CN207278269U - A kind of combination moving type construction operation platform for mining sectbn - Google Patents

A kind of combination moving type construction operation platform for mining sectbn Download PDF

Info

Publication number
CN207278269U
CN207278269U CN201720452698.XU CN201720452698U CN207278269U CN 207278269 U CN207278269 U CN 207278269U CN 201720452698 U CN201720452698 U CN 201720452698U CN 207278269 U CN207278269 U CN 207278269U
Authority
CN
China
Prior art keywords
landing slab
construction operation
operation platform
moving type
type construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720452698.XU
Other languages
Chinese (zh)
Inventor
陈庆章
陈典华
刘钊
刘蕊
江华
贾英男
王勇
汪岩
衣绍彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Construction Engineering Safety And Quality Supervision General Station
China University of Mining and Technology Beijing CUMTB
China Railway 18th Bureau Group Co Ltd
Original Assignee
Beijing Construction Engineering Safety And Quality Supervision General Station
China University of Mining and Technology Beijing CUMTB
China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Construction Engineering Safety And Quality Supervision General Station, China University of Mining and Technology Beijing CUMTB, China Railway 18th Bureau Group Co Ltd filed Critical Beijing Construction Engineering Safety And Quality Supervision General Station
Priority to CN201720452698.XU priority Critical patent/CN207278269U/en
Application granted granted Critical
Publication of CN207278269U publication Critical patent/CN207278269U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of combination moving type construction operation platform for mining sectbn, the combination moving type construction operation platform includes:First landing slab, the second landing slab and guardrail, first landing slab is arranged on the top of second landing slab, the guardrail is separately positioned on the both sides of first landing slab and the second landing slab, the guardrail is provided with shaft, the assembling mode of platform is optimized for being bolted by the combination moving type construction operation platform that the utility model is used for mining sectbn by welding, and increases lower part passage space to meet the needs of crossed construction in hole.

