[go: up one dir, main page]

CN207143970U - A kind of foundation pit enclosure stake - Google Patents

A kind of foundation pit enclosure stake Download PDF

Info

Publication number
CN207143970U
CN207143970U CN201721088478.XU CN201721088478U CN207143970U CN 207143970 U CN207143970 U CN 207143970U CN 201721088478 U CN201721088478 U CN 201721088478U CN 207143970 U CN207143970 U CN 207143970U
Authority
CN
China
Prior art keywords
pile body
foundation pit
filling plate
ring
pit enclosure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721088478.XU
Other languages
Chinese (zh)
Inventor
周晓军
蔡鹏麟
唐建辉
朱东峰
苏志刚
李战军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201721088478.XU priority Critical patent/CN207143970U/en
Application granted granted Critical
Publication of CN207143970U publication Critical patent/CN207143970U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型公开了一种基坑围护桩,其包括桩体,桩体内沿轴线方向贯穿设置有若干支撑钢筋,支撑钢筋邻近桩体中心的一侧垂直于桩体轴线方向设置有内侧环向箍筋,支撑钢筋邻近桩体表面的一侧垂直于桩体轴线方向设置有外侧环向箍筋,支撑钢筋上还套设有环向加强钢筋;桩体侧壁上开设有凹槽,凹槽内填充有填充板,填充板通过环向铁丝与桩体固定连接;桩体上贯穿设置有预埋钢筋。本实用新型通过用凹槽和填充板替代部分桩体,能够节省空间、便于安装基坑主体结构,具有构造简便、承载性能高、施工便利、节省空间和工程造价相对较低、使用范围广等优点。

The utility model discloses a foundation pit surrounding protection pile, which comprises a pile body, a plurality of supporting steel bars are arranged through the pile body along the axial direction, and an inner circumferential direction is arranged perpendicular to the axial direction of the pile body on the side of the supporting steel bars adjacent to the center of the pile body. Stirrups, the side of the supporting steel bar adjacent to the surface of the pile body is provided with outer circumferential stirrups perpendicular to the axis of the pile body, and the supporting steel bars are also sleeved with circumferential reinforcing steel bars; grooves are opened on the side walls of the pile body, and the grooves The inside is filled with a filling board, and the filling board is fixedly connected with the pile body through a hoop iron wire; the pile body is penetrated with pre-embedded steel bars. The utility model replaces part of the pile body with grooves and filling plates, which can save space and facilitate the installation of the main structure of the foundation pit, and has the advantages of simple structure, high bearing performance, convenient construction, space saving, relatively low engineering cost, and wide application range advantage.

Description

一种基坑围护桩foundation pit protection pile

技术领域technical field

本实用新型涉及基坑围护的技术领域,具体涉及一种基坑围护桩。The utility model relates to the technical field of foundation pit protection, in particular to a foundation pit protection pile.

背景技术Background technique

基坑是城市地下工程和市政工程设计与施工中经常遇到的地下空间,为围护基坑在坑内岩土体被挖出期间的稳定性,防止基坑坑壁的坍塌和失稳,通常需要采用各种措施对基坑周边的岩土体进行加固,以围护基坑坑壁岩土体的稳定与安全,而桩则是基坑工程中最常用的措施之一。The foundation pit is an underground space that is often encountered in the design and construction of urban underground engineering and municipal engineering. It is necessary to adopt various measures to reinforce the rock and soil around the foundation pit to protect the stability and safety of the rock and soil on the wall of the foundation pit, and piles are one of the most commonly used measures in foundation pit engineering.

目前我国以地铁为代表的城市轨道交通发展非常迅速。为缓解城市公共交通的压力,推进城市社会和经济快速发展,各大城市均将地铁和轻轨等纳入到城市建设优先发展的策略当中。此外,为建设海绵型城市,解决城市在夏季暴雨期间经常发生的内涝问题,各个城市正在兴建大量的城市地下综合管廊。由于城市地面土地资源有限,且城区的地面往往交通繁忙、建筑物密集,因此在上述区域内的地面已无法建设地铁和市政地下管廊等工程,而将其设置到地下的岩土体中则是目前较为可行和合理的方案。At present, my country's urban rail transit represented by the subway is developing very rapidly. In order to alleviate the pressure of urban public transportation and promote the rapid development of urban society and economy, major cities have incorporated subway and light rail into the priority development strategy of urban construction. In addition, in order to build a sponge city and solve the waterlogging problem that often occurs during summer rainstorms, various cities are building a large number of urban underground comprehensive utility corridors. Due to the limited urban ground land resources, and the urban ground is often busy with traffic and dense buildings, it is impossible to build subways and municipal underground pipe corridors on the ground in the above-mentioned areas. It is a more feasible and reasonable solution at present.

