CN207314524U - A kind of high performance concrete chain type combining structure - Google Patents

A kind of high performance concrete chain type combining structure Download PDF

Info

Publication number
CN207314524U
CN207314524U CN201721234942.1U CN201721234942U CN207314524U CN 207314524 U CN207314524 U CN 207314524U CN 201721234942 U CN201721234942 U CN 201721234942U CN 207314524 U CN207314524 U CN 207314524U
Authority
CN
China
Prior art keywords
steel
performance concrete
column
steel column
high performance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721234942.1U
Other languages
Chinese (zh)
Inventor
李琰
田黎敏
李天际
潘峰
卢磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Xian University of Architecture and Technology
Shanghai Construction No 5 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology, Shanghai Construction No 5 Group Co Ltd filed Critical Xian University of Architecture and Technology
Priority to CN201721234942.1U priority Critical patent/CN207314524U/en
Application granted granted Critical
Publication of CN207314524U publication Critical patent/CN207314524U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型公开了一种高性能混凝土链式组合结构,包括中心钢柱、上部钢柱、下部钢柱、第一高性能混凝土柱、第二高性能混凝土柱、四根H型钢梁、四根中间H型钢、四根第一高性能混凝土梁、四根普通混凝土梁、四根第二高性能混凝土梁及四根端部H型钢,其中,中心钢柱的一个侧面对应一根H型钢梁、一根中间H型钢、一根第一高性能混凝土梁、一根普通混凝土梁、一根第二高性能混凝土梁及一根端部H型钢,该组合结构的重量较轻、梁柱连接节点强度较高,并且成本低。

The utility model discloses a high-performance concrete chain composite structure, which comprises a central steel column, an upper steel column, a lower steel column, a first high-performance concrete column, a second high-performance concrete column, four H-shaped steel beams, four One central H-shaped steel, four first high-performance concrete beams, four ordinary concrete beams, four second high-performance concrete beams and four end H-shaped steels, wherein one side of the central steel column corresponds to one H-shaped steel beam, a middle H-shaped steel, a first high-performance concrete beam, an ordinary concrete beam, a second high-performance concrete beam and an end H-shaped steel. The node strength is high and the cost is low.

Description

一种高性能混凝土链式组合结构A High Performance Concrete Chain Composite Structure

技术领域technical field

本实用新型涉及一种链式组合结构,具体涉及一种高性能混凝土链式组合结构。The utility model relates to a chain combination structure, in particular to a high performance concrete chain combination structure.

背景技术Background technique

随着建筑行业的快速发展,降低成本、提高建筑质量已成为建筑行业的热门话题。现有建筑中的梁柱结构,大多全部采用钢筋混凝土结构或者全部采用钢结构。然而钢筋混凝土结构的问题在于不利于建筑工业化,且采用全钢的梁柱结构的问题在于成本较高。因此需要开发出一种全装配式且成本低的链式组合结构。With the rapid development of the construction industry, reducing costs and improving construction quality has become a hot topic in the construction industry. Most of the beam-column structures in existing buildings adopt reinforced concrete structures or steel structures. However, the problem of the reinforced concrete structure is that it is not conducive to the industrialization of construction, and the problem of adopting an all-steel beam-column structure is that the cost is relatively high. Therefore need to develop a fully assembled and low-cost chain combination structure.

实用新型内容Utility model content

本实用新型的目的在于克服上述现有技术的缺点,提供了一种高性能混凝土链式组合结构,该组合结构的重量较轻、梁柱连接节点强度较高,并且成本低。The purpose of the utility model is to overcome the above-mentioned shortcomings of the prior art and provide a high-performance concrete chain composite structure, which is light in weight, high in the strength of beam-column connection nodes, and low in cost.

