CN207407057U - The gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon - Google Patents
The gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon Download PDFInfo
- Publication number
- CN207407057U CN207407057U CN201720986675.7U CN201720986675U CN207407057U CN 207407057 U CN207407057 U CN 207407057U CN 201720986675 U CN201720986675 U CN 201720986675U CN 207407057 U CN207407057 U CN 207407057U
- Authority
- CN
- China
- Prior art keywords
- lng
- liquid
- landing stage
- filling
- gas burning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 238000011049 filling Methods 0.000 title claims abstract description 44
- 239000004215 Carbon black (E152) Substances 0.000 title claims abstract description 16
- 229930195733 hydrocarbon Natural products 0.000 title claims abstract description 16
- 150000002430 hydrocarbons Chemical class 0.000 title claims abstract description 16
- 239000007788 liquid Substances 0.000 claims abstract description 69
- 238000009413 insulation Methods 0.000 claims abstract description 33
- 238000000034 method Methods 0.000 claims abstract description 16
- 230000008569 process Effects 0.000 claims abstract description 14
- 238000011068 loading method Methods 0.000 claims abstract description 8
- 238000003860 storage Methods 0.000 claims description 31
- 239000010410 layer Substances 0.000 claims description 20
- 238000005086 pumping Methods 0.000 claims description 17
- 238000004804 winding Methods 0.000 claims description 8
- 239000011229 interlayer Substances 0.000 claims description 7
- 239000000463 material Substances 0.000 claims description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000002131 composite material Substances 0.000 claims description 4
- 150000001875 compounds Chemical class 0.000 claims description 4
- 229920001971 elastomer Polymers 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 229920000742 Cotton Polymers 0.000 claims description 3
- 230000009471 action Effects 0.000 claims description 3
- 239000000956 alloy Substances 0.000 claims description 3
- 229910045601 alloy Inorganic materials 0.000 claims description 3
- 239000005030 aluminium foil Substances 0.000 claims description 3
- 238000005260 corrosion Methods 0.000 claims description 3
- 230000007797 corrosion Effects 0.000 claims description 3
- 238000009792 diffusion process Methods 0.000 claims description 3
- 238000001704 evaporation Methods 0.000 claims description 3
- 230000008020 evaporation Effects 0.000 claims description 3
- 239000006261 foam material Substances 0.000 claims description 3
- 239000003365 glass fiber Substances 0.000 claims description 3
- 238000002386 leaching Methods 0.000 claims description 3
- 238000004080 punching Methods 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims description 3
- 238000005520 cutting process Methods 0.000 claims description 2
- 230000013011 mating Effects 0.000 claims description 2
- 239000010935 stainless steel Substances 0.000 claims description 2
- 229910001220 stainless steel Inorganic materials 0.000 claims description 2
- 238000013461 design Methods 0.000 abstract description 11
- 239000007789 gas Substances 0.000 abstract description 10
- 239000000567 combustion gas Substances 0.000 abstract description 4
- 238000007599 discharging Methods 0.000 abstract description 4
- 238000009834 vaporization Methods 0.000 abstract description 2
- 230000008016 vaporization Effects 0.000 abstract description 2
- 239000003949 liquefied natural gas Substances 0.000 description 62
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 10
- 230000000694 effects Effects 0.000 description 7
- 238000012986 modification Methods 0.000 description 7
- 230000004048 modification Effects 0.000 description 7
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 4
- 238000011161 development Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 4
- 239000012774 insulation material Substances 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 238000004891 communication Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 3
- 230000001737 promoting effect Effects 0.000 description 3
- 230000004888 barrier function Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000005429 filling process Methods 0.000 description 2
- 239000012530 fluid Substances 0.000 description 2
- 239000013505 freshwater Substances 0.000 description 2
- 239000000446 fuel Substances 0.000 description 2
- 229910052757 nitrogen Inorganic materials 0.000 description 2
- 238000010926 purge Methods 0.000 description 2
- 229920005830 Polyurethane Foam Polymers 0.000 description 1
- 206010037544 Purging Diseases 0.000 description 1