由于受到城市既有建筑物、道路交通以及其他市政设施地下桩基和基础的影响,在建设地铁地下车站、区间隧道以及城市市政地下管廊等地下工程时,其基坑开挖的范围有限,同时为围护基坑周边坑壁岩土体的稳定性,防止基坑的坍塌和失稳,需要在基坑周边设置一定数量的围护桩。当基坑的开挖范围有限,且受到周边既有建筑物或结构物地下基础的影响时,往往会造成在基坑周边无多余的位置来设置基坑的围护桩,由此会影响到基坑在开挖期间的安全和稳定性。Due to the influence of the existing buildings, road traffic and other underground piles and foundations of municipal facilities in the city, the scope of foundation pit excavation is limited when constructing underground projects such as subway underground stations, interval tunnels and urban municipal underground pipe corridors. At the same time, in order to protect the stability of the wall rock and soil around the foundation pit and prevent the collapse and instability of the foundation pit, it is necessary to set a certain number of surrounding protection piles around the foundation pit. When the excavation range of the foundation pit is limited and is affected by the underground foundation of the surrounding existing buildings or structures, there will often be no redundant positions around the foundation pit to set the surrounding protection piles of the foundation pit, which will affect the Safety and stability of foundation pits during excavation.

此外在基坑开挖范围有限的条件下如果必须设置基坑围护桩时,则又存在围护桩设置后要侵占基坑内主体结构建筑空间或位置情况,由此对基坑内地下主体建筑工程的设计和施工带来干扰与困难,也势必会影响到基坑内主体建筑的预定功能和安全。In addition, if the excavation range of the foundation pit is limited, if it is necessary to install the surrounding protection piles of the foundation pit, there will be a situation that the surrounding protection piles will occupy the building space or position of the main structure in the foundation pit after being installed, so the underground main construction project in the foundation pit will be affected. The design and construction of the foundation pit will bring interference and difficulties, and will inevitably affect the intended function and safety of the main building in the foundation pit.

目前我国正处于城市地下空间开发和利用的兴盛时期,大量地下空间工程的开发和建设需要开挖大量的基坑工程,为解决由于受既有地面建筑物地基与基础带来的影响而无法设置基坑围护桩以及围护桩设置后侵占基坑内主体建筑空间位置的技术问题,需要寻求一种适合城市复杂环境下的用于围护基坑的新型围护桩。At present, our country is in the prosperous period of urban underground space development and utilization. The development and construction of a large number of underground space projects requires the excavation of a large number of foundation pits. The technical problem of enclosing the foundation pit and the enclosing piles encroaching on the space position of the main building in the foundation pit after being set up requires finding a new type of enclosing piles suitable for enclosing the foundation pit in a complex urban environment.

发明内容Contents of the invention

本实用新型针对现有技术的上述不足,提供了一种能够节省空间、便于安装基坑主体结构的基坑围护桩。The utility model aims at the above-mentioned deficiencies of the prior art, and provides a foundation pit surrounding protection pile which can save space and facilitate the installation of the main structure of the foundation pit.

为解决上述技术问题,本实用新型采用了下列技术方案:In order to solve the problems of the technologies described above, the utility model adopts the following technical solutions:

提供了一种基坑围护桩,其包括桩体,桩体内沿轴线方向贯穿设置有若干支撑钢筋,支撑钢筋邻近桩体中心侧设置有垂直于桩体轴线的内侧环向箍筋,支撑钢筋邻近桩体表面的一侧设置有垂直于桩体轴线的外侧环向箍筋,至少三根支撑钢筋上套设有环向加强钢筋;桩体侧壁上开设有凹槽,凹槽内设有填充板,填充板通过环向铁丝与桩体固定连接;桩体上贯穿设置有预埋钢筋。Provided is a foundation pit enclosure protection pile, which includes a pile body, in which a number of supporting steel bars are arranged through the pile body along the axial direction, and inner circumferential stirrups perpendicular to the axis of the pile body are arranged adjacent to the center side of the supporting steel bars, and the supporting steel bars The side adjacent to the surface of the pile body is provided with outer circumferential stirrups perpendicular to the axis of the pile body, and at least three supporting steel bars are sleeved with circumferential reinforcement bars; grooves are opened on the side walls of the pile body, and filling holes are provided in the grooves. The slab and the filling slab are fixedly connected to the pile body through hoop iron wires; the pile body is penetrated with pre-embedded steel bars.