为达到上述目的,本实用新型所述的高性能混凝土链式组合结构包括中心钢柱、上部钢柱、下部钢柱、第一高性能混凝土柱、第二高性能混凝土柱、四根H型钢梁、四根中间H型钢、四根第一高性能混凝土梁、四根普通混凝土梁、四根第二高性能混凝土梁及四根端部H型钢,其中,中心钢柱的一个侧面对应一根H型钢梁、一根中间H型钢、一根第一高性能混凝土梁、一根普通混凝土梁、一根第二高性能混凝土梁及一根端部H型钢;In order to achieve the above purpose, the high-performance concrete chain composite structure described in the utility model includes a central steel column, an upper steel column, a lower steel column, a first high-performance concrete column, a second high-performance concrete column, four H-shaped steel columns Beams, four middle H-shaped steels, four first high-performance concrete beams, four ordinary concrete beams, four second high-performance concrete beams and four end H-shaped steels, wherein one side of the central steel column corresponds to one H-shaped steel beam, a middle H-shaped steel, a first high-performance concrete beam, an ordinary concrete beam, a second high-performance concrete beam and an end H-shaped steel;

四根H型钢梁的一端分别依次焊接于中心钢柱的四个侧面上,H型钢梁的另一端与中间H型钢的一端相连接,中间H型钢的另一端插入于第一高性能混凝土梁的一端内,第一高性能混凝土梁的另一端与普通混凝土梁的一端相连接,普通混凝土梁的另一端与第二高性能混凝土梁的一端相连接,端部H型钢的端部插入于第二高性能混凝土梁的另一端内,中心钢柱的上端与上部钢柱的下端相连接,上部钢柱的上端插入于第一高性能混凝土柱内,中心钢柱的下端与下部钢柱的上端相连接,下部钢柱的下端插入于第二高性能混凝土柱的上端内,第二高性能混凝土柱的下端与普通混凝土柱相连接;One end of the four H-shaped steel beams is respectively welded to the four sides of the central steel column in sequence, the other end of the H-shaped steel beam is connected to one end of the middle H-shaped steel, and the other end of the middle H-shaped steel is inserted into the first high-performance concrete In one end of the beam, the other end of the first high-performance concrete beam is connected to one end of the ordinary concrete beam, the other end of the ordinary concrete beam is connected to one end of the second high-performance concrete beam, and the end of the H-shaped steel at the end is inserted into the In the other end of the second high-performance concrete beam, the upper end of the central steel column is connected to the lower end of the upper steel column, the upper end of the upper steel column is inserted into the first high-performance concrete column, and the lower end of the central steel column is connected to the lower end of the lower steel column. The upper ends are connected, the lower end of the lower steel column is inserted into the upper end of the second high-performance concrete column, and the lower end of the second high-performance concrete column is connected with the ordinary concrete column;

中心钢柱与四根H型钢梁的连接位置包裹于高性能混凝土内。The connections between the central steel column and the four H-shaped steel beams are wrapped in high-performance concrete.

所述中心钢柱、下部钢柱及上部钢柱均由两个H型钢拼接而成,其中,所述两个H型钢中的腹板垂直相交,四个H型钢梁的端部分别焊接于两个H型钢的翼缘上。The central steel column, the lower steel column and the upper steel column are all spliced by two H-shaped steels, wherein the webs of the two H-shaped steels intersect vertically, and the ends of the four H-shaped steel beams are respectively welded to On the flanges of the two H-beams.

中心钢柱的侧面与下部钢柱的侧面、中心钢柱的侧面与上部钢柱的侧面、中间H型钢的翼缘与H型钢梁的翼缘、以及中间H型钢的腹板与H型钢梁的腹板均通过钢板及螺栓相连接。The side of the central steel column and the side of the lower steel column, the side of the central steel column and the side of the upper steel column, the flange of the middle H-shaped steel and the flange of the H-shaped steel beam, and the web of the middle H-shaped steel and the H-shaped steel The webs of the beams are connected by steel plates and bolts.

