- CN207347077U CN207347077U CN201720994559.XU CN201720994559U CN207347077U CN 207347077 U CN207347077 U CN 207347077U CN 201720994559 U CN201720994559 U CN 201720994559U CN 207347077 U CN207347077 U CN 207347077U
- Authority
- CN
- China
- Prior art keywords
- fixed
- top surface
- support plate
- vertical
- straight slot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
The utility model discloses it is a kind of can wing drop blanking heavy construction materials in the tube clamp hoisting mechanism, including base, the top surface of the base is fixed with bottom support plate, the rear portion top surface of bottom support plate is fixed with vertical mainboard, the top surface of vertical mainboard is fixed with upper backup pad, at least two vertical screw rods are in the left and right sides of bottom support plate, the bottom of vertical screw rod is hinged in bottom support plate, the top of vertical screw rod is hinged on upper backup pad, driving motor is fixed with left and right sides of the top surface of upper backup pad, the output shaft for driving motor is splined shaft, splined shaft sleeve is in the splined hole that the top of vertical screw rod has, two movable blocks setting up and down are screwed onto in two vertical screw rods.The utility model, which may be mounted at, to be promoted on car, and materials in the tube both ends can be clamped and be promoted at the top splicing of building and forward extend out automatic blanking by it automatically, convenient manually to take, and be installed, and substantially reduce manual labor amount, improve efficiency.
Description
Technical field:
The utility model is related to Architectural Equipment technical field, more specifically to it is a kind of can wing drop blanking heavy type
Build materials in the tube clamping hoisting mechanism.
Background technology:
Existing to carry out a lower height of such as two layers to three layers house of building, it carries out needing to convey heavy materials in the tube progress
During installation, it is generally conveyed using crane, and since building is relatively low, crane landed cost is high, and effect is also paid no attention to
Think, therefore be much to need the eminence either cart for manually lifting to building to promote to carry up, it is very troublesome, and consume body
Power, efficiency are low.
Utility model content:
The purpose of the utility model is to overcome the deficiencies in the prior art, there is provided it is a kind of can wing drop blanking heavy construction
Materials in the tube clamp hoisting mechanism, it, which may be mounted at, promotes on car, and materials in the tube both ends can be clamped and be promoted to building by it automatically
Top splicing at and forward extend out automatic blanking, it is convenient manually to take, installed, substantially reduce manual labor amount, improved
Efficiency.
The utility model solve the technical problem scheme be:
It is a kind of can wing drop blanking heavy construction materials in the tube clamping hoisting mechanism, including base, the top surface of the base
Bottom support plate is fixed with, the rear portion top surface of bottom support plate is fixed with vertical mainboard, and the top surface of vertical mainboard is fixed with branch
Fagging, at least two vertical screw rods are in the left and right sides of bottom support plate, and the bottom of vertical screw rod is hinged on bottom support plate
On, the top of vertical screw rod is hinged on upper backup pad, and driving motor, driving electricity are fixed with left and right sides of the top surface of upper backup pad
The output shaft of machine is splined shaft, and splined shaft sleeve is in the splined hole that the top of vertical screw rod has, two shiftings setting up and down
Motion block is screwed onto in two vertical screw rods, and the front portion between two movable blocks is fixed with center vertical support plate, center vertical branch
Be fixed with the rear surface of fagging it is multiple laterally urge oil cylinder, laterally urge the push rod of oil cylinder through center vertical support plate and solid
Surely there is anterior pushing plate, main connecting plate is fixed with the lower front wall face of anterior pushing plate, the middle top surface of main connecting plate is fixed
There is upper supporting block, lateral rotation axis is hinged with upper supporting block, the both sides of the upper supporting block of both ends stretching of lateral rotation axis are simultaneously solid
It is scheduled on two side contiguous blocks, two side contiguous blocks are fixed on the bottom surface of transverse beam, and the front face of transverse beam has to be stretched backward
The horizontal straight slot gone out, transverse screw are in horizontal straight slot, and the both ends of transverse screw are hinged on the inner side of left and right two of horizontal straight slot
On wall, two horizontal grip blocks are screwed onto in transverse screw, and the front end of two horizontal grip blocks is stretched out horizontal straight slot and is fixed with
Main grip block, has clamp groove on the relative wall of two main grip blocks, and the top of main grip block is stretched out on the top of clamp groove
Face is communicated with the external world;
One end of the transverse screw stretches out the end face of transverse beam and is fixed with travelling gear, the end rear wall of transverse beam
Connecting plate for electric motor is fixed with face, mobile motor is fixed on connecting plate for electric motor, and the output shaft of mobile motor is connected through motor
Plate is simultaneously fixed with drive gear, and drive gear is meshed with travelling gear.