上述技术方案中,优选的,桩体的横截面呈圆形、椭圆形或多边形。In the above technical solution, preferably, the cross section of the pile body is circular, oval or polygonal.

上述技术方案中,优选的,填充板沿桩体轴线方向的长度小于桩体的总长度,填充板的厚度小于或等于凹槽的高度。In the above technical solution, preferably, the length of the filling plate along the axis of the pile body is less than the total length of the pile body, and the thickness of the filling plate is less than or equal to the height of the groove.

上述技术方案中,优选的,填充板邻近桩体的内侧面设置成与凹槽底面贴合的平面,填充板的外侧面的形状与桩体外侧面外形相同。In the above technical solution, preferably, the inner surface of the filling plate adjacent to the pile body is set to a plane that fits with the bottom surface of the groove, and the shape of the outer surface of the filling plate is the same as that of the outer surface of the pile body.

上述技术方案中,优选的,支撑钢筋等间距设置于桩体内;邻近填充板处的支撑钢筋呈直线排列,远离填充板的支撑钢筋与桩体外表面的距离均相等。In the above technical solution, preferably, the supporting steel bars are arranged at equal intervals in the pile body; the supporting steel bars adjacent to the filling plate are arranged in a straight line, and the distances between the supporting steel bars away from the filling plate and the outer surface of the pile are equal.

上述技术方案中,优选的,环向加强钢筋至少设置有三个,环向加强钢筋套设于三个支撑钢筋上并呈三角形结构,多个环向加强钢筋沿桩体轴线方向的间距相等。In the above technical solution, preferably, there are at least three circumferential reinforcing bars, the circumferential reinforcing bars are sheathed on the three supporting bars and form a triangular structure, and the spacing of the plurality of circumferential reinforcing bars along the axis of the pile body is equal.

上述技术方案中,优选的,内侧环向箍筋与外侧环向箍筋均至少有三个,多个内侧环向箍筋之间的间距相等,多个外侧环向箍筋之间的间距相等。In the above technical solution, preferably, there are at least three inner hoop stirrups and outer hoop hoop stirrups, the intervals between multiple inner hoop hoop stirrups are equal, and the intervals between multiple outer hoop hoop stirrups are equal.

上述技术方案中,优选的,预埋钢筋垂直于桩体轴线,预埋钢筋的中部与邻近填充板的内侧面平行,预埋钢筋的两端位于桩体外部。In the above technical solution, preferably, the pre-embedded steel bar is perpendicular to the axis of the pile body, the middle part of the pre-embedded steel bar is parallel to the inner surface of the adjacent filling plate, and the two ends of the pre-embedded steel bar are located outside the pile body.

上述技术方案中,优选的,环向铁丝穿过邻近填充板的一侧的支撑钢筋,并套设于填充板上,环向铁丝至少有两个。In the above technical solution, preferably, the hoop iron wire passes through the supporting steel bar on the side adjacent to the filler plate, and is sheathed on the filler plate, and there are at least two hoop iron wires.

上述技术方案中,优选的,填充板为泡沫板。In the above technical solution, preferably, the filling board is a foam board.

本实用新型提供的上述基坑围护桩的主要有益效果在于:The main beneficial effects of the above-mentioned foundation pit surrounding protection pile provided by the utility model are:

将基坑围护桩部分长度的桩体用一定厚度的填充板进行填充,使桩体成为非完整桩。用填充板填充的桩体部位无需浇筑混凝土,且填充板的价格远低于混凝土的价格,因此可降低围护桩的工程造价。Partial length of the pile body around the foundation pit is filled with a filling plate of a certain thickness, so that the pile body becomes an incomplete pile. There is no need to pour concrete in the pile body filled with the filling board, and the price of the filling board is much lower than that of concrete, so the engineering cost of the enclosure pile can be reduced.