中间H型钢的腹板及翼缘上均设置有第一栓钉,所述第一栓钉插入于第一高性能混凝土梁内;Both the web and the flange of the middle H-shaped steel are provided with first studs, and the first studs are inserted into the first high-performance concrete beam;

端部H型钢的腹板及翼缘上均设置有第二栓钉,所述第二栓钉插入于第二高性能混凝土梁内。Both the web and the flange of the H-shaped steel at the end are provided with second studs, and the second studs are inserted into the second high-performance concrete beam.

上部钢柱的侧面设置有若干第三栓钉,各第三栓钉插入于第一高性能混凝土柱内。A plurality of third pegs are arranged on the side of the upper steel column, and each third peg is inserted into the first high-performance concrete column.

下部钢柱的侧面设置有若干第四栓钉,各第四栓钉插入于第二高性能混凝土柱内。A plurality of fourth studs are arranged on the side of the lower steel column, and each fourth stud is inserted into the second high-performance concrete column.

本实用新型具有以下有益效果:The utility model has the following beneficial effects:

本实用新型所述的高性能混凝土链式组合结构在具体操作时,通过四根H型钢梁的端部分别依次焊接于中心钢柱的四个侧面,且中心钢柱与四根H型钢梁的连接位置包裹于高性能混凝土内,从而有效的加强梁柱连接节点的强度,避免输入能量时,梁柱连接节点提前断开。同时本实用新型通过第一高性能混凝土梁及第二高性能混凝土梁将普通混凝土梁、中间H型钢及端部H型钢相连接,同时柱子与梁采用相似的设计,相比于传统钢筋混凝土梁,本实用新型的重量更轻,并且承载力更高,同时相对于传统钢结构梁,本实用新型的成本较低,并且结构简单,制作过程较为方便。When the high-performance concrete chain composite structure described in the utility model is operated specifically, the ends of the four H-shaped steel beams are respectively welded to the four sides of the central steel column in sequence, and the central steel column is connected to the four H-shaped steel beams. The connection position of the beam is wrapped in high-performance concrete, thereby effectively strengthening the strength of the beam-column connection node, and avoiding the early disconnection of the beam-column connection node when energy is input. At the same time, the utility model connects the ordinary concrete beam, the middle H-shaped steel and the end H-shaped steel through the first high-performance concrete beam and the second high-performance concrete beam. At the same time, the column and the beam adopt a similar design. , the utility model is lighter in weight and has a higher bearing capacity, and at the same time, compared with the traditional steel structure beam, the utility model has a lower cost, a simple structure, and a more convenient manufacturing process.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型中梁柱节点的结构示意图;Fig. 2 is the structural representation of beam-column node in the utility model;

图3为本实用新型中梁的结构示意图。Fig. 3 is a structural schematic diagram of the middle girder of the present invention.

其中,1为中心钢柱、2为H型钢梁、3为中间H型钢、4为第一高性能混凝土梁、5为普通混凝土梁、6为第二高性能混凝土梁、7为端部H型钢、8为上部钢柱、9为第一高性能混凝土柱、10为下部钢柱、11为第二高性能混凝土柱、12为普通混凝土柱。Among them, 1 is the central steel column, 2 is the H-shaped steel beam, 3 is the middle H-shaped steel, 4 is the first high-performance concrete beam, 5 is the ordinary concrete beam, 6 is the second high-performance concrete beam, and 7 is the end H Shaped steel, 8 is the upper steel column, 9 is the first high-performance concrete column, 10 is the lower steel column, 11 is the second high-performance concrete column, and 12 is an ordinary concrete column.

