A kind of existing building installs ladder additional Download PDF

Info

Publication number
CN207209679U
CN207209679U CN201720951005.1U CN201720951005U CN207209679U CN 207209679 U CN207209679 U CN 207209679U CN 201720951005 U CN201720951005 U CN 201720951005U CN 207209679 U CN207209679 U CN 207209679U
Authority
CN
China
Prior art keywords
steel construction
section steel
interlude
elevator
existing building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720951005.1U
Other languages
Chinese (zh)
Inventor
黄业华
陈海华
葛志超
宋云
吴正涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuancheng Hualing Precision Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of CN207209679U publication Critical patent/CN207209679U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model is that a kind of existing building installs ladder additional, bottom section steel construction is provided with pit pedestal, the bottom of at, the upper square steel of section steel construction is provided with least one section of interlude steel construction, in the top of interlude steel construction by being provided with top section steel construction, an at least root post in the section steel construction of bottom, an at least root post at least root post and top section steel construction of interlude steel construction is provided with the flange as integrated miberal powder counterweight pair guide rail, bottom section steel construction, interlude steel construction and top section steel construction form the hoistway with steel structure for installing ladder additional, compartment system is set by main orbit in hoistway with steel structure, on top, the upper end of section steel construction is provided with main frame and several directive wheels by spandrel girder, compartment system is moved up and down by the driving of main frame and directive wheel.The utility model without rail brackets, elevator hoistways sectional making, carries out the installation of hoistway with steel structure and elevator, time saving and energy saving, the reduction duration simultaneously at the scene by the use of a part for steel construction body as counter weight guide track.

