container according to real work), resistivity adjustment chamber 2 with And the stent 3 of setting may be selected, resistivity adjustment chamber 2 is set in the periphery of well bore casing 1.Wherein, more preferably, wellbore set Pipe is made of glass steel material or steel material;A diameter of 5 inches of well bore casing or 7 inches, the length of well bore casing is longer than electricity Resistance rate adjusts the length of chamber;And resistivity adjustment chamber 2 is made of in hollow cylinder shape glass steel material;Resistivity adjusts chamber A diameter of 0.4-0.5 meters, resistivity adjustment chamber length be not less than 2 meters.Isolation is internally provided in resistivity adjustment chamber 2 Baffle 21, the isolation baffle plate 21 can by resistivity adjust chamber 2 inner space be separated into size, shape all same first inside 211 and second inner chamber 221 of chamber;The coil array of logger is positioned over inside well bore casing, is set in the first inner chamber 211 The first receiving coil system 212 is equipped with, the second receiving coil system 222 is provided in the second inner chamber 221;First receiving coil system 212 is opposite with the winding direction of the second receiving coil system 222 and Same Name of Ends is drawn afterwards in succession(Specifically as shown in Figure 1, first connects Rear exit is A0 ends to the Same Name of Ends of receipts coil array and the second receiving coil system in succession, and the other end of the first receiving coil system is A1 End, the other end of the second receiving coil system is A2 ends), so as to form comparison expression receiving coil system.
And the utility model one kind more preferred embodiment is used as, this kind of transient electromagnetic resistivity logging tool is carved Degree device further includes the first opening window and second opens window, wherein the first opening window is arranged on resistivity adjustment chamber the On one inner chamber side wall, the second opening window is arranged on resistivity adjustment chamber the second inner chamber side wall.
The specifically used process of this kind of transient electromagnetic resistivity logging tool graduation apparatus can be described as follows:Basis first Borehole size requirement determines the diameter of well bore casing, such as:The diameter of well bore casing is set as 5 inches or 7 inches;Then Resistivity adjustment chamber is placed in the periphery of well bore casing, window and second dozen are opened by first on well bore casing respectively Windowing injects the pure distilled water of equivalent into the first inner chamber and the second inner chamber;Be closed first open window and Second opens window, is fixed using fluid sealant, and by the horizontal placement of device.Logger is positioned over inside well bore casing, It is worth noting that, in transient electromagnetic signal emission process, direct current is connected in transmitting coil, in pit shaft, well bore casing And stable Primary field can be generated in the corresponding internal chamber of resistivity adjustment chamber.And transient electromagnetic signal battery has fired Afterwards, Primary field will be zero through changing after a period of time.Within the period for fading to zero, Primary field can form vortex and then production Raw secondary magnetic field, the secondary magnetic field voltage signal can be received coil reception, and waveform can be recorded by instrument.And due to The resistivity value of one inner chamber and the second inner chamber is equal(Wherein, it is preferable that the first receiving coil system keeps off away from isolation The distance of plate is identical with the second distance of the receiving coil system away from isolation baffle plate;And it is injected in the first inner chamber and the second inner chamber Pure distilled water is also equivalent), therefore for two end signals of comparison expression receiving coil system, amplitude and attenuation It is identical that situation, which changes over time, but direction is on the contrary, as shown in Figure 2.Both first receiving coil system, the second receiving coil system After signal differential operation output, the voltage difference of the two is measured, total differential effect is zero.That is, instrument is completed at this time Be zero degree value scale measure.With resistivity instrument measurement liquid resistivity, as standard value when starting scale.
One of both first inner chamber or the second inner chamber are then selected, electricity is gradually added into the inner chamber of selection Matter salt is solved, and is stirred evenly;The situation of change of resistivity instrument measurement resistivity is used after the completion of addition(Not selected inner chamber Keep original state constant).At this point, the amplitude of both the first receiving coil system, the second receiving coil system signal and attenuation are at any time Between variation be it is different, transient electromagnetic resistivity logging tool carry out calculus of differences output result tested, can measure Total voltage difference data.Difference waveform amplitude at this time has acute variation, and total differential effect is rendered as an amplitude and changes over time And the curve decayed.With resistivity instrument measurement saline fluid resistivity, the standard value as certain test point during scale.
It then proceedes to repeatedly be gradually added into electrolytic salt into the inner chamber of same selection, continue after stirring evenly Later data is tested.The resistivity data true value that many experiments obtain(Standard value), so as to each survey engineering of calibrating instrument Value, and then the engineering value coefficient of transient electromagnetic resistivity logging tool is obtained, realize the scale to instrument.
And after realizing to the accurate calibration of the engineering value coefficient of transient electromagnetic resistivity logging tool, by this kind of transition Electromagnetic resistance rate logger, which is lowered under practical well environment, carries out logging operation.Since geologic body resistivity value is around well It is changed with well depth, and the resistivity of medium and unbalanced in the range of the comparison expression coil array of instrument.It is at this point, defeated A curve in attenuation change trend can be obtained after measuring circuit by going out signal, by parsing the change curve and then realization Measurement to surrounding medium resistivity.
The utility model provides a kind of transient electromagnetic resistivity logging tool graduation apparatus, this kind of transient electromagnetic resistance The structures such as rate logger graduation apparatus setting well bore casing, the resistivity adjustment chamber for being set in well bore casing periphery, stent Unit, wherein resistivity adjustment chamber are internally provided with isolation baffle plate, and resistivity adjustment intracavitary part is divided into greatly by isolation baffle plate Small, shape all same the first inner chamber and the second inner chamber;The coil array of logger is positioned over inside well bore casing, the The first receiving coil system is provided in one inner chamber, the second receiving coil system is provided in the second inner chamber;First receiving coil It is that and Same Name of Ends opposite with the winding direction of the second receiving coil system is drawn afterwards in succession, so as to form comparison expression receiving coil system. Transient electromagnetic resistivity logging tool graduation apparatus with above structure unit, can be relatively easy to complete what it was provided Standard electric values of resistivity is adjusted, and so as to fulfill the amendment to transient electromagnetic resistivity logging tool survey engineering value, is finally had Help the scale work of logger.
The above, only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to In this, in the technical scope that any one skilled in the art discloses in the utility model, variation can be readily occurred in Or replace, it should be covered within the scope of the utility model.Therefore, the scope of protection of the utility model should be with the power Subject to the protection domain of profit requirement.