将围护桩设置为非完整桩后,一方面可承受基坑外侧地层产生的水土压力,保证基坑坑壁岩土体的稳定性,防止基坑失稳和坍塌,另一方面又可以在桩体上拆除填充板后的凹槽段内浇筑基坑主体结构的部分结构如侧墙、腰梁等,进而可以弥补基坑内主体结构由于围护桩浇筑后而导致的空间不足,或解决由于基坑场地狭窄而无法浇筑围护桩的技术难题。After the retaining piles are set as incomplete piles, on the one hand, they can withstand the water and soil pressure generated by the strata outside the foundation pit, ensuring the stability of the rock and soil on the wall of the foundation pit, and preventing the foundation pit from being unstable and collapsing. Partial structures of the main structure of the foundation pit, such as side walls, waist beams, etc., are poured in the groove section after the filling board is removed on the body, so as to make up for the lack of space of the main structure in the foundation pit due to the pouring of the enclosure piles, or solve the problem caused by the foundation pit. The pit site is narrow and it is impossible to pour the technical problem of the surrounding piles.

通过使基坑内主体结构的一部分伸入到围护桩上预先设定的凹槽内,主体结构与围护桩之间能够合理衔接,并提高桩的承载性能,解决因基坑开挖时空间不足,进而产生的桩与主体结构之间互相干扰的问题,也使围护桩与基坑主体结构之间形成共同的承载结构。By making a part of the main structure in the foundation pit extend into the preset groove on the surrounding protection piles, the main structure and the surrounding protection piles can be reasonably connected, and the bearing performance of the piles can be improved to solve the problem of space when the foundation pit is excavated. Insufficient, and then the problem of mutual interference between the pile and the main structure, also makes the surrounding protection pile and the main structure of the foundation pit form a common bearing structure.

附图说明Description of drawings

图1为基坑围护桩的主视结构示意图。Figure 1 is a schematic diagram of the front view structure of the foundation pit surrounding protection pile.

图2为基坑围护桩的沿A-A方向的剖视图。Fig. 2 is a cross-sectional view along the A-A direction of the foundation pit surrounding protection pile.

图3为基坑围护桩的沿B-B方向的剖视图。Fig. 3 is a cross-sectional view along the B-B direction of the foundation pit surrounding protection pile.

其中,1、桩体,2、填充板,3、支撑钢筋,4、内侧环向箍筋,5、外侧环向箍筋,6、环向加强钢筋,7、预埋钢筋,8、环向铁丝。Among them, 1. Pile body, 2. Filling plate, 3. Supporting steel bar, 4. Inner hoop hoop, 5. Outer hoop hoop, 6. Hoop reinforcement, 7. Embedded steel bar, 8, hoop iron wire.

具体实施方式Detailed ways

下面结合附图对本实用新型作进一步说明:Below in conjunction with accompanying drawing, the utility model is further described:

如图1至图3所示,其为基坑围护桩的结构示意图。As shown in Fig. 1 to Fig. 3, they are structural schematic diagrams of foundation pit surrounding protection piles.

本实用新型的基坑围护桩包括桩体1和填充板2,桩体1为在地层中挖除岩土体后所形成的钻孔内浇筑的混凝土,桩体1侧壁上开设有凹槽,凹槽内填充有填充板2,填充板2的材质可选用泡沫板;桩体1和填充的泡沫板材2共同构成在地层中因开挖桩体而形成的钻孔空间。The protection pile for the foundation pit of the utility model includes a pile body 1 and a filling plate 2. The pile body 1 is concrete poured in a borehole formed after the rock and soil body is excavated in the stratum. The side wall of the pile body 1 is provided with a concave Groove, filling board 2 is filled in the groove, and the material of filling board 2 can choose foam board; Pile body 1 and filled foam board material 2 together constitute the drilling space formed by excavating the pile body in the formation.

桩体1未设置凹槽的区段呈封闭的完整桩,桩体1的横截面可设置为圆形、椭圆形或多边形,这里以桩体的横截面为圆形为例进行说明;填充板2与桩体1 接触的内侧面设置成与凹槽底面贴合的平面,填充板2的外侧面形状与桩体1 外侧面外形相同。The section of the pile body 1 without grooves is a closed and complete pile, and the cross section of the pile body 1 can be set as a circle, ellipse or polygon. Here, the cross section of the pile body is circular as an example for illustration; the filling plate 2 The inner surface in contact with the pile body 1 is set as a plane that fits with the bottom surface of the groove, and the shape of the outer surface of the filling plate 2 is the same as that of the pile body 1 .