The top and bottom of the transverse direction grip block are respectively and fixedly provided with self-lubricating layer, and self-lubricating layer is close to the top surface of horizontal straight slot
Or on bottom surface.
The bottom surface of the main connecting plate is fixed with rotary drive motor, and rotation is fixed with the output shaft of rotary drive motor
Drive gear, what rotary drive gear part sleeve had on main connecting plate is driven in straight slot vertically, and lateral rotation axis is in
Rotary transmission gear is partly fixed between the side of upper supporting block and side contiguous block, rotary transmission gear part sleeve is vertical
It is meshed in transmission straight slot and with rotary drive gear.
The rear portion top surface of the base fixes organic frame, and control main frame is fixed with the top surface of rack, drives motor and shifting
Dynamic motor is electrically connected by connecting line with control main frame.
The rear portion top surface of the base is fixed with hydraulic station, and hydraulic station is electrically connected by connecting line with control main frame, hydraulic pressure
Stand and be connected by oil pipe with laterally urging oil cylinder.
The protrusion effect of the utility model is:Compared with prior art, it, which may be mounted at, promotes on car, it can be automatic
Materials in the tube both ends are clamped and is promoted at the top splicing of building and forward extends out automatic blanking, it is convenient manually to take, carry out
Installation, substantially reduces manual labor amount, improves efficiency.
Brief description of the drawings:
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the partial structural diagram at the main grip block of the utility model.
Embodiment:
Embodiment, is shown in as shown in Figure 1 to Figure 2, it is a kind of can wing drop blanking heavy construction materials in the tube clamping hoisting mechanism,
Including base 10, the top surface of the base 10 is fixed with bottom support plate 11, and the rear portion top surface of bottom support plate 11 is fixed with perpendicular
Straight mainboard 12, the top surface of vertical mainboard 12 are fixed with upper backup pad 13, and at least two vertical screw rods 14 are in bottom support plate 11
The left and right sides, the bottom of vertical screw rod 14 is hinged in bottom support plate 11, and the top of vertical screw rod 14 is hinged on support
On plate 13, driving motor 15 is fixed with left and right sides of the top surface of upper backup pad 13, the output shaft of driving motor 15 is splined shaft, flower
For key axis sleeve in the splined hole that the top of vertical screw rod 14 has, two movable blocks 16 setting up and down are screwed onto two vertically
In screw rod 14, the front portion between two movable blocks 16 is fixed with center vertical support plate 20, the rear wall of center vertical support plate 20
Be fixed with face it is multiple laterally urge oil cylinder 21, laterally urge the push rod of oil cylinder 21 through center vertical support plate 20 and be fixed with
Anterior pushing plate 23, is fixed with main connecting plate 24, the middle top surface of main connecting plate 24 on the lower front wall face of anterior pushing plate 23
Supporting block 25 is fixed with, lateral rotation axis 26 is hinged with upper supporting block 25, the both ends of lateral rotation axis 26, which are stretched out, to be supported
The both sides of block 25 are simultaneously fixed on two side contiguous blocks 27, and two side contiguous blocks 27 are fixed on the bottom surface of transverse beam 17, laterally
The front face of beam 17 has the horizontal straight slot 171 stretched out backward, and transverse screw 172 is in horizontal straight slot 171, transverse screw
172 both ends are hinged on two madial wall of left and right of horizontal straight slot 171, and two horizontal grip blocks 18 are screwed onto transverse screw 172
In, the front end of two horizontal grip blocks 18 stretches out horizontal straight slot 171 and is fixed with main grip block 19, the phase of two main grip blocks 19
To having clamp groove 191 on wall, the top surface of the main grip block 19 of top stretching of clamp groove 191 is communicated with the external world;
One end of the transverse screw 172 stretches out the end face of transverse beam 17 and is fixed with travelling gear 173, transverse beam 17
End rear surface on be fixed with connecting plate for electric motor 174, mobile motor 175 is fixed on connecting plate for electric motor 174, mobile motor
175 output shaft is through connecting plate for electric motor 174 and is fixed with drive gear 176, and drive gear 176 is nibbled with 173 phase of travelling gear
Close.