具体实施方式Detailed ways

下面结合附图对本实用新型做进一步详细描述:Below in conjunction with accompanying drawing, the utility model is described in further detail:

参考图1、图2及图3,本实用新型所述的高性能混凝土链式组合结构包括中心钢柱1、上部钢柱8、下部钢柱10、第一高性能混凝土柱9、第二高性能混凝土柱11、四根H型钢梁2、四根中间H型钢3、四根第一高性能混凝土梁4、四根普通混凝土梁5、四根第二高性能混凝土梁6及四根端部H型钢7,其中,中心钢柱1的一个侧面对应一根H型钢梁2、一根中间H型钢3、一根第一高性能混凝土梁4、一根普通混凝土梁5、一根第二高性能混凝土梁6及一根端部H型钢7;四根H型钢梁2的一端分别依次焊接于中心钢柱1的四个侧面上,H型钢梁2的另一端与中间H型钢3的一端相连接,中间H型钢3的另一端插入于第一高性能混凝土梁4的一端内,第一高性能混凝土梁4的另一端与普通混凝土梁5的一端相连接,普通混凝土梁5的另一端与第二高性能混凝土梁6的一端相连接,端部H型钢7的端部插入于第二高性能混凝土梁6的另一端内,中心钢柱1的上端与上部钢柱8的下端相连接,上部钢柱8的上端插入于第一高性能混凝土柱9内,中心钢柱1的下端与下部钢柱10的上端相连接,下部钢柱10的下端插入于第二高性能混凝土柱11的上端内,第二高性能混凝土柱11的下端与普通混凝土柱12相连接;中心钢柱1与四个四根H型钢梁2的连接位置包裹于高性能混凝土内。Referring to Fig. 1, Fig. 2 and Fig. 3, the high-performance concrete chain composite structure described in the utility model comprises a central steel column 1, an upper steel column 8, a lower steel column 10, a first high-performance concrete column 9, a second high Performance concrete column 11, four H-shaped steel beams 2, four intermediate H-shaped steel beams 3, four first high-performance concrete beams 4, four ordinary concrete beams 5, four second high-performance concrete beams 6 and four ends Part H-shaped steel 7, wherein one side of the central steel column 1 corresponds to an H-shaped steel beam 2, an intermediate H-shaped steel 3, a first high-performance concrete beam 4, an ordinary concrete beam 5, and a first Two high-performance concrete beams 6 and one end H-shaped steel 7; one end of four H-shaped steel beams 2 is respectively welded to the four sides of the central steel column 1 in turn, and the other end of the H-shaped steel beam 2 is connected to the middle H-shaped steel 3 are connected at one end, the other end of the middle H-shaped steel 3 is inserted into one end of the first high-performance concrete beam 4, and the other end of the first high-performance concrete beam 4 is connected with one end of the ordinary concrete beam 5, and the ordinary concrete beam 5 The other end of the second high-performance concrete beam 6 is connected to one end, the end of the end H-shaped steel 7 is inserted into the other end of the second high-performance concrete beam 6, the upper end of the central steel column 1 and the upper steel column 8 The lower ends are connected, the upper end of the upper steel column 8 is inserted into the first high performance concrete column 9, the lower end of the central steel column 1 is connected with the upper end of the lower steel column 10, and the lower end of the lower steel column 10 is inserted into the second high performance concrete column In the upper end of the column 11, the lower end of the second high-performance concrete column 11 is connected with the ordinary concrete column 12; the connection positions between the central steel column 1 and four H-shaped steel beams 2 are wrapped in high-performance concrete.

所述中心钢柱1、下部钢柱10及上部钢柱8均由两个H型钢拼接而成,其中,所述两个H型钢中的腹板垂直相交,四个H型钢梁2的端部分别焊接于两个H型钢的翼缘上。The central steel column 1, the lower steel column 10 and the upper steel column 8 are all spliced by two H-shaped steels, wherein the webs of the two H-shaped steels intersect vertically, and the ends of the four H-shaped steel beams 2 The parts are respectively welded on the flanges of two H-shaped steels.