Description

A kind of existing building installs ladder additional
Technical field
The utility model belongs to elevator processing technique field, particularly relates to a kind of existing building and installs ladder additional.
Background technology
Because high level just starts to popularize on a large scale in last decade, elevator also just come therewith by popularization, still has at present Huge old residential area house, small high-rise house do not have elevator, cell pattern spaces compact, and supporting community service lacks.Together When these houses it is often in the majority with person in middle and old age person, no elevator brings inconvenience to their life, and existing installation elevator is Hoistway with steel structure independently installed first, then extend counterweight rail bracket in hoistway, rail brackets is installed, then installation pair Weight guide rail.Installation, adjustment counter weight guide track, stent procedures are cumbersome, consume a large amount of man-hours, simultaneously because steel construction typically uses section bar Assembly, steel structural upright column, the width of crosspiece all occupies hoistway space reduces clear hoistway, fails effectively to utilize well Road space, traditional elevator counterweight(Balance weight)Structure forms by counterweight frame and to pouring weight, and counterweight frame height is higher, scene peace Dress is wasted time and energy;It is existing installation elevator be hoistway with steel structure independently installed first, then elevator is installed, not only the set-up time have elder generation Afterwards, more durations are spent, and caused expense is also more;Existing lift car is assembled into van-type by sedan-chair wall, car top, sole Structure, elevator use process, and personnel need to stand in car always, when stop is higher or elevator speed is low, in elevator Interior increased retention, fatigue is easily produced, existing lift space integrated functionality is single, and pole is not arrived to the service efficiency in space Cause, while in view of tackling outage condition Emergency use in the case of existing, at present elevator substantially with supporting emergency plant at Reason.
The content of the invention
In order to solve the above problems, the utility model provides a kind of installation ladder, and the elevator elevator can utilize steel construction Hoistway crosspiece extends rail brackets installation counter weight guide track, and the flange conduct pair of at least root post in steel construction can also be used Weight guide rail uses, and takes full advantage of hoistway space, and employs integral counterweight frame, and hoistway sectional making, and floor space is small, Engineering time is short, and outer wall is provided with photovoltaic panel installing binding for ladder additional, is provided with the super capacitor storage being connected with photovoltaic panel Electric energy, by intelligence control system Distribution utilization, this part electric energy is used as daily elevator operation and power-off condition emergence power and intelligence Can charging pile, the power supply of community service module service.
In order to achieve the above object, the utility model is achieved through the following technical solutions:
The utility model is that a kind of existing building installs ladder additional, bottom section steel construction is provided with pit pedestal, in bottom Duan Gang The upper square steel of structure is provided with least one section of interlude steel construction, in the top of interlude steel construction by being provided with top Duan Gangjie Structure, at least root post and top section steel construction of an at least root post, interlude steel construction in the section steel construction of bottom at least One root post is provided with the flange as integrated miberal powder counterweight pair guide rail, bottom section steel construction, interlude steel construction and top section Steel construction forms the hoistway with steel structure for installing ladder additional, and compartment system is set by main orbit in hoistway with steel structure, in top Duan Gangjie The upper end of structure is provided with main frame and several directive wheels by spandrel girder, and compartment system is transported up and down by the driving of main frame and directive wheel It is dynamic.
Further improvement of the utility model is:Interlude steel construction is one section or two sections, bottom section steel construction and centre Section steel construction, interlude steel construction and top section steel construction between or bottom section steel construction and interlude steel construction, two sections of interludes Connected between steel construction, between interlude steel construction and top section steel construction by steel-structure connecting plate, every section of interlude steel knot The height of structure is respectively less than 18 meters and more than 6 meter, and the height of bottom section steel construction and top section steel construction is all higher than 3 meters and less than 6 meters.
Further improvement of the utility model is:Be provided with plank on the sedan-chair wall of compartment system, on sedan-chair wall with plate Position corresponding to son is provided with the groove for plank insertion, and plank is connected by connecting rod and axle with sedan-chair wall.
Further improvement of the utility model is:The toeguard being connected with the car floor of compartment system is tied to fold scaling Structure.
Further improvement of the utility model is:Outer wall is provided with photovoltaic panel installing binding for ladder additional, in spandrel girder Top be provided with the super capacitor being connected with photovoltaic panel.
Further improvement of the utility model is:Installing terraced bottom additional, community service add-on module is set.
Further improvement of the utility model is:The bottom of at, section steel construction, interlude steel construction and top section steel construction are also set It is equipped with several steel construction crosspieces.
Further improvement of the utility model is:Install ladder additional and drive elevator or forcibly driving elevator for traction machine.
Further improvement of the utility model is:Required elevator pit depth≤600mm.