Further, the top and bottom of the horizontal grip block 18 are respectively and fixedly provided with self-lubricating layer 181, self-lubricating layer
181 are close on the top surface of horizontal straight slot 171 or bottom surface.
Further, the bottom surface of the main connecting plate 24 is fixed with rotary drive motor 241, rotary drive motor 241
Output shaft on be fixed with rotary drive gear 242,242 part sleeve of rotary drive gear has perpendicular on main connecting plate 24
In direct-transmission straight slot 243, lateral rotation axis 26 is between the side of upper supporting block 25 and side contiguous block 27 and is partly fixed with rotation
Turn travelling gear 28,28 part sleeve of rotary transmission gear is nibbled in transmission straight slot 243 vertically and with 242 phase of rotary drive gear
Close.
Further, the rear portion top surface of the base 10 fixes organic frame 1, and control master is fixed with the top surface of rack 1
Machine 2, drives motor 15 and mobile motor 175 to be electrically connected by connecting line with control main frame 2.
Further, the rear portion top surface of the base 10 is fixed with hydraulic station 3, and hydraulic station 3 passes through connecting line and control
Host 2 is electrically connected, and hydraulic station 3 is connected by oil pipe with laterally urging oil cylinder 21.In the present embodiment, various connecting lines are in attached drawing
In save.
Operation principle:Mechanism is installed in moving carriage, being moved to needs cartage department, then, passes through mobile motor
175 operations so that two main grip blocks 19 relatively move, and make its position meet that materials in the tube can be placed, then, heavy materials in the tube are put
Put in the clamp groove 191 of two main grip blocks 19, then, driving motor 15 is run, so that heavy materials in the tube be lifted, is lifted
To splicing, promoted, heavy materials in the tube are moved in building, by rotation driving by the push rod for laterally urging oil cylinder 21
Motor 241 is run so that transverse beam 17 rotates, so that main grip block 19 rotates clockwise so that heavy materials in the tube are from clamping
Drop in groove 191, complete feeding, then, several operating personnel take heavy materials in the tube, very convenient.
Finally, embodiment of above is merely to illustrate the utility model, and is not limitation of the utility model, related skill
The those of ordinary skill in art field, in the case where not departing from the spirit and scope of the utility model, can also make various changes
Change and modification, therefore all equivalent technical solutions fall within the category of the utility model, the patent protection model of the utility model
Enclosing to be defined by the claims.