桩体1内沿轴线方向等间距平行设置有若干支撑钢筋3,支撑钢筋3贯穿于桩体1上下端,支撑钢筋3等间距设置于桩体1内;支撑钢筋3在邻近填充板2 的一侧呈直线排列,远离填充板2的支撑钢筋3与桩体1外表面的距离均相等。A number of supporting steel bars 3 are arranged in parallel at equal intervals along the axial direction in the pile body 1, and the supporting steel bars 3 run through the upper and lower ends of the pile body 1, and the supporting steel bars 3 are arranged in the pile body 1 at equal intervals; The sides are arranged in a straight line, and the distances between the supporting steel bars 3 away from the filling plate 2 and the outer surface of the pile body 1 are equal.

支撑钢筋3邻近桩体1中心侧设置有垂直于桩体1轴线的内侧环向箍筋4,内侧环向箍筋4至少有三个,多个内侧环向箍筋4之间的间距相等;支撑钢筋3 邻近桩体1表面的一侧垂直于桩体1轴线方向设置有若干外侧环向箍筋5,外侧环向箍筋5至少有三个,多个外侧环向箍筋5之间的间距相等。The support reinforcement bar 3 is provided with an inner hoop 4 perpendicular to the axis of the pile body 1 adjacent to the center of the pile body 1, there are at least three inner hoop hoops 4, and the spacing between multiple inner hoop hoops 4 is equal; The side of the steel bar 3 adjacent to the surface of the pile body 1 is provided with several outer hoop stirrups 5 perpendicular to the axial direction of the pile body 1. There are at least three outer hoop hoop stirrups 5, and the distance between the plurality of outer hoop hoop stirrups 5 is equal. .

支撑钢筋3上还套设有环向加强钢筋6,环向加强钢筋6有至少三个,环向加强钢筋6套设于三个支撑钢筋3上并呈三角形结构,多个环向加强钢筋6之间的间距相等;内侧环向箍筋4、外侧环向箍筋5和环向加强钢筋6沿桩体1轴线方向上的间距和数量应根据桩的深度和地层水、土压力等因素确定。There are at least three circumferential reinforcing bars 6 on the supporting steel bars 3. The circumferential reinforcing bars 6 are set on the three supporting bars 3 and have a triangular structure. Multiple circumferential reinforcing bars 6 The spacing between them is equal; the spacing and quantity of the inner hoop 4, outer hoop 5 and hoop reinforcement 6 along the axis of the pile body 1 should be determined according to the depth of the pile, formation water, earth pressure and other factors .

桩体1上贯穿设置有预埋钢筋7,预埋钢筋7沿垂直于桩体1轴线方向设置,预埋钢筋7中部与邻近填充板2的内侧面平行,预埋钢筋7的两端位于桩体1 外部;在填充板2与桩体1之间还设置有环向铁丝8,环向铁丝8至少有两个,填充板2通过环向铁丝8与桩体1固定连接,环向铁丝8穿过邻近填充板2的一侧的支撑钢筋3并套设于填充板2上。A pre-embedded steel bar 7 is installed through the pile body 1, and the pre-embedded steel bar 7 is arranged along a direction perpendicular to the axis of the pile body 1. The middle part of the pre-embedded steel bar 7 is parallel to the inner surface of the adjacent filling plate 2. The outside of the body 1; between the filling plate 2 and the pile body 1, there are also hoop iron wires 8, at least two hoop iron wires 8, the filling plate 2 is fixedly connected with the pile body 1 through the hoop iron wires 8, and the hoop iron wires 8 Pass through the supporting steel bar 3 on one side adjacent to the filling plate 2 and sleeve on the filling plate 2 .

填充板2设置在桩体1外侧的凹槽内,填充板2沿桩体1轴线方向的长度小于桩体1的总长,填充板2的厚度小于或等于凹槽的高度。桩体1上被填充板2填充的区段长度和厚度可根据桩承受的地层水土压力和基坑内主体建筑确定。The filling plate 2 is arranged in the groove outside the pile body 1, the length of the filling plate 2 along the axial direction of the pile body 1 is less than the total length of the pile body 1, and the thickness of the filling plate 2 is less than or equal to the height of the groove. The section length and thickness of the pile body 1 filled with the filling plate 2 can be determined according to the ground water and soil pressure that the pile bears and the main building in the foundation pit.