The beneficial effects of the utility model are:The utility model by the use of a part for steel construction body as counter weight guide track, Without rail brackets, installation alignment step is saved, using the special construction of steel structural upright column, before hoistway bulk strength is kept Put, the dead size of hoistway is reached maximization, the structure of elevator is reached most compact and reasonable;Integral type counterweight frame used will be right Weight is integrated with framework, and weight is concentrated, the hoistway space of occupancy minimum, is settled at one go during installation;The utility model is by electricity Stair shaft road sectional making, just the elevator components in segmentation are installed in place before installation at the scene, carry out steel knot simultaneously at the scene The installation of structure hoistway and elevator, it is time saving and energy saving, reduce the duration.Influence to scene is minimum, and occupied ground is small, does not influence resident's life Work, engineering time are short;The utility model utilizes sedan-chair wall thickness director space, by suitably increasing sedan-chair wall thickness, pacifies on sedan-chair wall One block of plate that can be fallen and pack up is filled, when packing up, in plate insertion sedan-chair wall, outside flushes with sedan-chair wall, when falling, one side and sedan-chair Wall is the elevator that can be sat in just sincere justice as rest stool with sedan-chair wall into 90 all angles by connecting rod or axis connection;This The additional platform for providing community service of utility model elevator floor and intelligent charge service, accomplish to occupy little space, integrate simultaneously Community service, practicality are higher;The utility model lift car toeguard, will to elevator pit depth using pantograph structure is folded Ask smaller than general elevator, need ground cutting depth more shallow when elevator is installed, be suitable for the complicated underground environment of cell;Electricity Ladder binds and outer wall installs photovoltaic panel additional, elevator arrangement super capacitor, reduces consumption of the elevator to electric energy, save user's use into This, does green elevator, and hoistway framework releases use directly as enclosure frameworks, saves conventional elevator components branch mailbox packaging Shipping, one is to reduce cost, while reduces resource consumption, the now universal elevator shipment mode of contrast, there is obvious energy-conservation Consumption reduction advantage, elevator pit depth≤600mm, considerably reduce the limitation to fabricating yard environment
When for tractive driving when, car is connected with counterweight by traction steel wire or steel band, traction machine traction steel wire or steel Band driving, counterweight is up, and car is descending, and so on;When to force to drive, balance weight and car have steel wire rope around being oriented to Wheel both ends are connected, and only do balance car weight purposes, and car is connected with roller by traction steel-cable, and car is forced to drive by roller Dynamic folding and unfolding steel wire rope makees lifting action.
The utility model has excellent wind-proof, rain-proof and an anti-seismic performance, meets requirement of the country to elevator hoistways, with after Heat, noise isolating effect are functional, and ride comfort has very big lifting.
Brief description of the drawings
Fig. 1 is the installation ladder structural representation of the utility model traction machine driving.
Fig. 2 is the installation ladder structural representation that the utility model forces driving.
Fig. 3 is the utility model Fig. 1 top partial view diagram.
Fig. 4 is structural representation when the utility model plank is packed up.
Fig. 5 is structural representation when the utility model plank is opened.
Fig. 6 is the structural representation of the utility model column 16.
Fig. 7 is the stereogram of the utility model column 16.
Fig. 8 is the utility model bottom section steel construction stereogram.
Fig. 9 is the utility model interlude steel construction stereogram.
Figure 10 is the utility model top section steel construction stereogram.
Figure 11 is the structural representation that the utility model toeguard folds pantograph structure.
Figure 12 is the top view that the utility model installs counter weight guide track using counterweight rail bracket 18.
Embodiment
In order to deepen to understanding of the present utility model, the utility model is done further below in conjunction with drawings and examples Very thin description, the embodiment are only used for explaining the utility model, and the scope of protection of the utility model is not formed and limited.
As shown in figs. 1-12, the utility model is that a kind of existing building installs ladder additional, and bottom Duan Gang is provided with pit pedestal Structure 5, pit 600mm, the upper square steel of the bottom section steel construction 5 is provided with least one section of interlude steel construction 4, preferably , the interlude steel construction 4 is one section or two sections, installs ladder entirety additional and is formed by three to four sections, assembles transportation midsole section Steel structure assembling is controlled within 6m into frame structure, whole height, main guide rail installation fix in position, car, sedan-chair frame, first floor door System, which assembles, to be fixed in bottom frame, while section integrated add-on module in bottom provides logistics express delivery transceiving piece for community service and put down Platform, that is, community service add-on module 17, by software Background control, Express Logistics transmitting-receiving reservation and trustship are realized, it is middle Layer is assembled into laminated structure transport, and layer door system 7 corresponding to column, crosspiece, landing position is fixedly mounted in place, backbone installation Side assembles column, crosspiece, the advance adjustment of guide rail, installation fastening, pushes up section steel structure assembling into frame structure, whole height control System requires, the hoistway computer room part such as layer door gear, guide rail, fag end device, spandrel girder installs within 6m according to specific design Into and top level structure bind it is good after dispatch from the factory, the interlude steel construction 4 of bottom section steel construction 5, interlude steel construction 4 and top section Between steel construction 3 or between 4, two sections of interlude steel constructions 4 of the bottom section steel construction 5 and interlude steel construction, interlude steel Connected between structure 4 and top section steel construction 3 by steel-structure connecting plate 9, the height of every section of interlude steel construction 4 is respectively less than 18 Rice, specific height are set according to the height of floor, highly can be more than 6 meters, the bottom section steel construction 5 and the top Duan Gangjie The height of structure 3 is all higher than 3 meters and less than 6 meter, and the bottom section steel construction 5, interlude steel construction 4 and top section steel construction 3 are formed and added The