Claims (5)
1. it is a kind of can wing drop blanking heavy construction materials in the tube clamping hoisting mechanism, including base (10), it is characterised in that:Institute
The top surface for stating base (10) is fixed with bottom support plate (11), and the rear portion top surface of bottom support plate (11) is fixed with vertical mainboard
(12), the top surface of vertical mainboard (12) is fixed with upper backup pad (13), and at least two vertical screw rods (14) are in bottom support plate
(11) the left and right sides, the bottom of vertical screw rod (14) are hinged in bottom support plate (11), the top hinge of vertical screw rod (14)
It is connected on upper backup pad (13), driving motor (15), driving motor (15) is fixed with left and right sides of the top surface of upper backup pad (13)
Output shaft be splined shaft, for splined shaft sleeve in the splined hole that the top of vertical screw rod (14) has, two are setting up and down
Movable block (16) is screwed onto in two vertical screw rods (14), and the front portion between two movable blocks (16) is fixed with center vertical support
Plate (20), be fixed with the rear surface of center vertical support plate (20) it is multiple laterally urge oil cylinder (21), laterally urge oil cylinder
(21) push rod is through center vertical support plate (20) and is fixed with anterior pushing plate (23), before the lower part of anterior pushing plate (23)
Main connecting plate (24) is fixed with wall, the middle top surface of main connecting plate (24) is fixed with supporting block (25), upper supporting block
(25) lateral rotation axis (26) is hinged with, the both ends of lateral rotation axis (26) are stretched out the both sides of upper supporting block (25) and are fixed on
On two side contiguous blocks (27), two side contiguous blocks (27) are fixed on the bottom surface of transverse beam (17), the antetheca of transverse beam (17)
Face has the horizontal straight slot (171) stretched out backward, and transverse screw (172) is in horizontal straight slot (171), transverse screw (172)
Both ends be hinged on two madial wall of left and right of horizontal straight slot (171), two horizontal grip blocks (18) are screwed onto transverse screw
(172) in, the front end of two horizontal grip blocks (18) stretches out horizontal straight slot (171) and is fixed with main grip block (19), two masters
There is clamp groove (191), main grip block (19) is stretched out on the top of clamp groove (191) on the relative wall of grip block (19)
Top surface is communicated with the external world;
One end of the transverse screw (172) stretches out the end face of transverse beam (17) and is fixed with travelling gear (173), transverse beam
(17) connecting plate for electric motor (174) is fixed with end rear surface, mobile motor (175) is fixed on connecting plate for electric motor (174),
The output shaft of mobile motor (175) is through connecting plate for electric motor (174) and is fixed with drive gear (176), drive gear (176) with
Travelling gear (173) is meshed.
2. it is according to claim 1 it is a kind of can wing drop blanking heavy construction materials in the tube clamping hoisting mechanism, its feature
It is:The top and bottom of the transverse direction grip block (18) are respectively and fixedly provided with self-lubricating layer (181), and self-lubricating layer (181) is close to horizontal stroke
On top surface or bottom surface to straight slot (171).
3. it is according to claim 1 it is a kind of can wing drop blanking heavy construction materials in the tube clamping hoisting mechanism, its feature
It is:The bottom surface of the main connecting plate (24) is fixed with rotary drive motor (241), the output shaft of rotary drive motor (241)
On be fixed with rotary drive gear (242), it is vertical that rotary drive gear (242) part sleeve has on main connecting plate (24)
It is driven in straight slot (243), lateral rotation axis (26) is between the side of upper supporting block (25) and side contiguous block (27) partly solid
Surely there is rotary transmission gear (28), rotary transmission gear (28) part sleeve drives in transmission straight slot (243) vertically and with rotation
Moving gear (242) is meshed.
4. it is according to claim 1 it is a kind of can wing drop blanking heavy construction materials in the tube clamping hoisting mechanism, its feature
It is:The rear portion top surface of the base (10) fixes organic frame (1), and control main frame (2) is fixed with the top surface of rack (1), drives
Dynamic motor (15) and mobile motor (175) are electrically connected by connecting line with control main frame (2).