- 238000010521 absorption reaction Methods 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000007767 bonding agent Substances 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 239000008358 core component Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000013013 elastic material Substances 0.000 description 1
- 239000000806 elastomer Substances 0.000 description 1
- 238000010304 firing Methods 0.000 description 1
- 238000005187 foaming Methods 0.000 description 1
- 238000001802 infusion Methods 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 239000011810 insulating material Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- FDZZZRQASAIRJF-UHFFFAOYSA-M malachite green Chemical compound [Cl-].C1=CC(N(C)C)=CC=C1C(C=1C=CC=CC=1)=C1C=CC(=[N+](C)C)C=C1 FDZZZRQASAIRJF-UHFFFAOYSA-M 0.000 description 1
- 230000036244 malformation Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 239000011496 polyurethane foam Substances 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 230000001052 transient effect Effects 0.000 description 1
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The utility model is related to a kind of gas burning systems on the multi-functional filling landing stage of aqueous hydrocarbon, and liquid system, cold insulation of LNG system and auxiliary system are unloaded including LNG liquefied cargo systems, LNG process pipe works, LNG loading systems, LNG;The auxiliary system includes pressure relief system, BOG supply and instrument wind system.Loading system in the technical solution is with unloading liquid system using integrated design, the designing scheme fully utilizes combustion gas process pipeline, a set of pipe-line system can be shared by filling operation and liquid discharging operation, this kind of designing scheme had both met Specification Design requirement, pipeline mileage is greatly saved simultaneously, the amount of vaporization of BOG gases is reduced, cost has both been saved and has also saved system occupied space and place.
Description
Technical field
The present invention relates to a kind of gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon, belongs to shipbuilding technical field.
Background technology
2014, based on the conditions of the current stage of communications and transportation development, traffic and transportation science development, traffic is better achieved
Department of Transportation proposes construction --- comprehensive traffic, wisdom traffic, green traffic, the safety traffic of " four traffic ".LNG is as cleaning
The energy is the strong pushing hands for developing " green traffic ", and to promote LNG, in the application development of water transport project, Department of Transportation puts into effect
A series of policies and measures:
Department of Transportation's issue《Department of Transportation is on the instruction for promoting water transport project application liquefied natural gas》,
It is the Top-layer Design Method of State-level, has shown that China is promoting clean energy resource application, adjustment energy structure, promoting water transport emission reduction etc.
The proactive of aspect.To carry out《Instruction》, it is pushed further into applications of the LNG in water transport project, communications and transportation
It issues in portion《Water transport project application liquefied natural gas pilot demonstration work embodiment》Embodiment, it is determined that《Water transport project should
With the first batch of pilot demonstrative project list of liquefied natural gas》, Changjiang River Trunk Line Jiangsu Section water transport project application LNG is as first batch of demonstration item
Mesh, is explored, demonstrating leads by pilot, and Changjiang River Trunk Line ship is driven to apply LNG, is that China's water transport project energy structure improves
Important means, meet the needs of China green traffic development.
Sea port China of enterprise has designed and has built up first generation LNG filling stations waterborne " harbour star 01 " number at present, is sent out according to company
Exhibition and industry requirement, company prepare filling station on design aqueous hydrocarbon multifunctional water of new generation, are provided simultaneously with LNG, oil product, fresh water
Filled function.Filling landing stage structure function currently on the market is relatively simple, and therefore, there is an urgent need for a kind of new technical sides
Case solves above-mentioned technical problem.
The content of the invention
The present invention is exactly for technical problem in the prior art, provides a kind of multi-functional filling landing stage of aqueous hydrocarbon
Gas burning system, the technical solution smart structural design is compact, which is provided simultaneously with the filling work(of LNG, oil product, fresh water
Energy.