下面是本实用新型在实际实用过程中的工作原理:Below is the working principle of the utility model in the actual practical process:

在实际实施时,将支撑钢筋3、内侧环向箍筋4、外侧环向箍筋5、环向加强钢筋6和预埋钢筋7按照需要的桩体1的大小、横截面形状、桩的深度和地层水、土压力等经计算后进行配置,并加工成钢筋笼,钢筋笼上预留根据计算所确定的桩体上凹槽的位置,支撑钢筋3也根据凹槽位置做相应的调整,并将填充板2用环向铁丝8固定到凹槽部位的呈直线排列的支撑钢筋3上,同时将预埋钢筋7外露出钢筋笼的两端沿桩体1横截面方向扳弯并使之紧贴填充板2,便于将钢筋笼吊放入钻孔内。In actual implementation, the supporting steel bar 3, the inner hoop hoop 4, the outer hoop hoop 5, the hoop reinforcing bar 6 and the pre-embedded steel bar 7 are arranged according to the size of the pile body 1, the cross-sectional shape, and the depth of the pile. and formation water, earth pressure, etc. are calculated and configured, and processed into a reinforcement cage. The position of the groove on the pile body determined according to the calculation is reserved on the reinforcement cage, and the supporting steel bar 3 is also adjusted accordingly according to the groove position. And fix the filler plate 2 to the supporting steel bars 3 arranged in a straight line at the groove part with the hoop iron wire 8, and at the same time bend the two ends of the embedded steel bar 7 out of the steel cage along the cross-sectional direction of the pile body 1 and make it Close to the filling plate 2, it is convenient to hoist the reinforcement cage into the drilled hole.

在钢筋笼上凹槽部设置的填充板2的具体位置和长度以及厚度需要根据桩体1的大小、深度和基坑状况等经过计算加以确定。The specific position, length and thickness of the filler plate 2 provided on the groove portion of the reinforcement cage need to be determined through calculation according to the size, depth and condition of the foundation pit of the pile body 1 .

待基坑周边满足设计深度的围护桩钻孔内岩土体被挖除后,将绑扎有填充板2的钢筋笼吊放入已经挖好的钻孔内。吊放钢筋笼时将绑扎有填充板2的一侧朝向基坑内,而未绑扎填充板2的一侧则朝向基坑外侧,并对钢筋笼进行定位,然后向钻孔内灌注水下混凝土直至桩顶,并对桩体1内混凝土进行养护直到达到所确定的设计强度。After the rock and soil in the surrounding retaining pile boreholes that meet the design depth around the foundation pit are excavated, the steel cage bound with the filling plate 2 is hoisted into the dug borehole. When hoisting the reinforcement cage, the side bound with the filling board 2 faces the foundation pit, while the side without the filling board 2 faces the outside of the foundation pit, and the reinforcement cage is positioned, and then the underwater concrete is poured into the drilled hole until The top of the pile, and the concrete in the pile body 1 is cured until it reaches the determined design strength.

由于桩体1的部分区段被填充板2所填充,因此填充板2所在的区域内混凝土无法灌入,从而在桩体1被填充板所填充的区域无硬化混凝土,由此可形成围护基坑的非完整围护桩。Since part of the pile body 1 is filled by the filling board 2, the concrete cannot be poured in the area where the filling board 2 is located, so that there is no hardened concrete in the area where the pile body 1 is filled by the filling board, thereby forming an enclosure Incomplete enclosure piles for foundation pits.

当围护桩浇筑完毕并达到设计的混凝土强度等级后,即可在围护桩的围护下开挖基坑内的岩土体,直至基坑底部达到所确定的设计高度,同时将桩体1 上被填充板2所填充的部位裸露出来。此时基坑壁上就可以露出已浇筑的带有填充板2的围护桩。When the retaining piles are poured and reach the designed concrete strength level, the rock and soil in the foundation pit can be excavated under the protection of the retaining piles until the bottom of the foundation pit reaches the determined design height, and the pile body 1 The position filled by the filling board 2 is exposed. At this moment, the enclosure pile with the filling plate 2 that has been poured can be exposed on the wall of the foundation pit.