中心钢柱1的侧面与下部钢柱10的侧面、中心钢柱1的侧面与上部钢柱8的侧面、中间H型钢3的翼缘与H型钢梁2的翼缘、以及中间H型钢3的腹板与H型钢梁2的腹板均通过钢板及螺栓相连接;中间H型钢3的腹板及翼缘上均设置有第一栓钉,所述第一栓钉插入于第一高性能混凝土梁4内;端部H型钢7的腹板及翼缘上均设置有第二栓钉,所述第二栓钉插入于第二高性能混凝土梁6内;上部钢柱8的侧面设置有若干第三栓钉,各第三栓钉插入于第一高性能混凝土柱9内;下部钢柱10的侧面设置有若干第四栓钉,各第四栓钉插入于第二高性能混凝土柱11内。The side of the central steel column 1 and the side of the lower steel column 10, the side of the central steel column 1 and the side of the upper steel column 8, the flange of the middle H-shaped steel 3 and the flange of the H-shaped steel beam 2, and the middle H-shaped steel 3 The web of the H-shaped steel beam 2 and the web of the H-shaped steel beam 2 are connected by steel plates and bolts; the web and the flange of the middle H-shaped steel 3 are provided with first pegs, and the first pegs are inserted into the first height In the performance concrete beam 4; the web and the flange of the end H-shaped steel 7 are provided with second studs, and the second studs are inserted into the second high performance concrete beam 6; the side of the upper steel column 8 is provided with There are several third studs, and each third stud is inserted into the first high-performance concrete column 9; the side of the lower steel column 10 is provided with several fourth studs, and each fourth stud is inserted into the second high-performance concrete column within 11.

需要说明的是,本实用新型中梁及柱子能够在工厂中进行预制,然后再在现场进行拼装。It should be noted that the central beam and pillars of the present invention can be prefabricated in a factory, and then assembled on site.

Claims (6)

  1. A kind of 1. high performance concrete chain type combining structure, it is characterised in that including center steel column (1), top steel column (8), under Portion's steel column (10), the first Hpc Columns (9), the second Hpc Columns (11), four H profile steel beams (2), in four Between H profile steel (3), four first high performance concrete beams (4), four normal concrete beams (5), four second high performance concretes Beam (6) and four radicle H profile steels (7), wherein, a side of center steel column (1) corresponds to a H profile steel beam (2), a centre H profile steel (3), a first high performance concrete beam (4), a normal concrete beams (5), a second high performance concrete beam (6) and a radicle H profile steel (7);
    One end of four H profile steel beams (2) is welded on four sides of center steel column (1) successively respectively, H profile steel beam (2) it is another One end is connected with one end of middle H profile steel (3), and the other end of middle H profile steel (3) is inserted in the first high performance concrete beam (4) in one end, the other end of the first high performance concrete beam (4) is connected with one end of normal concrete beams (5), common mixed The other end of solidifying Tu Liang (5) is connected with one end of the second high performance concrete beam (6), and the end of end H profile steel (7) is inserted in In the other end of second high performance concrete beam (6), the upper end of center steel column (1) is connected with the lower end of top steel column (8), on The upper end of portion's steel column (8) is inserted in the first Hpc Columns (9), lower end and the lower part steel column (10) of center steel column (1) Upper end be connected, the lower end of lower part steel column (10) is inserted in the upper end of the second Hpc Columns (11), the second high property The lower end of energy concrete column (11) is connected with common concrete column (12);
    Center steel column (1) and the link position of each H profile steel beam (2) are wrapped in high performance concrete.
  2. 2. high performance concrete chain type combining structure according to claim 1, it is characterised in that the center steel column (1), Lower part steel column (10) and top steel column (8) are spliced by two H profile steels, wherein, the web in described two H profile steels is vertical Intersecting, the end of four H profile steel beams (2) is respectively welded on the edge of a wing of two H profile steels.
  3. 3. high performance concrete chain type combining structure according to claim 1, it is characterised in that the side of center steel column (1) Face and the side of lower part steel column (10), the side of the side of center steel column (1) and top steel column (8), the wing of middle H profile steel (3) The web of the web and H profile steel beam (2) on the edge of a wing and middle H profile steel (3) of edge and H profile steel beam (2) passes through steel plate and bolt It is connected.
  4. 4. high performance concrete chain type combining structure according to claim 1, it is characterised in that the abdomen of middle H profile steel (3) The first peg is both provided with plate and the edge of a wing, first peg is inserted in the first high performance concrete beam (4);
    The second peg is both provided with the web of end H profile steel (7) and the edge of a wing, second peg is inserted in the second high-performance and mixes In solidifying Tu Liang (6).
  5. 5. high performance concrete chain type combining structure according to claim 4, it is characterised in that the side of top steel column (8) Face is provided with some 3rd pegs, and each 3rd peg is inserted in the first Hpc Columns (9).
  6. 6. high performance concrete chain type combining structure according to claim 5, it is characterised in that the side of lower part steel column (10) Face is provided with some 4th pegs, and each 4th peg is inserted in the second Hpc Columns (11).
CN201721234942.1U 2017-09-25 2017-09-25 A kind of high performance concrete chain type combining structure Active CN207314524U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721234942.1U CN207314524U (en) 2017-09-25 2017-09-25 A kind of high performance concrete chain type combining structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721234942.1U CN207314524U (en) 2017-09-25 2017-09-25 A kind of high performance concrete chain type combining structure