To achieve these goals, technical scheme is as follows:
A kind of gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon, including LNG liquefied cargo systems, LNG process pipe works,
LNG loading systems, LNG unload liquid system, cold insulation of LNG system and auxiliary system;The liquefied cargo system includes LNG storage tank, institute
The LNG stated goes out the liquid outlet of liquid storage tank and inlet is arranged on the top of tank contents device, and pump chamber is set inside LNG storage tank,
Pump chamber is inside and outside bladder structure, and middle level is vacuum interlayer, and pumping system is built in bottom end under pump work chamber, the inlet of pump work chamber
Place is connected with the urgent bottom stop valve of low temperature;The LNG, which unloads liquid system, to be included unloading liquid operating platform, is set on liquid platform is unloaded
The interlude prepackage emergency cut-off part of liquid pipe mouth, the flange unloaded at liquid pipe mouth and pipeline is unloaded, flange end prepackage is fast
Fast linker B ends, the filling port prepackage quick connector A ends of LNG filling ships, A/B ends have mating special-shaped decorative pattern, by not
Rules rotating can make A/B ends realize quick links, and A/B ends are provided with rubber seal;LNG loading systems include filling
Platform;Two sleeve openings are reserved respectively on liquid platform and filling platform in described unload, and are filled, are unloaded liquid part pipeline and share, work as pipe
Road separates when being connected to LNG process pipe works, is divided into inlet and liquid outlet that 4 tunnels connection LNG goes out liquid storage tank;Described
Cold insulation of LNG system is included in the Cold-keeping Layer of LNG process pipe works setting, and the Cold-keeping Layer is specially:It is straight in straight-through low temperature
The position that spool road is longer, shut-off valve is more, elbow is more, using resilient foam material cold insulation;It is corrosion-resistant, it is resistance to strike, it is resistance to
The outer layer position of high temperature uses alloy protecting layer;The prefabricated cold insulations of PPR are used at pipeline support position;The auxiliary system includes letting out
Pressure system, BOG supply and instrument wind system.
As a modification of the present invention, ultravacuum multi-lay winding cold insulation is used in pressure vessel or pressure tube portions,
It is realized by prefabricated mode, by the way that glass fiber paper to be carried out to compound, winding of tiling after composite material is punched in batches with aluminium foil
In inner tube or inner cylinder, the winding number of plies is 30~50 layers, finally using steel material sealed outer pipe or outer barrel, reserved
Pumping hole vacuumized.
As a modification of the present invention, pumping system pump work chamber is in suspended structure in tank contents device, and has down
Support is hung to weld with pump work chamber.
As a modification of the present invention, being provided in tank contents device prevents cryogenic liquid various factors on landing stage
Liquid is caused to shake punching, evaporation and the drastically swash plate of boost conditions.
As a modification of the present invention, connect the top inlet tube of inlet and fill structure for the porous mouth leaching of single tube.
As a modification of the present invention, being internally located in LNG storage tank outer barrel in the range of 60 ° of peak both sides increases by two
Layer adiabatic cotton, back-up sand is carried out after being fixed with hexagonal stainless steel net to interlayer again.
As a modification of the present invention, the operation valve and instrument of LNG storage tank are from tank body Base top contact.
As a modification of the present invention, all safety valve delivery pipes of LNG storage tank converge to safe diffusion system and concentrate
It is discharged, shut-off valve and quick action emergency valve is provided with into, return line to jacking, bottom.
Compared with the prior art, the invention has the advantages that,
1st, with unloading liquid system using integrated design, which fully utilizes the loading system in the technical solution
Combustion gas process pipeline, that is, a set of pipe-line system can be shared by filling operation and liquid discharging operation, this kind of designing scheme both meets specification
Design requirement, while pipeline mileage is greatly saved, the amount of vaporization of BOG gases is reduced, cost has both been saved and has also saved system
Occupied space and place;
2nd, storage tank go out liquid form be on go out liquid and be domestic initiation and apply, this innovation and creation advantage is meeting rule
On the premise of the requirement of model, it can greatly save cost to avoid ice chest and storage tank cofferdam is set, save the duration, while by space
Utilize maximization.
3. compound cold insulation system utilizes the respective advantage of different adiabatic patterns:Elastomer foamed thermal insulation material is convenient for big rule
Mould is utilized, cut out convenient for cutting, convenient for the utilization of labyrinth form;Foam-in-place form can be constructed with adaptation to local conditions, be had
Higher intensity may be used as the cold insulation of support section;Vacuum multi-layer wound insulation pipeline has higher heat-insulating property, can be with
It is prefabricated, available for fixing circuit, the pipeline heat insulation easily welded.
4. employing pumping system built in storage tank, in addition expense that pump pond is set and place are avoided, avoids external pumping system
Caused by BOG gases and pressure transient, save LNG tubing general expenses and the duration, make full use of storage tank carries pressure,
Liquid output is more smooth, powerful.