由于桩体1的部分区段被填充板2所填充,在基坑内浇筑主体结构前可将已露出的桩体1上用环向铁丝8绑扎的填充板2拆除,拆除填充板2后在桩体1 上的对应区域就会腾出预先设置的凹槽所对应的空缺位置,并将预埋钢筋7预先弯曲的两端部重新扳直,以便与基坑主体结构的钢筋连接。在该空缺位置处就可以浇筑基坑内地下主体结构的部分混凝土,使桩和基坑主体结构共同承受地层压力和地下水压力。Since some sections of the pile body 1 are filled by the filling board 2, before pouring the main structure in the foundation pit, the filling board 2 bound with the hoop iron wire 8 on the exposed pile body 1 can be removed, and after the filling board 2 is removed, the pile The corresponding area on the body 1 will vacate the vacant position corresponding to the pre-set groove, and straighten the pre-bent ends of the pre-embedded steel bar 7 so as to be connected with the steel bar of the main structure of the foundation pit. Part of the concrete of the underground main structure in the foundation pit can be poured at the vacant position, so that the pile and the main structure of the foundation pit can jointly bear formation pressure and groundwater pressure.

上面是对本实用新型的具体实施方式进行描述,以便于本技术领域的技术人员理解本实用新型,但应该清楚,本实用新型不限于具体实施方式的范围,对本技术领域的普通技术人员来讲,只要各种变化在所附的权利要求限定和确定的本实用新型的精神和范围内,这些变化是显而易见的,一切利用本实用新型构思的发明创造均在保护之列。The above is a description of the specific implementation of the present utility model, so that those skilled in the art understand the utility model, but it should be clear that the utility model is not limited to the scope of the specific implementation, for those of ordinary skill in the art, As long as various changes are within the spirit and scope of the utility model defined and determined by the appended claims, these changes are obvious, and all inventions and creations utilizing the concepts of the utility model are included in the protection list.

Claims (10)

1. a kind of foundation pit enclosure stake, it is characterised in that including pile body (1), be provided through in the axial direction in the pile body (1) Some spacer bars (3), neighbouring pile body (1) central side of spacer bar (3) are provided perpendicular to the inner side ring of pile body (1) axis Stirrup (4), the side on neighbouring pile body (1) surface of spacer bar (3) are provided perpendicular to the outside ring stirrup of pile body (1) axis (5), at least it is arranged with ring stiffener (6) on three spacer bars (3);Opened up in pile body (1) side wall it is fluted, in groove Provided with filling plate (2), the filling plate (2) is fixedly connected by ring iron wire (8) with pile body (1);Through setting on pile body (1) There is embedded bar (7).
2. foundation pit enclosure stake according to claim 1, it is characterised in that circular in cross-section, the ellipse of the pile body (1) Shape or polygon.
3. foundation pit enclosure stake according to claim 1, it is characterised in that the plate (2) of filling is along pile body (1) axis direction Length be less than pile body (1) total length, filling plate (2) thickness be less than or equal to groove height.
4. foundation pit enclosure stake according to claim 3, it is characterised in that the inner side of the neighbouring pile body (1) of filling plate (2) Face is arranged to the plane being bonded with groove floor, and the shape of the lateral surface of filling plate (2) is identical with facial contour on the outside of pile body (1).
5. foundation pit enclosure stake according to claim 1, it is characterised in that spacer bar (3) spaced set is in stake In body (1);The spacer bar (3) at neighbouring filling plate (2) place is arranged in a linear, spacer bar (3) and stake away from filling plate (2) The distance of body (1) outer surface is equal.
6. foundation pit enclosure stake according to claim 1, it is characterised in that the ring stiffener (6) at least provided with Three, ring stiffener (6) is sheathed on three spacer bars (3) and structure triangular in shape, multiple ring stiffeners (6) It is equal along the spacing of pile body (1) axis direction.
7. foundation pit enclosure stake according to claim 1, it is characterised in that the inner side ring stirrup (4) and outside ring Stirrup (5) at least three, the spacing between multiple inner side ring stirrups (4) is equal, between multiple outside ring stirrups (5) Spacing it is equal.
8. foundation pit enclosure stake according to claim 1, it is characterised in that the embedded bar (7) is perpendicular to pile body (1) axle Line, embedded bar (7) middle part is parallel with the medial surface of neighbouring filling plate (2), and the both ends of embedded bar (7) are located at pile body (1) outside Portion.
9. foundation pit enclosure stake according to claim 1, it is characterised in that the ring iron wire (8) passes through neighbouring filling plate (2) spacer bar (3) of side, and be sheathed on filling plate (2), at least two, ring iron wire (8).
10. foundation pit enclosure stake according to claim 1, it is characterised in that the filling plate (2) is cystosepiment.
CN201721088478.XU 2017-08-28 2017-08-28 A kind of foundation pit enclosure stake Expired - Fee Related CN207143970U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721088478.XU CN207143970U (en) 2017-08-28 2017-08-28 A kind of foundation pit enclosure stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721088478.XU CN207143970U (en) 2017-08-28 2017-08-28 A kind of foundation pit enclosure stake