Description

A kind of combination moving type construction operation platform for mining sectbn
Technical field
Concrete pouring construction technical field is the utility model is related to, more particularly to the combination movement for mining sectbn Formula construction operation platform.
Background technology
With developing rapidly for national economy, urbanization process is increasingly accelerated, and the development process of urban underground space is increasingly Accelerate.Subsurface excavation method is with technical maturity, structure type is flexible and changeable, it is little etc. that surface structures, road and underground utilities are influenced Advantage, therefore be widely used in the construction in Urban underground Tunnel section.
In metro built by mining method work progress, after the completion of first branch structure applies, it is necessary to carried out after first supporting back backfill slip casting, The construction such as slip casting is backfilled after the processing of waterproof basal plane, two lining waterproofs, two lined steel muscle, two backings, is generally required at this time in tunnel not Parallel operations are carried out with height.
Metro built by mining method is because tunnel cross-section is highly larger, and inverted arch is arc, is existed using ordinary steel tubular scaffolding The features such as stability is poor, peace is torn open and movement is difficult, uneconomical.In the past slip casting and arch waterproof basal plane processing procedure were backfilled in section In, mostly using welded still pipe frame hand cradle, but the dead weight of welded still pipe frame is larger, mobile difficult, and lower space is small, influences other Job execution
It is desirable to have a kind of combination moving type construction operation platform for mining sectbn by the assembling mode of platform by Welding is optimized for being bolted, and increases lower part passage space to meet the needs of crossed construction in hole.
Utility model content
The purpose of this utility model is to provide a kind of combination moving type construction operation platform for mining sectbn come gram Take the above-mentioned problems in the prior art.
To achieve the above object, the utility model provides a kind of combination moving type construction operation for mining sectbn and puts down Platform, the combination moving type construction operation platform include:First landing slab, the second landing slab and guardrail, first landing slab The top of second landing slab is arranged on, the guardrail is separately positioned on the two of first landing slab and the second landing slab Side, the guardrail are provided with shaft.
Preferably, the guardrail is rotated perpendicular to horizontal plane by shaft and connects first landing slab and Two landing slabs.
Preferably, the portable construction operation platform further includes 4 walking rollers, and the walking roller is arranged on described The lower section of second landing slab.
Preferably, the bottom installation radial direction back rib of first landing slab and the second landing slab, to ensure that different sizes are applied The overall stability of work job platform.
Preferably, the guardrail is 32 assembled steel tube guardrails of φ.
Preferably, carried out between first landing slab and the second landing slab by perforate on the steel plate using high-strength bolt Connection.
The utility model is put down by using the combination moving type construction operation for mining sectbn being attached by bolt Platform overcomes numerous shortcomings of the ordinary steel tubular scaffolding in mining sectbn work progress, and the utility model is used for tunneling area Between the assembling of combination moving type construction operation platform it is convenient, flat form variation, suitable for various sizes of bored tunnel, especially It meets to arrive after just branch closing is cyclic different high in tunnel double-lining construction period a large amount of tunnels for the section of duration anxiety relatively Spend parallel operations demand.
Brief description of the drawings
Fig. 1 is the structure diagram of the combination moving type construction operation platform for mining sectbn.
Embodiment
To make the purpose, technical scheme and advantage that the utility model is implemented clearer, below in conjunction with the utility model Attached drawing in embodiment, is further described in more detail the technical scheme in the embodiment of the utility model.In the accompanying drawings, from beginning Same or similar element is represented to same or similar label eventually or there is same or like element.Described reality It is the utility model part of the embodiment to apply example, instead of all the embodiments.Below with reference to the embodiment of attached drawing description It is exemplary, it is intended to for explaining the utility model, and it is not intended that limitation to the utility model.It is new based on this practicality Embodiment in type, the every other implementation that those of ordinary skill in the art are obtained without creative efforts Example, shall fall within the protection scope of the present invention.The embodiment of the utility model is described in detail below in conjunction with the accompanying drawings.
In the description of the utility model, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", "front", "rear", The orientation or position relationship of the instruction such as "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outer " is based on attached drawing institutes The orientation or position relationship shown, is for only for ease of description the utility model and simplifies description, rather than indicates or imply and is signified Device or element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to this practicality The limitation of novel protected scope.
As shown in Figure 1, maximum assembling width 4.4m, height 3.4m, the bottom of platform is provided with four walking rollers 3, is Meet the electric vehicle installation dimensions required when lower part is passed through, the main platform 1 of first layer is apart from lower section clear height 2.2m, clear span 3m. 2 clear span 4m of second layer platform, all working at height when completely being assembled suitable for platform in the range of 150 ° of vault, and the bottom of platform Portion is provided with four walking rollers.
The main platform of the first layer and second layer platform are using 80 square tubes of φ, 32 assembled steel tube guardrails of φ, stair and flat Platen, component are connected using steel plate perforate and high-strength bolt, are connected by screw bolts assembling, method for dismounting is simple, assembling form Variation, can rationally be assembled according to the tunnel of different size and shapes.
The guardrail of platform both wings sets shaft, can form cat ladder, when personnel to be onstructed are located on combined platform, pull-up is climbed Ladder, forms guardrail, facilitates job platform above and below construction personnel and ensures its personal safety.
The bottom installation radial direction back rib of first landing slab and the second landing slab, to ensure that different size construction operations are put down The overall stability of platform.
The main platform of the first layer and second layer platform are respectively basal plane processing, reinforcing bar binding, waterproof construction, two lining backfills Slip casting etc. provides operating space.Second layer platform is suitable for all working at height in the range of 150 ° of vault when platform completely assembles
It is last it is to be noted that:Above example is only to illustrate the technical solution of the utility model, rather than it is limited System.Although the utility model is described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should manage Solution:It can still modify the technical solution described in foregoing embodiments, or to which part technical characteristic into Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the utility model The spirit and scope of technical solution.

Claims (6)