5. unloading liquid stream journey to be optimized, all land based installations are avoided, including land route unloading deck, vacuum transmission pipeline, bank
The facilities such as base control system, trestle.So that all liquid discharging operations can unload complete independently on liquid platform on filling landing stage, it will
The work efficiency that LNG unloads liquid improves several times, utilization rate of equipment and installations is maximized, project cost minimizes, space utilization is integrated.
6. the tank pressure of storage tank provides stable pressure source for pumping system, distance of the pumping system apart from medium source is shortened,
So that filling output speed faster, power it is stronger, while save placement pump sump space, shorten LNG output pipes.7. it protects
Cold effect is more preferable, and construction efficiency higher is more convenient.More prefabricated original paper is used simultaneously, is not only reduced cost, but also is saved the duration.
Description of the drawings
Fig. 1 is combustion gas process system layout drawing.
Fig. 2 is the structure diagram of the LNG storage tank of the present invention.
Specific embodiment:
In order to deepen the understanding of the present invention, the present embodiment is described in detail below in conjunction with the accompanying drawings.Need what is illustrated
It is above-described embodiment, is not used for limiting protection scope of the present invention, it is made based on the above technical solutions to be equal
Conversion or replacement each fall within the scope that the claims in the present invention are protected
Such as a kind of Fig. 1 to the gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon shown in Fig. 2, including LNG liquefied cargo systems,
LNG process pipe works, LNG loading systems, LNG, which unload liquid system, cold insulation of LNG system and auxiliary system, auxiliary system, to be included
Pressure relief system, BOG supply and instrument wind system.
LNG unloads the critical workflow that liquid stream journey is LNG cargo tank fluid infusion, unloads liquid mode and unloads liquid for ship-to-ship.Flow includes LNG
Filling ship berthing → LNG system pipelines systematic connection → each related valve opening → gaseous pressure balances → starts LNG and unloads liquid work
Disconnect pipe-line system → nitrogen purges → to fluid level condition shutdown → respectively having closing valve to close → unloads industry → unloading liquid process monitoring →
Liquid stream journey completion → LNG fills ship from pool.
Liquid operating platform is being unloaded in main operation when unloading liquid, and emergency cut-off is pre-installed by the interlude in flange and pipeline
Part, its effect are that emergency occurs when unloading liquid, and blank can unload liquid pipe mouth with emergency cut-off, play safeguard protection work
With.Flange end prepackage quick links device B ends, the filling port prepackage quick connector A ends of LNG filling ships, A/B ends, which have, matches somebody with somebody
The special-shaped decorative pattern of set, can make A/B ends realize quick links, and the rubber seal at A/B ends can make chain by irregularly rotating
Junction is not easy to leak, so as to achieve the effect that high-speed communication.
It is exactly abundant that the LNG, which unloads liquid stream journey and the maximum difference for unloading liquid stream journey on the first pickup bank formula LNG filling landing stage,
Make use of LNG pipe-line systems, redesigned the first pickup bank formula LNG filling landing stage unload liquid must by land LNG transport unload
Liquid is transferred to the technology path of accumulating by vacuum line again, avoids all land based installations, is passed including land route unloading deck, vacuum
The facilities such as defeated pipeline, bank base control system, trestle.So that all liquid discharging operations can unloading on liquid platform solely on filling landing stage
Vertical to complete, the work efficiency that LNG is unloaded to liquid improves several times, utilization rate of equipment and installations is maximized, project cost minimizes, space utilization
It is integrated.
LNG filling flows are the critical workflow filled to LNG Power Vessels and the core of entire combustion gas process system
Flow.Its groundwork object is LNG fuels and energy ships, and working method is ship-to-ship liquid feeding.Flow includes LNG fuels and energies
Ship berthing → pipeline flowmeter precooling → LNG pipe-line systems link → each related valve opening → gaseous pressure balance → LNG storages
Pump startup built in tank and fill → fill NG purgings after the completion of stage LNG Power Vessel return-air → filling machine autostop → filling →
Respectively there is closing valve to close → disconnect flange → liquid feeding, return line nitrogen displacement → filling and complete Power Vessel from pool.