hoistway with steel structure of ladder is filled, hoistway framework releases use directly as outer packing, save conventional elevator components branch mailbox packaging Shipping, reduces cost, while reduces resource consumption, the now universal elevator shipment mode of contrast, has obvious energy-saving excellent Elevator components in segmentation are just installed in place by gesture, the utility model by elevator hoistways sectional making, at the scene installation before, Scene carries out the installation of hoistway with steel structure and elevator simultaneously, time saving and energy saving, the duration is reduced, in the upper of the interlude steel construction 4 Side is by being provided with top section steel construction 3, an at least root post in the bottom section steel construction 5, at least the one of interlude steel construction 4 An at least root post 16 in root post and the top section steel construction 3 is provided with as integrated 10 secondary guide rail of miberal powder counterweight Flange or setting counterweight rail bracket 18 install counter weight guide track, that is to say, that extend using hoistway with steel structure crosspiece Go out rail brackets 18 and counter weight guide track is installed, counterweight and framework are integrated by integral type counterweight frame used in the utility model, weight To concentrate, the hoistway space of occupancy minimizes, and settles at one go during installation, and the utility model utilizes the special construction of steel structural upright column, On the premise of hoistway bulk strength is kept, the dead size of hoistway is reached maximization, the structure of elevator is reached most compact conjunction Reason, compartment system 6 is set by main orbit 12 in hoistway with steel structure, pass through spandrel girder 2 in the upper end of the top section steel construction 3 Main frame 1 and several directive wheels are provided with, the compartment system 6 is moved up and down by the driving of main frame 1 and directive wheel, at the bottom Section steel construction 5, interlude steel construction 4 and the top section steel construction 3 are additionally provided with several steel construction crosspieces 8, in the car system Plank 15 is provided with the sedan-chair wall of system 6, the quantity of plank 15 can be 1 or two, corresponding with the plank 15 on sedan-chair wall Position be provided with the groove 19 being embedded in for plank 15, the plank 15 is connected by connecting rod and axle with the sedan-chair wall, sedan-chair wall Thickness is >=25mm and≤50mm, when packing up, in plate insertion sedan-chair wall, outside flushes with sedan-chair wall, when falling, while with sedan-chair wall It is the elevator that can be sat in just sincere justice as rest stool with sedan-chair wall into 90 all angles by connecting rod or axis connection;With institute The toeguard 13 of car floor connection of compartment system 6 is stated to fold pantograph structure, toeguard 13 includes toeguard epimere 21 and spats Plate hypomere 22, toeguard epimere 21 and toeguard hypomere 22 are connected by slide rail 23, and toeguard epimere 21 is solid with sill component 24 It is fixed, while toeguard epimere 21 is also connected by diagonal support 25 with car floor, is shunk by slide rail, realizes sole epimere and spats The upper and lower of plate hypomere stretches, smaller than general elevator to elevator pit depth requirements, needs ground cutting depth when installing elevator It is more shallow, it is suitable for the complicated underground environment of cell;Outer wall is provided with photovoltaic panel 14 in the binding for installation ladder, described The top of spandrel girder 2 is provided with the super capacitor being connected with the photovoltaic panel 14, elevator arrangement super capacitor, reduces elevator to electricity The consumption of energy, power-off condition emergence power can be used as, save customer using cost, do green elevator;Terraced bottom is installed additional described Layer sets community service add-on module 17 and intelligent charging spot 19, and community service add-on module 17 is with intelligent charging spot 19 according to electricity The difference of terraced structure and be set in different positions, in the utility model, community service add-on module 17 and intelligent charging spot 19 The space being arranged at left and right sides of elevator, outwardly, the body of community service add-on module 17 and intelligent charging spot 19 is embedded in opening Inside steel construction, community service add-on module 17 shares power supply with intelligent charging spot 19 and elevator, has network signal transmitting-receiving dress Put.
Elevator of the present utility model be traction machine drive elevator by steel wire rope or steel band car suspension on elevator top On the traction sheave in portion, the counterweight balanced is made in the other end suspension of steel wire rope or steel band, and counterweight is generally cab plus 50% load When weight, when cab moves along main guide rail, counterweight can be led to the replacement that opposite direction is formed along steel structural upright column body The side movement of rail, traction sheave are pulled by the frictional force between line is cheated on the rough surface and traction sheave of steel wire rope or steel band Cab.Main frame i.e. motor are responsible for driving traction sheave to rotate, there is provided power rises or put down cab, and motor is probably to hand over Stream, is also likely to be direct current, and a wirerope or chain are provided between cab and counterweight and is connected, effect be compensation suspension cab or The wirerope length of counterweight change caused by weight change, traction elevator also has various safety devices, prevent cab because wirerope after Split, degeneration caused by any reason such as brake failure, the safety device of bottom line includes:In the wirerope speed limit of computer room installing Device, safety tongs is installed in cab and counterweight, in the bottom of elevator, will also be fitted with buffer, as last protection.
Elevator of the present utility model is forcibly driving elevator, by steel wire rope or steel band, car suspension on elevator top On the Electrical machinery cylinder in portion, when cab moves along main guide rail, counterweight can be formed to opposite direction along steel structural upright column body Replacement guide rail side travel motor be responsible for drive roller rotate, there is provided power rise or put down cab, motor is probably Exchange, is also likely to be direct current, and a wirerope is provided between cab and counterweight or chain connects, and effect is compensation suspension cab Or weight change caused by the wirerope length change of counterweight.