5. it is according to claim 4 it is a kind of can wing drop blanking heavy construction materials in the tube clamping hoisting mechanism, its feature
It is:The rear portion top surface of the base (10) is fixed with hydraulic station (3), and hydraulic station (3) passes through connecting line and control main frame (2) electricity
Connection, hydraulic station (3) are connected by oil pipe with laterally urging oil cylinder (21).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720994559.XU CN207347077U (en) | 2017-08-10 | 2017-08-10 | It is a kind of can wing drop blanking heavy construction materials in the tube clamping hoisting mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720994559.XU CN207347077U (en) | 2017-08-10 | 2017-08-10 | It is a kind of can wing drop blanking heavy construction materials in the tube clamping hoisting mechanism |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207347077U true CN207347077U (en) | 2018-05-11 |
Family
ID=62360007
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720994559.XU Expired - Fee Related CN207347077U (en) | 2017-08-10 | 2017-08-10 | It is a kind of can wing drop blanking heavy construction materials in the tube clamping hoisting mechanism |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207347077U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108706510A (en) * | 2018-05-28 | 2018-10-26 | 南安市鸿博计算机技术有限公司 | A kind of hoisting apparatus for engineering shop |
-
2017
- 2017-08-10 CN CN201720994559.XU patent/CN207347077U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108706510A (en) * | 2018-05-28 | 2018-10-26 | 南安市鸿博计算机技术有限公司 | A kind of hoisting apparatus for engineering shop |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107399681B (en) | A kind of Telescopic heavy building materials in the tube clamping hoisting mechanism | |
CN116014633B (en) | Diversified cable laying support | |
CN204250826U (en) | The automatic metalworking travel line of cage guide free parking type | |
CN102180423A (en) | Special hoisting tool for replacing capacitor bank | |
CN107399691A (en) | A clamping and lifting mechanism for heavy-duty construction pipe materials that can be automatically tilted and unloaded | |
CN106428300B (en) | Auto assembly parts transport system flexibility embraces tool device | |
CN202346605U (en) | Trolley for slag conveying crane and slag conveying crane employing trolley | |
CN202379457U (en) | Lifting machine | |
CN207347077U (en) | It is a kind of can wing drop blanking heavy construction materials in the tube clamping hoisting mechanism | |
CN105672160B (en) | Cone separates and warehousing apparatus | |
CN203961229U (en) | Automatic plastering machine | |
CN201415927Y (en) | Beam relocating trolley | |
CN102616520B (en) | Auxiliary device for shield single-well integral starting belt conveyor | |
CN108442894A (en) | A kind of tubing string Automatic Conveying device and carrying method | |
CN207347051U (en) | A kind of Telescopic heavy building materials in the tube clamping hoisting mechanism | |
CN208220680U (en) | A kind of tubing string Automatic Conveying device | |
CN204528633U (en) | A kind of axle sleeve gripping feedway is with promoting swivel mount | |
CN208558424U (en) | One kind ordering punch-out equipment | |
CN207534299U (en) | Ball valve telescopic joint fast assembling-disassembling equipment | |
CN113356772B (en) | Environment-friendly pipe rod storage measurement system for drilling/workover operation | |
CN207276131U (en) | A kind of heavy construction materials in the tube clamp hoisting mechanism | |
CN103949621B (en) | The T-shaped driving of foundry production line | |
CN108640017B (en) | cargo handling device | |
CN207329439U (en) | A kind of machine frame movement device | |
CN105692221A (en) | Full-automatic stacking system for large cement component steam curing kiln and control method of system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180510 Address after: 313000 third floor, 898 Zhongxing North Road, Wu Kang Town, Deqing County, Huzhou, Zhejiang Patentee after: ZHEJIANG HUASHENGDA CONSTRUCTION GROUP Co.,Ltd. Address before: 523000 productivity building 406, high tech Industrial Development Zone, Songshan Lake, Dongguan, Guangdong Patentee before: Dongguan Lianzhou Intellectual Property Operation Management Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180511 |
|
CF01 | Termination of patent right due to non-payment of annual fee |