New liquefied cargo system and pumping system are its core components in filling process, with first generation LNG filling landing stage
Loading system is compared, and the system has done larger innovation, and LNG storage tank is redesigned, and LNG goes out 16 He of liquid outlet of liquid storage tank
Inlet 8 is arranged on the top of tank contents device, and cryogenic pump system is built into tank inside, and pump chamber is set in tank inside,
Pump chamber is designed to inner-outer tube, and middle level is vacuum interlayer, and cryogenic pump continuous firing in pump chamber during filling, the tank pressure of storage tank is pump system
System provide stable pressure source, shorten distance of the pumping system apart from medium source so that filling output speed faster, power more
By force, while the space of placement pump sump is saved, shortens LNG output pipes.It is also improved in the design of charging line, directly
It is filled using the link of new quick links device.
Particularly the design of liquid discharge type low-temperature storage tank is as follows:
1) the pump work chamber 7 of pumping system 6 can be placed by being equipped in inner pressurd vessel 5, and pumping system 6 is built in pump work chamber 7 and goes to the bottom
At end, it is connected at the inlet 9 of pump work chamber 7 with the urgent bottom stop valve 10 of low temperature, in normal use, the urgent bottom of this low temperature
Portion's stop valve 10 is constantly in normally open, when storage tank needs maintenance, the urgent bottom stop valve 10 of low temperature is closed, to overhaul
Pump work chamber 7 can be entered during pumping system 6 with barrier liquid, the urgent bottom stop valve 10 of low temperature at pump work chamber inlet 9 with connecting
It connects, to compensate the pipeline shrinkage problem after inner pressurd vessel feed liquor;
2) pumping system 6 is in suspended structure in pump work chamber 7 in inner pressurd vessel 5, and has projecting support 11 to be welded with pump work chamber 7
Connect, so as to support pump work chamber, while during the design of suspended structure in order to prevent after 5 feed liquor of inner pressurd vessel caused by cylinder receive
Caused by contracting the problem of weld seam drawing crack;
3) be provided in inner pressurd vessel 5 prevent cryogenic liquid various factors on landing stage cause liquid shake punching, evaporation and drastically
The swash plate 12 of boost conditions.
4) the top inlet tube for connecting inlet 8 is designed as the leaching of single tube porous mouth and fills structure, can fill cryogenic liquid
Maidenliness when entering inner pressurd vessel.And the partial gas phase in inner pressurd vessel 5 can be made to be liquefied by low temperature absorption, to keep inner pressurd vessel in filling process
The relative stability of 5 gaseous pressure.
5) being internally located in storage tank outer barrel 13 in the range of 60 ° of peak both sides increases by two layers of adiabatic cotton 14, with hexagonal not
It becomes rusty after steel mesh 15 is fixed and back-up sand is carried out to interlayer again.The purpose of this way is to prevent storage tank after using for a longer period due to thermal insulation
The pearlife of layer occurs sedimentation and influences the insulation effect of storage tank.
6) tank contents device 5 employs combined support with storage tank outer barrel 13 (one end is fixed, one end slides), it is ensured that
It will not make relative displacement and malformation and inner pressurd vessel occur between inner pressurd vessel and housing because of rocking in use
The phenomenon that support and pipeline are broken due to shrinkage after having filled cryogenic liquid.
7) the operation valve of storage tank and instrument are from tank body Base top contact.Low temperature is safely stored to ensure that tank body can be stablized
Liquid, tank body are provided with maltilevel security device and instrument:Radar level gauge is configured, interlayer is equipped with outer barrel explosion-protection equipment, and inner cylinder is set
There is combination security system(Double safety valve), pipeline safety valve etc..
8) all safety valve delivery pipes converge to safe diffusion system(It is designed by skid-mounted system this part)Concentration is arranged
It puts.Duplicate protection is provided with into, return line to jacking, bottom(First is shut-off valve, and second is quick action emergency valve).