Publications (1)

Publication Number Publication Date
CN207314524U true CN207314524U (en) 2018-05-04

Family

ID=62383911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721234942.1U Active CN207314524U (en) 2017-09-25 2017-09-25 A kind of high performance concrete chain type combining structure

Country Status (1)

Country Link
CN (1) CN207314524U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587606A (en) * 2017-09-25 2018-01-16 上海建工五建集团有限公司 High performance concrete chain type combining structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587606A (en) * 2017-09-25 2018-01-16 上海建工五建集团有限公司 High performance concrete chain type combining structure

Similar Documents

Publication Publication Date Title
CN102979162B (en) Multi-story high-rise assembled steel structure frame - prestressed centrally-braced system
CN103114648B (en) Multi-high-layer assembly type steel structure frame-center supporting system
CN108532760B (en) Semi-through combined column-through double steel beam connection structure and construction method thereof
CN201433507Y (en) Honeycomb beam and steel building frame
CN104652610B (en) Box-type module builds corner splicing node structure
WO2020181794A1 (en) Fabricated self-restoration pitch point
CN103132708B (en) Beam-column joint reinforcing method and beam-column joint reinforcing device
CN107587606A (en) High performance concrete chain type combining structure
CN205189144U (en) Articulation node that reinforced concrete column and girder steel are connected
CN105064503A (en) Steel tube and core tube mixed structure
CN206554244U (en) The nodal connection device of steel core concrete column and composite beam
CN209384393U (en) Node-reinforced assembled steel pipe concrete connection structure
CN108316477A (en) Band steel pipe concrete column and section steel beam interior joint connection structure and construction method
CN207314524U (en) A kind of high performance concrete chain type combining structure
CN107100275A (en) The angle steel web member connecting node that a kind of steel plate shear force wall is connected with concrete frame
CN103643625A (en) Steel truss-concrete plate combined beam based on shear-resisting connecting structure
CN207314537U (en) A kind of assembled Outsourcing-type steel chain type combining structure
CN204715540U (en) A kind of round steel pipe binding type steel concrete column and steel beam joint structure
CN204715539U (en) A kind of round steel pipe binding type steel concrete column and reinforced concrete beam node structure
CN110607743A (en) A full-bolt connection type honeycomb multi-layer H-shaped steel bridge structure and its assembly method
CN105839789A (en) H-shaped column minor axis separation type double-T-shaped-piece connecting structure easy to assemble
WO2023202490A1 (en) Built-in laced-type lattice column double steel plate shear wall having wall-beam joint region
CN217000315U (en) Steel pipe and steel plate concrete shear wall structure with struts
CN205637164U (en) Weak axle disconnect -type double T shape connection structure of I -shaped post who easily assembles
CN109702859A (en) A U-shaped steel component composite beam provided with a reinforcing tube and a manufacturing method thereof