Claims (6)

1. a kind of transient electromagnetic resistivity logging tool graduation apparatus, which is characterized in that including:
Well bore casing;
The resistivity adjustment chamber of well bore casing periphery is set in, resistivity adjustment chamber is internally provided with isolation baffle plate, isolation gear Resistivity adjustment intracavitary part is divided into the first inner chamber and the second inner chamber of size, shape all same by plate;Inside first Intracavitary is provided with the first receiving coil system, and the second receiving coil system is provided in the second inner chamber;First receiving coil system and the The winding direction of two receiving coil systems is drawn on the contrary and after Same Name of Ends connection, so as to form comparison expression receiving coil system.
2. a kind of transient electromagnetic resistivity logging tool graduation apparatus according to claim 1, which is characterized in that also wrap It includes:First be arranged on resistivity adjustment chamber the first inner chamber side wall opens window and is arranged on resistivity adjustment chamber second Second on inner chamber side wall opens window.
3. a kind of transient electromagnetic resistivity logging tool graduation apparatus according to claim 1 or 2, which is characterized in that Resistivity adjustment chamber is made of in hollow cylinder shape glass steel material;A diameter of 0.4-0.5 meters of resistivity adjustment chamber, electricity The length of resistance rate adjustment chamber is not less than 2 meters.
A kind of 4. transient electromagnetic resistivity logging tool graduation apparatus according to claim 1, which is characterized in that wellbore Casing is made of glass steel material or steel material;A diameter of 5 inches of well bore casing or 7 inches, the length of well bore casing is longer than Resistivity adjusts the length of chamber.
5. a kind of transient electromagnetic resistivity logging tool graduation apparatus according to claim 1, which is characterized in that also wrap It includes:The stent of well bore casing and resistivity adjustment chamber is used to support, the material of the stent has non-magnetic, non-conductive spy Sign.
6. a kind of transient electromagnetic resistivity logging tool graduation apparatus according to claim 1, which is characterized in that first Distance of the receiving coil system away from isolation baffle plate is identical with the second distance of the receiving coil system away from isolation baffle plate.
CN201721395395.5U 2017-10-26 2017-10-26 A kind of transient electromagnetic resistivity logging tool graduation apparatus Withdrawn - After Issue CN207485419U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721395395.5U CN207485419U (en) 2017-10-26 2017-10-26 A kind of transient electromagnetic resistivity logging tool graduation apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721395395.5U CN207485419U (en) 2017-10-26 2017-10-26 A kind of transient electromagnetic resistivity logging tool graduation apparatus

Publications (1)