Process pipeline cold insulation mode is redesigned and optimized in the present system.Common pipeline cold insulation material
It is a variety of that the prefabricated cold insulation of flexible foaming cold insulation, PPR, polyurethane foam cold insulation, ultravacuum multi-lay winding cold insulation etc. can be divided into
Cold insulation material.The innovation of the special design of the system cold insulation is mainly reflected in for complex large-sized system pipeline and equipment
Different cold insulation requirements use different cold insulation schemes, and are combined innovation for cold insulation material.
In the straight-through position that low temperature straight line pipeline is longer, shut-off valve is more, elbow is more, protected using resilient foam material
Cold, expanded material is the main heat-insulating material in the part, is covered according to tubing thickness using MULTILAYER COMPOSITE, between multilayer elastic material
Brush bonding agent and fissure of displacement arrangement;Alloy protecting layer is used for corrosion-resistant, resistance to strike, heat safe outer layer position.
The prefabricated cold insulations of PPR have higher intensity and rigidity, suitable for pipeline support position, are conducive to keep the water of pipeline
It is steady fixed, it prevents from settling, deform.
In order to keep higher heat insulation effect, the duration is saved, the construction volume at the scene of reducing, cold insulation requires high, body in part
Long-pending position that is big, directly linking LNG storage tank is using ultravacuum multi-lay winding cold insulation, and often the part original paper is pressure vessel or pressure
Solenoid material is realized by prefabricated mode.It is compound by the way that glass fiber paper is carried out with aluminium foil, it is put down after composite material is punched in batches
Paving is wrapped on inner tube or inner cylinder, and the winding number of plies can be adjusted on demand, about 30~50 layers, finally using steel material
Expect sealed outer pipe or outer barrel, vacuumized in reserved pumping hole, to achieve the purpose that vacuum cold insulation.The vacuum multi-layer insulation
Insulation effect with reflective thermal radiation, barrier thermal convection current and heat transfer.
Claims (8)
1. a kind of gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon, it is characterised in that:Including LNG liquefied cargo systems, LNG process ducts
Road system, LNG loading systems, LNG unload liquid system, cold insulation of LNG system and auxiliary system;The liquefied cargo system includes LNG
Storage tank, the LNG goes out the liquid outlet of liquid storage tank and inlet is arranged on the top of tank contents device, is set inside LNG storage tank
Pump chamber is put, pump chamber is inside and outside bladder structure, and middle level is vacuum interlayer, and pumping system is built in bottom end under pump work chamber, pump work chamber
Inlet at be connected with the urgent bottom stop valve of low temperature;The LNG, which unloads liquid system, to be included unloading liquid operating platform, is put down unloading liquid
It is provided on platform and unloads liquid pipe mouth, the interlude prepackage emergency cut-off part of the flange unloaded at liquid pipe mouth and pipeline, flange end
Portion prepackage quick links device B ends, the filling port prepackage quick connector A ends of LNG filling ships, A/B ends have mating abnormity flower
Line can make A/B ends realize quick links, and A/B ends are provided with rubber seal by irregularly rotating;LNG filling system
System includes filling platform;Two sleeve openings are reserved respectively on liquid platform and filling platform in described unloading, and are filled, are unloaded liquid part pipeline
It shares, is separated when pipeline is connected to LNG process pipe works, be divided into 4 tunnels connection LNG and go out the inlet of liquid storage tank and go out liquid
Mouthful;The cold insulation of LNG system is included in the Cold-keeping Layer of LNG process pipe works setting, and the Cold-keeping Layer is specially:Straight
The position that logical low temperature straight line pipeline is longer, shut-off valve is more, elbow is more, using resilient foam material cold insulation;Corrosion-resistant, resistance to
Strike, heat safe outer layer position use alloy protecting layer;The prefabricated cold insulations of PPR are used at pipeline support position;The auxiliary system
System includes pressure relief system, BOG supply and instrument wind system.
2. the gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon according to claim 1, it is characterised in that:In pressure vessel
Or pressure tube portions are realized by prefabricated mode using ultravacuum multi-lay winding cold insulation, by by glass fiber paper and aluminium foil into
Row is compound, and tiling after composite material is punched in batches is wrapped on inner tube or inner cylinder, and the winding number of plies is 30~50 layers, most
Afterwards using steel material sealed outer pipe or outer barrel, vacuumized in reserved pumping hole.