Claims (8)

1. a kind of existing building installs ladder additional, bottom section steel construction is provided with pit pedestal(5), it is characterised in that:At the bottom Section steel construction(5)Upper square steel be provided with least one section of interlude steel construction(4), in the interlude steel construction(4)Top By being provided with top section steel construction(3), the bottom section steel construction(5)In an at least root post, interlude steel construction(4)Extremely A few root post and the top section steel construction(3)In an at least root post(16)It is provided with as integrated miberal powder counterweight (10)The flange of secondary guide rail, the bottom section steel construction(5), interlude steel construction(4)With top section steel construction(3)Form and install ladder additional Hoistway with steel structure, pass through main orbit in hoistway with steel structure(12)Compartment system is set(6), in the top section steel construction(3)'s Upper end passes through spandrel girder(2)It is provided with main frame(1)With several directive wheels, the compartment system(6)Pass through main frame(1)And directive wheel Driving move up and down.
2. a kind of existing building installs ladder additional according to claim 1, it is characterised in that:The interlude steel construction(4)For one Section or two sections, the bottom section steel construction(5)With interlude steel construction(4), interlude steel construction(4)With pushing up section steel construction(3)It Between or the bottom section steel construction(5)With interlude steel construction(4), two sections of interlude steel constructions(4)Between, interlude steel construction (4)With pushing up section steel construction(3)Between pass through steel-structure connecting plate(9)Connection, every section of interlude steel construction(4)Height it is small In 18 meters and more than 6 meters, the bottom section steel construction(5)With the top section steel construction(3)Height be all higher than 3 meters and less than 6 meters.
3. a kind of existing building installs ladder additional according to claim 1, it is characterised in that:In the compartment system(6)Sedan-chair wall On be provided with plank(15), on sedan-chair wall with the plank(15)Corresponding position is provided with for plank(15)Embedded groove (19), the plank(15)It is connected by connecting rod and axle with the sedan-chair wall.
4. a kind of existing building installs ladder additional according to claim 1, it is characterised in that:With the compartment system(6)Car floor The toeguard of connection(13)To fold pantograph structure.
5. a kind of existing building installs ladder additional according to claim 1, it is characterised in that:It is described install additional ladder bind and outer wall It is provided with photovoltaic panel(14), in the spandrel girder(2)Top be provided with and the photovoltaic panel(14)The super capacitor of connection.
6. a kind of existing building installs ladder additional according to claim 1, it is characterised in that:Terraced bottom setting community is installed additional described Service add-on module(17).
7. a kind of existing building installs ladder additional according to claim 1, it is characterised in that:In the bottom section steel construction(5), it is middle Section steel construction(4)With the top section steel construction(3)It is additionally provided with several steel construction crosspieces(8).
8. ladder is installed additional according to a kind of any one of claim 1-7 existing building, it is characterised in that:It is described to install ladder additional to drag Draw machine driving elevator or forcibly driving elevator.
CN201720951005.1U 2017-07-13 2017-08-01 A kind of existing building installs ladder additional Active CN207209679U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201720846652 2017-07-13
CN2017208466526 2017-07-13

Publications (1)

Publication Number Publication Date
CN207209679U true CN207209679U (en) 2018-04-10