Publication Number Publication Date
CN207485419U true CN207485419U (en) 2018-06-12

Family

ID=62477646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721395395.5U Withdrawn - After Issue CN207485419U (en) 2017-10-26 2017-10-26 A kind of transient electromagnetic resistivity logging tool graduation apparatus

Country Status (1)

Country Link
CN (1) CN207485419U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107956466A (en) * 2017-10-26 2018-04-24 中石化石油工程技术服务有限公司 A kind of transient electromagnetic resistivity logging tool graduation apparatus
CN112112637A (en) * 2019-06-04 2020-12-22 中石化石油工程技术服务有限公司 Measuring method for obtaining formation resistivity in production well

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107956466A (en) * 2017-10-26 2018-04-24 中石化石油工程技术服务有限公司 A kind of transient electromagnetic resistivity logging tool graduation apparatus
CN107956466B (en) * 2017-10-26 2023-09-08 中国石油化工集团有限公司 A scale device for transient electromagnetic resistivity logging instruments
CN112112637A (en) * 2019-06-04 2020-12-22 中石化石油工程技术服务有限公司 Measuring method for obtaining formation resistivity in production well

Similar Documents

Publication Publication Date Title
CN107956466A (en) A kind of transient electromagnetic resistivity logging tool graduation apparatus
CN101263404B (en) High resolution resistivity earth imager
US7202671B2 (en) Method and apparatus for measuring formation conductivities from within cased wellbores by combined measurement of casing current leakage and electromagnetic response
JP2980680B2 (en) Well exploration system during well drilling
EP2514915A1 (en) Downhole time-domain pulsed electromagnetic method for detecting resistivity of stratum outside metal cased pipe
CN103630853B (en) induction type magnetic field sensor
US20120215448A1 (en) Method for detecting formation resistivity outside of metal casing using time-domain electromagnetic pulse in well
RU96118234A (en) METHOD AND DEVICE FOR MEASURING THE INDIVIDUAL RESISTANCE OF FORMATIONS USING A CASING TUBE USING A SINGLE-TERMINAL ELECTRIC CABLE
NO315725B1 (en) Device for measuring and monitoring resistivity outside a well pipe in a petroleum reservoir
CN102042009A (en) Array induction logging coil system for measuring formation resistivity
CN100363758C (en) Logging Instruments and Methods for Induction-Spherically Focusing Laterologging
CN111594154A (en) Device and method for measuring resistivity of stratum in front of drill bit
CN207485419U (en) A kind of transient electromagnetic resistivity logging tool graduation apparatus
CN203684198U (en) Soil in-situ resistivity test device utilizing static penetration device
CN102562026A (en) Method and instrument for testing gas and water production profiles of coal-bed gas well
CN108049865B (en) Electric field calibration method for induction logging while drilling
CN108802852A (en) A kind of Magnetic Sensor test device
CN111122977B (en) Over-drill resistivity measurement while drilling method and device
CN204126629U (en) π Imaging Logging System
US10025003B1 (en) Calibration method under near-bit wireless short-transmission ground envrionment based on electric field theory
CN207554032U (en) For the rod rotation speed measuring device of middle wind pressure medium-length hole portable dth drill
CN103291277A (en) Calibration device for three-dimensional array induction logging instrument
CN101050700B (en) Electromagnetic wave logging instrument correcting method using high permeable magnetic material
CN211144481U (en) An azimuth-while-drilling nuclear magnetic resonance logging device for geosteering
CN106840445A (en) A kind of high-precision quartz crystal temperature effect meter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220210

Address after: 100029 Chaoyang District, Beijing Hui Xin Street six, Twelfth level.

Patentee after: SINOPEC OILFIELD SERVICE Corp.

Patentee after: SINOPEC SHENGLI PETROLEUM ENGINEERING Co.,Ltd.

Patentee after: Sinopec Jingwei Co.,Ltd.

Patentee after: Shengli logging company of Sinopec Jingwei Co.,Ltd.

Address before: 100101 Beichen West Road, Chaoyang District, Beijing 8 Beichen world center, block A 703.

Patentee before: SINOPEC OILFIELD SERVICE Corp.

Patentee before: SINOPEC SHENGLI PETROLEUM ENGINEERING Co.,Ltd.

Patentee before: WELL LOGGING COMPANY, SINOPEC SHENGLI PETROLEUM ENGINEERING Co.,Ltd.

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20180612

Effective date of abandoning: 20230908

AV01 Patent right actively abandoned

Granted publication date: 20180612

Effective date of abandoning: 20230908