3. the gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon according to claim 1, it is characterised in that:In tank contents
Pumping system pump work chamber is in suspended structure in device, and has projecting support to be welded with pump work chamber.
4. the gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon according to claim 1, it is characterised in that:In tank contents
Being provided in device prevents cryogenic liquid various factors on landing stage from liquid being caused to shake punching, evaporation and the drastically anti-ripple of boost conditions
Plate.
5. the gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon according to claim 1, it is characterised in that:Connect inlet
Top inlet tube fill structure for the leaching of single tube porous mouth.
6. the gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon according to claim 1, it is characterised in that:In LNG storage tank
Outer barrel, which is internally located in the range of 60 ° of peak both sides, increases by two layers of adiabatic cotton, again to interlayer after being fixed with hexagonal stainless steel net
Carry out back-up sand.
7. the gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon according to claim 1, it is characterised in that:LNG storage tank
Valve and instrument are operated from tank body Base top contact.
8. the gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon according to claim 1, it is characterised in that:LNG storage tank
All safety valve delivery pipes converge to safe diffusion system concentration and are discharged, and jacking, bottom are provided with cutting into, return line
Only valve and quick action emergency valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720986675.7U CN207407057U (en) | 2017-08-09 | 2017-08-09 | The gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720986675.7U CN207407057U (en) | 2017-08-09 | 2017-08-09 | The gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207407057U true CN207407057U (en) | 2018-05-25 |
Family
ID=62322871
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720986675.7U Withdrawn - After Issue CN207407057U (en) | 2017-08-09 | 2017-08-09 | The gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207407057U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107606475A (en) * | 2017-08-09 | 2018-01-19 | 江苏海企港华燃气股份有限公司 | The gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon |
-
2017
- 2017-08-09 CN CN201720986675.7U patent/CN207407057U/en not_active Withdrawn - After Issue
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107606475A (en) * | 2017-08-09 | 2018-01-19 | 江苏海企港华燃气股份有限公司 | The gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109027662B (en) | LNG/L-CNG skid-mounted gas station | |
US20080127654A1 (en) | Container for Transport and Storage for Compressed Natural Gas | |
CN108916648B (en) | LNG gas supply system on deck transport ship | |
WO2013025108A1 (en) | Shipping method for co2 storage and import of cng | |
KR102438790B1 (en) | bunkering vessel | |
CN1605008A (en) | Method and apparatus for warming and storage of cold fluids | |
BRPI0714011A2 (en) | system for producing oil and heavier gas fraction from a seabed reservoir, method for producing oil and heavier gas fractions from a seabed reservoir, and, vessel | |
CN1784570A (en) | Storage in a salt cavern of a gas in the dense phase,with an lng-incoming state | |
CN203640865U (en) | Moveable tank-type fuel supply system for LNG power-driven vessel | |
RU2589811C2 (en) | Vessel for transportation of compressed gas | |
CN108194835B (en) | Marine LNG fuel supply system | |
CN102242864A (en) | Liquefied natural gas (LNG) receiving system and treatment method | |
CN104165266B (en) | A kind of pressure reduction formula liquefied natural gas filling station adds injection system and method thereof | |
CN102494244B (en) | Pontoon LNG aeration device and operation method thereof | |
CN207407057U (en) | The gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon | |
CN107600339A (en) | The filling landing stage of the new multi-functional preferred arrangement of aqueous hydrocarbon | |
CN107559105A (en) | Ship and its double air supply systems | |
CN105927846B (en) | LNG field station loading and unloading integrated system and loading and unloading method using same | |
CN111365610B (en) | Discharging pressure regulating system applied to hydrogen storage type hydrogenation station | |
CN207394348U (en) | Marine liquefied natural gas (LNG) production, storage, transfer device | |
CN207374610U (en) | The filling landing stage of the new multi-functional preferred arrangement of aqueous hydrocarbon | |
CN207865031U (en) | LNG fuel air supply system peculiar to vessel | |
CN107606475A (en) | The gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon | |
CN202065670U (en) | Liquefied natural gas receiving system | |
CN102155614A (en) | Recovery method and system for natural gas of marginal offshore oil field |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20180525 Effective date of abandoning: 20230331 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20180525 Effective date of abandoning: 20230331 |