Family

ID=61815065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720951005.1U Active CN207209679U (en) 2017-07-13 2017-08-01 A kind of existing building installs ladder additional

Country Status (1)

Country Link
CN (1) CN207209679U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107253652A (en) * 2017-07-13 2017-10-17 黄业华 A kind of existing building installs ladder additional
CN110143508A (en) * 2019-05-20 2019-08-20 西尼机电(杭州)有限公司 A kind of prepackage elevator with plug-in type hoistway with steel structure
CN112962916A (en) * 2021-02-08 2021-06-15 斯迈普电梯(中国)有限公司 Novel cold-formed thin-walled steel elevator well
CN113911079A (en) * 2021-11-25 2022-01-11 河南艾泰科技发展有限公司 Pneumatic device for vertical lifting of transverse brush of car washer

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107253652A (en) * 2017-07-13 2017-10-17 黄业华 A kind of existing building installs ladder additional
CN110143508A (en) * 2019-05-20 2019-08-20 西尼机电(杭州)有限公司 A kind of prepackage elevator with plug-in type hoistway with steel structure
CN112962916A (en) * 2021-02-08 2021-06-15 斯迈普电梯(中国)有限公司 Novel cold-formed thin-walled steel elevator well
CN112962916B (en) * 2021-02-08 2021-12-07 斯迈普电梯(中国)有限公司 Cold-formed thin-walled steel elevator shaft
CN113911079A (en) * 2021-11-25 2022-01-11 河南艾泰科技发展有限公司 Pneumatic device for vertical lifting of transverse brush of car washer
CN113911079B (en) * 2021-11-25 2024-04-30 河南艾泰科技发展有限公司 Pneumatic device for vertical lifting of transverse brush of car washer

Similar Documents

Publication Publication Date Title
CN207209679U (en) A kind of existing building installs ladder additional
KR101739424B1 (en) Articulated funiculator
CN205312834U (en) Many cars of ring rail formula elevator follows
CN206785022U (en) Micro-scale stand-alone intelligent three-dimensional parking stall
WO2010054570A1 (en) Lifting device
CN103130069A (en) Multi-car chain type circulation elevator-stair composite vertical transportation system
CN202022639U (en) Structure free of car frame of car bottom wheel traction elevator
CN1101331C (en) Integrated conveying and hoisting machine
CN107253652A (en) A kind of existing building installs ladder additional
CN207192547U (en) A kind of existing building installs ladder and garage parking additional
CN203529674U (en) Energy-saving elevator set with tractor driving two lift cars
CN203048360U (en) Double-well four-lift-car elevator
CN105507632B (en) Double-shaft vertical elevating garage
CN201106296Y (en) Motorbus up-down parallel-moving parking equipment with weight counterbalance
CN202988485U (en) Single-well multi-car tandem lift
CN205892445U (en) Circulating vertical lift elevator track system and have its elevator system
CN202643043U (en) Domestic villa elevator
CN102674112A (en) Household elevator for villa
CN207551639U (en) A kind of double-car elevator
CN107253656A (en) A kind of existing building installs ladder and garage parking additional
CN208906988U (en) A kind of forcibly driving elevator
CN107720481A (en) A kind of air pressure type buffering stake device
CN201850035U (en) Counterweight-free traction type passenger elevator with tractor on top of shaft
CN103449288A (en) Energy-saving elevator bank with traction machine driving two lift cars
CN109537951B (en) Hybrid electric power energy stereo garage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180913

Address after: 242100 Anhui province Xuancheng County Langxi County Meishan town Da Liang Industrial Park

Patentee after: Xuancheng Anhua Electromechanical Equipment Co., Ltd.

Address before: 213300 202 unit three, 2 building, 119 South Street, Liyang, Changzhou, Jiangsu.

Patentee before: Huang Yehua

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190703

Address after: 242100 Langmei Road, Meizhu Town, Langxi County, Xuancheng City, Anhui Province

Patentee after: Xuancheng Hualing Precision Technology Co., Ltd.

Address before: 242100 Anhui province Xuancheng County Langxi County Meishan town Da Liang Industrial Park

Patentee before: Xuancheng Anhua Electromechanical Equipment Co., Ltd.