Publications (1)

Publication Number Publication Date
CN207143970U true CN207143970U (en) 2018-03-27

Family

ID=61668923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721088478.XU Expired - Fee Related CN207143970U (en) 2017-08-28 2017-08-28 A kind of foundation pit enclosure stake

Country Status (1)

Country Link
CN (1) CN207143970U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326911A (en) * 2017-08-28 2017-11-07 西南交通大学 A kind of foundation pit enclosure stake

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326911A (en) * 2017-08-28 2017-11-07 西南交通大学 A kind of foundation pit enclosure stake

Similar Documents

Publication Publication Date Title
CN102182325B (en) Storey adding method for existing building basement with frame structure and independent foundation
CN106088650B (en) A kind of method and building suitable for building with brick-concrete structure underground increasing layer
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN103195085B (en) Downward story-adding basement and construction method thereof
CN205742213U (en) Foundation pit supporting construction
CN101509263A (en) Digging method foundation pit structure of steel cover and plate cover, and construction method
CN101215834A (en) Construction Method of Outrigger Type Diaphragm Wall
CN102704957A (en) Shed-frame method for shallowly burying large-sized underground structure construction
CN105756091B (en) A Construction Method of Subway Station Foundation Pit Controlling the Deformation of Adjacent Buildings
CN105714831A (en) Abnormal-shape double-row pile for supporting foundation pit side wall and construction method of abnormal-shape double-row pile
CN106245927B (en) A kind of method and building suitable for frame structure building underground increasing layer
CN104005414B (en) Large-size rebar cast in place concrete pile supports the constructional method of column
CN111502691A (en) Anti-slip tunnel structure and construction method thereof
CN205242441U (en) Oval contrary shaft of doing of suspension type
CN113026816B (en) Underpinning reverse-acting open caisson supporting structure for grouting reinforcement soil body and construction method
CN111851515B (en) Adjacent foundation pit cooperative construction enclosure structure and construction method thereof
CN207143970U (en) A kind of foundation pit enclosure stake
CN105178355B (en) The stratum pre-reinforcement processing method of underground space construction
CN107143149A (en) A kind of existing masonry structure building sets up the construction method of basement
CN207672609U (en) A kind of foundation pit supporting construction also serves as the pipe gallery of main body
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN107326911B (en) foundation pit protection pile
CN109306712A (en) Upper pipe working well is inverse to build construction
CN210507517U (en) Combined member suitable for retaining wall heightening
CN208219667U (en) Foundation pit supporting construction based on campshed and inner support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Su Zhigang

Inventor after: Cai Penglin

Inventor after: Tang Jianhui

Inventor after: Zhu Dongfeng

Inventor after: Jiang Huaizu

Inventor after: Zhou Xiaojun

Inventor after: Li Jingbai

Inventor after: Cheng Yingzhang

Inventor after: Jing Wenqi

Inventor after: Ren Yanchao

Inventor after: Wang Yongqiang

Inventor before: Zhou Xiaojun

Inventor before: Cai Penglin

Inventor before: Tang Jianhui

Inventor before: Zhu Dongfeng

Inventor before: Su Zhigang

Inventor before: Li Zhanjun

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20210423

Address after: 250021 18-21 / F, Xiyuan Daxia, intersection of Shun'an road and Yantai Road, Jinan west railway station, Shandong Province

Patentee after: CHINA RAILWAY 21 BUREAU GROUP RAIL TRANSIT ENGINEERING Co.,Ltd.

Patentee after: SOUTHWEST JIAOTONG University

Address before: 610031 north section of two ring road, Sichuan, Chengdu

Patentee before: SOUTHWEST JIAOTONG University

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180327

CF01 Termination of patent right due to non-payment of annual fee