  1. A kind of 1. combination moving type construction operation platform for mining sectbn, it is characterised in that including:First landing slab, Two landing slabs and guardrail, first landing slab are arranged on the top of second landing slab, and the guardrail is separately positioned on institute The both sides of the first landing slab and the second landing slab are stated, the guardrail is provided with shaft.
  2. 2. it is used for the combination moving type construction operation platform of mining sectbn as claimed in claim 1, it is characterised in that the shield Column is rotated perpendicular to horizontal plane by shaft and connects first landing slab and the second landing slab.
  3. 3. it is used for the combination moving type construction operation platform of mining sectbn as claimed in claim 1, it is characterised in that the shifting Dynamic formula construction operation platform further includes 4 walking rollers, and the walking roller is arranged on the lower section of second landing slab.
  4. 4. it is used for the combination moving type construction operation platform of mining sectbn as claimed in claim 1, it is characterised in that described the Radial direction back rib is installed in the bottom of one landing slab and the second landing slab, to ensure the monolithic stability of different size construction operation platforms Property.
  5. 5. it is used for the combination moving type construction operation platform of mining sectbn as claimed in claim 1, it is characterised in that the shield Column is 32 assembled steel tube guardrails of φ.
  6. 6. it is used for the combination moving type construction operation platform of mining sectbn as claimed in claim 1, it is characterised in that described the It is attached between one landing slab and the second landing slab by perforate on the steel plate using high-strength bolt.
CN201720452698.XU 2017-04-27 2017-04-27 A kind of combination moving type construction operation platform for mining sectbn Expired - Fee Related CN207278269U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720452698.XU CN207278269U (en) 2017-04-27 2017-04-27 A kind of combination moving type construction operation platform for mining sectbn

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720452698.XU CN207278269U (en) 2017-04-27 2017-04-27 A kind of combination moving type construction operation platform for mining sectbn

Publications (1)

Publication Number Publication Date
CN207278269U true CN207278269U (en) 2018-04-27

Family

ID=61992131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720452698.XU Expired - Fee Related CN207278269U (en) 2017-04-27 2017-04-27 A kind of combination moving type construction operation platform for mining sectbn

Country Status (1)

Country Link
CN (1) CN207278269U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109664928A (en) * 2018-12-21 2019-04-23 上海隧道工程质量检测有限公司 A kind of multi-functional auxiliary vehicle of tunnel quality testing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109664928A (en) * 2018-12-21 2019-04-23 上海隧道工程质量检测有限公司 A kind of multi-functional auxiliary vehicle of tunnel quality testing

Similar Documents

Publication Publication Date Title
CN102953739B (en) Bidirectional punching method for underground excavation of subway station
CN208280965U (en) Coal mine deep well tunnel smooth surface concrete spraying support structure
CN104847380B (en) A kind of structure and its construction method for reducing tunnel lining structure internal force
CN103410528B (en) Tunnel lining structure and construction method
CN102071941B (en) Fully mechanized mining gob-side entry retaining-based concrete block staggered joint longitudinal stacking wall forming method
CN102852550B (en) Coal-pillar-free semi-normal-position goaf-side entry retaining method
CN106979021B (en) Large-section loess tunnel excavates and preliminary bracing quick closure cyclization method
CN108868778A (en) A kind of Large Underground Structure no-dig technique construction method
CN110821513B (en) Construction method for performing advanced grouting and supporting on tunnel local collapse
CN111022076B (en) Construction method for large-span subway tunnel secondary lining vault by adopting split self-propelled form jumbo
CN106968691A (en) Improve CD method construction methods in a kind of extremely frigid zones silty clay tunnel
CN109458185B (en) Construction Method of Shield Tunnel with Overlapping and Crossing Parallel Tunnels
CN106930777A (en) The construction method of the lining of Bored Section of Metro main track assembled two
CN102852528A (en) Method for controlling floor heave through inverted arch anchoring beam
CN106223967A (en) A kind of great burying rectangle or class Rectangular Tunnel shield-tunneling construction device and method
CN110242334A (en) An assembled FRP high-water material mine composite pillar and its construction method
CN109611103A (en) A method of for boulder group consolidation process outstanding on shield section
CN108266191A (en) A kind of multiple-arch tunnel optimized construction method
CN103953361A (en) Clearance strengthening system for serious cracks of existing tunnel arch lining
CN105484763B (en) A kind of semiclosed reinforced concrete segment method for protecting support of deep coalmine
CN206816265U (en) A kind of air channel arch combined retaining structure
CN107130983A (en) A kind of large cross-section tunnel tunneling construction grillage strengthening supporting method
CN109488347A (en) A kind of excavation construction method for special formation chamber
CN202325550U (en) Secondary lining assembled head blocking device for subway mined tunnel
CN103953362A (en) Clearance-free strengthening system for serious cracks of existing tunnel arch lining

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180427

CF01 Termination of patent right due to non-payment of annual fee